← All vessels
MOSTEFA BEN BOULAID
MOSTEFA BEN BOULAID is a 1976 tank ship. The Coast Guard has recorded 193 inspections since 1988, most recently in May 2002, along with 186 deficiencies and 2 operational controls.
Records from 1988 to 2002. Most recent: inspection, 20 May 2002.
- Built
- 1976
- Last inspected
- 20 May 2002
- Documentation
- Not in the documentation file of 10 September 2026
- Inspections
- 193
- Deficiencies
- 186 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
7359955 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
7TGE
51546
Flag
ALGERIA
—
Maury page id
psix-51546
Inspections, by type
…with no type recorded172
Years with a record
15 calendar years (1988–2002)
The 193 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 24 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it24401 - Regulatory (Subpart C or D), Net Ton
74920 - Dead Weight, Ton
81337 - Regulatory (Subpart C or D), Gross Ton
74920 - Dead Weight, Ton
81337 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 193
20 May 2002
Deficiency Check · Periodic Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1616619
18 May 2002
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1633500
28 February 2002
Letter of Compliance (Initial/Renewal)
Administrative · Activities Europe · Activity 1487256
12 July 2001
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 473287
5 May 2001
Type not recorded
No type recorded · Station Point Allerton · USCG Northeast District (CGD-NE) · Activity 1496641
4 May 2001
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 289418
29 April 2001
Type not recorded
No type recorded · Station Point Allerton · USCG Northeast District (CGD-NE) · Activity 1496640
3 April 2001
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 289166
4 March 2001
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 288086
3 January 2001
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 285728
6 September 2000
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 281940
2 September 2000
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 282655
10 May 2000
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 277731
22 March 2000
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 277041
16 February 2000
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 275857
21 January 2000
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 500753
20 January 2000
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 274081
26 November 1999
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 435464
28 September 1999
Letter of Compliance (Initial/Renewal)
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 789168
28 July 1999
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1381647
25 July 1999
Type not recorded
No type recorded · Activities Europe · Activity 776894
12 May 1999
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 445783
16 April 1999
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 427380
25 March 1999
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 427097
27 February 1999
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 425915
26 January 1999
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 524537
3 January 1999
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 424012
11 December 1998
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 423652
28 October 1998
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 470035
7 October 1998
Letter of Compliance (Initial/Renewal)
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1418414
16 March 1998
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1409869
9 February 1998
Letter of Compliance (Initial/Renewal) · Damage Survey
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1388465
7 February 1998
Letter of Compliance (Initial/Renewal)
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1112085
26 November 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 525691
3 November 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 521857
13 October 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 481428
22 September 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 458293
23 August 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 442936
2 August 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 536719
10 July 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 486175
19 June 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 524518
23 March 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 513567
25 February 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 462782
31 January 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 536586
9 January 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 510863
17 December 1996
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 529037
22 November 1996
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 523842
29 October 1996
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 485869
29 October 1996
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 857447
1 April 1996
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 505614
1 April 1996
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1078169
1 March 1996
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 689423
24 February 1996
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 885535
5 February 1996
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 400
5 February 1996
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1411245
3 February 1996
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 514217
3 February 1996
Letter of Compliance (Initial/Renewal)
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 871938
11 January 1996
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 502330
17 December 1995
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 87137
16 December 1995
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 442923
7 November 1995
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 530800
7 November 1995
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1190082
26 February 1995
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 376034
18 January 1995
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 689424
7 January 1995
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 88758
29 December 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 373585
29 December 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 852351
20 September 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 689419
10 September 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 482125
10 September 1994
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 868373
7 September 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 455240
7 September 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 868628
30 July 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 868368
15 June 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1419280
14 June 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 499592
5 May 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 858211
7 April 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 453689
7 April 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1166559
7 March 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 493442
7 March 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1167881
2 February 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 532027
2 February 1994
Letter of Compliance (Initial/Renewal)
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1162578
5 January 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 363367
5 January 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1434075
7 December 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 362702
7 December 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1356457
8 November 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1144690
12 October 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 361322
12 October 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 834940
9 September 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 483918
9 September 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 832544
23 August 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 689421
17 August 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 485067
15 August 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1153860
24 July 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1154468
23 July 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 359811
28 June 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 538491
28 June 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1153417
8 June 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1379807
4 April 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 357460
4 April 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 836110
9 February 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 689418
5 February 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 73674
5 February 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1133740
3 February 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 355834
27 January 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 57608
31 December 1992
Certificate of Compliance
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 961681
21 December 1992
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1132605
16 December 1992
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 830801
24 November 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 354503
24 November 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 828124
1 November 1992
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 511197
14 August 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 478916
14 August 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1268686
23 June 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 61355
23 June 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 532559
23 June 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 958424
5 April 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 460886
5 April 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 945636
11 March 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1268493
17 February 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 458827
17 February 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1254996
22 January 1992
Certificate of Compliance
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1255627
27 December 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 949297
4 December 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 489342
3 December 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1253039
25 October 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 521380
25 October 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1249095
2 October 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 468901
2 October 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 940865
9 July 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 942835
8 July 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 498955
8 July 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1244519
30 May 1991
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 508657
4 February 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 497220
4 February 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 996282
9 January 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 341133
9 January 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1219252
12 December 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 479206
11 December 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1226227
9 November 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 516376
9 November 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 906674
14 October 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 912475
12 September 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 468416
12 September 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 912566
21 August 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 534563
21 August 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 903670
30 July 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 436263
29 July 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1244584
1 July 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 912726
23 May 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 437883
23 May 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 908775
26 April 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 458842
26 April 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 897937
5 April 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1212665
4 April 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 533957
5 March 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 482435
5 March 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 924678
2 February 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1242935
11 January 1990
Certificate of Compliance
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 924077
5 December 1989
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 919174
8 November 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 518128
8 November 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1033939
17 October 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 464196
16 October 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1042465
25 September 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 463571
25 September 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 899010
21 June 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 539425
21 June 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1194802
31 May 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 441930
31 May 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1033727
5 May 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 511915
5 May 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1342091
12 April 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 513303
8 April 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1035823
20 February 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 500990
20 February 1989
Certificate of Compliance
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1346713
29 January 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 535885
29 January 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1207504
9 January 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 483861
8 January 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1198595
17 December 1988
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 473749
15 December 1988
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 888859
19 November 1988
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 474194
19 November 1988
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1204814
28 October 1988
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 452974
28 October 1988
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1201763
25 March 1988
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 996297
22 March 1988
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 474559
29 January 1988
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 520459
28 January 1988
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1016824
3 January 1988
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 476336
2 January 1988
Certificate of Compliance
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1314979
Deficiency record · 186
Pollution Prevention/Response › Prevention Equipment
Issued 28 February 2002
Resolved
Provide means to lock sewage overboard LEGACY COMPONENT DESC: Sewage System Piping
Fire Fighting
Issued 28 February 2002
Resolved
Trouble shoot repair and prove proper operation of the gas detection system, methane and air, #1,#2,#12.
Fire Fighting › Automatic Sprinkler System
Issued 28 February 2002
Resolved
Renew wasted/missing brackets for the port and starboard cargo manifold sprinkler heads. LEGACY COMPONENT DESC: Piping
Fire Fighting › Fire Main
Issued 28 February 2002
Resolved
Fire main rupture disc port side main deck adjacent to cat walk ladder to cargo manifold leaking.
