Inspection history · 57
23 April 2023
Type not recorded
No type recorded · Marine Safety Unit Kodiak · USCG Arctic District (CGD-A) · Activity 7674986
9 October 2018
Damage Survey
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6557725
8 October 2018
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6561770
13 July 2018
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6481208
11 August 2017
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6237565
5 August 2016
Administrative Inspection · COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5963450
18 July 2016
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5945092
20 January 2016
Type not recorded
No type recorded · Station Venice · USCG Heartland District (CGD-H) · Activity 5800827
18 September 2015
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5721542
4 August 2014
Administrative Inspection · Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4939762
30 September 2011
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 4166599
20 September 2011
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4149329
27 July 2011
Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4095226
26 October 2010
Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3869698
15 October 2008
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3346671
17 January 2007
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2863513
31 May 2006
COI Inspection · Internal Structural Exam · Examination of Repairs · Hull Examination · Construction Oversight · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2665808
10 March 2004
Administrative Inspection
Administrative · Activities Europe · Activity 2030919
7 March 2002
Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1605423
16 August 2001
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1464412
31 May 2001
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1413940
22 August 2000
Examination of Repairs · Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1053222
28 June 2000
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1408555
17 August 1999
Re-Inspection · Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1378799
2 July 1998
COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1368794
22 May 1998
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1126254
22 May 1997
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1424417
22 May 1996
Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1457359
7 November 1995
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 672959
21 October 1995
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 166524
5 July 1995
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 884209
3 August 1994
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1467421
11 July 1994
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 864912
3 May 1994
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 672960
2 May 1994
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 50222
9 February 1994
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1162846
30 September 1993
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 846962
8 September 1993
Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 840553
1 October 1992
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 950206
7 August 1992
COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 953581
6 July 1992
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 958884
13 June 1991
Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1044545
5 June 1991
Damage Survey
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1316511
15 June 1990
Deficiency Check · Hull Examination · COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 926748
31 August 1989
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 892169
30 March 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1351452
2 March 1989
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1031489
13 February 1989
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1040787
21 March 1988
Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 971177
21 March 1987
Hull Examination · Deficiency Check · COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1008806
18 April 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1306223
28 March 1986
COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 998527
1 June 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1290759
21 March 1985
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1289427
8 February 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1282516
12 March 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1280769
24 November 1981
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1279858
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 5 August 2016
Resolved
Show proper operation of E-light at emergency egress in engine room.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 5 August 2016
Resolved 5 August 2016
Resolution: Received email with pictures clearing open def.
Engineering › Pressure Vessel › Relief Valve
Issued 5 August 2016
Resolved
Prove proper setting on R/V on air receiver.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 5 August 2016
Resolved 5 August 2016
Resolution: Received email with pictures clearing open def and picture of receipt.
Construction/Loadline › Structures › Deck Plating
Issued 5 August 2016
Resolved
Provide deck plating at emergency egress in engine room.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 5 August 2016
Resolved 5 August 2016
Resolution: Received email with pictures clearing open def.
Electrical › Electric Generation Source (service) › Conductor
Issued 5 August 2016
Resolved
Remove dead end wires in engine room
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 5 August 2016
Resolved 5 August 2016
Resolution: Received email with pictures clearing open def.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 5 August 2016
Resolved
Place blank in opening of switchboard and properly label switchboard
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 5 August 2016
Resolved 5 August 2016
Resolution: Received email with pictures clearing open def.
Engineering › Fuel Oil Storage/Transfer System › Pump
Issued 5 August 2016
Resolved
Properly secure/mount/bolt fuel transfer pump
Action required: 17 - Rectify deficiencies prior to departure
Due 5 August 2016
Resolved 5 August 2016
Resolution: Received email with pictures clearing open def.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 5 August 2016
Resolved
Provide fuel transfer procedures and line diagram at fuel transfer manifold.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 August 2016
Resolved 5 August 2016
Resolution: Received email with pictures clearing open def.
