MAURY USCG vessel records Sign in
← All vessels

VINCITA

VINCITA is a 1973 tank ship. The Coast Guard has recorded 60 inspections since 1984, most recently in February 2002, along with 106 deficiencies — 1 with no resolution recorded —.

Records from 1984 to 2002. Most recent: inspection, 15 February 2002.

Built
1973
Last inspected
15 February 2002
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7329273 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
LIBERIA
—
Maury page id
psix-51829

Inspections, by type

…with no type recorded37
…past their stated due date1
Years with a record 16 calendar years (1984–2002)
The 60 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 24 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it8710 - Regulatory (Subpart C or D), Net Ton
25300 - Dead Weight, Metric Ton
32320 - Displacement, Metric Ton
15380 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 60

15 February 2002 Certificate of Compliance
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1488255
9 October 2001 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 294571
22 June 2001 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 291301
21 June 2001 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 291823
25 January 2001 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 286492
25 January 2001 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1056863
25 February 2000 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 815957
15 February 2000 Letter of Compliance (Initial/Renewal)
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1046432
14 May 1996 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 391022
14 May 1996 Letter of Compliance (Initial/Renewal)
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1083786
15 March 1995 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1175100
17 August 1994 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 369596
17 August 1994 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1172627
23 May 1994 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 670508
12 April 1994 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1167629
1 April 1994 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 365724
1 April 1994 Letter of Compliance (Initial/Renewal)
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 858077
1 June 1993 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 358757
21 May 1993 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 827271
23 March 1993 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 837399
22 February 1993 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 843413
20 February 1993 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1359505
19 February 1993 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1144381
16 February 1993 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1387300
8 February 1993 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 835616
30 January 1993 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 356017
29 October 1992 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1384991
25 November 1991 Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 441839
25 November 1991 MARPOL Annex II Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 942744
25 November 1991 Certificate of Compliance
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1253338
24 September 1991 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 494268
21 June 1991 Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 900946
9 May 1991 Deficiency Check
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1241633
27 March 1991 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 902083
10 March 1991 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 342326
8 March 1991 Certificate of Compliance
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1222743
22 January 1991 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 341385
19 January 1991 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 536326
23 July 1990 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 462188
8 June 1990 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 337613
16 May 1990 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 337159
12 January 1990 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 334623
17 November 1989 Certificate of Compliance
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 926221
29 December 1988 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 887334
15 August 1988 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 534135
15 August 1988 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1039286
23 February 1988 Type not recorded
No type recorded · THE UNKNOWN UNIT · Activity 1331939
5 February 1988 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1327787
28 December 1987 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1318509
10 September 1987 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 451902
8 September 1987 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 523061
20 March 1987 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1325153
13 March 1987 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 314833
13 March 1987 Certificate of Compliance
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1017015
16 July 1986 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 310570
16 July 1986 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 998692
11 July 1985 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 303003
22 April 1985 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1290121
6 February 1985 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 980168
6 August 1984 Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 297229

Deficiency record · 106

Pollution Prevention/Response › Prevention Equipment
Issued 15 February 2002 No resolution recorded
Crew unable to demonstrate proper operation marine sanitation device solenoid valve for automatic chloride addition as designed. LEGACY COMPONENT DESC: Marine Sanitation Device, Type II
Action required: 705 - Other - as specified
Due 22 February 2002 — due date passed with no resolution recorded
Deck/Cargo
Issued 25 January 2001 Resolved
Repair all damaged (weather) high level/overfill alarms on cargo tanks to satisfaction of USCG prior to next U.S. port IAW 33 CFR 157.12..
Condition: Unknown
Due 28 June 2001
Resolved 28 June 2001
Engineering
Issued 25 January 2001 Resolved
Prove proper operation of Oily Water Separator to the satisfaction of Classand USCG prior to entering next U.S. port IAW MARPOL 73/78 Annex I/16(7).
Condition: Unknown
Due 28 June 2001
Resolved 28 June 2001
Deck/Cargo
Issued 14 May 1996 Resolved
CARGO VENT PIPES ARE WASTED AT #7 PORT WING TANK AND AT #9 STBD WING TANK. 46 CFR 56.50-85, 46 CFR 32.55-20._x001C_ CORRECT PRIOR TO LOADING CARGO.
