Records from 2008 to 2019. Most recent: inspection, 29 August 2019.
Inspection history · 14
29 August 2019
COC-MODU Annual
Type not classified · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6815990
21 May 2019
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6689038
10 August 2018
COC-MODU Renew
Type not classified · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6549341
24 April 2018
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6436209
27 December 2017
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6329411
25 September 2017
In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6275566
2 August 2017
COC-MODU Annual
Type not classified · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6228717
17 June 2017
In-Service Inspection
Physical examination · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 6178417
9 April 2017
In-Service Inspection
Physical examination · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 6120584
2 March 2017
In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6100351
15 October 2016
In-Service Inspection
Physical examination · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 6022972
2 August 2016
COC-MODU Renew · In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5963421
26 July 2016
In-Service Inspection
Physical examination · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 5953741
12 June 2016
In-Service Inspection
Physical examination · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 5904605
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 29 August 2019
Resolved
Vessel is not recording sludge and oil residue quantities for weekly soundings of 3.1 tanks on Form A of Supplement to IOPP certificate correctly. Vessel is not recording disposal of bilge water and sludge and oil residues in Oil Record Book.
MARPOL Annex I, Reg. 17
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2019
Resolved 18 September 2019
Resolution: Oil record book training conducted and corrections made.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Bunker delivery notes
Issued 29 August 2019
Resolved
Vessel does not maintain bunker delivery notes with required information in Appendix V of MARPOL Annex VI. Vessel is also not maintaining fuel oil samples to accompany bunker delivery notes with appropriate information, seals, or signatures to verify authenticity.
MARPOL Annex VI, Regulation 18
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2019
Resolved 18 September 2019
Resolution: Bunker delivery notes obtained.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 29 August 2019
Resolved
Vessel is not launching lifeboats every 4 months as per 79 MODU Code.
Panama Rules Technical Note- MODU 1/83 Port B.9.6.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2019
Resolved 18 September 2019
Resolution: Lifeboat was launched, video/pictures sent via email. Valid Marine radio operators permit provided.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificate for medical care
Issued 29 August 2019
Resolved
Certain personnel do not have original credentials and endorsements to meet safe manning documents.
Safe Manning Certificate
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2019
Resolved 18 September 2019
Resolution: Valid Marine radio operators permit provided, along with medical certs.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 29 August 2019
Resolved
Emergency stop on STBD crane is inoperable. Load cell needs calibration, boom lights are burned out, and cabin windows are cracked, impeding operators vision.
Panama Rules Technical Note- MODU 1/83 Port B.6.1.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2019
Resolved 18 September 2019
Resolution: Crane cabin window replaced, boom lights and E-stop repaired. Load cell calibrated.
09 - Working and Living Conditions › 092 - Working Conditions › Other (working space ILO)
Issued 29 August 2019
Resolved
Eye wash stations throughout the rig are inoperable and life ring buoy outside the galley needs to be serviced.
33 CFR 146.15.a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2019
Resolved 18 September 2019
Resolution: Potable water restored throughout rig and eye wash stations flushed and opertional. Ring buoy replaced.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 29 August 2019
Resolved
Fire panel in third party quarters is displaying alarm and crew is unable to reset.
Panama Rules Technical Note- MODU 1/83 Port B.8.5.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2019
Resolved 18 September 2019
Resolution: Fire panel reset and functioning properly.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 10 August 2018
Resolved
The units Oil record book does not contain correct entries as set out in MARPOL Annex I regulation 17.2
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2018
Resolved 20 September 2018
Resolution: ABS sent findings to inspector
14 - Pollution Prevention › 146 - MARPOL Annex VI › Technical files and if applicable, monitoring manual
Issued 10 August 2018
Resolved
Unit could not provide any of the information required by the regulation in regards to the 2 crane engines listed on IAPP, This includes EIAPP's. MARPOL Annex VI Reg 13.8
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2018
Resolved 20 September 2018
Resolution: ABS sent email for clearance
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 August 2018
Resolved
At the time of inspection shut-off arrangements for stand-by generator could not be demostrated.
Panama Tech Note 1/83 reg 6.4
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2018
Resolved 20 September 2018
Resolution: Recieved email from ABS for clearance
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 10 August 2018
Resolved
Unit had preexisting steel shutters covering windows facing drill floor. Crew members could not demostrated proper installation due to multiple seized bolts.
Panama Tech note 1/83 reg 1.3
79 MODU 9.2.13
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2018
Resolved 10 September 2018
Resolution: recieved email from ABS clearing the items
Engineering › Pressure Vessel › Shell Plate
Issued 29 September 2017
Resolved
Shell plate was found with significant piting. When the crew were asked for the last report of testing for this pressure vessel they were unable to demostrate required testing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 October 2017
Resolved 23 October 2018
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 29 September 2017
Resolved
Escape ladders from the deck of the Jack up to the water surface did not get close enough to the water for a resonable escape to take place. Suffieceint means of escape must be provided.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 October 2017
Resolved 2 October 2017
Resolution: ladder extensions installed ladder can now reach the water line.
Construction/Loadline › Structures › Door
Issued 29 September 2017
Resolved
Multiple watertight doors on the main deck that are requried to be closed during transits are worn to a condition that they cannot be properly closed.
Action required: 705 - Other - as specified
Due 29 October 2017
Resolved 2 October 2017
Resolution: repairs completed.
Electrical › Lighting (service) › Conductor
Issued 25 September 2017
Resolved
Outer sheathing on electrical wire is worn through above the mud flats.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 October 2017
Resolved 25 September 2017
Resolution: issue was corrected by vessel crew on the spot to satisfaction of Marine Inspector.
Operations/Management › Drills/Instruction › Launching/Recovery of Survival Craft
Issued 2 August 2016
Resolved
Each lifeboat must be launched with its assigned operating crew aboard, and maneuvered in the water at least once every 3 months, during an abandonment drill. Vessel's crew has not launched and maneuvered any lifeboat in over one year.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 August 2016
Resolution: Vessel's crew lauched and recovered both lifeboats and provided pictures and detail description to inspection team.
Operations/Management › Drills/Instruction › Fire
Issued 2 August 2016
Resolved
Each of the crew members and industrial personnel must participate in at least one abandonment drill and one fire drill every month. Vessel is not fully crewed and has been unable to complete proper drills.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 March 2017
Resolution: Reviewed vessel drill records and spoke with OIM. Vessel has been conducting fire and abandon ship drills during each crew rotation. Witnessed SAT fire and abandon ship drill while on board.
Communications › Alarms/Indicators › General Alarm
Issued 2 August 2016
Resolved
Internal means of communication should be available for transfer of information between all spaces where action may be necessary in case of emergency. The General Alarm bell in the portable quarters module did not sound.
Action required: 705 - Other - as specified
Due 9 August 2016
Resolved 2 August 2016
Resolution: Vessel electrian repaired general alarm bell.