Communications › Alarms/Indicators › Bilge Alarm
Issued 5 August 2016
Resolved
Bilge High level alarm in rudder room not working.
Action required: 17 - Rectify deficiencies prior to departure
Due 5 August 2016
Resolved 5 August 2016
Resolution: Port Captain worked on it and prepared it and got it to work, corrected on spot prior to end of inspection.
Construction/Loadline › Structures › Scuttle
Issued 5 August 2016
Resolved
Emergency egress/escape hatch could not be opened from engine room
Action required: 17 - Rectify deficiencies prior to departure
Due 5 August 2016
Resolved 5 August 2016
Resolution: Crew member adjusted dogs of scuttle and corrected on spot prior to completeion of inspection.
Accommodation/Occupational Safety › Refrigeration (air conditioning) › General
Issued 18 September 2015
Resolved
The refrigerator had a junction box without a cover exposing electrical wiring. Install cover.
Due 25 September 2015
Resolved 21 September 2015
Resolution: Installed cover, all sat.
Lifesaving › Buoyant Apparatus › Floating Electric Waterlight
Issued 18 September 2015
Resolved
The waterlight line was of improper type and was wasted. Replace line with proper type/size.
Due 25 September 2015
Resolved 21 September 2015
Resolution: Replaced line, all sat.
Engineering › Fuel Oil Service System › Vent Pipe
Issued 18 September 2015
Resolved
The vent/flame screen was dirty with dryer vent lint. Clean vent.
Due 25 September 2015
Resolved 21 September 2015
Resolution: Cleaned vent screen, all sat.
Engineering › Fuel Oil Service System › Filter
Issued 18 September 2015
Resolved
The port engine filter plug was plastic and leaking. Replace plug with a brass fitting.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 September 2015
Resolution: Installed brass plug, all sat.
Communications › Alarms/Indicators › General Alarm
Issued 18 September 2015
Resolved
The general alarm was inop on emergency power. Ensure alarm works on emergency power.
Due 25 September 2015
Resolved 21 September 2015
Resolution: The general alarm operated correctly on emergency power, all sat.
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 18 September 2015
Resolved
Both generator overspeed devices were inop.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 September 2015
Resolution: The overspeeds were adjusted and function properly. All sat.
Navigation › Piloting/Steering › Marine Charts
Issued 20 September 2011
Resolved
Provide a Chart for the area where the vessel is located. Chart # 11321.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2011
Resolution: Chart provided at the completion of the inspection.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 20 September 2011
Resolved
Prove proper operation of the rudder room bilge alarm light.
Action required: 705 - Other - as specified
Due 4 October 2011
Resolved 26 September 2011
Resolution: Item repaired.
Navigation › Piloting/Steering › Inland Navigation Rules
Issued 26 October 2010
Resolved
Vessel must obtain day shapes in accordance with NAVRULES.
Due 26 November 2010
Resolved 23 November 2010
Resolution: Day shapes were purchased and onboard the vsl.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 26 October 2010
Resolved
Replace hydrostatic release on EPIRB.
Due 26 November 2010
Resolved 23 November 2010
Resolution: EPIRB hydrostatic release was replaced with new one.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 26 October 2010
Resolved
Ensure fuel oil hoses comply with SAE J 1942 on MDE, Reduction Gear, and SSDG.
Due 26 November 2010
Resolved 23 November 2010
Resolution: All engine hoses are in compliance with SAE J 1942.
Stability › Watertight Integrity › General
Issued 26 October 2010
Resolved
Make engine room escape hatch watertight.
Due 26 November 2010
Resolved 23 November 2010
Resolution: Vsl reps purchased new engine room escape hatch cover to make hatch watertight.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 26 October 2010
Resolved
Re-label control boxes in the engine room.
Due 26 November 2010
Resolved 23 November 2010
Resolution: Control boxes were relabeled.