Make permanent repair the rupture disc and prove proper operation of the fire main. LEGACY COMPONENT DESC: Condition
Lifesaving › Lifeboat
Issued 28 February 2002
Resolved
Starboard lifeboat propeller loose on the shaft. Repair and properly secure propeller to the shaft and ;prove prper operation. LEGACY COMPONENT DESC: Propeller
Deck/Cargo
Issued 3 January 2001
Resolved
PROVIDE MASTER'S ATTESTATION OF PROPER OPERATION OF CARGO DISCHARGE VALVES TANK #5 AND #6 PRIOR TO RETURN TO U.S.
Engineering
Issued 3 January 2001
Resolved
PROVE PROPER OPERATION OF MAIN GAS VALVE ON STBD BOILER PRIOR TO ENTRY INTOBOSTON HARBOR.
Deck/Cargo
Issued 3 January 2001
Resolved
PROVIDE CLASS ATTESTATION TO THE PROPER REPAIR OF CRACK ON MAIN STEAM PIPE MANIFOLD IN ENGINE ROOM PRIOR TO ENTRY INTO BOSTON HARBOR.
Deck/Cargo
Issued 3 January 2001
Resolved
PROVIDE SERVICE REPORT FOR MSA "METHANE IN AIR" GAS DETECTION SYSTEM PRIOR TO RETURN TO U.S.
Fire Fighting
Issued 6 September 2000
Resolved
RENEW RUPTURED FIREMAIN SECTION ON PORT SIDE BETWEEN TANKS 3,AND 4. PRIOR TO NEXT INBOUND TRANSIT.
Lifesaving
Issued 6 September 2000
Resolved
PROVIDE PROPER OPERATION OF PORT DAVIT BRAKING SYSTEM.
Deck/Cargo
Issued 2 September 2000
Resolved
PROVIDE PROPER CLASS SOCIETY ATTESTATION TO THE TEMPORARY REPAIR TO SALTWATER LEAK ON STARBOARD MAIN CIRCULATING PUMP PIPING PROIR TO DEPARTURE
Deck/Cargo
Issued 2 September 2000
Resolved
PROVIDE CLASS SOCIETY ATTESTATION OF SATISFACTORY PERMANENT REPAIR TO PORT LOW DUTY COMPRESSOR
Deck/Cargo
Issued 22 March 2000
Resolved
PROVIDE CLASS SOCIETY ATTESTATION IN CONJUNCTION WITH TECHNIGAZ REPORT TO THE PROPER REPAIR/REPLACEMENT OF DECK PLATING IN THE WAY OF TANK FOURLIQUIDDOME AND TANK FIVE VAPOR DOME AND THAT BOTH TANKS ARE FIT FOR THE INTENDED SERVICE.
Deck/Cargo
Issued 22 March 2000
Resolved
PROVIDE COPY OF SMS NON-CONFORMITY REPORT AND CORRECTIVE ACTIONS FOR LNG SPILL ASSOCIATED WITHNON-RETURN VALVES HINGE PIN CAPS.
Electrical
Issued 22 March 2000
Resolved
PROVIDE CALSS SOCIETY ATTESTATION TO THE PROPER INSTALLATION OF THE REMPORARY GENERATOR.
Deck/Cargo
Issued 16 February 2000
Resolved
PROVIDE THIS OFFICE WITH A COPY OF SMS NON-CONFORMITY REPORT IN REGARDS TO VENTING OF GAS FROM VENT MAST #4 BY WAY OF REGULATING VALVE PRIOR TO RETURNTO NEXT US PORT.
Deck/Cargo
Issued 16 February 2000
Resolved
PROVIDE PROPER SPAN GAS TO TEST MAIN GAS VALVE SHUT DOWN FROM BOILER HOODS PRIOR TO NEXT INBOUND TRANSIT.
Deck/Cargo
Issued 16 February 2000
Resolved
REPAIR BOUNDING STRAP FOR TANK #1 PORT RELIEF VALVE PRIOR TO NEXT INBOUND TRANSIT
Deck/Cargo
Issued 16 February 2000
Resolved
PROVIDE CLASS SOCIETY ATTESTATION TO THE PROPER OPERATION AND CLOSING OF MAST #4 REGULATING VALVE PRIOR TO NEXT INBOUND TRANSIT.
Deck/Cargo
Issued 20 January 2000
Resolved
REPLACE MISSING E.S.D.S. PLACARD ON PORT MANIFOLD.
Lifesaving
Issued 27 February 1999
Resolved
POST LIFEBOAT LOWERING AND LIFERAFT INSTRUCTIONS ON PORT BOAT DECK PRIOR TONEXT U.S. VISIT
Deck/Cargo
Issued 27 February 1999
Resolved
REPAIR STARBOARD DISCHARGE MANIFOLD VALVE #59 (BLOWING BY AIR) PRIOR TO NEXT U.S. VISIT.
Electrical
Issued 27 February 1999
Resolved
REPAIR BROKEN VAPOR-TIGHT LIGHT FIXTURE UNDER COMPRESSOR ROOM, STBD SIDE MAIN DECK PRIOR TO NEXT U.S. VISIT.
Fire Fighting
Issued 27 February 1999
Resolved
MAKE PERMANENT REPAIRS TO LEAKING FIRE MAIN PIPE (NOW TEMPORARILY REPAIRED)IN WAY OF CARGO TANK #6, PORT SIDE AT NEXT TECHNICAL STOP AND NO LATER THAN30 JUNE 1999.
Construction/Loadline
Issued 27 February 1999
Resolved
BASED ON APPROX. 18 INCHES OF WATER FOUND IN COFFERDAM #2, PROVIDE CLASSIFICATION SOCIETY ATTESTATION TO SATISFACTORY CONDITION OF ALL COFFERDAMS AND ASSOCIATED PIPING AT NEXT TECHNICAL STOP AND NO LATER THAN_x001C_ 30 JUN 99.
Fire Fighting
Issued 27 February 1999
Resolved
PROVIDE CLASSIFICATION SOCIETY ATTESTATION TO THE SATISFACTORY CONDITION OFTHE IMCO PUMP SEAWATER INTAKE PIPING AT NEXT TECHNICAL STOP AND NO LATER THAN 30 JUNE 1999
Deck/Cargo
Issued 27 February 1999
Resolved
PERMANENTLY REPAIR WORN NUTS AND BOLTS ON CARGO TANKS #3 & #6 LIQUID DOME COVERS AT NEXT TECHNICAL STOP AND NO LATER THAN 30 JUNE 1999
Deck/Cargo
Issued 11 December 1998
Resolved
REPLACE BROKEN CARGO AND STRIPPING PUMP PRESSURE GUAGES IN CABINETS AT EACHCARGO TANK.
Deck/Cargo
Issued 11 December 1998
Resolved
COLOR CODE EMERGENCY SHUTDOWN HANDLE AT STARBOARD MANIFOLD.
Deck/Cargo
Issued 11 December 1998
Resolved
REPAIR SMALL LEAK IN DAMAGED BOLT IN WAY OF STBD FORWARD CORNER OF #4 CARGOTANK LIQUID DOME.
Construction/Loadline
Issued 11 December 1998
Resolved
PAINT LOADLINE MARKS (PLIMSOLL) ON BOTH PORT AND STARBOARD SIDES OF HULL INCOLOR WHICH CONTRASTS HULL COLOR.
Deck/Cargo
Issued 9 February 1998
Resolved
PROVIDE CLASS SOCIETY ATTESTATION AS TO OPERATION OF PORT CARGO PUMP IN CARGO TANK #6 PRIOR TO RETURN TO U.S. PORT.
