Records from 1985 to 2008. Most recent: inspection, 31 January 2008.
Inspection history · 77
31 January 2008
COC-CHEM Annual · Ballast Water Examination · ISPS II Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3139461
23 August 2006
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2757432
13 August 2006
MARPOL Annex II Examination · MARPOL Annex I Examination · MARPOL Annex V Examination · COC-CHEM Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2744964
6 August 2006
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2737509
9 August 2004
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2161047
3 June 2004
MTSA/ISPS Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2087878
28 April 2004
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2054420
8 April 2004
Ballast Water Examination · MARPOL Annex I Examination · MARPOL Annex II Examination · Certificate of Compliance
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2040127
30 November 2003
Certificate of Compliance
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1953342
19 October 2002
Security Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1692780
14 October 2002
Security Inspection
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 1690653
14 April 2002
Ballast Water Examination · Certificate of Compliance
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1604557
11 April 2002
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1603776
26 May 2001
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 290474
30 April 2000
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 277666
30 April 2000
Letter of Compliance (Initial/Renewal)
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1451556
6 January 2000
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 436027
18 July 1999
Type not recorded
No type recorded · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 430595
18 July 1999
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 774746
9 November 1998
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 422434
7 May 1998
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 415734
7 May 1998
Letter of Compliance (Initial/Renewal)
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1125095
26 July 1997
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 406206
24 July 1997
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 406051
23 March 1997
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 401719
16 November 1996
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 526662
26 March 1996
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 389369
20 March 1996
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 389035
15 March 1996
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 539871
9 March 1996
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 388679
9 March 1996
Letter of Compliance (Initial/Renewal)
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 884766
24 November 1995
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 441295
8 March 1995
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 460990
8 March 1995
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1175681
1 November 1994
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 521173
30 October 1994
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1174836
18 October 1994
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1431426
7 October 1994
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1179291
21 June 1994
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 367936
11 March 1994
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 365269
7 March 1994
Letter of Compliance (Initial/Renewal)
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 854220
4 March 1994
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 364965
3 November 1993
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 513771
21 July 1993
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1155801
5 March 1993
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 438101
2 October 1992
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1270661
25 June 1992
Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1266825
26 March 1992
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 677679
22 March 1992
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1261031
17 March 1992
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1266737
15 March 1992
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 467601
8 March 1992
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 101873
7 March 1992
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 483489
27 November 1991
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 939142
16 August 1991
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 651719
15 August 1991
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 345543
21 June 1991
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1213343
20 June 1991
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 344466
20 June 1991
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1213464
22 May 1991
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 439435
20 February 1991
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 912295
20 June 1990
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 337808
20 June 1990
Certificate of Compliance
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 921715
23 October 1989
Certificate of Compliance
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 898140
10 October 1989
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1024276
29 March 1989
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 457618
21 June 1988
Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 492971
21 June 1988
Certificate of Compliance
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 893638
21 June 1988
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1206530
8 April 1988
Type not recorded
No type recorded · THE UNKNOWN UNIT · Activity 995043
18 September 1987
Type not recorded
No type recorded · THE UNKNOWN UNIT · Activity 1005953
15 February 1987
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 314368
15 February 1987
Certificate of Compliance
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1321998
10 July 1986
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 526437
10 July 1986
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 988157
29 November 1985
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 305642
29 November 1985
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1293155
Documentation › Logs/Records › Garbage Recordkeeping
Issued 31 January 2008
No resolution recorded
Mixed Garbage was found throughout the vessel. The Garbage Plan is not ship specific there are no set instructions for burning garbage. USCG inspectors were told only oily rags were being burned. However we found gasket material, cans, nylon items and batteries in the ash. Receptacles need to be identified, the plan and those who are in charge for the collection and disposal need to be identified.
Action required: 705 - Other - as specified
Personnel › Certificates/Documents/Licenses › MMD, Able Seaman
Issued 31 January 2008
Resolved
The Panama certificates issued for 2, OS, 1, AB and 1, Motor-man were due to expire 1 Feb 08. The ship was going to move on the morning of 1 Feb. The Minimum Manning document calls for 3, AB'S 2, OS and 3, Oiler / Motor-men. They would have been minus 1, OS and 1, Motor-men.
