Records from 1984 to 1995. Most recent: inspection, 11 October 1995.
Inspection history · 43
11 October 1995
Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 383587
11 July 1995
Type not recorded
No type recorded · MSD CONCORD · USCG Southwest District (CGD-SW) · Activity 380320
11 July 1995
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 875604
30 April 1995
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 377779
6 April 1995
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 376839
6 April 1995
Tank Vessel Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1456259
7 December 1994
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 46607
1 December 1994
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 373291
12 October 1994
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 371558
8 April 1994
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 646737
8 March 1994
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 365011
10 September 1993
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 677550
4 September 1993
Certificate of Compliance
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 833884
3 September 1993
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 360595
14 May 1993
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 358321
14 May 1993
Certificate of Compliance
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1442008
4 January 1993
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1140900
10 November 1992
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 956822
20 August 1991
Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1251308
10 June 1991
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 344317
1 June 1991
Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1228980
3 May 1990
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 336827
30 March 1990
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 485549
20 November 1989
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 333801
17 November 1989
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 911172
11 September 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 537288
14 April 1989
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1197651
12 April 1989
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 329647
9 April 1989
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 329672
15 August 1988
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1035650
14 August 1988
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 441183
10 May 1988
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 323265
8 May 1988
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 323075
25 February 1988
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 445051
26 January 1988
Type not recorded
No type recorded · THE UNKNOWN UNIT · Activity 1323024
5 January 1988
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 320576
5 October 1987
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 318904
4 October 1987
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 440382
25 February 1986
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 442563
21 August 1985
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 994838
21 March 1985
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 440229
14 June 1984
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 296637
27 May 1984
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 296445
Lifesaving
Issued 6 April 1995
Resolved
REPLACE / REMOVE ALL OUTDATED MEDICINES FROM HOSPITAL SPACE.
Condition: Unknown
Due 9 April 1995
Resolved 14 April 1995
Deck/Cargo
Issued 6 April 1995
Resolved
REPAIR CONDENSATE RETURN LINE FOR TANK HEATING IN WAS OF MAIN DECK FORE ANDAFT OF GANGWAY. SEVERAL SOFT PATCHES WERE LOCATED DURING INSPECTION. CLASS INSPECTED PIPING AND PALCED A CONDITION ON IT. REPAIRE MUST BE MADE BY 31 AUGUST 95. TO THE SATISFACTION OF THE CLASS SURVEYOR.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Fire Fighting
Issued 6 April 1995
Resolved
REPLACE MAIN DECK FIRE LINE. FOUR (4) WERE DISCOVERED WHILE CONDUCTING TESTING OF LINE.
Condition: Unknown
Due 9 April 1995
Resolved 13 April 1995
Lifesaving
Issued 6 April 1995
Resolved
INSTALL COVERS FOR BATTERIES IN THE EMERGENCY GENERATOR SPACE.
Condition: Unknown
Due 9 April 1995
Resolved 14 April 1995
Electrical
Issued 6 April 1995
Resolved
INSTALL GROUNDING STRAPS ON ALL MAIN DECK CARGO PIPING, AND MAIN AND BRANCHELECTRICAL LINES AS NECESSARY.
Condition: Unknown
Due 9 April 1995
Resolved 14 April 1995
Lifesaving
Issued 6 April 1995
Resolved
REPLACE FROZEN SHEAVE ON THE STARBOARD LIFEBOAT BOAT DAVITS.
Condition: Unknown
Due 9 April 1995
Resolved 14 April 1995
Lifesaving
Issued 6 April 1995
Resolved
REPLACE BOTH THE BATTERY ROOM DOOR GASKET AND FLAME SCREEN.
Condition: Unknown
Due 9 April 1995
Resolved 13 April 1995
Fire Fighting
Issued 6 April 1995
Resolved
REPLACE AND REPAIR THE FOLLOWING VENTS. POTH P/S ENGINE RM INTAKES, 4SC,8S,3C,2S,AND 1P TANK VENTS. VENT ON TOP OF FAN HOUSE NR 2 AND VENT TO EMERGENCY FIRE PUMP ROOM.