Deck/Cargo
Issued 9 February 1998
Resolved
PROVIDE CLASS SOCIETY ATTESTATION AS TO THE OPERATION/REPAIR RECOMMENDATIONS OF ALL CARGO TANK STRIPPING PUMPS PRIOR TO RETURN TO U.S. PORT.
Deck/Cargo
Issued 9 February 1998
Resolved
MAKE PERMANENT REPAIRS TO STEAM LINES ON PORT AND STBD FORWARD SPRING LINE DECK WINCHES PRIOR TO RETURN TO U.S. PORT.
Electrical
Issued 9 February 1998
Resolved
PROVIDE CLASS SOCIETY ATTESTATION AS TO REPAIRS MADE TO ELECTRICAL GENERATING SETS AND THE SHIP'S ABILITY TO SAFELY AND TIMELY OFFLOAD CARGO PRIOR TO RETURN TO U.S. PORT.
Electrical
Issued 7 February 1998
Resolved
PROVIDE CLASS SOCIETY ATTESTATION TO THE RENEWAL OF THE WIRE CONDUIT IN VICINITY OF #6 CARGO TANK LIQUID DOME.
Accommodation/Occupational Safety
Issued 7 February 1998
Resolved
PROVIDE CLASS SOCIETY ATTESTATION OF THE REPAIR TO THE CATWALK DECKPLATE INVICINITY OF #3 CARGO TANK NITROGEN CABINET.
Engineering
Issued 7 February 1998
Resolved
PROVIDE CLASS SOCIETY ATTESTATION TO THE REPAIR OF THE PATCHED BUNKER LINE IN VICINITY OF CARGO TANK #3 LIQUID DOME.
Deck/Cargo
Issued 7 February 1998
Resolved
PROVIDE CLASS SOCIETY ATTESTATION TO THE PROPER OPERATION OF THE CARGO TANK#2 LIQUID LEVEL INDICATOR IN CARGO CONTROL ROOM.
Deck/Cargo
Issued 7 February 1998
Resolved
PROVIDE CLASS SOCIETY ATTESTATION TO THE PROPER OPERATION OF THE CARGO TANK#1 GAS DOME PRESSURE GAUGE IN CARGO CONTROL ROOM.
Fire Fighting
Issued 7 February 1998
Resolved
PROVICE CLASS SOCIETY ATTESTATION OF THE EXPERT SERVICING OF THE FIREFIGHTING EMERGENCY BREATHING APPARATUS REFILL COMPRESSOR.
Deck/Cargo
Issued 7 February 1998
Resolved
PROVIDE CLASS SOCIETY ATTESTATION TO THE CONDITION AND SERVICABILITY OF THEGNG AND LNG PIPELINE INSULATION PRIOR TO RETURN TO U.S. PORT.
Accommodation/Occupational Safety
Issued 7 February 1998
Resolved
PROVIDE CLASS SOCIETY ATTESTATION TO THE CONDITION AND SERVICABILITY OF THETANK TOP DECK PLATING (MAIN DECK) BETWEEN THE VAPOR AND LIQUID DOMES OF ALLTANKS WHERE HEAVILY CORRODED PRIOR TO RETURN TO U.S. PORT.
Deck/Cargo
Issued 7 February 1998
Resolved
PROVIDE CLASS SOCIETY ATTESTATION TO THE PROPER OPERATION OF THE BALLAST TANK LEVEL GAUGES IN CARGO CONTROL ROOM FOR #1P, #2P, #1S AND #2S BALLAST TANKS.
Construction/Loadline
Issued 7 February 1998
Resolved
MAKE WATERTIGHT THE HULL PENETRATION IN THE PORT BOW DRY POWDER ROOM.
Lifesaving
Issued 7 February 1998
Resolved
PROVE PROPER OPERATION OF THE PORT LIFEBOAT ENGINE.
Lifesaving
Issued 7 February 1998
Resolved
REPLACE FOOD IN STBD LIFEBOAT DUE TO WETNESS AND WATER IN PORT LIFEBOAT DUETO EXPIRATION.
Fire Fighting
Issued 7 February 1998
Resolved
PROVIDE CLASS SOCIETY ATTESTATION TO THE LABELING OF THE VALVES IN THE #2 AND #6 DRY CHEMICAL HOSE STATIONS.
Deck/Cargo
Issued 1 April 1996
Resolved
PRIOR TO CARGO DISCHARGE MAKE PERMANENT REPAIRS TO STBD SIDE DISCHARGE MAINFOLD REMOTE FLAG/INDICATOR GUIDES._x001C_ _x001C_ _x001C_
Electrical
Issued 1 April 1996
Resolved
PRIOR TO CARGO DISCHARGE MAKE PERMANENT REPAIR TO LIGHTING IN WAY OF STBD MAIN PROPULSION BOILER BURNER FLAT._x001C_ _x001C_ _x001C_
Electrical
Issued 1 April 1996
Resolved
AT NEXT YARD PERIOD BUT NOT LATER THAN 31 JULY 1996, MAKE PERMANENT REPAIR TO MAIN BUS BAR PORT SIDE ISOLATING DEVICE, AS PER CLASS SOCIETY RECOMMENDATION. _x001C_ _x001C_
Electrical
Issued 1 April 1996
Resolved
AT NEXT YARD PERIOD BUT NOT LATER THAN 31 JULY 1996 MAKE PERMANENT REPAIR TO EMERGENCY GENERATOR RADIATOR, AS PER CLASS SOCIETY RECOMMENDATION._x001C_ _x001C_ _x001C_
Electrical
Issued 1 April 1996
Resolved
AT NEXT YARD PERIOD BUT NOT LATER THAN 31 JULY 1996 MAKE PERMANENT REPAIRS TO INSULATION MONITORING SYSTEM FOR 440 VOLT PANEL, AS PER CLASS SOCIETY RECOMMENDATION._x001C_ _x001C_
Deck/Cargo
Issued 1 April 1996
Resolved
AT NEXT YARD PERIOD BUT NOT LATER THAN 31 JULY 1996 MAKE PERMANENT REPAIRS TO CARGO TANK #3 PRIMARY BARRIER, AS PER CLASS SOCIETY RECOMMENDATION. IN THE INTERIM TANK #3 TO BE EMPTY, BLANKED OFF, AND INERTED._x001C_ _x001C_
Deck/Cargo
Issued 1 April 1996
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT PROVIDE CLASS SOCIETY ATTESTATION OF PROOF OF OR PERMANENT REPAIR TO THE LNG AND GNG MAIN LINE SUPPORT BRACKETS._x001C_ _x001C_
Deck/Cargo
Issued 1 April 1996
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT PROVIDE CLASS SOCIETY ATTESTATION OF PROOF OF OR PERMANENT REPAIRS TO STEAM LINE IN WAY OF PORT SIDE DECK WINCH WHERE CURRENTLY FITTED WITH BAND CLAMP._x001C_ _x001C_
Construction/Loadline
Issued 1 April 1996
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT PROVIDE CLASS SOCIETY ATTESTATION OF PROOF OF OR RECOMMENDATION FOR PERMANENT REPAIR TO #4 CENTER DOUBLE BOTTOM SALT WATER BALLAST TANK LEVEL INDICATOR._x001C_ _x001C_
Deck/Cargo
Issued 1 April 1996
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT PROVIDE CLASS SOCIETY ATTESTATION OF PROOF OF OR RECOMMENDATION FOR PERMANENT REPAIR TO N2 LINE SUPPORT BRACKETSIN WAY OF CARGO TANK #3 LIQUID DOME._x001C_ _x001C_
Deck/Cargo
Issued 1 April 1996
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT MAKE PERMANENT REPAIRS TO WATERTIGHT DOORLEADING TO FWD STROAGE AREA._x001C_ _x001C_ _x001C_
