STOLT BOEL is a 1971 tank ship. The Coast Guard has recorded 30 inspections since 1984, most recently in March 1993, along with 35 deficiencies.

Records from 1984 to 1993. Most recent: inspection, 31 March 1993.

Built
1971
Last inspected
31 March 1993
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7102429 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
LIBERIA
—
Maury page id
psix-51676

Inspections, by type

…with no type recorded17
Years with a record 9 calendar years (1984–1993)
The 30 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 33 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it8897 - Regulatory (Subpart C or D), Net Ton
25233 - Dead Weight, Ton
13831 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 30

31 March 1993 MARPOL Annex II Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1144809
30 March 1993 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 540772
30 September 1992 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 958183
29 September 1992 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 353501
20 July 1992 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 695761
16 July 1992 Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1269809
9 July 1992 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 437262
8 May 1992 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 472099
4 May 1992 Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1255884
25 February 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 950387
21 February 1992 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 947441
19 November 1991 Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1246925
21 February 1991 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 920128
19 February 1991 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 505280
12 February 1991 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 472516
30 August 1990 Certificate of Compliance
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1222528
31 January 1990 Certificate of Compliance
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 908336
24 October 1989 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 480469
7 March 1989 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 517711
23 December 1988 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1347188
20 October 1988 Certificate of Compliance
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 887984
1 September 1988 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1041203
29 August 1988 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 536302
3 February 1988 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 321111
2 February 1988 Certificate of Compliance
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1326757
10 September 1987 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 525939
20 October 1986 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 312134
16 October 1986 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1009713
15 October 1986 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 312068
30 August 1984 Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 463482