Action required: 705 - Other - as specified
Resolved 31 January 2008
Resolution: A letter of dispensation was granted from Panama allowing the vessel to operate.
Documentation › Logs/Records › Ballast Water Logs/Records
Issued 31 January 2008
No resolution recorded
The following items have not been conducted nor maintained as per the Ballast Water Management Plan. Crew training, Safety Guidelines established by the Master, documentation of Sediment, outline of Sampling Points and the establishment of the person who is overall in charge.
Action required: 705 - Other - as specified
Fire Fighting › Ventilation Systems › Ducts
Issued 31 January 2008
No resolution recorded
The vent louvers are missing from the aft of the bridge for the sanitation space and the vent from the galley port side poop deck. Even with the doors closed the missing louver holes are still allowing air to enter the spaces. The doors on the aft accommodations need to be re-sealed to keep out weather and air in case of a fire. The aft windows to the CCR need to be re-sealed as well.
Action required: 705 - Other - as specified
Electrical › Electrical Distribution System (service) › Conductor
Issued 31 January 2008
No resolution recorded
No documentation is on board showing that the electrical matting meets any SOLAS safety standards. The lights in the power pack space and throughout the engine room are missing their light covers or the covers are being held in place with wire. Grounding straps in the power pack space, steering and engine room are missing, broken or disconnected. Electrician on board needs to inspect all spaces.
Action required: 705 - Other - as specified
Accommodation/Occupational Safety › Medical/First Aid › Hospital Space
Issued 31 January 2008
Resolved
One of the ship's stretchers is unusable and needs to be replaced. One of the safety belts is torn and the grommets on the other three belts are missing. The belt buckles will become loose and not support a person for safe transfer.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 February 2008
Resolution: A [name withheld] stretcher was purchased and place on board.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 31 January 2008
No resolution recorded
The portable compressor for re-charging air bottles has not been serviced as per the manufacturer's requirements. The crew is changing the oil regularly but they have not inspected or replaced the air filter as required. This could lead to the contamination of the bottles.
Action required: 705 - Other - as specified
Engineering › Sea-water System (primary cooling) › Piping
Issued 31 January 2008
No resolution recorded
Items found in the engine room; a patch on the S/W supply line leading to the Fire/Wash pump, this line is also seeping in front of the OWS, a patch on the bilge line leading to the OWS and the S/W inlet line for the Main Engine F/W cooler is patched. Both doors for the IGG blowers need self-closing devices installed and the IGG line has been altered by the crew adding a fire plug for cleaning.
Action required: 705 - Other - as specified
Deck/Cargo › Holds/Tanks
Issued 9 April 2004
Resolved
During inspection in the CCR noted the vsl's fixed cargo temperature system/sensors are inop. Issued requirement for vsl not to carry cargo(es) requiring fixed temp sensors in U.S. waters until Class/Flag attestation of system operation is rcvd. 46CFR153.440. LEGACY COMPONENT DESC: Fixed Cargo Temperature Sensors
Action required: 705 - Other - as specified
Resolved 28 April 2004
Resolution: Via fax from DNV.
Deck/Cargo › Inert Gas System
Issued 9 April 2004
Resolved
Indicator lights on the CCR IG panel inop. LEGACY COMPONENT DESC: CCR Panel Indicator Lights
Action required: 705 - Other - as specified
Resolved 9 April 2004
Navigation › Emergency Steering
Issued 8 April 2004
Resolved
Non slip surface for aft (pump #1) emergency steering operations area not installed. LEGACY COMPONENT DESC: Non-slip Surface
Action required: 705 - Other - as specified
Resolved 9 April 2004
Fire Fighting › Miscellaneous Items
Issued 8 April 2004
Resolved
Renew missing gasket from Dry Chem station #4 in the Cargo Transfer area. LEGACY COMPONENT DESC: Fixed Dry Chem Station
Action required: 705 - Other - as specified
Resolved 9 April 2004
Deck/Cargo
Issued 18 July 1999
Resolved
Repair IGS high temperature alarm and shutdown and high O2 alarm. Do not use IGS until all IGS alarms are tested and IGS operation is demonstrated to the satisfaction of the attending classification society surveyor.