Fire Fighting
Issued 1 April 1996
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT MAKE PERMANENT REPAIRS TO DECK SPRAY PIPING BRACKETS WHERE MISSING/BROKEN._x001C_ _x001C_ _x001C_
Electrical
Issued 1 April 1996
Resolved
AT NEXT YARD PERIOD BUT NOT LATER THAN 31 JULY 1996 COMPLETE PERMANENT REPAIRS TO ELECTRICAL CABLES FOR CARGO STRIPPING PUMPS #2, AND #4 AS PER CLASS SOCIETY RECOMMENDATION._x001C_ _x001C_
Deck/Cargo
Issued 1 April 1996
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT PROVIDE CLASS SOCIETY ATTESTATION OF PROOF OF OR RECOMMENDATION FOR PERMANENT REPAIR OF N2 LINE STBD SIDE IN WAYOF DISCHARGE MANIFOLD._x001C_ _x001C_
Lifesaving
Issued 24 February 1996
Resolved
PRIOR TO RETURN TO NEXT U.S PORT MAKE PREMANENT REPAIRS TO VESSEL'S ACCOMADATION LADDERS WHERE DAMAGED. BOTH PORT AND STBD._x001C_ _x001C_ _x001C_
Deck/Cargo
Issued 24 February 1996
Resolved
PRIOT TO RETURN TO NEXT U.S. PORT PROVIDE EITHER CLASS SOCIETY ATTESTATION OF CARGO TANK #3 PRIMARY BARRIOR INTEGRITY, OR STEPS TAKEN TO ISOLATE/INERTAND MONITOR TANK ATMOSPHERE, TO INCLUDE DATE FOR COMPLETION FOR PERMANENT REPAIRS._x001C_
Deck/Cargo
Issued 24 February 1996
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT PROVIDE CLASS SOCIETY ATTESTATION OF SERVICABILITY OF INTERBARRIOR SPACE NITROGEN SUPPLY/PURGING SYSTEM FOR ALL SIX CARGO TANKS._x001C_ _x001C_
Deck/Cargo
Issued 24 February 1996
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT PROVIDE CLASS SOCIETY ATTESTATION OF APPROVAL AND PROPER OPERATION OF THE NEWLY INSTALLED GAS DETECTION SYSTEM_x001C_ _x001C_ _x001C_
Deck/Cargo
Issued 24 February 1996
Resolved
PRIOR TO RETURN TO NEXT U.S PORT PROVIDE EVIDENCE THAT ALL EQUIPMENT REQUIRED BY VESSEL OPERATING MANUAL IS OPERATIONAL, AND READILY AVAILABLE, AND EVIDENCE THAT CREW IS ADEQUATELY TRAINED IN TIS USE._x001C_ _x001C_
Electrical
Issued 24 February 1996
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT PROVIDE REPORT AS TO THE CLEANING AND SERVICING OF ALL CARGO PUMP ELECTRICAL CONTROLLERS, AND SHIPS SERVICE GENERATORS MAIN BUS DISCONNECT BREAKERS._x001C_ _x001C_
Electrical
Issued 24 February 1996
Resolved
PRIOR TO RETURN TO NEXT U.S PORT PROVIDE DOCUMENTATION OF PERMANENT REPAIRSTO CARGO TANK #6 PORT PUMP ELECTRICAL CONTROL PANEL._x001C_ _x001C_ _x001C_
Engineering
Issued 24 February 1996
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT PROVIDE CLASS SOCIETY ATTESTATION OF THE PROPER OPERATION OF THE FORWARD BUNKERS TANK STEAM HEATING SYSTEM._x001C_ _x001C_ _x001C_
Deck/Cargo
Issued 24 February 1996
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT PROVIDE CLASSIFICATION SOCIETY APPROVAL FOR LOADING CONDITION 6D3._x001C_ _x001C_ _x001C_
Documentation
Issued 24 February 1996
Resolved
PRIOR TO RETURN TO NEXT U.S PORT PROVIDE FLAG STATE EVIDENCE OF PERSON IN CHARGE TRAINING AS REQUIRED BY CHAPTER 5 OF STCW._x001C_ _x001C_ _x001C_
Electrical
Issued 5 February 1996
Resolved
PROVIDE DOCUMENTATION OF MEGGAR READING FOR ALL CARGO PUMP ELECTRICAL POWERLEAD CABLES.
Electrical
Issued 5 February 1996
Resolved
PROVDE REPORT AS TO THE CLERNING AND SERVICING OF ALL CARGO PUMP ELECTRICALCONTROLLERS LOCATED IN THE ENGINE ROOM SWITHBOARD (PORT & STBD SIDES).
Electrical
Issued 5 February 1996
Resolved
COMPLETION OF PERMANENT REPAIRS TO CARGO TANK NO. 5 PORT PUMP ELECTRICAL CONTROL PANEL. (FIRE DAMAGE)
Electrical
Issued 5 February 1996
Resolved
PROVIDE REPORT OF CLEANING AND SERVICING OF ALL GENERATOR MAIN BUS DISCONNECT BREAKERS.
Electrical
Issued 5 February 1996
Resolved
PROVIDE DOCUMENTATION OF PERMANENT REPAIR TO NO. 2 S/S DIESEL GENERATOR.
Electrical
Issued 5 February 1996
Resolved
PROVE PROPER OPERATION OF THE NO. 2 S/S TURBO ALTERNATOR INCLUDING THE LOW LUBE OIL PRESSURE SWITCH.
Deck/Cargo
Issued 5 February 1996
Resolved
PERMANENT REPAIRS TO ALL ON DECK STEAM LEAKS INCLUDING MOORING WINCHES AND COMPRESSOR ROOM SUPPLY.
Electrical
Issued 5 February 1996
Resolved
PROVIDE SATISFACTORY PHYSICAL EXAMINATION OF ALL ON DECK CARGO PUMP ELECTRICAL SUPPLY CABLES AND CABLE TRAYS, WITH PARTICULAR ATTENTION BEING PAID TO CHAFFING.
Unknown
Issued 29 December 1994
Resolved
FAILURE TO COMPLY WITH COTP ORDER. VESSEL FAILED TO INCLUDE INFORMATION CONCERNING INOPERATIVE BALLAST SYSTEM IN PREARRIVAL NOTIFICATION MESSAGE ASREQUIRED BY MSO BOSTON LNG PLAN.
Unknown
Issued 29 December 1994
Resolved
VESSEL FAILED TO NOTIFY COTP OF A HAZARDOUS CONDITION DUE TO THE VESSEL NOTBEING ABLE TO BALLAST BELOW THREE METERS DUE TO WASTED BALLAST PIPING INTERNAL TO BALLAST TANKS.
Navigation
Issued 29 December 1994
Resolved
VESSEL DID NOT HAVE CURRENTLY CORRECTED LIGHT LIST PUBLICATION.
Unknown
Issued 29 December 1994
Resolved
NOTED THAT THE [name withheld] OF THE OIL BEING DISCHARGED INTO BOSTON HARBOR AND DID NOT NOTIFY THE MARINE SAFETY OFFICE.
Deck/Cargo
Issued 29 December 1994
Resolved
TWO CARGO HOSES WERE NOT BLANKED OFF PROPERLY AND LEAKING FUEL OIL.
Navigation
Issued 29 December 1994
Resolved
VESSEL DID NOT HAVE CURRENTLY CORRECTED COAST PILOT PUBLICATION.
