Records from 1987 to 2019. Most recent: inspection, 5 September 2019.
Inspection history · 47
5 September 2019
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6903606
4 November 2018
Type not recorded
No type recorded · USCGC ALEX HALEY (WMEC 39) · Activity 6574398
9 January 2017
Type not recorded
No type recorded · USCGC ALEX HALEY (WMEC 39) · Activity 6112966
11 March 2016
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 5831752
26 September 2015
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5902635
27 August 2015
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5793419
8 March 2014
Type not recorded
No type recorded · USCGC ALEX HALEY (WMEC 39) · Activity 4817973
16 July 2009
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3576380
13 January 2009
Damage Survey
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 3393710
22 December 2008
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 3383700
21 December 2008
Type not recorded
No type recorded · USCG Arctic District (dr) · USCG Arctic District (CGD-A) · Activity 3413128
30 September 2008
Type not recorded
No type recorded · USCGC ALEX HALEY (WMEC 39) · Activity 3384118
21 May 2008
Uninspected Other · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3213605
7 April 2008
Administrative Inspection
Administrative · USCG Northwest District (dp) · USCG Northwest District (CGD-NW) · Activity 3225573
16 August 2006
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2749400
3 August 2006
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2749383
14 July 2006
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2712889
24 January 2006
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2598976
20 January 2006
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2577711
25 September 2005
Type not recorded
No type recorded · USCGC ACUSHNET (WMEC 167) · Activity 2513701
27 January 2005
Type not recorded
No type recorded · USCGC SHERMAN (WHEC 720) · Activity 2282633
23 May 2002
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1620165
22 May 2002
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1620103
22 May 2002
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1627777
14 September 2000
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 674330
24 July 2000
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 183578
16 March 2000
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 88837
16 March 2000
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 655090
14 March 2000
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 644349
14 March 2000
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 644350
11 March 2000
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 189244
11 March 2000
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 765554
7 June 1999
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 158346
20 April 1999
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 121973
2 June 1997
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 198800
2 June 1997
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 756437
10 December 1996
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 489224
25 January 1996
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 127997
23 January 1996
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 674329
7 December 1995
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 198801
28 September 1995
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 125562
7 April 1995
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 151169
13 January 1994
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 68905
12 January 1994
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 23207
17 December 1993
Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1160096
5 August 1992
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 188232
29 May 1987
Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1337554
Construction/Loadline › Structures › Transverse Bulkhead
Issued 16 July 2009
Resolved
Seal holes over 6 dog door on portside leading fm setting staton to CO2 area.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 27 July 2009
Resolution: Hole were sealed
Construction/Loadline › Structures › Manhole
Issued 16 July 2009
Resolved
Place a T-Handle near the oval hatch in Compressor room (Label hatch must be closed at sea.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 July 2009
Resolution: T-Handle was mounted near the hatch
Construction/Loadline › Structures › Transverse Bulkhead
Issued 16 July 2009
Resolved
Seal holes in lower sill portside doorway.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 July 2009
Resolution: A plug was installed
Construction/Loadline › Structures › Transverse Bulkhead
Issued 16 July 2009
Resolved
Seal holes in BLKHD near hualing area door 2x2
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 July 2009
Construction/Loadline › Structures › Door
Issued 16 July 2009
Resolved
QAWTD leading from factory to hauling area installed upside down
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 July 2009
Resolution: The door was re-installed corretly
Construction/Loadline › Structures › Scupper
Issued 16 July 2009
Resolved
small scupper STBD side factory to hauling area won't close or seal.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 July 2009
Construction/Loadline › Structures › Scuttle
Issued 16 July 2009
Resolved
2X2 fish scuttle opening from factory to hauling area won't open or close and doesn't seal.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 July 2009
Resolution: Maintenance done on scuttle
Deck/Cargo › Fishing › General
Issued 16 July 2009
Resolved
Remove the paint on dogs for the 1'x1' opening in portside factory forward side.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 July 2009
Construction/Loadline › Structures › Door
Issued 16 July 2009
Resolved
Repair/replace factory door leading to the accommodations area, door must function as designed, lower sill wasted.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 July 2009
Resolution: New door handale was installed
Fire Fighting › Fire Hydrants › Condition
Issued 16 July 2009
Resolved
Paint all fire stations red.
Action required: 705 - Other - as specified
Resolved 27 July 2009
Resolution: Completed.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 16 July 2009
Resolved
The new wiring leads from forward factory centerline not run through thru-hole penetrations.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 July 2009
Resolution: Sealed
Construction/Loadline › Structures › Scuttle
Issued 16 July 2009
Resolved
The escape hatch fm lower forward storage room will not open. No means to open hatch from the passageway.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 July 2009
Stability › Watertight Integrity › General
Issued 16 July 2009
Resolved
The bilge OVBD for the bow thruster room is threaded and must be flanged.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 July 2009
Resolution: The threaded pipe was removed and a new flanged valve was installed.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 16 July 2009
Resolved
In STBD side chain locker room, in upper corner of the collision bulkhead seal (2) 1 inch holes leading to the storage room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 July 2009
Resolution: A doubler was welded on the storage side of the bulkhead and welded %100 by welding the chain locker side.
