Records from 1985 to 1992. Most recent: inspection, 8 June 1992.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 15
8 June 1992
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1268084
28 April 1992
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 946685
15 November 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1258974
8 January 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1226943
17 December 1990
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1220056
22 November 1990
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1257046
21 October 1990
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 933138
20 October 1990
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1244778
6 October 1989
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1323420
25 April 1989
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 889169
7 October 1988
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 891490
29 September 1987
Hull Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1014704
25 September 1986
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1007339
17 March 1986
Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 997917
25 September 1985
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 993003
Fire Fighting
Issued 15 November 1991
Resolved
FILL EMPTY 100LB, CO2 CYLINDER (#5151380) FOR MACHINERY SPACE FIXED EXTINGUISHING SYSTEM.
Condition: Unknown
Due 15 November 1991
Resolved 15 November 1991
Fire Fighting
Issued 15 November 1991
Resolved
HAVE ALL THREE 100LB CO2 CYLINDERS PROPERLY HYDRO-TESTED (RSPA FACILITY) FOR MACHINERY SPACE FIXED EXTINGUISHING SYSTEM OR REPLACE WITH FILLED CYLINDERS PROPERLY HYDRO-TESTED WITHIN PAST 10 YEARS.
Condition: Unknown
Due 15 November 1991
Resolved 15 November 1991
Construction/Loadline
Issued 20 October 1990
Resolved
REMOVE EXISTING TOP SECTION OF HALF ROUND PIPE RUB RAIL ON STERN AND RENEW IN LIFE KIND AND QUALITY AS ORIGINAL APPROX 4 INCH BY 15 FT.
Condition: Unknown
Due 20 October 1990
Resolved 20 October 1990
Documentation
Issued 20 October 1990
Resolved
PERMANENTLY MARK THE VSL WITH FORWARD AND AFT DRAFT MARKS TO ENABLE OPERATORS TO COMPLY WITH DRAFT LIMIATION NOTED IN 17 DEC 1974 USCG STABILITY LETTER ISSUED BY [name withheld].
Condition: Unknown
Due 20 October 1990
Resolved 20 October 1990
Engineering
Issued 6 October 1989
Resolved
INSTALL A RELIEF VALVE OF NOT LESS THAN ONE INCH DIAMETER AND NOT MORE THAN50 PSI ON POTABLE WATER HEAD TANK.
Condition: Unknown
Due 6 October 1989
Resolved 6 October 1989
Construction/Loadline
Issued 25 April 1989
Resolved
VESSEL NAME AND HAILING PORT REPAINTED ON TRANSOM WHERE MISSING.
Condition: Unknown
Due 25 April 1989
Resolved 25 April 1989
Construction/Loadline
Issued 25 April 1989
Resolved
MAKE PERMANENT THE TEMPORARY REPAIRS TO THE PORT AND STARBOARD AFT CORNERS WHERE INSET. CROP AND RENEW THE CORNERS, WITH INSERT TO EXTEND BEYOND THE VERTICAL STIFFENERS AT EACH SIDE FORMING THE TURN OF THE CORNER.
Condition: Unknown
Due 25 April 1989
Resolved 25 April 1989
Navigation
Issued 7 October 1988
Resolved
REPAIR RUDDER ANGLE INDICATORS ON BRIDGE TO SHOW FULL MOVEMENT OF RUDDERS.
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988
Engineering
Issued 7 October 1988
Resolved
FIT ALL RACOR FUEL FILTERS WITH MARINE KITS.
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988
Engineering
Issued 7 October 1988
Resolved
REPLACE GUARDS OVER PULLEYS/FLY WHEELS ON ALL THREE MAIN DIESEL ENGINES.
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988
Construction/Loadline
Issued 7 October 1988
Resolved
REMOVE SPLASH SHIELD FROM EMERGENCY ESCAPE HATCH IN THE FORWARD PASSENGER ACCOMODATION.
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988
Navigation
Issued 7 October 1988
Resolved
REPLACE EXISTING NAVIGATION LIGHTS WITH COAST GUARD APPROVED NAVIGATION LIGHTS.
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988
Deck/Cargo
Issued 7 October 1988
Resolved
REPLACE 110 FT ANCHOR LINE WITH ANCHOR LINE WHICH IS AT LEAST 600 FT LONG AND MAKE FWD ANCHOR WINDLASS OPERATIONAL.
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988
Construction/Loadline
Issued 7 October 1988
Resolved
PAINT VESSELS NAME AND HOME PORT STERN OF VESSEL. THIS SHOULD BE PLACED ON THE STERN IN SUCH A MANNER AS TO NOT BE OBSTRUCTED BY DOCKING FENDERS.
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988
Fire Fighting
Issued 7 October 1988
Resolved
REPLACE NON COAST GUARD APPROVED CHEMICAL FIRE EXTINGUISHERS WITH COAST GUARD APPROVED B-II DRY CHEMICAL EXTINGUISHERS.
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988