SCF POLAR is a 1969 tank ship. The Coast Guard has recorded 101 inspections since 1984, most recently in February 2012, along with 33 deficiencies and 2 operational controls.

Records from 1984 to 2012. Most recent: inspection, 16 February 2012.

Built
1969
Last inspected
16 February 2012
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

6901892 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
LIBERIA
—
Maury page id
psix-51651

Inspections, by type

…with no type recorded69
Years with a record 19 calendar years (1984–2012)
The 101 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 14 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it14536 - Convention (Subpart B), Net Ton
32878 - Dead Weight, Ton
48454 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 101

16 February 2012 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4245805
1 February 2012 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4235036
17 January 2012 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4226779
1 January 2011 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3919229
16 December 2010 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3911671
14 December 2010 COC-GAS Renew · ISPS II Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3908680
27 November 2010 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3920187
10 November 2010 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3887698
22 September 2010 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3853344
6 September 2010 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3843674
16 March 2010 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3693965
28 February 2010 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3687200
9 February 2010 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3677380
27 January 2010 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3671319
10 January 2010 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3661432
10 January 2010 Type not recorded
No type recorded · Station Point Allerton · USCG Northeast District (CGD-NE) · Activity 3661594
26 December 2009 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3655400
10 December 2009 NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3647814
3 March 2007 ISPS II Exam · Ballast Water Examination · COC-GAS Renew
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2881076
28 June 2004 COC-GAS Annual · ISPS II Exam
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2113477
2 December 2002 Deficiency Check
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1713316
14 November 2002 Deficiency Check
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1705869
18 October 2002 Security Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1692246
18 October 2002 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1693607
24 September 2002 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1680943
23 September 2002 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1678998
11 September 2002 Damage Survey
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1674071
8 September 2002 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1673299
15 August 2002 Security Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1661813
29 July 2002 Certificate of Compliance
Administrative · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1654181
18 July 2002 Certificate of Compliance
Administrative · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1648424
7 April 2000 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 525097
7 October 1999 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 433571
22 September 1999 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 433488
20 May 1999 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 39904
15 May 1999 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 428763
15 May 1999 Letter of Compliance (Initial/Renewal)
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 797375
18 August 1993 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 360267
18 August 1993 Certificate of Compliance
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1158668
14 May 1993 Certificate of Compliance
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 836044
15 October 1992 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 512489
3 August 1992 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 352397
3 August 1992 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1260986
9 June 1992 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 443443
5 March 1992 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 467853
12 August 1991 Certificate of Compliance
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1245112
11 March 1991 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 342467
30 October 1990 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 498047
6 April 1990 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 439540
19 January 1990 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 335015
28 December 1989 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 445738
28 December 1989 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 471056
8 December 1989 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 439562
15 August 1989 Certificate of Compliance
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1236485
27 July 1989 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 467542
18 April 1989 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 521161
21 December 1988 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 509766
13 September 1988 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 450002
3 June 1988 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 487604
13 January 1988 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 499703
21 October 1987 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 456378
23 August 1987 Certificate of Compliance
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1031370
3 June 1987 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 482027
22 April 1987 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 460108
1 April 1987 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 452436
7 February 1987 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 523095
28 January 1987 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 459117
7 January 1987 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 509522
18 December 1986 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 472416
7 November 1986 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 503250
17 October 1986 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 475557
27 September 1986 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 467856
7 September 1986 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 490758
18 August 1986 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 525636
29 July 1986 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 486157
9 July 1986 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 441698
19 June 1986 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 500506
30 May 1986 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 495703
12 April 1986 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 445861
22 March 1986 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 504843
1 March 1986 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 512188
8 February 1986 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 473277
18 January 1986 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 521895
28 December 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 492659
7 December 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 525236
15 November 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 519014
25 October 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 450227
4 October 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 523864
15 September 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 442808
28 August 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 989181
8 August 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 487852
20 July 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 447563
1 July 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 467554
12 June 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 490943
24 May 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 502049
29 March 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 477050
18 February 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 533177
31 January 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 489332
12 January 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 492641
24 December 1984 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 535973
13 November 1984 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 497265

