Records from 1986 to 2002. Most recent: inspection, 10 April 2002.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 9
10 April 2002
Ballast Water Examination · Certificate of Compliance
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1601082
22 April 2001
Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 289280
12 March 2001
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 288061
13 June 1986
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 510269
12 May 1986
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1300360
9 May 1986
Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 988149
8 May 1986
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 308651
22 April 1986
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 999276
8 April 1986
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1307056
Navigation
Issued 12 March 2001
Resolved
Procure a copy of the rules of the road
Condition: Unknown
Due 22 April 2001
Resolved 22 April 2001
Navigation
Issued 12 March 2001
Resolved
Procure a copy of Coast Pilot
Condition: Unknown
Due 22 April 2001
Resolved 22 April 2001
Deck/Cargo
Issued 22 April 1986
Resolved
CALIBRATE ALL PRESSURE GAUGES AT MANIFOLDS AND CARGO PUMPS TO WITHIN 10 PERCENT OF ACTUAL READING. (33 CFR 156.170) TO BE COMPLETED PRIOR TO NEXT U.S. PORT UPON COMPLETION OF PRESENT VOYAGE.
Condition: Unknown
Due 22 April 1986
Resolved 22 April 1986
Deck/Cargo
Issued 22 April 1986
Resolved
SUBMIT MANUFACTURER'S SPECIFICATIONS ON THE NEW GAS DETECTION UNIT INSTALLED ON THE VESSEL TO COMMANDANT (G-MTH-1).
Condition: Unknown
Due 22 June 1986
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Deck/Cargo
Issued 22 April 1986
Resolved
DEMONSTRATE PROPER OPERATION OF INERT GAS SYSTEM IN AUTOMATIC MODE PRIOR TO ENTRY NEXT U.S. PORT UPON COMPLETION OF THIS VOYAGE.
Condition: Unknown
Due 22 April 1986
Resolved 22 April 1986
Deck/Cargo
Issued 22 April 1986
Resolved
DEMONSTRATE PROPER OPERATION OF VAPOR QUICK CLOSING VALVE FOR #1 CARGO TANKPRIOR TO NEXT U.S. PORT UPON COMPLETION OF PRESENT VOYAGE.
Condition: Unknown
Due 22 April 1986
Resolved 22 April 1986
Fire Fighting
Issued 22 April 1986
Resolved
DEMONSTRATE PROPER OPERATION OF ALL FIRE DAMPERS PRIOR TO NEXT U. S. PORT UPON COMPLETION OF PRESENT VOYAGE.
Condition: Unknown
Due 22 April 1986
Resolved 22 April 1986
Deck/Cargo
Issued 22 April 1986
Resolved
REPAIR LEAK AT GAUGING APPARATUS FOR #1 CARGO TANK STARBOARD SIDE PRIOR TO NEXT U.S. PORT UPON COMPLETION OF PRESENT VOYAGE.
Condition: Unknown
Due 22 April 1986
Resolved 22 April 1986
Deck/Cargo
Issued 22 April 1986
Resolved
CONDUCT HYDROSTATIC TEST OF CARGO PIPING TO 1.5 TIMES THE MAXIMUM ALLOWABLEWORKING PRESSURE. PROVIDE DOCUMENTATION AT NEXT U.S. PORT UPON COMPLETION OF PRESENT VOYAGE.
Condition: Unknown
Due 22 April 1986
Resolved 22 April 1986
Fire Fighting
Issued 8 April 1986
Resolved
DEMONSTRATE PROPER OPERATION OF ALL FIRE DAMPERS PRIOR TO ISSUANCE OF CERTIFICATE OF COMPLIANCE.
Condition: Unknown
Due 8 April 1986
Resolved 8 April 1986
Deck/Cargo
Issued 8 April 1986
Resolved
CALIBRATE ALL PRESSURE GAUGES AT MANIFOLDS AND CARGO PUMPS TO WITHIN 10 PERCENT OF ACTUAL READING. (33 CFR 156.170) TO BE COMPLETED PRIOR TO ISSUANCE OF CERTIFICATE OF COMPLIANCE.