Condition: Unknown
Due 6 January 2000
Resolved 6 January 2000
Lifesaving
Issued 18 July 1999
Resolved
Replace inop EPIRB.
Condition: Unknown
Due 21 July 1999
Resolved 21 July 1999
Navigation
Issued 18 July 1999
Resolved
Replace stbd steering motor to the satisfaction of the attending classification society surveyor, per BAND COTP Order 1-99._x001C_ (Cleared by class on 20JUN99)
Condition: Unknown
Due 21 July 1999
Resolved 21 July 1999
Deck/Cargo
Issued 7 May 1998
Resolved
REPAIR AND PROVE OPERATION OF THE CARGO TANK HIGH LEVEL AND OVERFILL ALARMSON ALL CARGO WING TANKS PRIOR TO CARGO LOADING OPERATIONS IN U.S. WATERS.
Condition: Unknown
Due 10 May 1998
Resolved 11 May 1998
Lifesaving
Issued 7 May 1998
Resolved
RENEW THE EMBARKATION LADDERS PRIOR TO DEPARTING PORT.
Condition: Unknown
Due 10 May 1998
Resolved 11 May 1998
Deck/Cargo
Issued 7 May 1998
Resolved
PROVIDE DOCUMENTATION OF CURRENT HYDROSTATIC TEST OF ALL VAPOR RECOVERY HOSES PRIOR TO USING THE VAPOR RECOVERY SYSTEM IN U.S. WATERS.
Condition: Unknown
Due 10 May 1998
Resolved 11 May 1998
Deck/Cargo
Issued 7 May 1998
Resolved
REPAIR THE CARGO TEMPERATURE SENSORS IN CARGO TANKS AND CARGO TEMPERATURE MONITORING DEVICES IN THE CARGO CONTROL ROOM.
Condition: Unknown
Due 9 November 1998
Resolved 9 November 1998
Navigation
Issued 7 May 1998
Resolved
REPAIR AND PROVE OPERATION OF THE ALARMS FOR THE AUTOMATIC RADAR PLOTTING AID (ARPA) PRIOR TO DEPARTING PORT.
Condition: Unknown
Due 10 May 1998
Resolved 13 May 1998
Deck/Cargo
Issued 7 May 1998
Resolved
INSTALL STUDS IN THE VAPOR RECOVERY MANIFOLDS PRIOR TO THE NEXT U.S. VOYAGE.
Condition: Unknown
Due 7 June 1998
Resolved 11 May 1998
Fire Fighting
Issued 7 May 1998
Resolved
REPLACE OR CHARGE THE NITROGEN BOTTLES FOR THE CARGO DECK DRY CHEMICAL FIREFIGHTING SYSTEM PRIOR TO CARGO OPERATIONS.
Condition: Unknown
Due 10 May 1998
Resolved 11 May 1998
Fire Fighting
Issued 7 May 1998
Resolved
REPAIR THE INITIATOR FOR THE FIXED HALON SYSTEM PRIOR TO DEPARTING PORT.
Condition: Unknown
Due 10 May 1998
Resolved 11 May 1998
Navigation
Issued 23 March 1997
Resolved
Install autopilot alarm on bridge in accordance with 33 CFR 157.440.
Condition: Unknown
Due 23 December 1997
Resolved 23 December 1997
Lifesaving
Issued 23 March 1997
Resolved
Place onboard Drager tubes for "Phenol"._x001C_ _x001C_ _x001C_ BCH 3.11.2_x001C_
Condition: Unknown
Due 23 December 1997
Resolved 23 December 1997
Lifesaving
Issued 23 March 1997
Resolved
Professionally calibrate explosive meter and provide service report to Coast Guard._x001C_ _x001C_ BCH 3.11.1
Condition: Unknown
Due 23 December 1997
Resolved 23 December 1997
Lifesaving
Issued 9 March 1996
Resolved
SAFETY EQUIPTMENT CERTIFICATE REQUIRES SIX IMMERSION SUITS, VESSEL ONLY_x001C_ HAS THREE. VSL TO HAVE 3 ADDITIONAL SUITS PRIOR TO DEPARTURE FROM NEXT_x001C_ U.S. PORT CALL.