Condition: Unknown
Due 25 February 2000
Resolved 25 February 2000
Lifesaving
Issued 14 May 1996 Resolved
LTARBOARD LIFEBOAT DAVIT HAS NO LIMIT SWITCH._x001C_ SOLAS 60, III/36(k)._x001C_ CORRECT PRIOR TO DEPARTING PORT OF NEW ORLEANS.
Condition: Unknown
Due 25 February 2000
Resolved 25 February 2000
Construction/Loadline
Issued 14 May 1996 Resolved
AFT BULKHEADS AT #3 AND #4 PUMP ROOMS, MAIN DECK, ARE NOT WEATHERTIGHT / GASTIGHT._x001C_ ILLC 66 ANNEX 1/17._x001C_ CORRECT PRIOR TO ARRIVAL AT NEXT U.S. PORT.
Condition: Unknown
Due 25 February 2000
Resolved 25 February 2000
Fire Fighting
Issued 14 May 1996 Resolved
CARGO PUMP ROOM VENTILATION FIRE DAMPERS ARE NOT OPERATING PROPERLY AT #1 SUPPLY AND EXHAUST, #2 SUPPLY AND EXHAUST, #3 SUPPLY VENTS._x001C_ SOLAS 60 II/47(a)._x001C_ CORRECT PRIOR TO LOADING CARGO.
Condition: Unknown
Due 25 February 2000
Resolved 25 February 2000
Navigation
Issued 15 March 1995 Resolved
REPAIR OR REPLACE LEAKING PACKING GLAND ON TOP OF STEERING GEAR. CORRECT PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Deck/Cargo
Issued 12 April 1994 Resolved
PRIOR TO DEPARTING PORT OF HOUSTON, OBTAIN AUTHORIZATION IN VESSELS RESPONSE PLAN TO CARRY OPA '90 CARGOES.
Condition: Unknown
Due 19 April 1994
Resolved 19 April 1994
Electrical
Issued 12 April 1994 Resolved
PRIOR TO DEPARTURE PLACE COVER OVER & SCAZ OPEN ELECTRICAL JUNCTION BOX ON DECK IN WAY OF MID BODY AREA UNDERNEATH CATWALK.
Condition: Unknown
Due 14 April 1994
Resolved 14 April 1994
Electrical
Issued 12 April 1994 Resolved
AFFIX ELECTRICAL JUNCTION BOX DANGLING FROM CATWALK TO STRUCTURE OF CATWALK.
Condition: Unknown
Due 12 April 1994
Resolved 12 April 1994
Deck/Cargo
Issued 12 April 1994 Resolved
PRIOR TO CARRYING SUBCHAPTER "O" CARGOES, SUBMIT CURRENT IMO CERTIFICATE OFFITNESS TO G-MSC FOR REVIEW AND ISSUANCE OF SUBCHAPTER "O" ENDORSEMENT AND PLACE ENDORSEMENT ONBOARD VESSEL.
Condition: Unknown
Due 12 April 1994
Resolved 12 April 1994
Construction/Loadline
Issued 12 April 1994 Resolved
PRIOR TO NEXT U.S. PORT CALL, REPAIR ON REPLACE CRACKED VALVE ON FOREPEAK BALLAST PUMP STEAM RETURN LINE IN WAY OF BALLAST PUMPROOM.
Condition: Unknown
Due 12 April 1994
Resolved 12 April 1994
Fire Fighting
Issued 12 April 1994 Resolved
PRIOR TO DEPARTURE OPERATE EMERGENCY FIRE PUMP TO SATISFACTION OF WITNESSING U.S.C.G. MARINE INSPECTOR.
Condition: Unknown
Due 14 April 1994
Resolved 14 April 1994
Electrical
Issued 12 April 1994 Resolved
PRIOR TO DEPARTURE, MAKE TEMPORARY REPAIRS TO BROKEN ELECTRICAL JUNCTION BOX ON DECK IN WAY OF CATWALK AT MID BODY AREA.
Condition: Unknown
Due 13 May 1994
Resolved 14 April 1994
Documentation
Issued 1 April 1994 Resolved
VESSEL'S OIL RECORD BOOK NOT SIGNED BY PERSON IN CHARGE FOR EACH OPERATION.