Construction/Loadline › Structures › Deck Plating
Issued 16 July 2009
Resolved
Seal old wire runs x3 in chain locker room portside between frames 7 @ 8 in ovhd.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 July 2009
Resolution: holes were sealed
Construction/Loadline › Structures › Door
Issued 16 July 2009
Resolved
Horizontal hydraulic WTD in bow thruster room thruster room check for correct operation.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 July 2009
Resolution: cleared when def 31 was cleared
Fire Fighting › Fixed CO2 Fire Extinguishing System › Nozzle
Issued 16 July 2009
Resolved
Could only locate a single discharge nozzle for the CO2 system that protects the Bow Thruster room. Have a Fire Safety company look at the system to ensure that the system is correctly installed and there is adequate CO2 for the space. Also have Fire Safety company provide a line drawing of the system to the vessel.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 July 2009
Resolution: Done
Deck/Cargo › Cargo Refrigeration › General
Issued 16 July 2009
Resolved
The main hold freezer was reconfigured have Naval Architect provide a line draw of the ABS approved reconfiguration.
Action required: 705 - Other - as specified
Resolved 27 July 2009
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 July 2009
Resolved
All new wiring being done must be held up with wire ties that have a metal center or run in existing metal wire runs
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 27 July 2009
Resolution: completed
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 16 July 2009
Resolved
ensure all new electrical boxes are correctly labeled
Action required: 705 - Other - as specified
Due 30 July 2009
Resolved 30 July 2009
Resolution: Completed
Construction/Loadline › Penetrations › Pipe Flange
Issued 16 July 2009
Resolved
Seal around hauling line tube portside of factory
Action required: 705 - Other - as specified
Resolved 27 July 2009
Resolution: Sealed
Construction/Loadline › Structures › Door
Issued 16 July 2009
Resolved
Repair/Replace door to aft steering room. Dogs do not function correctly and pins are worn.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 27 July 2009
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 16 July 2009
Resolved
Provide a maintenance log for all hatches and valves I.A.W ACSA requirements.
Action required: 705 - Other - as specified
Resolved 30 July 2009
Resolution: Completed
Construction/Loadline › Structures › Door
Issued 16 July 2009
Resolved
Port STBD weathertight doors on 01 deck need new gaskets. The gaskets were renewed. Both sill heights need to be 24" inches vise the current 18" inches they have until 31DEC09 to complete sill height modification.
Action required: 705 - Other - as specified
Due 31 December 2009
Resolved 27 December 2011
Construction/Loadline › Penetrations › Flange Pad
Issued 16 July 2009
Resolved
Portside anchor was removed and a doubler plate was place over the hawse pipe. Weld out %100 on maindeck side.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 July 2009
Resolution: Completed
Engineering › Sea-water System (primary cooling) › Piping
Issued 16 July 2009
Resolved
Replace all screw type hose clamps with T-Clamps on MDEs and Generators.
Action required: 705 - Other - as specified
Resolved 27 July 2009
Resolution: completed
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 16 July 2009
Resolved
update maintenance log to reflect all QAWTDs, WTDs, Hatches I.A.W ABS LL-11-D form
Action required: 705 - Other - as specified
Resolved 30 July 2009
Resolution: completed
Stability › Watertight Integrity › General
Issued 16 July 2009
Resolved
Have ABS update the vessels LL-11-D form to reflect the changes made during Shipyard period
Action required: 705 - Other - as specified
Resolved 30 July 2009
Resolution: ABS determined that all changes made do not need to be on the LL-11-D form.
Construction/Loadline › Structures › Door
Issued 16 July 2009
Resolved
Inspect all QAWTDs, WTDs, and hatches. Remove paint from grease fittings. Renew worn gaskets, free up all dogs and replace all bolts in the hinges with the correct bronze pins.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 July 2009
Resolution: Completed
Construction/Loadline › Structures › Door
Issued 16 July 2009
Resolved
The WTD leading from the bow thruster room to the freezer hold needs the following done to it. Before vsl departs Seattle weld a new bracket to the bulkhd to support the ram that closes the door ensure that the new bracket is supported so it will not pull away from the bulkhd. Demonstrate the correct operation of the door.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 July 2009
Resolution: Completed
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Piston Rod
Issued 13 January 2009
Resolved
Prove proper operation of inoperable generator to attending marine inspector once repairs are completed.
Action required: 705 - Other - as specified
Due 27 January 2009
Resolved 14 October 2009
Resolution: Cleared