Navigation
Issued 29 December 1994
Resolved
VESSEL'S ARPA NOT RECEIVING SHIPS SPEED FROM THE VESSEL'S SPEED LOG.
Deck/Cargo
Issued 29 December 1994
Resolved
VESSEL DID NOT HAVE FIXED MANIFOLD CONTAINMENT.
Construction/Loadline
Issued 29 December 1994
Resolved
PROVE PROPER OPERATION OF BALLAST SYSTEM AND PROVIDE CLASS ATTESTATION THATSYSTEM COMPLIES WITH VESSEL'S STABILITY . PORT & STARBOARD BALLAST PIPING REPORTED TO BE WASTED IN AREA OF NUMEROUS BALLAST TANKS.
Fire Fighting
Issued 29 December 1994
Resolved
PROVIDE CLASSIFICATION SOCIETY ATTESTATION REGARDING COMPLETION OF PERMANENT REPAIRS TO FIRE MAIN LINES._x001C_ _x001C_ _x001C_
Deck/Cargo
Issued 29 December 1994
Resolved
REPLACE CARGO TANK #4 DOME GAS PRESSURE GUAGE LOCATED ON CARGO CONTROL ROOMCONSOLE._x001C_ _x001C_ _x001C_
Deck/Cargo
Issued 29 December 1994
Resolved
REPLACE STARBOARD COMPRESSOR PRESSURE INDICATOR GUAGE LOCATED ON THE CARGO CONTROL ROOM CONSOLE._x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 29 December 1994
Resolved
PROVIDE CLASS SOCIETY ATTESTATION AS TO THE STRUCTURAL AND WATERTIGHT INTEGRITY OF COFFERDAM VOID SPACE BETWEEN CARGO TANKS #2 AND #3._x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 29 December 1994
Resolved
UPON RETURN TO NEXT U.S. PORT MAKE SALT WATER BALLAST TANKS AND COFFERDAMS IN WAY OF ANY AND ALL COMPLETED AND ATTESTED REPAIRS AVAILABLE FOR COAST GUARD INTERNAL STRUCTURAL EXAM, AND SUPPLY CERTIFIED MARINE CHEMIST CERTIFICATE INDICATING SPACES ARE SAFE FOR ENTRY._x001C_
Engineering
Issued 29 December 1994
Resolved
MAKE PERMANENT REPAIR TO FIXED BUNKER LINE CONTAINMENT IN WAY OF UPPER LEVEL CARGO MANIFOLDS. (AMIDSHIPS)_x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 29 December 1994
Resolved
PROVIDE CLASSIFICATION SOCIETY ATTESTATION THAT ALL REMAINING WASTED, HOLEDAREAS IN OVERHEAD OF CARGO COMPRESSOR ROOM HAVE BEEN PERMANENTLY REPAIRED._x001C__x001C_ _x001C_
Electrical
Issued 29 December 1994
Resolved
PROVIDE CLASSIFICATION SOCIETY ATTESTATION AS TO THE ACCEPTANCE OF CONDITION OF WIRING AND LIGHTING ARRANGEMENTS AS PRESENTLY INSTALLED IN WAYOF ACCOMMODATION HOUSE, WEATHER DECK, AND OVERHEAD OF AFTER WINCH DECK._x001C_ _x001C_
Construction/Loadline
Issued 29 December 1994
Resolved
PROVIDE CLASSIFICATION SOCIETY ATTESTATION REGARDING COMPLETION OF PERMANENT REPAIRS AND SUCCESSFUL HYDRO TESTING/OPERATION OF BALLAST PIPING._x001C_ _x001C_
Deck/Cargo
Issued 29 December 1994
Resolved
REPAIR/REPLACE BONDING STRAPS ON CARGO PIPING WHERE MISSING OR DAMAGED IN ACCORDANCE WITH IMO CODE FOR CONSTRUCTION AND EQUIPMENT OF SHIPS CARRING LIQUIFIED GASES IN BULK (CHAPTER 5, 5.2.1.4).
Deck/Cargo
Issued 29 December 1994
Resolved
REPAIR AND PROVE PROPER OPERATION AND PROVIDE CLASS SOCIETY ATTESTATION_x001C_ THAT SYSTEM FUNCTIONS PROPERLY.
Engineering
Issued 29 December 1994
Resolved
INSTALL FIXED BUNKER LINE CONTAINMENT IN WAY OF AFTER BUNKER STATION AT DECK HOUSE._x001C_ _x001C_ _x001C_
Lifesaving
Issued 29 December 1994
Resolved
PROVIDE MISSING EXPLOSION PROOF LAMP FOR MACHINERY SPACE FIREFIGHTING SAFETY EQUIPMENT IN COMPLIANCE WITH SOLAS AND IMO CODE FOR GAS VESSELS.
Navigation
Issued 29 December 1994
Resolved
PROVIDE CLASS SOCIETY ATTESTATION VESSEL'S ARPA MEETS REQUIREMENTS OF IMO (PERFORMANCE STANDARDS FOR AUTOMATIC RADAR PLOTTING AIDS). SPEED LOG INPUTINOPERATIVE.
Deck/Cargo
Issued 29 December 1994
Resolved
PROVIDE CLASS SOCIETY ATTESTATION AS TO THE CONDITION AND SERVICABILITY OF REMOTE CARGO TANK LEVEL INDICATORS FOR CARGO TANKS #1,AND #2._x001C_ _x001C_ _x001C_
Fire Fighting
Issued 29 December 1994
Resolved
STARBOARD SELF CONTAINED DRY CHEMICAL SYSTEM FOUND INOPERATIVE. RENEW SYSTEM AND PROVE PROPER OPERATION OR PROVIDE SERVICE REPORT BY AUTHORIZED SERVICE TECHNICIAN ATTESTING TO PROPER OPERATION.
Deck/Cargo
Issued 10 September 1994
Resolved
RENEW CARGO VALVE #31 PRIOR TO RETURN TO NEXT U.S. PORT.
Deck/Cargo
Issued 10 September 1994
Resolved
PROVIDE PROOF OF PROPER HYDRO TEST OF CARGO PIPING TO INCLUDE VALVE #31 PRIOR TO RETURN TO NEXT U.S. PORT.
Electrical
Issued 7 September 1994
Resolved
PROPERLY SUPPORT AFT MAIN DECK CABLE SPLICES AND CABLE RUNS OVER ENGINE EXHAUSTS.
Deck/Cargo
Issued 7 September 1994
Resolved
MAKE PERMANENT REPAIRS TO MAIN DECK STEAM PIPING THAT HAS BEEN TEMPORARILY REPAIRED WITH FIBERGLASS PRIOR TO RETURN TO NEXT U. S. PORT.
Electrical
Issued 7 September 1994
Resolved
MAKE PERMANENT REPAIRS TO AFT MAIN DECK CABLE RUNS AND LIGHTING FIXTURES PRIOR TO RETURN TO NEXT U. S. PORT.
Unknown
Issued 7 September 1994
Resolved
PROVIDE EMERGENCY COMMUNICATIONS HEADSET AT STEERING GEAR STATION.