Condition: Unknown
Due 1 April 1994
Resolved 20 April 1994
Documentation
Issued 1 April 1994 Resolved
VESSEL'S OIL TRANSFER PROCEDURES ARE INCOMPLETE.
Condition: Unknown
Due 17 August 1994
Resolved 17 August 1994
Engineering
Issued 1 April 1994 Resolved
VESSEL HAS CONCRETE PLUGS IN SCUPPERS.
Condition: Unknown
Due 17 August 1994
Resolved 17 August 1994
Deck/Cargo
Issued 1 April 1994 Resolved
USED CARGO HOSES ON DECK NOT BLANKED OFF.
Condition: Unknown
Due 17 August 1994
Resolved 17 August 1994
Deck/Cargo
Issued 1 April 1994 Resolved
VESSEL'S CARGO HOSES NOT MAKED AS REQUIRED.
Condition: Unknown
Due 17 August 1994
Resolved 17 August 1994
Navigation
Issued 1 April 1994 Resolved
MANEUVERING FACT SHEET INCOMPLETE.
Condition: Unknown
Due 17 August 1994
Resolved 17 August 1994
Accommodation/Occupational Safety
Issued 1 April 1994 Resolved
INSTALL DECK RAIL PORT SIDE BY PILOT LADDER ACCESS IN ACCORDANCE WITH TITLE46 C.F.R. SECTION 32.01-10 PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Accommodation/Occupational Safety
Issued 1 April 1994 Resolved
REPAIR DOOR LATCH TO DEEP FREEZER BOX AND MAKE OPERABLE FROM BOTH SIDES PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Accommodation/Occupational Safety
Issued 1 April 1994 Resolved
REPAIR REFRIGERATION UNIT IN DEEP FREEZER BOX AND REMOVE ICE FROM FLOOR PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Deck/Cargo
Issued 1 April 1994 Resolved
PROPERLY IDENTIFY ALL EMERGENCY STOPS FOR CARGO PUMPS PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Lifesaving
Issued 1 April 1994 Resolved
PROVIDE COVER FOR PARTS WASHER BARREL LOCATED IN PAINT LOCKER PRIOR TO NEXTU.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Deck/Cargo
Issued 1 April 1994 Resolved
REPAIR OR REPLACE WEATHER HOOD FOR #2 PORT VENT MAST WHICH IS BADLY WASTED PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Deck/Cargo
Issued 1 April 1994 Resolved
REPAIR WASTED AREAS IN #2 PORT VENT MAST PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Deck/Cargo
Issued 1 April 1994 Resolved
REPAIR OR REPLACE WEATHER HOOD FOR #4 STBD VENT MAST WHICH IS BADLY WASTED PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Accommodation/Occupational Safety
Issued 1 April 1994 Resolved
REMOVE SOFT PATCH AND PROPERLY REPAIR AIRLINE LEAK IN AFT MAIN DECK HOUSE LOCATED ON FORWARD SIDE OF MAIN DECK HOUSE PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Accommodation/Occupational Safety
Issued 1 April 1994 Resolved
PROVIDE ADEQUATE DECKING AROUND 12 METER VENTS, WHERE WASTED AND MISSING PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Deck/Cargo
Issued 1 April 1994 Resolved
PROPERLY IDENTIFY HIGH LEVEL ALARMS AND OVERFILL ALARMS AT THE ON DECK LOCATIONS PROIR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Deck/Cargo
Issued 1 April 1994 Resolved
PROVIDE OPERATING PRESSURE GUAGES FOR ALL CARGO PIPING MANIFOLD LINES IN ACCORDANCE WITH 33 C.F.R. SECTION 156.170(c)(3) PRIOR TO NEXT U.S. PORT
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Construction/Loadline
Issued 1 April 1994 Resolved
REPAIR LEAK IN FOREPEAK BALLAST LINE TO PREVENT FLOODING OF EMERGENCY FIRE PUMP ROOM PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Fire Fighting
Issued 1 April 1994 Resolved