Deficiency record · 33

Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 1 February 2012 Resolved
To ensure compliance with regulations, the ship does not currently have a written procedure in Cargo Systems Operating Manual. Manual is not approved by administration and does not specifically address procedure to be followed to comply with IGC Code. Manual to be amended and approved by Administration. To the satisfaction of the administration upon returning to US after sailing foreign.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 16 February 2012
Resolved 5 March 2012
Resolution: Verified Cargo Systems Operations Manual is approved by administration. Witnessed crew following approved procedure during port manifold ESD test.
Deck/Cargo › Cargo Refrigeration › General
Issued 1 February 2012 Resolved
Ship's cargo pressure gages in CCR do not agree with mechanical and computer read outs for each tank. Calibration needs to occur on all gages to the SAT of Administration.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 16 February 2012
Resolved 2 February 2012
Resolution: Received Class Report stating that cargo pressure gages have been calibrated and are working properly.
Engineering › Steam Boiler (propulsion) › Superheater
Issued 1 January 2011 Resolved
The vessel's starboard main propulsion boiler had been placed out of commission and off line due to the boiler had suffered a ruptured superheater tube bundle and repairs had not yet been made to satisfaction of ABS surveyor and the vessel's flag administration. Repairs must be accomplished prior to departure from port of Boston.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 January 2011
Resolved 3 January 2011
Resolution: Sector Boston - Deficiency Rectified base on American Bureau Of Shipping ABS class survey report . ALL SAT.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 28 June 2004 Resolved
RKEN KEIKI HC/O2 PORTABLE GAS DETECTOR HAD NO ALARM SIGNAL.
Condition: Design Flaw
Action required: 15 - Rectify deficiencies by next port
Resolved 23 July 2004
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 28 June 2004 Resolved
Install dielectric guard on CCR main panel cover (back side) to shield connections to CH4 water heater.
Action required: 15 - Rectify deficiencies by next port
Resolved 23 July 2004
Electrical › Electric Supply System (service) › Cable
Issued 28 June 2004 Resolved
Install stuffing tubes or packing for wiring penetrations of compressor room deck.
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Resolved 23 July 2004
Electrical › Electric Supply System (service) › Cable
Issued 28 June 2004 Resolved
Install blank on "GCR A/C control" cover in compressor room.
Action required: 15 - Rectify deficiencies by next port
Resolved 23 July 2004
Electrical › Electric Supply System (service) › Cable
Issued 28 June 2004 Resolved
Install permanent wiring on vacuum pump in compressor room.
Action required: 15 - Rectify deficiencies by next port
Resolved 23 July 2004
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 28 June 2004 Resolved
Install motor control cover on compressor.
Action required: 15 - Rectify deficiencies by next port
Resolved 23 July 2004
Electrical › Electric Supply System (service) › Cable
Issued 28 June 2004 Resolved
Install plugs in electrical junction box on overhead in the boatswain's stores.
Action required: 15 - Rectify deficiencies by next port
Resolved 23 July 2004
Deck/Cargo › Marine Portable Tanks › Securing Device
Issued 28 June 2004 Resolved
Secure compressed gas cylinders in boatswain's stores with wire rope, chain or steel retainers.
Action required: 15 - Rectify deficiencies by next port
Resolved 23 July 2004
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 28 June 2004 Resolved
Install machinery guards on winch motors. (2)
Action required: 15 - Rectify deficiencies by next port
Resolved 23 July 2004
Engineering › Steam Boiler (propulsion) › Steam Smothering
Issued 28 June 2004 Resolved
Make permanent repairs to steam dump cooling spray line in E/R.
Action required: 15 - Rectify deficiencies by next port
Resolved 23 July 2004
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Manifold
Issued 28 June 2004 Resolved
Replace valve handle on STBD manifold control box. (main deck)
Action required: 15 - Rectify deficiencies by next port
Resolved 23 July 2004
Engineering › Compressed Air System (control) › Compressor