Fire Fighting
Issued 15 June 1994
Resolved
PROVIDE CLASSIFICATION SOCIETY ATTESTATION AS TO CONDITION AND SERVICABILITY OF CURRENT ARRANGEMENTS FOR FIXED FIRE FIGHTING IN THE FLAMMABLE STORAGE LOCKER,(PAINT LOCKER)._x001C_ _x001C_
Engineering
Issued 15 June 1994
Resolved
PROVIDE CLASSIFICATION SOCIETY ATTESTATION AS TO CONDITION AND SERVICABILITY OF SOFT PATCH ON BUNKER OIL LINE STBD MAIN DECK AT HOUSE._x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 15 June 1994
Resolved
PROVIDE CLASSIFICATION SOCIETY ATTESTATION AS TO CONDITION AND SERVICABILITY OF CEMENT SOFT PATCH ON 500 MM BALLAST INTAKE LINE LOCATED INTHE LOWER LEVEL OF THE ENGINE ROOM ON THE PORT SIDE._x001C_ _x001C_
Engineering
Issued 15 June 1994
Resolved
PROVIDE CLASSIFICATION SOCIETY ATTESTATION AS TO CONDITION AND SERVICABILITY OF SOFT PATCH ON CROSS OVER BUNKER OIL LINE IN WAY OF #5 CARGO TANK._x001C_ _x001C_
Deck/Cargo
Issued 15 June 1994
Resolved
PROVIDE CLASSIFICATION SOCIETY ATTESTATION AS TO CONDITION AND SERVICABILITY OF #1 CARGO TANK REMOTE LEVEL INDICATOR._x001C_ _x001C_ _x001C_
Deck/Cargo
Issued 15 June 1994
Resolved
PROVIDE CLASSIFICATION SOCIETY ATTESTATION AS TO CONDITION AND SERVICABILITY OF #5 CARGO TANK REMOTE LEVEL INDICATOR._x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 15 June 1994
Resolved
PROVIDE CLASSIFICATION SOCIETY ATTESTATION AS TO CONDITION AND SERVICABILITY OF STBD AFTER END OF COMPRESSOR ROOM OVERHEAD WHERE HOLED ANDTEMPORARILY REPAIRED._x001C_ _x001C_
Deck/Cargo
Issued 15 June 1994
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT MAKE PERMANENT REPAIR TO LNG VALVES # 30 AND #31 SO AS TO ALLOW FULL DISCHARGE FLOW AND PRESSURE WITH NO LEAKAGE, ORREQUIREMENT FOR TEMPORARY PATCHES RAGS/PLASTIC IN ORDER TO PREVENT LEAKAGE.THIS IS TO BE TO THE SATISFACTION OF AN ATTENDING C.G. MARINE INSPECTOR._x001C_
Deck/Cargo
Issued 5 May 1994
Resolved
FASTEN GROUND BONDING STRAPS FOR THE DISCHARGE PIPING ON CARGO TANKS NO. 2,3, 4. STRAPS WERE NOT FASTENED TO THE BLANK FLANGE ON THE DISCHARGE LINE PIPING.
Construction/Loadline
Issued 5 May 1994
Resolved
MAKE PERMANENT REPAIR TO HOLE IN OVERHEAD THAT WAS LEAKING LOCATED ON THE STARBOARD AFT END OF THE COMPRESSIOR ROOM. HOLE HAD A TEMPORARY PATCH.
Deck/Cargo
Issued 7 April 1994
Resolved
PRIOR TO RETURN NEXT U. S. PORT, MAKE PERMANENT REPAIR TO LEAKING FLANGE ATTANK #1, PUMP #1. TO BE EXAMINED DURING VESSEL'S NEXT COOL-DOWN OPERATION.
Deck/Cargo
Issued 7 April 1994
Resolved
FOUND EMERGENCY SHUTDOWN TO NUMBER 2 CARGO MANIFOLD VALVE SECURED. OPENED VALVE AND TESTED SHUTDOWN THIS EXAM. RESULTS: SAT
Engineering
Issued 7 April 1994
Resolved
REPAIR AND PROVE PROPER OPERATION OF MAIN PROPULSION THROTTLE CONTROL PRIORTO ENTRY PORT OF BOSTON. PROVIDE CLASS SOCIETY ATTESTATION INDICATING ACCEPTANCE OF REPAIRS.
Engineering
Issued 7 April 1994
Resolved
PRIOR TO RETURN NEXT U. S. PORT, CONDUCT REPAIR/ADJUSTMENT TO PNEUMATIC REGULATOR TO THROTTLE CONTROL AND PROVE PROPER OPERATION OF THE SAME UPON ARRIVAL.
Electrical
Issued 2 February 1994
Resolved
NOTED NUMEROUS DECK LIGHTING FIXTURES BROKEN.
Engineering
Issued 2 February 1994
Resolved
NOTED SOFT PATCH ON BUNKER OIL LINE STBD SIDE MAIN DECK. PROVIDE ATTESTATION THAT THE CONDITION IS TO THE SATISFACTION OF CLASS/FLAG STATE ADMINISTRATION NO LATER THAN VESSEL'S NEXT REGULARLY SCHEDULED DRYDOCK.
Deck/Cargo
Issued 2 February 1994
Resolved
NOTED NR 1 CARGO TANK LEVEL INDICATOR IN CARGO CONTROL ROOM INOPERATIVE. PROVIDE ATTESTATION THAT THE CONDITION IS TO THE SATISFACTION OF CLASS/FLAGSTATE ADMINISTRATION.
Engineering
Issued 2 February 1994
Resolved
PROVIDE FLANGE SPRAY SHIELDS WHERE MISSING IN LOCAL FUEL ROOM IN ACCORDANCEWITH SOLAS CHAPTER II-2 REG. 15(2.4)
Electrical
Issued 2 February 1994
Resolved
EMERGENCY GENERATOR OVERHEATED DUE TO BROKEN KEY ON FRESH WATER COOLING PUMP. PUMP REPAIRED AND TESTED SAT.
Construction/Loadline
Issued 2 February 1994
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Engineering
Issued 2 February 1994
Resolved
NOTED FUEL OIL TANK VENTS NOT FITTED WITH FLAME SCREENS.
Construction/Loadline
Issued 2 February 1994
Resolved
NOTED SOFT PATCH ON BILGE PISTON PUMP SUCTION LINE. PROVIDE ATTESTATION THAT THE CONDITION IS TO THE SATISFACTION OF CLASS/FLAG STATE ADMINISTRATION NO LATER THAN VESSEL'S NEXT REGULARLY SCHEDULED DRYDOCK.
Fire Fighting
Issued 2 February 1994
Resolved
PROVIDE CERTIFICATE INDICATING INSPECTION AND TESTING OF SCBA AIR COMPRESSOR IN ACCORDANCE WITH IMO CODE CHAPTER XIV PARA 14.7.
Documentation
Issued 2 February 1994
Resolved
PROVIDE UPDATED CERTIFICATE OF FITNESS TO REFLECT CURRENT CONDITION OF PROPANE CARGO SYSTEM.
Fire Fighting
Issued 7 December 1993
Resolved
CONDUCT HYDROSTATIC TEST OF ALL PIPING ASSOCIATED W/THE "ANSUL SOFRAMI" FIXED FIREFIGHTING SYSTEM AND PROVIDE WRITTEN ATTESTATION FROM CLASS SOCIETY/FLAG STATE ADMINISTRATION THAT SYSTEM IS SATISFACTORY PRIOR TO RETURN NEXT U. S. PORT.
Deck/Cargo
Issued 7 December 1993
Resolved
MAKE PERMANENT REPAIR TO STBD CARGO PUMP (TANK#1) PRIOR TO RETURN NEXT_x001C_ U. S. PORT BUT NLT 07JAN94.
Fire Fighting
Issued 7 December 1993
Resolved
MAKE PERMANENT REPAIR TO DRY CHEM LINE LEADING TO COMPRESSOR ROOM AS PER BUREAU VERITAS (BV) CONDITION OF CLASS PRIOR TO RETURN NEXT U. S. PORT BUT NLT 07JAN94.