Condition: Unknown
Due 20 March 1996
Resolved 20 March 1996
Lifesaving
Issued 9 March 1996
Resolved
LIFE RING ON BRIDGE WING MISSING SMOKE AND LIGHT. VSL TO HAVE PRIOR TO DEPARTURE FROM NEXT U.S. PORT CALL.
Condition: Unknown
Due 20 March 1996
Resolved 20 March 1996
Deck/Cargo
Issued 9 March 1996
Resolved
INERT GAS SYSTEM NOT OPERATING. PROPER OPERATION TO BE PROVEN PRIOR TO DEPARTURE FROM NEXT U.S. PORT CALL.
Condition: Unknown
Due 9 April 1996
Resolved 9 April 1996
Engineering
Issued 7 October 1994
Resolved
VESSEL RESTRICTED FROM USING OIL BUNKER HOSES UNTIL PROPER HYDRO TESTS ARE ACCOMPLISHED.
Condition: Unknown
Due 7 October 1994
Resolved 7 October 1994
Deck/Cargo
Issued 7 March 1994
Resolved
LABEL ALL CARGO HOSES IN ACCORDANCE WITH 33 CFR 154.500 AND 155.800 PRIOR TO NEXT U.S. VOYAGE.
Condition: Unknown
Due 7 March 1994
Resolved 7 March 1994
Deck/Cargo
Issued 7 March 1994
Resolved
PREPARE AND DISPLAY "OIL TRANSFER PROCEDURES" IN ACCORDANCE WITH 33 CFR 155.740, 750 PRIOR TO NEXT U.S. VOYAGE.
Condition: Unknown
Due 11 March 1994
Resolved 11 March 1994
Lifesaving
Issued 7 March 1994
Resolved
DEMONSTRATE TO COAST GUARD INSPECTOR THAT ALL SCBA'S HAVE BEEN "EXPERTLY" SERVICED IN ACCCORDANCE WITH IMO REG'S PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 11 March 1994
Resolved 11 March 1994
Navigation
Issued 7 March 1994
Resolved
DEMONSTRATE PROPER OPERATION OF STEERING AND LOW HYDRAULIC OIL ALARMS ON BRIDGE PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 11 March 1994
Resolved 11 March 1994
Navigation
Issued 7 March 1994
Resolved
PROVIDE OPERATIONAL 3 CM RADAR PRIOR TO NEXT U. S. PORT.
Condition: Unknown
Due 7 March 1994
Resolved 7 March 1994
Lifesaving
Issued 7 March 1994
Resolved
DEMONSTRATE PROPER OPERATIOM OR EMERGENCY STAIRWAY LIGHTING PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 11 March 1994
Resolved 11 March 1994
Deck/Cargo
Issued 7 March 1994
Resolved
INSTALL METAL BLANK FLANGES FOR ALL CARGO HOSES IN ACCORDANCE WITH 33 CFR 155.805 PRIOR TO NEXT U.S. VOYAGE.
Condition: Unknown
Due 7 March 1994
Resolved 7 March 1994
Deck/Cargo
Issued 7 March 1994
Resolved
INSTALL HIGH LEVEL AND OVERFILL ALARMS IN ACCORDANCE WITH 46 CFR 153.408 & 409, PRIOR TO LOADING CARGOES THAT REQUIRE THESE ALARMS IN U. S. WATERS.
Condition: Unknown
Due 7 March 1994
Resolved 7 March 1994
Lifesaving
Issued 7 March 1994
Resolved
CORRECTLY STOW LIFERAFTS IN THEIR CRADLES,(THE WRONG TIE DOWNS ARE BEING USED),PRIOR TO DEPARTING THE PORT.