Deficiency record · 35

Documentation
Issued 31 March 1993 Resolved
PROVIDE TEST OF CARGO TANK HEATING SYSTEM BY CLASS SOCIETY FOR SUITABILITY FOR NLS CARGOS AND INCLUDE INFORMATION FOR CARGO TEMPERATURES IN P&A MANUALIAW STANDARDS-APPENDIX D PART 3.4 OF MARPOL ANNEX II.
Condition: Unknown
Due 30 April 1993
Resolved 31 March 1993
Construction/Loadline
Issued 19 November 1991 Resolved
MAKE PERMANENT REPAIRS TO LONGITUDINAL BULKHEAD BETWEEN #4 PORT WING BALLAST TANK AND #9 PORT CARGO TANK NLT 31JUL92 IAW CLASS SOCIETY RECOMMENDATION. PROVIDE CLASS SOCIETY DOCUMENTATION ATTESTING TO THE SATISFACTORY COMPLETION OF REPAIRS.
Condition: Unknown
Due 19 November 1991
Resolved 19 November 1991
Fire Fighting
Issued 30 August 1990 Resolved
REPAIR HOLE ON FIRE MAIN PIPING IN ENGINE ROOM.
Condition: Unknown
Due 30 August 1990
Resolved 30 August 1990
Construction/Loadline
Issued 30 August 1990 Resolved
REPAIR OR REPLACE GUAGES ON GERERAL SERVICE PUMP 1-INOP 1-WITH BROKEN GLASS.
Condition: Unknown
Due 30 August 1990
Resolved 30 August 1990
Construction/Loadline
Issued 30 August 1990 Resolved
REPAIR FWD CROSSOVER, MIDSHIPS. WASTED AND HOLED.
Condition: Unknown
Due 30 August 1990
Resolved 30 August 1990
Deck/Cargo
Issued 31 January 1990 Resolved
PROPERLY LABEL CARGO HOSES IN ACCORDANCE WITH 46 CFR 153.940.
Condition: Unknown
Due 31 January 1990
Resolved 31 January 1990
Deck/Cargo
Issued 31 January 1990 Resolved
PROVIDE AT LEAST FOUR (4) BOLTS FOR BLANKED CARGO LINES.
Condition: Unknown
Due 31 January 1990
Resolved 31 January 1990
Deck/Cargo
Issued 31 January 1990 Resolved
REPAIR SOFT PATCH ON BLEEDER CONNECTION OF P/V VALVE FOR TANK 14C BY INSTALLING NEW BLEEDER VALVE.
Condition: Unknown
Due 31 January 1990
Resolved 31 January 1990
Deck/Cargo
Issued 31 January 1990 Resolved
REPAIR CLOSED GAUGING DEVICE FOR NO. 3 CENTER TANK.
Condition: Unknown
Due 31 January 1990
Resolved 31 January 1990
Deck/Cargo
Issued 31 January 1990 Resolved
REPAIR DRAIN PLUG ON STBD CONTAINMENT BIN.
Condition: Unknown
Due 31 January 1990
Resolved 31 January 1990
Deck/Cargo
Issued 31 January 1990 Resolved
PROPERLY SUPPORT NO. 4 CROSSOVER PIPE AT PORT MANIFOLD.
Condition: Unknown
Due 31 January 1990
Resolved 31 January 1990
Accommodation/Occupational Safety
Issued 31 January 1990 Resolved
REPAIR STEP ON PORT LADDER AFT OF MANIFOLD.
Condition: Unknown
Due 31 January 1990
Resolved 31 January 1990
Accommodation/Occupational Safety
Issued 31 January 1990 Resolved
REPAIR TWO STEPS ON STBD LADDER FWD OF STORAGE SHACK.
Condition: Unknown
Due 31 January 1990
Resolved 31 January 1990
Deck/Cargo
Issued 31 January 1990 Resolved
PROVIDE CAP FOR PORT CONTAINMENT BIN.
Condition: Unknown
Due 31 January 1990
Resolved 31 January 1990
Engineering
Issued 20 October 1988 Resolved
REPLACE FLAMESCREENS ON BUNKER TANK VENTS FORWARD MAIN DECK PORT AND STARBOARD WITH 30 X 30 MESH SCREEN. TO BE COMPLETED PRIOR TO NEXT U. S. VOYAGE.
Condition: Unknown
Due 20 October 1988
Resolved 20 October 1988
Deck/Cargo
Issued 20 October 1988 Resolved
REPLACE MISSING AND WASTED CARGO PIPE SUPPORT BRACKETS THROUGH OUT THE CARGO BLOCK AREA. TO BE COMPLETED PRIOR TO NEXT U. S. VOYAGE.
Condition: Unknown
Due 20 October 1988
Resolved 20 October 1988
Accommodation/Occupational Safety
Issued 20 October 1988 Resolved
REPLACE RUBBER GASKET IN WATERTIGHT DOOR FOR FOSLE. TO BE COMPLETED PRIOR TO NEXT U. S. VOYAGE.
Condition: Unknown
Due 20 October 1988
Resolved 20 October 1988
Fire Fighting
Issued 20 October 1988 Resolved
FREE UP FIRE DAMPER (STARBOARD) FOR PUMPROOM. TO BE COMPLETED PRIOR TO NEXT U. S. VOYAGE.
Condition: Unknown
Due 20 October 1988