Condition: Unknown
Due 8 April 1986
Resolved 8 April 1986
Deck/Cargo
Issued 8 April 1986
Resolved
DEMONSTRATE PROPER OPERATION OF ALL QUICK CLOSING VALVES IN CARGO SYSTEM PRIOR TO ISSUANCE OF CERTIFICATE OF COMPLIANCE.
Condition: Unknown
Due 8 April 1986
Resolved 8 April 1986
Deck/Cargo
Issued 8 April 1986
Resolved
INSPECT AND TEST RELIEF VALVES FOR INTERBARRIER SPACES. PROVIDE DOCUMENTATION AT CERTIFICATE OF COMPLIANCE EXAMINATION.
Condition: Unknown
Due 8 April 1986
Resolved 8 April 1986
Deck/Cargo
Issued 8 April 1986
Resolved
STOP CARGO LEAKS FROM MANUAL CARGO VALVE PACKING GLANDS FOR #3 PORT AND #4 PORT CARGO TANKS. DEMONSTRATE VALVES CARGO TIGHT AT CERTIFICATE OF COMPLIANCE EXAMINATION.
Condition: Unknown
Due 8 April 1986
Resolved 8 April 1986
Deck/Cargo
Issued 8 April 1986
Resolved
STOP CARGO LEAKS FROM CLOSED GAUGING SYSTEM FOR #3 STARBOARD AND #4 STARBOARD CARGO TANKS. DEMONSTRATE PROPER OPERATION AND CARGO TIGHTNESS ATCERTIFICATE OF COMPLIANCE EXAMINATION.
Condition: Unknown
Due 8 April 1986
Resolved 8 April 1986
Deck/Cargo
Issued 8 April 1986
Resolved
DEMONSTRATE PROPER OPERATION OF THE FIXED GAS DETECTION SYSTEM AT ALL SAMPLING POINTS AT CERTIFICATE OF COMPLIANCE EXAMINATION.
Condition: Unknown
Due 8 April 1986
Resolved 8 April 1986
Deck/Cargo
Issued 8 April 1986
Resolved
CONDUCT HYDROSTATIC TEST OF CARGO PIPING TO 1.5 TIMES THE MAXIMUM ALLOWABLEWORKING PRESSURE. IN LIEU OF THIS TEST, PROPER DOCUMENTATION INDICATING THAT THIS TEST HAS BEEN COMPLETED WITHIN THE LAST YEAR WILL BE ACCEPTABLE. PROVIDE DOCUMENTATION AT CERTIFICATE OF COMPLIANCE EXAMINATION.
Condition: Unknown
Due 8 April 1986
Resolved 8 April 1986
Deck/Cargo
Issued 8 April 1986
Resolved
PROVIDE FUSIBLE ELEMENTS FOR ALL QUICK CLOSING VALVES (46 CFR 38.10-1(J) PRIOR TO CERTIFICATE OF COMPLIANCE EXAMINATION.
Condition: Unknown
Due 8 April 1986
Resolved 8 April 1986
Deck/Cargo
Issued 8 April 1986
Resolved
PROVIDE CURRENT GAS DETECTION CURVES FOR ALL AUTHORIZED CARGOES AND POST INCARGO CONTROL ROOM PRIOR TO CERTIFICATE OF COMPLIANCE EXAMINATION.
Condition: Unknown
Due 8 April 1986
Resolved 8 April 1986
Navigation
Issued 8 April 1986
Resolved
PROVIDE CURRENTLY CORRECTED CHARTS FOR THE DELAWARE BAY AND RIVER, AND SCHUYKILL RIVER PRIOR TO RETURN TO THE PORT OF PHILADELPHIA.
Condition: Unknown
Due 8 April 1986
Resolved 8 April 1986