Records from 2016 to 2025. Most recent: inspection, 14 October 2025.
Inspection history · 17
14 October 2025
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8251406
26 June 2025
Cargo Tank Internal · Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8167945
16 October 2024
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8019594
25 October 2023
Deficiency Check · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7813476
30 May 2023
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7700326
10 November 2022
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7592068
24 September 2021
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7319775
3 August 2021
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7276529
3 August 2020
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7023887
4 June 2020
Administrative Inspection · Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6962571
30 September 2019
Plan Review "T" Boat · Administrative Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6824970
8 August 2019
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6775656
9 August 2018
COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6503463
9 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6505776
31 May 2018
Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6423313
14 August 2017
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6240655
26 July 2016
Annual Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5954900
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 14 October 2025
Resolved
A vessel must be fitted with ground tackle and mooring lines necessary for the vessel and mooring lines necessary for the vessel to be safely anchored or moored. Vessel's forward winch/capstan is inoperable. Repair to the satisfaction of MI.
46 CFR 184.300
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2025
Resolved 6 November 2025
Resolution: Verified capstan was repaired and fully operational
09 - Working and Living Conditions › 091 - Living Conditions › Access/structure
Issued 14 October 2025
Resolved
The owner of a vessel shall ensure that vessel is equipped with a vessel master key control system, manual or electronic, which provides controlled access to all copies of the vessel’s master key of which access shall only be available to the individuals… establish a list of all crew, identified by position, allowed to access and use the master key and maintain such list upon the vessel. Vessel does not have a master key control log. Provide a master key control log to satisfaction of MI.
46 USC 3106
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2025
Resolved 6 November 2025
Resolution: Vessel provided a master key control log
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 14 October 2025
Resolved
The minimum capacity of the power fire pump shall be 50 gallons per minute at a pressure of not less than 60 PSI at the pump outlet. During the testing, the pressure gauge at the fire pump outlet was observed at 50 PSI. Repair/replace gauge and/or fire pump and demonstrate adequate pressure to satisfaction of the MI.
46 CFR 181.10-1(c)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2025
Resolved 6 November 2025
Resolution: Replaced gauge. Verified adequate pressure
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 October 2025
Resolved
All wiring and cables shall be suitable for marine service… cable must be constructed in accordance with U.S. Navy standards, institute of Electrical and Electronic Engineers [name withheld] 45 or be a suitable commercial grade cable, with stranded conductors, that is UL listed and rated for at least 75 degrees Celsius. Observed ROMEX solid core wiring in lower berthing room above water heater. Replace all ROMEX wiring onboard with marine grade wiring to satisfaction of MI.
46 CFR 183.10-20(a)
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2025
Resolved 6 November 2025
Resolution: All ROMEX wire replaced with approved marine grade wire
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 14 October 2025
Resolved
Spaces containing machinery shall be fitted with adequate drip roof ventilators, trunks, louvers, etc. to provide sufficient air for proper operation of main engines and auxiliary engines. During inspection, a portable exhaust fan was found installed in exhaust ducting of the engine room. Remove portable fan and replace to original plans.
46 CFR 182.20-45(a)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2025
Resolved 6 November 2025
Resolution: Verified portable fan was removed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 October 2025
Resolved
Propulsion machinery shall be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Drive oil hose was found deteriorated on starboard main engine. Replace hose to satisfaction of MI.
46 CFR 185.05-1(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2025
Resolved 6 November 2025
Resolution: Drive oil hose replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 14 October 2025
Resolved
Auxiliary machinery shall be suitable in type and design for the purpose intended. Hydraulic fittings were found leaking on hydraulic reservoir in engine room. Repair/replace hydraulic fittings to stop leaks to satisfaction of MI.
46 CFR 182.10-1(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2025
Resolved 6 November 2025
Resolution: Hydraulic fitting replaced, verified no leaks
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 October 2025
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspector. Ground detection panel indicates a ground fault within the electrical system. Locate ground fault and repair to satisfaction of MI.
46 CFR 183.01-15(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2025
Resolved 6 November 2025
Resolution: Verified ground fault was repaired
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 October 2025
Resolved
Receptacle outlets and attachment plugs for the attachment of portable lamps, tools, and similar apparatus supplies as ship's equipment shall provide a grounding pole and grounding conductor in the portable cord. Outlet is forepeak was found with grounding conductor broken off in receptacle. Replace receptacle to satisfaction of MI.