Condition: Unknown
Due 9 April 1995
Resolved 13 April 1995
Lifesaving
Issued 6 April 1995
Resolved
REPLACE GUNWHALE RAILS ON BOAT PORT AND STARBOARD LIFEBOATS. CLASS REP INSEPCTED THE BOATS. CONDITION OF CLASS WAS PLACED ON THE BOATS BY CLASS. REPAIRS MUST BE MADE TO THE SATISFACTION OF THE CLASS SURVEYOR BY 30 JUNE 95.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Navigation
Issued 6 April 1995
Resolved
REPLACE MISSING AFT ANCHOR LIGHT.
Condition: Unknown
Due 9 April 1995
Resolved 13 April 1995
Construction/Loadline
Issued 6 April 1995
Resolved
RENEW PLATING TO THE PORT AND STARBOARD CHAIN LOCKERS. BOTH ARE WASTED AT THE BOTTOMS NEAR THE DECK. CLASS INSPECTED TEMP REPAIRS WERE MADE. ALL PALTING MUST BE RENEWED AND INSPECTED BY CLASS ON OR BEFORE 31 AUGUST 95.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Construction/Loadline
Issued 6 April 1995
Resolved
ENSURE WTD'S TO THE BOSN LOCKER AND NR 3 FAN HOUSE ARE WATERTIGHT.
Condition: Unknown
Due 9 April 1995
Resolved 13 April 1995
Engineering
Issued 6 April 1995
Resolved
REPLACE COOLING WATER LINE FOR AUX. ENGINES. CLASS INSPECTED THE LINE WHICHIS SOFT PATCHED NOW. HE PLACED A CONDITION ON IT TO BE REPLACED / AND INSPECTED TO THE SATISFACTION OF THE CLASS REP BY 31 AUGUST 95.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Lifesaving
Issued 6 April 1995
Resolved
REPLACE DAVIT LIMIT SWITCHES FOR BOTH LIFEBOATS.
Condition: Unknown
Due 9 April 1995
Resolved 13 April 1995
Engineering
Issued 6 April 1995
Resolved
REPLACE / REPAIR SEA WATER OUTLET LINE FROM GENERATORS. LINE HAS A TEMP SOFT PATCH ON IT. LINE HAS BEEN INSPECTED BY CLASS AND REQUIRED TO BE CORRECTED BY 31 AUGUST 95, TO THE SATISFACTION OF THE CLASS SURVEYOR.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Engineering
Issued 6 April 1995
Resolved
REPLACE / REPAIR ISOLATING VALVE FOR SALT WATER COOLING LINE TO AUX. CIRCULATING PUMP. ITEM HAS BEEN INSPECTED BY CLASS. CLASS REQUIRES REPAIR TO BE MADE BY 31 AUGUST 95 TO THE SATISFACTION OF THE CLASS SURVEYOR.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Fire Fighting
Issued 6 April 1995
Resolved
REPAIR FOAM TANK LOCATED ON 3RD POOP DECK STARBOARD SIDE. LEAKING, TEMPORARY SOFT PATCHED. CLASS INSPECTED. REPAIRS MUST BE MADE TO THE SATISFACTION OF THE CLASS SURVEYOR BY 30 JUNE 95. NOTE: THIS IS NOT THEIR MAIN FOAM TANK.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Deck/Cargo
Issued 6 April 1995
Resolved
REPAIR CARGO VENT LINES. FIFTY PERCENT OF THE VENT LINES ARE HOLED AND HAVESOFT PATCHES ON THEM. CLASS REP INSPECTED LINES HE PLACED A CONDITION OF CLASS ON THEM. REPAIRS MUST BE MADE BY 31 AUGUST 95.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Electrical
Issued 6 April 1995
Resolved
REPLACE MAIN DECK CONDUIT LINE LEADING TO THE HIGH LEVEL ALARMS. THE ENTIRELINE AND JUNCTION BOXES ARE WASTED. CLASS INSPECTED THE LINE AND PLACE A CONDITION OF CLASS ON IT. THE LINE MUST BE REPAIRED BY 31 AUGUST 95. TO CLASS SATISFACTION.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Deck/Cargo
Issued 6 April 1995
Resolved
TWO OF THE MAIN DECK CARGO LINES ON THE STARBOARD SIDE ARE HOLED AND SOFT PATCHED. CLASS INSPECTED LINES AND PLACED A CONDITION OF CLASS ON THEM. REPAIRS ARE TO BE MADE TO THE SATISFACTION OF THE CLASS SURVEYOR BY 31 AUGUST 95.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Navigation
Issued 8 March 1994
Resolved
VESSEL DID NOT HAVE A COPY OF THE INLAND NAVIGATION RULES ON BOARD.