Resolved 20 October 1988
Documentation
Issued 20 October 1988 Resolved
AMEND FIRE CONTROL PLAN TO SHOW EXISTING PUMPROOM VENTING. (PORT SIDE VENT REMOVED). TO BE COMPLETED PRIOR TO NEXT U. S. VOYAGE.
Condition: Unknown
Due 20 October 1988
Resolved 20 October 1988
Fire Fighting
Issued 20 October 1988 Resolved
FREE UP AND PROVE OPERATION OF ALL DECK FIRE MAIN ISOLATION VALVES. TO BE COMPLETED PRIOR TO NEXT U. S. VOYAGE.
Condition: Unknown
Due 20 October 1988
Resolved 20 October 1988
Documentation
Issued 20 October 1988 Resolved
SUBMIT FULL TERM IMO CERTIFICATE OF FITNESS TO COMMANDANT, U. S. COAST GUARD FOR ISSUANCE OF A FULL TERM SUBCHAPTER O ENDORSEMENT. TO BE COMPLETED PRIOR TO NEXT U. S. VOYAGE.
Condition: Unknown
Due 20 October 1988
Resolved 20 October 1988
Fire Fighting
Issued 20 October 1988 Resolved
RENEW WASTED NITROGEN LINES AND FITTINGS ON THE NO. 1 DRY CHEMICAL FIRE STATION. TO BE COMPLETED PRIOR TO NEXT U. S. VOYAGE.
Condition: Unknown
Due 20 October 1988
Resolved 20 October 1988
Fire Fighting
Issued 20 October 1988 Resolved
SERVICE ALL FIXED-SEMI PORTABLE DRY CHEMICAL STATIONS AND RENEW HOSES AS NEEDED. TO BE COMPLETED PRIOR TO NEXT U. S. VOYAGE.
Condition: Unknown
Due 20 October 1988
Resolved 20 October 1988
Accommodation/Occupational Safety
Issued 20 October 1988 Resolved
PROVIDE EVIDENCE OF CERTIFICATION AND INSTALL CERTIFICATION LABEL ON THE TYPE II MSD AS PER 33 CFR 159.7(C)(1). TO BE COMPLETED PRIOR TO NEXT U. S.VOYAGE.
Condition: Unknown
Due 20 October 1988
Resolved 20 October 1988
Documentation
Issued 20 October 1988 Resolved
AMEND OIL TRANSFER PROCEDURES TO INCLUDE BOTH TYPES OF BUNKERS RATHER THAN TWO SEPARATE PROCEDURES. TO BE COMPLETED PRIOR TO NEXT U. S. VOYAGE.
Condition: Unknown
Due 20 October 1988
Resolved 20 October 1988
Fire Fighting
Issued 3 February 1988 Resolved
VSL'S EMERGENCY FIRE PUMP REQ. BY SOLAS 74/78 52(B)(II) NOT OPERATIONAL.
Condition: Unknown
Due 3 February 1988
Resolved 3 February 1988
Deck/Cargo
Issued 16 October 1986 Resolved
REPLACE MISSING MOUNTING BRACKETS TO HYDRAULIC TO #3 STBD VENT PIPING.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Navigation
Issued 16 October 1986 Resolved
INSTALL RUDDER ANGLE INDICATOR IN STEERING GEAR ROOM THAT IS VISIBLE FROM BOTH PORT AND STBD STEERING GEAR MOTOR LOVAL CONTROLS. SOLAS REQ: 29.11 CH II-1 33CFR 164.39(F)(5)
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Deck/Cargo
Issued 16 October 1986 Resolved
REPAIR FROZEN CARGO TANK GAUGING DEVICES TO #3(P),#4(P),#4(C),#4(S),#5(C), #5(S),#6(S),#9(P),#9(S).
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Deck/Cargo
Issued 16 October 1986 Resolved
REPAIR LEAKING HYDRAULIC COUPLING AFT OF #2 PORT P/V VALVE.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Deck/Cargo
Issued 16 October 1986 Resolved
REPAIR CARGO PUMP EMERGENCY SHUT-DOWN FOR HYDRAULIC AGGREGATE #3 AND #6, INDIVIDUAL STOP BUTTONS WILL NOT SUFFICE AS EMERGENCY SHUT-DOWNS.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Deck/Cargo
Issued 16 October 1986 Resolved
REPLACE MISSING MOUNTING BRACKETS TO HYDRAULIC LINE IN WAY OF #7 DEEP WELL PUMP.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Deck/Cargo
Issued 16 October 1986 Resolved
CLEAN ALL CARGO RESIDUE FROM DECK.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Deck/Cargo
Issued 16 October 1986 Resolved
REPAIR FLAME SCREENS IN #12 STBD AND #8 STBD VENT RISER.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Deck/Cargo
Issued 16 October 1986 Resolved
PROVIDE METALLIC BLANK FLANGES TO ALL CARGO HOSES WITH MINIMUM OF (4) BOLTS
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.