46 CFR 183.10-20(o)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2025
Resolved 6 November 2025
Resolution: Receptacle replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 October 2023
Resolved
All pressure vessels must be provided with protective devices. Start air PV relief valve did not re-seat.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 December 2023
Resolved 17 November 2023
Resolution: Witnessed new relief valve. Valve was tested sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 October 2023
Resolved
Where flexible non-metallic hose is permitted for use in piping systems by this section it must meet SAE J-1942. Stbd MDE fuel hose had a cracked outer jacket.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 December 2023
Resolved 17 November 2023
Resolution: Witnessed new hose installed. All sat.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 10 November 2022
Resolved
Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date. Vsl missed their annual inspection due to repairs being made on the starboard main engine. Contact USCG Sector Delaware Bay to schedule annual inspection when vsl is fully operational.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 November 2022
Resolution: Annual Insp Completed.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 3 August 2021
Resolved
Fire extinguisher was not securely held as the bracket was not an approved bracket per the manufacturer. Provide and install approved bracket.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 August 2021
Resolved 24 September 2021
Resolution: Correct bracket was installed.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 3 August 2021
Resolved
Water heater in lower accommodation closet had a relief device that was capped. The cap was removed prior to the end of the inspection.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 August 2021
Resolution: Removed prior to the end of the inspection.
09 - Working and Living Conditions › 091 - Living Conditions › Galley, handlingroom (maintenance)
Issued 3 August 2021
Resolved
183.10-45 (1): Vessel had 01 fridge door that did not have a locking device to prevent door from swinging open. Doors shall be provided with hinges or locking devices to prevent accidental opening. 10-C corrected on the spot.
Action required: 10 - Deficiency Rectified
Resolved 3 August 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 3 August 2021
Resolved
Vessel crew was not able to line up the bilge suction in the E/R without second guessing the valves. This is concerning with regard to crew competency (only 02 crew members are regularly with the vessel, the deck hands are hired on an as needed basis when the vessel is awarded a contract for work). Vessel shall provide diagram or instructions with labeled valves so that any crew member is able to line up the bilge system for suction.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 August 2021
Resolved 18 August 2021
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 3 August 2020
Resolved
02 survival craft had improperly configured hydrostatic
releases that did not provide a connection to the
vessel.
Action required: 10 - Deficiency Rectified
Resolved 3 August 2020
Resolution: Cleared.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 3 August 2020
Resolved
Water heater on lower deck relief valve discharges
through the hull via a stop valve. Relief valves are not
to have valves installed. Propose alternate arrangement.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 September 2020
Resolution: Received pictures.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 August 2020
Resolved
For the battery stored in upper deck storage box:
Provide battery charger make/model information to
include power output of the battery charger in order to
determine the requirements for this installation.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 September 2020
Resolution: Received pictures.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 August 2020
Resolved
Vessel has been outfitted with new switchboard. This
office has no record of plan approval for this
installation. Provide proof of approval.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 February 2022
Resolution: Approved documents uploaded into MISLE
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 8 August 2019
Resolved
Stern sight gauges for fuel day tank made out of flexible clear plastic/rubber hose. Replace sight gauge with sight gauges made of heat resistant material.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 September 2019
Resolution: New sight gauge made from butyrate tubing installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 August 2019
Resolved
Install plugs in the bottom of both fuel strainer bowls on port main engine.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 September 2019
Resolution: Plugs installed
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 8 August 2019
Resolved
Program MMSI number into primary VHF-DSC radio.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 September 2019
Resolution: MMSI number programmed
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 8 August 2019
Resolved
Provide FCC Safety Radio Certificate and Bridge-to-Bridge Certificate.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 September 2019
Resolution: Updated FCC certificates provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 August 2019
Resolved
Secure and install cover for junction box located under main steering console.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 September 2019
Resolution: Junction box cover installed.
09 - Working and Living Conditions › 091 - Living Conditions › Galley, handlingroom (maintenance)
Issued 8 August 2019
Resolved
Install latch for oven door.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 September 2019
Resolution: Oven door latch installed
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 9 August 2018
Resolved
Vsl is broadcasting: No AIS Ship Type.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 September 2018
Resolved 6 November 2018
Resolution: AIS information updated.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 9 August 2018
Resolved
The rescue boat was not onboard during man overboard drills. the vessel's procedures include the use of a rescue boat. the vessel is required a rescue boat when underway.
Condition: Placed in Improper Service
Action required: 60 - Rectify deficiencies prior to movement
Resolved 10 August 2018
Resolution: The rescue boat was placed on the vessel