Condition: Unknown
Due 11 March 1994
Resolved 11 March 1994
Navigation
Issued 4 March 1994
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 8 March 1994
Resolved 11 March 1994
Navigation
Issued 20 June 1991
Resolved
33CFR164.35(k) THIS VESSEL OF OVER 1600 GT OPERATED IN THE NAVIGABLE WATERSOF THE U.S. AND DID NOT HAVE A BLOCK DIAGRAM OF THE STEERING SYSTEM ON THE BRIDGE OR IN THE EMERGENCY STEERING ROOM. VESSEL HAD INSTRUCTIONS ONLY._x001C_ _x001C_
Condition: Unknown
Due 31 March 1992
Resolved 31 March 1992
Navigation
Issued 20 June 1991
Resolved
33CFR164.53(b) VESSEL FAILED TO NOTIFY COTP THAT THE VESSEL'S SECONDARY RADAR WAS NOT OPERATING PROPERLY._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 21 June 1991
Resolved 8 August 1991
Navigation
Issued 20 June 1991
Resolved
33CFR164.33(a)(1)(ii) THIS VESSEL OF OVER 1600 GT OPERATED IN THE BROWNSVILLE SHIP CHANNEL, A NAVIGABLE WATER OF THE U.S., WITHOUT MARINE CHART 11302 THE REQUIRED CHART OF THE AREA TRANSITTED.
Condition: Unknown
Due 21 June 1991
Resolved 8 August 1991
Navigation
Issued 20 June 1991
Resolved
33CFR164.11.(r)THIS VESSEL OVER 10,000 GT OPERATED IN THE NAVIGABLE WATERS OF THE U.S. WITH A SECOND MARINE RADAR REQUIRED BY 33CFR164.37(a) THAT WAS NOT MAINTAINED IN OPERABLE CONDITION.
Condition: Unknown
Due 21 June 1991
Resolved 8 August 1991
Construction/Loadline
Issued 20 June 1991
Resolved
MAKE ONE MID-SHIP HALF LENGTH BALLAST TANK READY FOR INSPECTION AND PROVIDEMARINE CHEMIST CERTIFICATE NO LATER THAN 22JUNE91._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 June 1991
Resolved 20 June 1991
Deck/Cargo
Issued 20 June 1990
Resolved
UNABLE TO TEST IG PRESSURE AND LOW SEA WATER TO SCRUBBER SENSOR INOPERATIVETO BE TESTED TO THE SATISFACTION OF THE COGNIZANT [name withheld] CARGO REQUIRING INERT GAS
Condition: Unknown
Due 20 June 1990
Resolved 20 June 1990
Deck/Cargo
Issued 21 June 1988
Resolved
IGS SPAN GAS CALIBATION POTENTIONETER IS INOPERATIVE, TO BE REPAIRED PRIOR TO HANDLING CARGO REQUIRING THE OPERATION OF THE IGS.
Condition: Unknown
Due 21 June 1988
Resolved 21 June 1988
Engineering
Issued 21 June 1988
Resolved
OWS MONITOR. PROVE PROPER OPERATION OF OWS AT NEXT U.S. PORT. UNTIL SUCH PROVED, VESSEL MUST RETAIN ON BOARD ALL BILGE SLOPS UNLESS DISCHARGED TO ANAPPROVED FACILITY.
Condition: Unknown
Due 21 June 1988
Resolved 21 June 1988
Unknown
Issued 29 November 1985
Resolved
PRIOR TO OPERATION OF THE IGS IN U.S. WATERS, BUT NO LATER THAN 29NOV86, REPAIR IGS OXYGEN ANALYZER.
Condition: Unknown
Due 29 November 1985
Resolved 29 November 1985
Unknown
Issued 29 November 1985
Resolved
NO LATER THAN 01FEB86, PLACE ON BOARD EVIDENCE OF ACCEPTANCE OF THE HIGH VELOCITY P/V VALVES BY BOTH THE CLASSIFICATION SOCIETY AND FLAG ADMINIS- TRATION. ADDITIONALLY, INFORMATION AS TO SETTINGS AND VELOCITY SHALL BE INCLUDED. (IMO 2.14.2, MSM 32-1-30E)
Condition: Unknown
Due 29 November 1985
Resolved 29 November 1985