REPAIR AND REINSTALL THE EMERGENCY FIRE PUMP. UNTIL REINSTALLATION IS COMPLETE AND INSPECTED BY THE FLAG STATE #8 STEAM CARGO PUMP SHALL BE CONNECTED AND MAINTAINED AS AN EMERGENCY FIRE PUMP.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Navigation
Issued 1 April 1994 Resolved
PROVIDE A COMPLETE MANUEVERING FACT SHEET IN ACCORDANCE WITH TITLE 33 C.F.R. SECTION 164.35(g)(3) PRIOR TO THE NEXT U.S. PORT. PRESENT FACT SHEET IS MISSING SHAFT REVOLUTIONS PER MINUTE FOR REPRESENTATIVE SPEED RANGE.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Engineering
Issued 1 April 1994 Resolved
PROVIDE AND INSTALL INSULATION ON THE EMERGENCY FIRE PUMP EXHAUST SYSTEM INWAY OF THE ACCESS DOOR PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Deck/Cargo
Issued 1 April 1994 Resolved
PROPERLY MARK CARGO HOSES IN ACCORDANCED WITH 46 C.F.R. SECTION 153.940(b) PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Deck/Cargo
Issued 1 April 1994 Resolved
ENSURE ALL UNUSED CARGO HOSES ARE BLANKED OFF WHEN NOT IN USE IN ACCORDANCEWITH 33 C.F.R. SECTION 155.805
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Electrical
Issued 1 April 1994 Resolved
REMOVE OR DEAD END UNUSED ELECTRICAL CABLE LOCATED UNDER THE MIDSHIPS CATWALK PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Documentation
Issued 1 April 1994 Resolved
PROVIDE COMPLETE OIL TRANSFER PROCEDURES TO INCLUDE LINE DIAGRAM AND MEANS OF EMPTYING CARGO CONTAINMENT SYSTEM, IN ACCORDANCE WITH 33 C.F.R. SECTION 155.750 PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Documentation
Issued 1 April 1994 Resolved
ENSURE OIL RECORD BOOK IS PROPERLY SIGNED AFTER EACH EVOLUTION IN ACCORDANCE WITH 33 C.F.R. SECTION 155.805 PRIOR TO NEXT U.S. PORT
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Deck/Cargo
Issued 1 April 1994 Resolved
PROVIDE MECHANICAL MEANS OF PLUGGING SCUPPERS IN ACCORDANCE WITH 33 C.F.R. SECTION 156.120 PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Accommodation/Occupational Safety
Issued 1 April 1994 Resolved
CLEAN AND SANITIZE HOSPITAL SPACE PRIOR TO NEXT U.S. PORT IN ACCRODANCE WITH 46 C.F.R. SECTION 32.40-50.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Deck/Cargo
Issued 20 February 1993 Resolved
REPLACE PLUGS IN ALL CONTAINMENT AREAS.
Condition: Unknown
Due 30 March 1993
Resolved 9 April 1993
Lifesaving
Issued 20 February 1993 Resolved
PROPERLY INSTALL AND RIG INFLATABLE LIFERAFTS AND PROVIDE HYDROSTATIC RELEASES AND WEAK LINKS.
Condition: Unknown
Due 30 March 1993
Resolved 9 April 1993
Deck/Cargo
Issued 20 February 1993 Resolved
PROVIDE PROPER CONTAINMENT FOR LUBE OIL OVERFILL ON THE PORT SIDE AFT.
Condition: Unknown
Due 30 March 1993
Resolved 9 April 1993
Accommodation/Occupational Safety
Issued 20 February 1993 Resolved
REPLACE HAND RAIL PORT SIDE AFT.
Condition: Unknown
Due 30 March 1993
Resolved 9 April 1993
Deck/Cargo
Issued 20 February 1993 Resolved
REPLACE/REPAIR VENT HEAD RISER FOR THE CARGO TANKS ON THE PORT SIDE.
Condition: Unknown
Due 30 March 1993
Resolved 9 April 1993
Construction/Loadline
Issued 20 February 1993 Resolved
MAKE PERMENENT REPAIRS TO HANDRAIL ON MAIN DECK CATWALK._x001C_ _x001C_ NOTE: THIS IS A REISSUE OF A CORMS REQUIREMENT INADVERTENTLY DELETED._x001C_ ORIGINAL CASE MI93005569
Condition: Unknown
Due 25 November 1993
Resolved 9 June 1993
Deck/Cargo
Issued 20 February 1993 Resolved
REPAIR THE FORE PEAK VENT DUE TO WASTAGE.