Lifesaving › Lifefloat › Serviceable
Issued 26 October 2010
Resolved
Replace 15 person life float and batteries in life float light.
Due 26 November 2010
Resolved 23 November 2010
Resolution: 15 person life float and batteries in light were replaced.
Engineering › Diesel Engine (propulsion-direct drive) › Governor
Issued 26 October 2010
Resolved
Label emergency fuel oil shut off valves on deck.
Due 26 November 2010
Resolved 23 November 2010
Resolution: Emergency fuel shut off valves were found to be properly labeled.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 26 October 2010
Resolved
Provide adequate emergency lighting in lower deck berthing.
Due 26 November 2010
Resolved 23 November 2010
Resolution: Vsl reps installed emergency light lantern to provide adequate lighting.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 26 October 2010
Resolved
Provide paperwork or a new hose for fuel transfer.
Due 26 November 2010
Resolved 23 November 2010
Resolution: New fuel hose was purchased.
Operations/Management › Drills/Instruction › Not Conducted
Issued 15 October 2008
Resolved
Required vessel to conduct 2 fire drills, 1 abandon ship drill, and 1 man overboard drill due to unsat knowledge of new crewmember and improper logging of drills in vessel log.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 October 2008
Documentation › Logs/Records › Logbook (official)
Issued 15 October 2008
Resolved
Properly fill out official log IAW 46 USC for pre-u/w check list and properly log all drills.
Action required: 705 - Other - as specified
Due 15 October 2009
Resolved 13 August 2009
Communications › Public Address System › Loudspeaker
Issued 15 October 2008
Resolved
Permanantly fix public address system as to prevent accidental shut off.
Action required: 705 - Other - as specified
Due 15 October 2009
Resolved 13 August 2009
Stability › Unintentional Flooding › General
Issued 15 October 2008
Resolved
Replace shut off valve for collision bulkhead bilge piping due to wastage.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 October 2009
Fire Fighting › Remote Fuel Shutoff › General
Issued 15 October 2008
Resolved
Provide adaquate/correct reach rods for remote shut offs for fuel system.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 October 2009
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 15 October 2008
Resolved
Replace expired alcohol swabs.
Due 15 November 2008
Resolved 15 October 2008
Navigation › Piloting/Steering › Marine Charts
Issued 31 May 2006
Resolved
Provide Notice to Mariners or updated charts.
Due 22 September 2006
Resolved 31 May 2006
Operations/Management › Drills/Instruction › Safety Orientation
Issued 31 May 2006
Resolved
Update station bill
Due 22 September 2006
Resolved 31 May 2006
Operations/Management › Pollution › Removal Methods/Procedures
Issued 31 May 2006
Resolved
Post fuel oil transfer procedures next to fuel oil transfer pump.
Due 22 September 2006
Resolved 31 May 2006
Stability › Watertight Integrity › General
Issued 31 May 2006
Resolved
Adjust WTDs as discussed.
Due 22 September 2006
Resolved 31 May 2006
Stability › Watertight Integrity › General
Issued 31 May 2006
Resolved
Attach hatch lids to escape trunk with lanyard or chain.
Due 22 September 2006
Resolved 31 May 2006
Electrical › Lighting (emergency) › Lighting Fixture
Issued 31 May 2006
Resolved
Install e-light in laundry room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 August 2006
Deck/Cargo › Holds/Tanks › Ventilation Air Intake
Issued 31 May 2006
Resolved
Install flame screen in port side fuel vent.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 August 2006
Unknown
Issued 31 May 2001
Resolved
PROVIDE PROOF THAT VESSEL WAS CONSTRUCTED TO APPROVED PLANS/STANDARDS TO THE SATISFACTION OF THE OFFICER IN CHARGE MARINE INSPECTIONS MORGAN CITY, LA.