Condition: Unknown
Due 9 March 1994
Resolved 15 March 1994
Unknown
Issued 3 September 1993
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 5 September 1993
Resolved 10 September 1993
Deck/Cargo
Issued 3 September 1993
Resolved
A VIOLATION OF 46 C.F.R. 153.907(a) IN THAT THE CARGO INFORMATION FOR EACH CARGO CARRIED WAS NOT READILY AVAILABLE TO THOSE ON THE TANKSHIP. _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 5 September 1993
Resolved 9 September 1993
Deck/Cargo
Issued 14 May 1993
Resolved
Repair hole in cargo piping in molasses line in #3 pump room prior to returning to the U.S..
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Deck/Cargo
Issued 14 May 1993
Resolved
In all 3 pumprooms replace mechanical closures on all valves not in use, blank off all obsolete piping flanges, and replace all broken/wasted valve wheels prior to returning to the U.S..
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Deck/Cargo
Issued 14 May 1993
Resolved
Repair steam leak in #1 cargo pumproom.
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Deck/Cargo
Issued 14 May 1993
Resolved
Repair steam leak in piping over #7C tank under catwalk.
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Deck/Cargo
Issued 14 May 1993
Resolved
Relabel emergency cargo pump shut off valve location on forward bulkhead ofdeckhouse.
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Deck/Cargo
Issued 14 May 1993
Resolved
Repair small discharge containment around port spring winch.
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Construction/Loadline
Issued 14 May 1993
Resolved
Repair primary supports to main deck catwalk fore and aft - port and stbd side.
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Deck/Cargo
Issued 14 May 1993
Resolved
Repack cargo manifold valves as needed prior to returning to the U.S..
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Electrical
Issued 14 May 1993
Resolved
Make permanent repairs to electrical splice in way of #2C cargo tank, center deck.
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Construction/Loadline
Issued 14 May 1993
Resolved
Repack packing glands and repair expansion flanges on piping systems on main deck where leaking.
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Fire Fighting
Issued 14 May 1993
Resolved
Remove soft patch from fire main piping (forward of S/S) and make proper repairs prior to returning to the U.S..
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Deck/Cargo
Issued 14 May 1993
Resolved
Repair/replace flames screens on top of vent riser for 1CP, 9CP, SLOP, and main cargo pipe line prior to returning to the U.S..
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Deck/Cargo
Issued 14 May 1993
Resolved
Properly repair saltwater crossover piping in #2 cargo pump room prior to returning to the U.S..
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Deck/Cargo
Issued 14 May 1993
Resolved
Repair all wasted straps, brackets, and flanges on deck, steam, cargo, heating, firemain, and temperature piping prior to returning to the U.S..
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Lifesaving
Issued 14 May 1993
Resolved
Repair wasted areas on all 3 cargo pump houses where they meet the deck prior to returning to the U.S..
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Deck/Cargo
Issued 14 May 1993
Resolved
Remove cement and rags from all deck scuppers and install proper mechanicalclosures prior to returning to the U.S..
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Deck/Cargo
Issued 14 May 1993
Resolved
Replace all missing nuts on deck cargo plate covers.