Issued 28 June 2004 Resolved
Repair conductor for oil temp sending unit on STBD compressor. (compressor room)
Action required: 15 - Rectify deficiencies by next port
Resolved 23 July 2004
Deck/Cargo › Holds/Tanks › Independent Tank
Issued 14 November 2002 Resolved
Prior to entering U.S. waters make permanent repairs to #5 cargo tank to the satisfaction of class society or isolate 100% and inert tank #5 verified by class society to the satisfaction of the [name withheld]: Independent Tank
Action required: 705 - Other - as specified
Resolved 10 March 2007
Resolution: Received class survey report attesting to satisfactory repairs.
Deck/Cargo › Cargo Stowage
Issued 11 September 2002 Resolved
Repair #5 cargo tank to the satisfaction of classification society during next scheduled dry-docking. Until Permanent repairs are completed #5 cargo tank will be isolated and inerted while trading and transiting U. S. waters.
Action required: 705 - Other - as specified
Resolved 14 November 2002
Resolution: Issued new requirement concerning #5 cargo tank.
Deck/Cargo › Cargo Stowage
Issued 29 July 2002 Resolved
Repair or replace vessel gas detection system. Currently system will only detect gas in compressor room item #3 on detection system. LEGACY COMPONENT DESC: Gas detection system
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 July 2002
Resolution: Crew replaced #3 detection solenoid vavle. Solenoid vavle was not closing completly allowing fresh air to contaminate all other samples. Tested system in presence of marine inspector.
Deck/Cargo › Vapor Control Systems
Issued 18 July 2002 Resolved
Gas detection sys valve #3 for sampling was faulty, replaced by crew system fully operational. See [name withheld] activity No. 1654181
Due 29 July 2002
Resolved 29 July 2002
Fire Fighting
Issued 15 May 1999 Resolved
PROVIDE DOCUMENTATION THAT FUSIBLE PLUGS MEET MELTING RANGE REQUIRED BY 46 C.F.R. 154.540(D)
Condition: Unknown
Due 9 August 1999
Resolved 9 August 1999
Electrical
Issued 15 May 1999 Resolved
REMOVE ALL NON-CONFORMING ELECTRIC MOTOR HEATER WIRES IN MOTOR ROOM PRIOR TO 15 JUNE 1999.
Condition: Unknown
Due 9 August 1999
Resolved 9 August 1999
Deck/Cargo
Issued 15 May 1999 Resolved
INSTALL SUITABLE GUARD FOR PROTECTION OF MAIN GAS VALVE ON AFTER DECK PRIORTO 15 JUNE 1999.
Condition: Unknown
Due 9 August 1999
Resolved 9 August 1999
Fire Fighting
Issued 15 May 1999 Resolved
PROVIDE COPY OF EXPERT SERVICE REPORT FOR BREATHING APPARATUS PRIOR TO 15 JUNE 1999.
Condition: Unknown
Due 9 August 1999
Resolved 9 August 1999
Documentation
Issued 18 August 1993 Resolved
OIL TRANSFER PROCEDURES INCOMPLETE
Condition: Unknown
Due 24 May 1999
Resolved 24 May 1999
Deck/Cargo
Issued 3 August 1992 Resolved
WHILE CONDUCTING A TEST OF THE DECK SPRAY SYSTEM, NOTICED A RUPTURE IN THE PIPING SYSTEM.
Condition: Unknown
Due 24 May 1993
Resolved 24 May 1993
Deck/Cargo
Issued 3 August 1992 Resolved
WHILE CONDUCTING A TEST OF THE DECK SPRAY SYSTEM, FOUND MANY SPRAY NOZZLES THAT WERE PLUGGED UP.
Condition: Unknown
Due 24 May 1993
Resolved 24 May 1993
Deck/Cargo
Issued 12 August 1991 Resolved
MAKE PERMANENT REPAIRS TO #2 CARGO TANK STRIPPING LINE CHECK VALVE PRIOR TOCOMPLETION NEXT SCHEDULED DRYDOCKING
Condition: Unknown
Due 12 August 1991
Resolved 12 August 1991
Construction/Loadline
Issued 12 August 1991 Resolved
PROVIDE ACCESS TO ONE BALLAST TANK FOR INTERNAL INSPECTION NEXT INPORT NIKISKI
Condition: Unknown
Due 4 October 1991
Resolved 4 October 1991
Fire Fighting
Issued 12 August 1991 Resolved
CLEAN OUT ALL PLUGGED DECK SPRAY NOZZELS.
Condition: Unknown
Due 4 October 1991
Resolved 4 October 1991
Fire Fighting
Issued 11 March 1991 Resolved
PROVE THE PROPER OPERATION OF THE EXTERIOR WATER SPRAY SYSTEM USING BOTHMAIN EMERGENCY FIREPUMPS.
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Deck/Cargo
Issued 11 March 1991 Resolved
PROVIDE SPAN GAS IN NECESSARY QUANTITIES TO CALIBRATE AND PROVE BOTH GAS DETECTION SYSTEMS.
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Deck/Cargo
Issued 11 March 1991 Resolved
SHOW THE PROPER OPERATION OF THE GAS DETECTOR SYSTEM IN THE ENGINE CONTROL ROOM DRAWING SPAN GAS THROUGH THE SYSTEM TO THE ANALYZER.
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Deck/Cargo
Issued 11 March 1991 Resolved
PROVIDE EVIDENCE THAT THE MELTING RANGE OF THE FUSIBLE ELEMENTS IS WITHIN THE RANGE SET BY 46 CFR 154.540(d).
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.