Condition: Unknown
Due 9 June 1993
Resolved 9 June 1993
Construction/Loadline
Issued 20 February 1993 Resolved
CROP & RENEW FO'C'SLE BULKHEAD IWO STBD CATWALK SUPPORT._x001C_ _x001C_ NOTE: THIS IS A REISSUE OF CORMS REQUIREMENT THAT WAS INADVERTENTLY DELETED. ORIGINAL CASE MI93005569.
Condition: Unknown
Due 25 November 1993
Resolved 9 June 1993
Fire Fighting
Issued 16 February 1993 Resolved
Restow fire hoses at all main deck fire stations._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 18 February 1993
Resolved 18 February 1993
Deck/Cargo
Issued 16 February 1993 Resolved
Replace #6 port cargo tank vent P/V valve_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1993
Resolved 16 February 1993
Lifesaving
Issued 16 February 1993 Resolved
Make permanent repairs to hand rail on main deck catwalk._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1993
Resolved 16 February 1993
Construction/Loadline
Issued 16 February 1993 Resolved
Crop and renew bulkhead at forecastle, in way of starboard catwalk suppport._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1993
Resolved 16 February 1993
Construction/Loadline
Issued 16 February 1993 Resolved
Remove oil/water from #1 cargo pump room bilges._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1993
Resolved 16 February 1993
Fire Fighting
Issued 16 February 1993 Resolved
Replace missing fire main valve wheels._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1993
Resolved 16 February 1993
Construction/Loadline
Issued 16 February 1993 Resolved
Crop and renew bulkhead at forecastle, in way of steam line port side._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1993
Resolved 16 February 1993
Deck/Cargo
Issued 16 February 1993 Resolved
Make permanent repairs to cargo tank wash line in way of #2 cargo tank._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1993
Resolved 16 February 1993
Deck/Cargo
Issued 16 February 1993 Resolved
Close all tank tops and ullage openings while tanks are not gas free._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 18 February 1993
Resolved 18 February 1993
Lifesaving
Issued 16 February 1993 Resolved
Replace grating on #3 foam monitor._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1993
Resolved 16 February 1993
Engineering
Issued 16 February 1993 Resolved
Replace all fuel tank vent flame screens._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1993
Resolved 16 February 1993
Deck/Cargo
Issued 16 February 1993 Resolved
Replace all cargo tank vent flame screens._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1993
Resolved 16 February 1993
Fire Fighting
Issued 29 October 1992 Resolved
MAKE PERMENANT REPAIRS TO THE AFT CENTER FIRE MONITOR, CONTROL HANDLE BROKEN. PRIOR TO LEAVING PORT OF NEW ORLEANS.
Condition: Unknown
Due 26 November 1992
Resolved 29 October 1992
Deck/Cargo
Issued 29 October 1992 Resolved
PRIOR TO NEXT U.S. PORT OF ENTRY MAKE PERMENANT REPAIRS TO THE HYD COOLING PUMP. NOW USING FIRE MAIN WITH HOSE RUN THROUGH WTD.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Lifesaving
Issued 29 October 1992 Resolved
PRIOR TO NEXT U.S. PORT OF ENTRY MAKE PERMENANT REPAIRS TO THE WASTED DECK GRATES IN ALL FOUR CARGO PUMP ROOMS. SAFETY HAZARD. LOCATED ON ALL LEVEL OF PUMP ROOMS.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Construction/Loadline
Issued 29 October 1992 Resolved
PRIOR TO NEXT U.S. PORT OF ENTRY MAKE PERMENANT REPAIRS TO THE DECK STORES WATERTIGHT DOOR, THE HINGE PINS, CAUSING MISALIGNMENT OF THE DOOR.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Construction/Loadline
Issued 29 October 1992 Resolved
PRIOR TO NEXT U.S. PORT OF ENTRY MAKE PERMENANT REPAIRS TO THE FWD COFFERDAM HATCHES, PORT AND STBD. DOGS.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Construction/Loadline
Issued 29 October 1992 Resolved
PRIOR TO NEXT U.S. PORT OF ENTRY, MAKE WEATHER TIGHT THE CARGO PUMP ROOMS BULKHEADS, REPAIR HOLES IN BULKHEADS. ALL FOUR BULKHEADS.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Fire Fighting
Issued 29 October 1992 Resolved
MAKE PERMENANT REPAIRS TO FIRE PUMP EXHAUST SYSTEM, EXHAUST SYSTEM LEAKS INTO COMPARTMENT. FIX PRIOR TO LEAVING PORT OF NEW ORLEANS.