Condition: Unknown
Due 14 May 1993
Resolved 14 May 1993
Deck/Cargo
Issued 1 June 1991
Resolved
CREW UNABLE TO DEMONSTRATE PROPER OPERATION OF CARGO RESIDUE DISCHARGE MONITOR.
Condition: Unknown
Due 1 June 1991
Resolved 1 June 1991
Deck/Cargo
Issued 1 June 1991
Resolved
CARGO PIPING DID NOT HAVE A RECORD FOR LAST HYDRO TEST.
Condition: Unknown
Due 1 June 1991
Resolved 1 June 1991
Accommodation/Occupational Safety
Issued 1 June 1991
Resolved
VENTILATION DUCT FOR #2 PUMPROOM WASTED APPROXIMATELY 10 FT BELOW ENTRANCE TO PUMPROOM AT "T" SECTION.
Condition: Unknown
Due 1 June 1991
Resolved 1 June 1991
Deck/Cargo
Issued 1 June 1991
Resolved
CLOSED GAUGING SYSTEM INOPERABLE IN SEVERAL LOCATIONS. MAKE PERMANENT REPAIRS PRIOR TO FIRST U.S. PORT AFTER 30JUNE91.
Condition: Unknown
Due 1 June 1991
Resolved 1 June 1991
Deck/Cargo
Issued 1 June 1991
Resolved
SEVERAL HIGH LEVEL ALARMS ARE INOPERATIVE. MAKE PERMANENT REPAIRS PRIOR TO FIRST U.S. PORT AFTER 30JUNE91.
Condition: Unknown
Due 1 June 1991
Resolved 1 June 1991
Navigation
Issued 20 November 1989
Resolved
U.S. CHART 18656, 47TH ED. 07MAR87, NOT CURRENTLY CORRECTED; MISSING NOTICETO MARINER CORRECTIONS AS FOLLOWS: 1987-22,24,29,40,44; 1988-4,12,19,21.
Condition: Unknown
Due 20 November 1989
Resolved 20 November 1989
Navigation
Issued 20 November 1989
Resolved
U.S. COAST PILOT, VOL 7 1989, NOT CURRENTLY CORRECTED; MISSING NOTICE TO MARINER CORRECTIONS AS FOLLOWS: 1989-3,11,16,20.
Condition: Unknown
Due 20 November 1989
Resolved 20 November 1989
Deck/Cargo
Issued 17 November 1989
Resolved
INSTALL ALL MISSING BOLTS IN ALL FLANGES AND BUTTERWORTH COVERS.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Accommodation/Occupational Safety
Issued 17 November 1989
Resolved
PROPERLY STOW OXYGEN AND ACETYLENE BOTTLES.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Fire Fighting
Issued 17 November 1989
Resolved
SERVICE FIXED CO2 SYSTEM.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Fire Fighting
Issued 17 November 1989
Resolved
PROVIDE ADDITIONAL FIREFIGHTING FOAM FOR 100% CAPACITY IN ALL 3 TANKS.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Fire Fighting
Issued 17 November 1989
Resolved
PROVIDE PROOF OF FIREFIGHTING FOAM TEST.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Electrical
Issued 17 November 1989
Resolved
REMOVE DEAD-ENDED ELECTRICAL CABLE ON FORWARD BULKHEAD, MAINDECK.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Deck/Cargo
Issued 17 November 1989
Resolved
REPAIR AND PROVE PROPER OPERATION OF FIRE DAMPERS PRIOR TO DEPARTURE OF VESSEL.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Electrical
Issued 17 November 1989
Resolved
INSTALL MISSING LIGHT COVERS IN FORWARD LINE LOCKER.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Deck/Cargo
Issued 17 November 1989
Resolved
INSTALL MISSING FLAME SCREEN IN TANK 3 CENTER.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Deck/Cargo
Issued 17 November 1989
Resolved
TEST OR REMOVE ALL CARGO HOSES. IF TESTED, PROPERLY MARK EACH HOSE.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Deck/Cargo
Issued 17 November 1989
Resolved
REPAIR CLOSED GAUGING SYSTEM ON ALL CARGO TANKS.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Construction/Loadline
Issued 17 November 1989
Resolved
PROVE PROPER OPERATION OF OIL MONITOR FOR BALLAST WATER.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Deck/Cargo
Issued 17 November 1989
Resolved
REPAIR AND PROVE PROPER OPERATION OF CARGO HIGH LEVEL ALARMS.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Navigation
Issued 12 April 1989
Resolved
U.S. COAST PILOT, VOL 7 1988, NOT CURRENTLY CORRECTED; MISSING NOTICE TO MARINER CORRECTIONS AS FOLLOWS: 1988-16,25,31,33,42,49,51,52. 1989-3,11.