Condition: Unknown
Due 31 May 2001
Resolved 31 May 2001
Engineering
Issued 28 June 2000
Resolved
INSTALL STBD SIDE REACH ROD TO FUEL TANK AS PER 46CFR 56.50-60.
Condition: Unknown
Due 28 June 2000
Resolved 28 June 2000
Engineering
Issued 28 June 2000
Resolved
TEST FUEL TRANSFER HOSES AS PER 33CFR 156.170. HOSES SHALL NOT BE USED UNTIL TEST COMPLETED.
Condition: Unknown
Due 28 June 2000
Resolved 28 June 2000
Navigation
Issued 28 June 2000
Resolved
MAKE NECESSARY REPAIRS TO DEPTH SOUNDER TO ENSURE ACCURATE READING.
Condition: Unknown
Due 28 June 2000
Resolved 28 June 2000
Construction/Loadline
Issued 28 June 2000
Resolved
INSTALL POSITIVE CLOSING VALVE IN STUFFING BOX OVERBOARD DISCHARGE PIPING AS PER 46 CFR 56.50-65.
Condition: Unknown
Due 28 June 2000
Resolved 28 June 2000
Navigation
Issued 28 June 2000
Resolved
MAKE NECESSARY REPAIRS TO STEERING GEAR LOSS OF POWER ALARM AS REQUIRED BY 46CFR 58.25-25.
Condition: Unknown
Due 28 June 2000
Resolved 28 June 2000
Electrical
Issued 17 August 1999
Resolved
Repair 2 dim and 1 dead emergency lights.
Condition: Unknown
Due 13 September 1999
Resolved 13 September 1999
Lifesaving
Issued 17 August 1999
Resolved
Properly attach life floats to vessel via weak link.
Condition: Unknown
Due 13 September 1999
Resolved 13 September 1999
Lifesaving
Issued 17 August 1999
Resolved
Remove additional heaving line from ring buoys with waterlights. Shorten line attaching waterlight to ring buoys.
Condition: Unknown
Due 13 September 1999
Resolved 13 September 1999
Electrical
Issued 17 August 1999
Resolved
Replace missing cap on fuel piping on starboard generator.
Condition: Unknown
Due 13 September 1999
Resolved 13 September 1999
Construction/Loadline
Issued 17 August 1999
Resolved
Install rudder room bilge alarm.
Condition: Unknown
Due 13 September 1999
Resolved 13 September 1999
Engineering
Issued 17 August 1999
Resolved
Repair/remove leaking fuel transfer piping.
Condition: Unknown
Due 13 September 1999
Resolved 13 September 1999
Navigation
Issued 17 August 1999
Resolved
Provide current edition of Coast Pilot.
Condition: Unknown
Due 13 September 1999
Resolved 13 September 1999
Navigation
Issued 17 August 1999
Resolved
Install proper lamp in stern navigation light.
Condition: Unknown
Due 13 September 1999
Resolved 13 September 1999
Lifesaving
Issued 17 August 1999
Resolved
Replace missing ring buoy.
Condition: Unknown
Due 13 September 1999
Resolved 13 September 1999
Navigation
Issued 17 August 1999
Resolved
Provide sotter pins or double nuts for steering linkage in rudder room.
Condition: Unknown
Due 13 September 1999
Resolved 13 September 1999
Navigation
Issued 17 August 1999
Resolved
Tighten/replace excessive shaft and rudder packing. Packing leaking at excessive rate.
Condition: Unknown
Due 13 September 1999
Resolved 13 September 1999
Electrical
Issued 17 August 1999
Resolved
Remove dead end wire on aft bulkhead in engine room.
Condition: Unknown
Due 13 September 1999
Resolved 13 September 1999
Lifesaving
Issued 17 August 1999
Resolved
Properly attach paddles to lifefloats._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 13 September 1999
Resolved 13 September 1999
Electrical
Issued 7 August 1992
Resolved
PROVIDE MARINE APPROVED FUEL/WATER SEPERATORS ON BOTH S/S GENERATORS PRIOR TO PUTTING VESSEL IN SERVICE.