Deck/Cargo
Issued 7 December 1993
Resolved
MAKE PERMANENT REPAIR TO AIR LINE ON PORT SIDE AFT MANIFOLD TO SATISFACTIONOF CLASS SOCIETY/FLAG STATE ADMINISTRATION PRIOR TO RETURN NEXT U. S. PORT BUT NLT 07JAN94.
Deck/Cargo
Issued 15 August 1993
Resolved
PRIOR TO RETURN NEXT U.S. PORT REPAIR AND PROVE PROPER OPERATION AND PROVIDE ATTESTATION FROM CLASS SOCIETY OF PERMANENT REPAIRS TO VALVE NR 31 (CROSSOVER) MAIN CARGO LINE TO TRANSVERSE MANIFOLD. VALVE OBSERVED LEAKING LIQUID CARGO (LNG).
Deck/Cargo
Issued 24 July 1993
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT, MAKE PERMANENT REPAIR TO COMPRESSOR ROOMVENTILATION TRUNKS. FLAME SCREEN MISSING AND HOLED ON THE INSTALLED MECHANICAL VENT TRUNKS.
Deck/Cargo
Issued 24 July 1993
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT, PROVE PROPER OPERATION OF FOLLOWING VALVES # 31 (CROSSOVER), # 61, 62, STBD MANIFOLD DISCHARGE LINES. ALL VALVES OBSERVED LEAKING LIQUID CARGO (LNG). PROVIDE ATTESTATION FROM CLASS SOCIETY OF PERMANENT REPAIRS
Electrical
Issued 24 July 1993
Resolved
FUEL OIL LEAK DETECTED ON EMERGENCY GENERATOR AT INJECTOR PUMP. VESSEL PERSONNEL CORRECTED SAME. GENERATOR TESTED-SAT
Fire Fighting
Issued 24 July 1993
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT MAKE PERMANENT REPAIR TO ELBOW PATCHED ONDRY CHEMICAL HOSE STATION LOCATED AT THE STARBOARD TRANSFER MANIFOLD.
Deck/Cargo
Issued 8 June 1993
Resolved
REPAIR THE CARGO MONITORING PRINTER IN THE CARGO CONTROL ROOM PRIOR TO RETURNING TO NEXT UNITED STATES PORT.
Navigation
Issued 4 April 1993
Resolved
The ARPA was not labled in accordance with 33 CFR 164.38(d)(1)._x001C_
Navigation
Issued 4 April 1993
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT PERMANENTLY AFFIX LABEL ON VESSEL'S ARPA IN ACCORDANCE WITH 33 CFR 164.38(D)(1).
Fire Fighting
Issued 5 February 1993
Resolved
PRIOR TO RETURN NEXT U.S. PORT PROVIDE DOCUMENTATION FROM VESSEL'S FLAG STATE ADMINISTRATION THAT ALL COMPRESSED AIR EQUIPMENT HAS BEEN INSPECTED AND TESTED BY AN EXPERT (IMO CODE 14.7). _x001C_
Lifesaving
Issued 5 February 1993
Resolved
PRIOR TO DEPARTING PORT OF BOSTON PROVIDE ADDITIONAL LIFE RAFTS FOR 100% OFTHE TOTAL PERSONS ON BOARD (41 CREWMEMBERS). _x001C_ _x001C_ _x001C_
Fire Fighting
Issued 5 February 1993
Resolved
PRIOR TO RETURN TO NEXT U.S PORT MAKE PERMANENT REPAIRS TO THE DECK WATER SPRAY LINE IN WAY OF TEMPORARY PATCHES IN VICINITY OF CARGO TANKS 2,3,AND 5, AS PER OUTSTANDING CLASS SOCIETY RECOMMENDATION NOTED ON VESSEL'S HULL CLASSIFICATION CERTIFICATE.
Fire Fighting
Issued 5 February 1993
Resolved
PRIOR TO RETURN NEXT U.S PORT MAKE PERMANENT REPAIRS TO DISCHARGE PIPING ATOUTLETS OF BOTH MAIN FIRE PUMPS IN THE ENGINE ROOM IN WAY OF TEMPORARY REPAIRS, AS PER OUTSTANDING CLASS SOCIETY RECOMMENDATION NOTED ON VESSEL'S HULL CLASSIFICATION CERTIFICATE.
Fire Fighting
Issued 5 February 1993
Resolved
PRIOR TO RETURN NEXT U.S. PORT MAKE PERMANENT REPAIRS TO FIRE MAIN BRANCH LINE "HYDRANT" IMMEDIATELY AFT OF THE COMPRESSOR ROOM IN WAY OF SOFT PATCH,AS PER OUTSTANDING CLASS SOCIETY RECOMMENDATION NOTED ON VESSEL'S HULL CLASSIFICATION CERTIFICATE. _x001C_
Fire Fighting
Issued 5 February 1993
Resolved
PRIOR TO ENTERING THE PORT OF BOSTON MAKE REPAIRS TO LEAKS IN DECK WATER SPRAY LINES IN WAY OF PORT MANIFOLD AND LEAKING PORT MAIN FIRE PUMP _x001C_ DISCHARGE LINE TO THE SATISFACTION OF A REPRESENTATIVE OF THE VESSELS FLAG_x001C_STATE ADMINISTRATION.
Accommodation/Occupational Safety
Issued 5 February 1993
Resolved
PRIOR TO RETURN TO NEXT U.S. PORT PROVIDE MANUFACTURER'S LABEL PLATE_x001C_ SHOWING CERTIFICATION OF THE MSD AS REQUIRED BY 33 CFR 159.7.
Deck/Cargo
Issued 5 February 1993
Resolved
PRIOR TO RETURN NEXT U.S. PORT MAKE PERMANENT REPAIRS AND PROVE PROPER OPERATION OF QUICK CLOSING CARGO VALVES # 51, AND #54 ON THE PORT CARGO MANIFOLD._x001C_ _x001C_
Deck/Cargo
Issued 5 February 1993
Resolved
PRIOR TO RETURN NEXT U.S. PORT PROVIDE MOST RECENT GLOBAL VACUUM TEST RESULTS OF SECONDARY BARRIER SPACES OF ALL CARGO TANKS FOR REVIEW._x001C_ _x001C_ _x001C_
Documentation
Issued 31 December 1992
Resolved
PROVIDE ON BOARD A COPY OF THE IMO CODE FOR EXISTING SHIPS CARRYING LIQUIFIED GASES IN BULK PRIOR TO NEXT U.S. PORT CALL.
Accommodation/Occupational Safety
Issued 31 December 1992
Resolved
MAKE PERMANENT REPAIRS TO THE AFT GANGWAY MOUNT STBD SIDE TO COME INTO COMPLAINCE WITH THE SECURITY REQUIREMENTS SET FORTH IN THE U.S.C.G. APPROVED OPERATION/EMERGENCY MANUAL FOR TRUNKLINE LNG LAKE CHARLES FACILITYPRIOR TO NEXT U.S. PORT CALL.
Lifesaving
Issued 31 December 1992
Resolved
HAVE ALL COMPRESSED AIR EQUIPMENT (SCBA'S) INSPECTED BY AN EXPERT PRIOR TO NEXT U.S. PORT CALL AS REQUIRED BY IMO CODE 14.7.
Accommodation/Occupational Safety
Issued 31 December 1992
Resolved
PROVIDE ON THE VESSEL'S MARINE SANITATION DEVICE THE CERTIFICATION LABEL REQUIRED BY 33 CFR 159.7 PRIOR TO NEXT U.S. PORT CALL.
