Records from 2016 to 2026. Most recent: inspection, 11 August 2026.
Documentation record
Registered dimensions (L × B × D)70.2 ft × 24.5 ft × 7.3 ft
Registered tonnagegross 99 / net 67
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSOMERSET, MA, UNITED STATES · built 1980
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portCASTINE, ME
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 21 January 2026 · expires 31 January 2027
Service, as the file records itSchool Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it99 - Regulatory (Subpart C or D), Gross Ton
67 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 16
11 August 2026
Annual Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 8457362
8 August 2025
Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 8205379
16 July 2025
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 8172211
2 June 2025
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 8117491
21 May 2024
Annual Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7916905
20 April 2023
Internal Structural Exam · Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7672119
13 April 2023
Excursion Permit
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7668128
24 June 2022
COI Inspection · DAPI Audit
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7485990
6 January 2022
Examination of Repairs
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7376414
10 June 2021
COI Inspection · DAPI Audit
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7221517
17 June 2020
Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6978888
17 June 2019
COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6716592
25 June 2018
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6455250
10 May 2018
Hull Examination
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6410745
13 July 2017
COI Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6208011
28 July 2016
COI Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 5955840
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 11 August 2026
No resolution recorded
Provide service report for life raft service. Route is reduced to less than 3 mile from land, until rafts are returned to proper service on vessel.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 August 2026 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 11 August 2026
No resolution recorded
Label emergency escape on hatch way exiting fwd berthing ladderway.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 11 September 2026
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 16 July 2025
Resolved
Conduct hydrostatic testing on portable CO2 extinguishers.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 July 2025
Resolved 21 July 2025
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 30 June 2021
Resolved
Provide spanner wrench on Fire Station #1.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 July 2021
Resolved 13 July 2021
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 10 August 2020
Resolved
Provide updated tide tables.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 September 2020
Resolved 10 August 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 August 2020
Resolved
Label Fuel shutoffs
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2020
Resolved 26 August 2020
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 10 August 2020
Resolved
Prove operation of Nav Lights and panel alarms/indicators.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2020
Resolved 26 August 2020
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 10 August 2020
Resolved
Provide guard for deck lighting globes.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2020
Resolved 2 September 2020
Resolution: Guards not required. Glass globes were replaced with high strength polycarnonate.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 10 August 2020
Resolved
Provide donning placard at upper stowage location.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2020
Resolved 26 August 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 10 August 2020
Resolved
Prove operation of bilge pump and manifold arrangement.
Action required: 17 - Rectify deficiencies prior to departure
Due 10 August 2020
Resolved 11 August 2020
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 4 August 2016
Resolved
Install lower bulbs in nav. lights and troubleshoot panel.
Due 4 September 2016
Resolved 2 September 2016
Resolution: Verified proper operation of upper and lower bulbs. 835 cleared.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 4 August 2016
Resolved
Obtain Coastwise endorsement on COD.
Due 4 September 2016
Resolved 2 September 2016
Resolution: Vessel has submitted paperwork and verified CG receipt of application. 835 cleared.
Engineering › Freshwater System (jacketwater cooling) › Valve
Issued 28 July 2016
Resolved
Prove operation of valves on keel cooler and bilge manifold.
Due 4 September 2016
Resolved 2 September 2016
Resolution: MI attested to proper operation, without mechanical assist, of the valves.835 cleared