Condition: Unknown
Due 7 August 1992
Resolved 7 August 1992
Engineering
Issued 13 June 1991
Resolved
REPAIR TACH DRIVE TO STBD MDE AND PROVE PROPER OPERATION OF STARBOARD MDE OVERSPEED TRIP._x001C_
Condition: Unknown
Due 13 June 1991
Resolved 13 June 1991
Accommodation/Occupational Safety
Issued 13 June 1991
Resolved
REPLACE BROKEN MIRRORS IN MAIN DECK HEAD.
Condition: Unknown
Due 13 June 1991
Resolved 13 June 1991
Fire Fighting
Issued 15 June 1990
Resolved
CONDUCT FIRE AND BOAT DRILL NOT LATER THAN 12 HOURS AFTER GETTING UNDERWAY.
Condition: Unknown
Due 15 June 1990
Resolved 15 June 1990
Electrical
Issued 2 March 1989
Resolved
REPLACE MISSING GUARDS ON LIGHT FIXTURE OUTSIDE FREEZER ON MAIN DECK AND COVERS MISSING ON NUMEROUS LIGHT FIXTURES IN ACCOMODATIONS AND HEADS.
Condition: Unknown
Due 2 March 1989
Resolved 2 March 1989
Engineering
Issued 2 March 1989
Resolved
PROVE PROPER OPERATION OF MAIN ENGINE OVERSPEED TRIPS (BOTH ENGINES).
Condition: Unknown
Due 2 March 1989
Resolved 2 March 1989
Navigation
Issued 2 March 1989
Resolved
MAKE NAVIGATION LIGHT FIXTURES AND BULBS IN COMPLIANCE WITH COLREGS.
Condition: Unknown
Due 2 March 1989
Resolved 2 March 1989
Electrical
Issued 2 March 1989
Resolved
FILL IN OPEN BREAKER SPACES IN GENERATOR SWITCHBOARD.
Condition: Unknown
Due 2 March 1989
Resolved 2 March 1989
Construction/Loadline
Issued 21 March 1987
Resolved
CROP AND RENEW CRACKED RUBRAIL PORTSIDE AFT APPROXIMATELY 6FT FORWARD OF STERN.
Condition: Unknown
Due 21 March 1987
Resolved 21 March 1987
Construction/Loadline
Issued 21 March 1987
Resolved
PROVIDE TO [name withheld] PLANS AND WELDING SCHEDULE FOR THE WELDED SEAMS BETWEEN FLAT KEEL PLATE AND DEADRISE PLATE POSITIONED STAR- BOARD.
Condition: Unknown
Due 21 March 1987
Resolved 21 March 1987
Navigation
Issued 28 March 1986
Resolved
MAKE REPAIRS TO STEERING FOLLOWING CONSOLE ON BRIDGE.
Condition: Unknown
Due 28 March 1986
Resolved 28 March 1986
Navigation
Issued 28 March 1986
Resolved
REPAIR RUDDER ANGLE INDICATOR AT AFT STEERING STATION.
Condition: Unknown
Due 28 March 1986
Resolved 28 March 1986
Navigation
Issued 28 March 1986
Resolved
REPAIR SOUND POWERED PHONES.
Condition: Unknown
Due 28 March 1986
Resolved 28 March 1986
Documentation
Issued 28 March 1986
Resolved
PROVIDE A VALID DOCUMENT FOR THE VESSEL.
Condition: Unknown
Due 28 March 1986
Resolved 28 March 1986
Fire Fighting
Issued 21 March 1985
Resolved
FURNISH AND POST A FIRE AND SAFETY PLAN,STABILITY LETTER, AND OIL TRANSFER PROCEDURES.
Condition: Unknown
Due 21 March 1985
Resolved 21 March 1985