Condition: Unknown
Due 26 November 1992
Resolved 29 October 1992
Engineering
Issued 29 October 1992 Resolved
RENEW FLAME SCREEN OF FWD F/O VENTS PORT AND STBD, LOCATED ON FORECASTLE DECK. PRIOR TO DEPARTURE FROM PORT OF NEW ORLEANS.
Condition: Unknown
Due 26 November 1992
Resolved 29 October 1992
Deck/Cargo
Issued 29 October 1992 Resolved
PRIOR TO NEXT U.S. PORT OF ENTRY MAKE PERMENANT REPAIRS TO THE CARGO TANK HIGH LEVEL ALARM SYSTEM. DEMONSTRATE TO MARINE INSPECTOR.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Engineering
Issued 29 October 1992 Resolved
PRIOR TO NEXT U.S. PORT OF ENTRY MAKE PERMENANT REPAIRS TO THE F/O VENT PIPE PORT SIDE AFT BEFOR DECK HOUSE. VENT PIPE IS NOW SOFT PATCHED.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Deck/Cargo
Issued 29 October 1992 Resolved
PRIOR TO NEXT U.S. PORT OF ENTRY MAKE PERMENANT REPAIRS TO THE PV VALVE LOCATED ON THE #8STBD CARGO TANK. FRACTURED. REPLACE VALVE.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Electrical
Issued 29 October 1992 Resolved
PRIOR TO NEXT U.S. PORT OF ENTRY MAKE PROPER AND PERMENANT REPAIRS TO SECURE DEAD END WIRES IN IGS ROOM OVERHEAD UNDER LADDER AND IN STORE ROOM FWD OF IGS ROOM.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Deck/Cargo
Issued 29 October 1992 Resolved
PRIOR TO NEXT U.S. PORT OF ENTRY MAKE PERMENANT REPAIRS TO THE CARGO HEATING PIPING LOCATED IN THE #2 PUMP ROOM. STEAM LEAKAGE.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Deck/Cargo
Issued 29 October 1992 Resolved
PRIOR TO NEXT U.S. PORT OF ENTRY MAKE PERMENANT REPAIRS TO THE MIDSHIPS DECK CRANE, HYD LEAKS.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Deck/Cargo
Issued 29 October 1992 Resolved
PRIOR TO NEXT U.S. PORT OF ENTRY MAKE PERMENANT REPAIRS TO THE EMERGENCY NOTICES IN THE CARGO PUMP ROOMS, PAINTED OVER AND NOT LEGIBLE.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Construction/Loadline
Issued 29 October 1992 Resolved
PRIOR TO NEXT U.S. PORT OF ENTRY MAKE PERMENANT REPAIRS TO THE EMERGENCY FIRE PUMP BULKHEAD HOLED, AND WASTED AT OVERHEAD AFT END.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Fire Fighting
Issued 29 October 1992 Resolved
PROVE THAT FIRE MONITOR VALVE ON AFT MONITOR STBD SIDE IS NOT CRACKED. PRIOR TO LEAVING NEW ORLEANS.
Condition: Unknown
Due 26 November 1992
Resolved 29 October 1992
Navigation
Issued 10 March 1991 Resolved
VESSEL ENTERED THE PORT OF NEW YORK WITHOUT AN OPERATIONAL SECOND RADAR AS REQUIRED BY 33 CFR 164.53 (B)_x001C_ _x001C_ _x001C_
Condition: Unknown
Due 10 March 1991
Resolved 10 March 1991
Deck/Cargo
Issued 8 March 1991 Resolved
REPIAR/REPLACE ALL CARGO TANKS/REPLACE FLAME SCREENS PRIOR TO CARRYING CARGOES REQUIRING FLAME SCREENS.
Condition: Unknown
Due 8 March 1991
Resolved 8 March 1991
Deck/Cargo
Issued 8 March 1991 Resolved
PROVE PROPER OPERATION OF HI,HI-HI AND HIGH TEMP CARGO ALARMS PRIOR TO CARRYING CARGOES REQUIRING THESE ALARMS.