Condition: Unknown
Due 13 September 1993
Resolved 13 September 1993
Navigation
Issued 12 April 1989
Resolved
U.S. CHART 18656, 47TH ED. 07MAR87, NOT CURRENTLY CORRECTED; MISSING NOTICETO MARINER CORRECTIONS AS FOLLOWS: 1987-22,24,29,40,44. 1988-4,12,19,,21, 23,27,28,29,37,51.
Condition: Unknown
Due 13 September 1993
Resolved 13 September 1993
Navigation
Issued 9 April 1989
Resolved
VSL MISSING CHART 18751 OR EQUIVALENT. A REQUIREMENT OF 33CFR164.33(A)(1).
Condition: Unknown
Due 9 April 1989
Resolved 9 April 1989
Navigation
Issued 5 January 1988
Resolved
A VIO OF 33 CFR 164.30 IN THAT THE U.S. COAST PILOT, VOL.3, USED BY THE VSLWAS NOT CORRECTED TO NTM 20/87, WHICH WAS REASONABLY AVAILABLE AND CONTAIN-ED CORRECTIONS THAT WERE APPLICABLE TO THE VSL'S ROUTE FROM SMITH PT. TO BALTIMORE HARBOR. NO FOREIGN EQUIV ON BOARD.
Condition: Unknown
Due 10 May 1988
Resolved 5 January 1988
Navigation
Issued 5 January 1988
Resolved
A VIO OF 33 CFR 164.30 IN THAT THE UK NP 82, VOL J, NOV 1986, USED THE VSL WAS NOT CORRECTED TO NTM 44/87, WHICH WAS REASONABLY AVAILABLE AND CONTAIN-ED CORRECTIONS THAT WERE APPLICABLE TO THE VSL'S ROUTE SMITH PT TO BALTIMORE HARBOR. NO U.S. EQUIV O/B.
Condition: Unknown
Due 10 May 1988
Resolved 5 January 1988
Navigation
Issued 5 January 1988
Resolved
A VIO OF 33 CFR 164.30 IN THAT U.S. CHARTS #12230,12263, AND 12278 USED BY THE VSL, WERE NOT CORRECTED TO NTM 42/87,47/87,AND 45/87 WHICH WERE REASON-ABLY AVAILABLE AND CONTAINED CORRECTIONS APPLICABLE TO THE VSL'S ROUTE FROMSMITH PT TO BALTIMORE HARBOR. NO FOREIGN EQUIV ON BOARD.
Condition: Unknown
Due 10 May 1988
Resolved 5 January 1988
Navigation
Issued 5 October 1987
Resolved
A VIO OF 33 CFR 164.30 IN THAT THE U.S. CHART 12281 USED BY THE VESSEL WAS NOT CURRENTLY CORRECTED VIA NTMS, WHICH WERE READILY AVAILABLE AND CONTAINED CORRECTIONS APPLICABLE TO THE VESSELS ROUTE FROM THE HEAD OF THE CHESAPEAKE BAY TO BALTIMORE HARBOR. NO FOREIGN EQUIVALENT O/B.
Condition: Unknown
Due 5 January 1988
Resolved 5 October 1987