Deck/Cargo
Issued 31 December 1992
Resolved
MAKE PERMANENT REPIARS IN WAY OF QUICK CLOSING VALVE 57 ON THE STBD CARGO MANIFOLD PRIOR TO NEXT U.S. PORT CALL AS REQUIRED BY IMO CODE 5.3 AND PROVEPROPER OPERATION TO THE COGIZANT OCMI.
Deck/Cargo
Issued 31 December 1992
Resolved
MAKE PERMANENT REPIARS IN WAY OF THE NOZZLES ON THE HULL PROTECTION WATER CURTAIN AS REQUIRED BY IMO CODE 5.2.2 PRIOR TO NEXT U.S. PORT CALL.
Deck/Cargo
Issued 31 December 1992
Resolved
PROVIDE TO THE COGNIZANT OCMI THE RESULTS OF THE GLOBAL VACUUM TEST ON THE SECONDARY BARRIER. (FOR ALL CARGO TANKS)
Construction/Loadline
Issued 24 November 1992
Resolved
PROVIDE DOCUMENTATION FROM THE VESSEL'S CLASS SOCIETY ATTESTING TO THE REPAIRS CONDUCTED TO THE #2 PORT AND #4 STARBOARD BALLAST TANKS. (OUTSTANDING CLASS SOCIETY RECOMMENDATION DUE SEPTEMBER 1992).
Deck/Cargo
Issued 24 November 1992
Resolved
PROVIDE DOCUMENTATION FROM THE VESSEL'S CLASS SOCIETY INDICATING THAT THE REQUIRED SURVEY WAS CONDUCTED ON THE PORT AND STARBOARD ANCHOR WINDLASS ANDHYDRAULIC JACKING MOTOR (LAST SURVEY FEB 87).
Documentation
Issued 24 November 1992
Resolved
PROVIDE DOCUMENTATION FROM THE VESSEL'S CLASS SOCIETY CLARIFYING THE STATUSOF THE VARIOUS EXEMPTIONS (ANNEX 2) ISSUED TO THE IMO CERTIFICATE OF FITNESS. THERE IS NO DATE TO INDICATE WHEN THE VESSEL NEEDS TO COMPLY WITH THESE REQUIREMENTS. (REF: MSO BOSTON LTR 16711 DATED 17 AUGUST 1992)
Engineering
Issued 24 November 1992
Resolved
PROVIDE DOCUMENTATION FROM THE VESSEL'S CLASS SOCIETY ATTESTING TO THE PROPER REPLACEMENT OF THE STEAM PIPING LAGGING MISSING IN THE MACHINERY SPACE (OUTSTANDING CLASS SOCIETY RECOMMENDATION DUE SEPTEMBER 1992).
Engineering
Issued 23 June 1992
Resolved
PROVE PROPER OPERATION OF MAIN PROPULSION LUBE OIL SYSTEM AND PROVIDE FLAG STATE SURVEY REPORT PRIOR TO ENTRY NEXT US PORT.
Deck/Cargo
Issued 11 March 1992
Resolved
REINSTALL PORT ANCHOR PRIOR TO RETURN TO THE UNITED STATES. CURRENTLY_x001C_ PORT ANCHOR IS MISSING ITS FLUKES.
Deck/Cargo
Issued 27 December 1991
Resolved
SAMPLE VALVE # 58 LEAKING. MAKE PERMANENT REPAIR TO VALVE PRIOR TO RETURNING TO US WATERS._x001C_
Fire Fighting
Issued 3 December 1991
Resolved
MAKE PERMANENT REPAIRS TO NUMBER ONE FIRE PUMP DISCHARGE PIPE LOCATED AT THE PUMP PRIOR TO ENTRY NEXT U.S. PORT. TEMPORARY REPAIRS HAVE BEEN MADE.
Electrical
Issued 3 December 1991
Resolved
MAKE PERMANENT REPAIRS TO THE TWO DECK LIGHTS LOCATED ON THE MAST FORWARD OF THE NUMBER ONE CARGO TANK PRIOR TO ENTRY NEXT U.S. PORT.
Deck/Cargo
Issued 25 October 1991
Resolved
VALVE # 55 PORT MANIFOLD LIQUID LINE LEAKING AT PACKING. VESSEL TO MAKE PERMANENT REPAIR TO VALVE PRIOR TO RETURN TO NEXT U.S. PORT.
Deck/Cargo
Issued 25 October 1991
Resolved
STEAM LINE TO FORWARD CAPSTAN HAS SMALL HOLE. MAKE REPAIRS TO STEAM LINE_x001C_ PRIOR TO RETURN TO U.S. PORT.
Fire Fighting
Issued 25 October 1991
Resolved
PIPE TO SPRINKLER HEAD IN COMPRESSOR ROOM HAS SMALL PIN HOLE. VESSEL PERSONNEL COMPLETED TEMPORARY REPAIR TO PIPE. VESSEL TO MAKE PERMANENT REPAIR TO SPRINKLER PIPE PRIOR TO NEXT U.S PORT VISIT.
Deck/Cargo
Issued 25 October 1991
Resolved
CARGO TANK # 4 HIGH LEVEL ALARM NOT OPERATING PROPERLY. SHOWS HIGH LEVEL WITH TANK NOT FULL. VESSEL TO MAKE PERMANENT REPAIR TO # 4 TANK HIGH LEVELALARM PRIOR TO NEXT U.S. PORT.
Deck/Cargo
Issued 2 October 1991
Resolved
VALVE # 81 STBD MANIFOLD LIQUID LINE LEAKING PRODUCT TO BLANK FLANGE. VESSEL TO MAKE PERMANENT REPAIR PRIOR TO RETURN TO U.S. PORT.
Deck/Cargo
Issued 12 September 1990
Resolved
CUSTODY TRANSFER SYSTEM MODIFIED TO EFFECT REPAIR. VESSEL OPERRATORS TO SUBMIT PLANS OF NEW SYSTEM TO USCG HEADQUARTERS FOR REVIEW.
Deck/Cargo
Issued 26 April 1990
Resolved
MAKE PERMANENT REPAIR TO FOXBORO CUSTODY TRANSFER SYSTEM PRIOR TO RETURN TONEXT U.S. PORT. UNTIL REPAIRS ARE EFFECTED, AND WHILE IN THE PORT OF BOSTONCREW MUST OBTAIN READINGS OF THE TEMPERATURES OF INNER AND SECONDARY BARRIER SPACES AT LEAST ONE PER WATCHL
Deck/Cargo
Issued 26 April 1990
Resolved
MAKE PERMANENT REPAIRS AND PROVE PROPER OPERATION OF THE VESSEL NITROGEN SYSTEM I.E. GAGES AND FLOW METERS PRIOR TO RETURN TO NEXT U.S. PORT.
Deck/Cargo
Issued 11 January 1990
Resolved
BOW THRUSTER -OOC
Deck/Cargo
Issued 11 January 1990
Resolved
FOXBORO CUSTODY TRANSFER SYSTEM, REMOTE READOUT-OOC
Engineering
Issued 11 January 1990
Resolved
OILY WATER SEPERATOR -MAKE PERMANENT REPAIR TO THE MONITOR AND ALARM PANEL.
Navigation
Issued 20 February 1989
Resolved
AARPA INOPERATIVE. REPAIR PRIOR TO DEPARTING PORT OF BOSTON.
Navigation
Issued 20 February 1989
Resolved
STBD RADAR INOPERATIVE. REPAIR PRIOR TO DEPARTING PORT OF BOSTON.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.