Condition: Unknown
Due 8 March 1991
Resolved 8 March 1991
Deck/Cargo
Issued 8 March 1991 Resolved
MAKE TEMPORARY TO VARIOUS PIN LEAKS/GASKETS ON STEAM LINE TO CARGO PUMPS ONDECK FOLLOWED BY PERMANENT REPAIRS IN DRYDOCK. TEMP REPAIRS TO BE MADE PRIOR TO RE-ENTRY U.S. WATERS PERMANENT REPAIRS TO OCTOBER 1991.
Condition: Unknown
Due 8 March 1991
Resolved 8 March 1991
Deck/Cargo
Issued 17 November 1989 Resolved
HOLE IN STEAM LINE TO #4 CARGO PUMP.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Accommodation/Occupational Safety
Issued 17 November 1989 Resolved
DECK RAILING BROKEN
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Accommodation/Occupational Safety
Issued 17 November 1989 Resolved
EMERGENCY WASHDOWN STATIONS INOPERATIVE
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Deck/Cargo
Issued 17 November 1989 Resolved
INSTALL PERMANENT PLUGS FOR DECK CONTAINMENT.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Navigation
Issued 17 November 1989 Resolved
PHONE IN STEERING ROOM INOPERATIVE.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Engineering
Issued 13 March 1987 Resolved
NO FIXED CONTAINER OR ENCLOSED DECK AREA UNDER OR AROUND BULK LUBRICATING OIL FILL PIPE.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Accommodation/Occupational Safety
Issued 13 March 1987 Resolved
REPAIR VALVE TO STARBOARD MSD BY PASS PIPING.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Accommodation/Occupational Safety
Issued 13 March 1987 Resolved
REPAIR CHLORINATION TABLE DISPENSER ON STARBOARD PART OF MSD SYSTEM.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Fire Fighting
Issued 13 March 1987 Resolved
PLACE FIRE CONTROL PLAN IN ACCESSIBLE CONTAINER ON MAIN DECK.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Deck/Cargo
Issued 13 March 1987 Resolved
CLEAN INSPECTION TANK FOR CARGO HEATING STEAM.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Construction/Loadline
Issued 13 March 1987 Resolved
REPAIR BULKHEAD OF #4 CARGO PUMPROOM IN WAY OF RED HAND AROUND STEAM PIPE INLET PENETRATION AFT OF HOUSE ON MAIN DECK.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Fire Fighting
Issued 13 March 1987 Resolved
SUPPORT BRACKET FOR FIRE MAIN BROKEN AT FRONT OF HOUSE.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Deck/Cargo
Issued 13 March 1987 Resolved
RENEW CORRODED COVERS TO LIGHTS IN PUMP ROOMS.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Deck/Cargo
Issued 13 March 1987 Resolved
MAKE PERMANENT REPAIR TO SERVICE AIR LINE IN WAY OF SOFT PATCH, JUST AFT OF U-JOINT ON MAIN DECK.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Fire Fighting
Issued 13 March 1987 Resolved
REPAIR LEAK IN FIRE MAIN AT DRESSLER COUPLING IN WAY OF #5C CARGO TANK.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Accommodation/Occupational Safety
Issued 13 March 1987 Resolved
FREE-UP AND DEMONSTRATE OPERATION OF DAMPERS TO ALL PUMP ROOM EXHAUST VENTS.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Construction/Loadline
Issued 13 March 1987 Resolved
HOLE IN AFTER BULKHEAD OF FOC'SLE IN WAY OF STEAM PIPE (AT HEAD OF STAIRWAYTO IGS).
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Deck/Cargo
Issued 13 March 1987 Resolved
HOLES IN MAIN STEAM LINE ABOVE #3 PORT CARGO TANK.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Deck/Cargo
Issued 13 March 1987 Resolved
NUMEROUS HOLES IN STEAM RETURN LINE ON MAIN DECK.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Lifesaving
Issued 13 March 1987 Resolved
EYEWASH STATIONS ON MAIN DECK INOPERATIVE.
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Navigation
Issued 6 August 1984 Resolved
VESSEL DID NOT LOG TESTS REQUIRED BY 33 CFR 164.25<A> IN ACCORDANCE WITH 33 CFR 164.11<Q>.
Condition: Unknown
Due 6 August 1984
Resolved 6 August 1984

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.