Records from 1981 to 2019. Most recent: inspection, 29 August 2019.
Inspection history · 51
29 August 2019
COC-MODU Annual
Type not classified · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6815990
21 May 2019
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6689038
10 August 2018
COC-MODU Renew
Type not classified · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6549341
24 April 2018
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6436209
27 December 2017
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6329411
25 September 2017
In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6275566
2 August 2017
COC-MODU Annual
Type not classified · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6228717
17 June 2017
In-Service Inspection
Physical examination · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 6178417
9 April 2017
In-Service Inspection
Physical examination · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 6120584
2 March 2017
In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6100351
15 October 2016
In-Service Inspection
Physical examination · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 6022972
2 August 2016
COC-MODU Renew · In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5963421
26 July 2016
In-Service Inspection
Physical examination · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 5953741
12 June 2016
In-Service Inspection
Physical examination · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 5904605
19 December 2015
In-Service Inspection
Physical examination · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 5784901
20 July 2015
COC-MODU Annual
Type not classified · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 5190663
15 May 2012
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4312368
7 December 2011
Plan Review (Other than "T")
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4203436
10 March 2010
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3693123
24 March 2009
COC-MODU Renew
Type not classified · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3439136
13 September 2008
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3330909
9 September 1995
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1187917
7 October 1991
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 940067
2 April 1991
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 918754
14 February 1991
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1221077
16 October 1990
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1237676
2 May 1990
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1237352
20 November 1989
Re-Inspection · Drydock Extension
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1211180
10 January 1989
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 895033
18 October 1988
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1207003
17 October 1988
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1197206
21 September 1988
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1043302
6 June 1988
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1196954
4 December 1987
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1310099
28 September 1987
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1317470
1 September 1987
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1310673
11 July 1986
Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 983208
5 July 1985
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1289951
27 June 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 983889
11 February 1985
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 979102
4 October 1984
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1282107
2 August 1984
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 974074
21 February 1984
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 971515
26 January 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 971270
26 January 1984
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 973406
26 January 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1278550
26 January 1984
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1280602
12 January 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 972210
21 October 1982
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1275746
2 March 1982
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 964907
24 November 1981
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1273559
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 29 August 2019
Resolved
Vessel is not recording sludge and oil residue quantities for weekly soundings of 3.1 tanks on Form A of Supplement to IOPP certificate correctly. Vessel is not recording disposal of bilge water and sludge and oil residues in Oil Record Book.
MARPOL Annex I, Reg. 17
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2019
Resolved 18 September 2019
Resolution: Oil record book training conducted and corrections made.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Bunker delivery notes
Issued 29 August 2019
Resolved
Vessel does not maintain bunker delivery notes with required information in Appendix V of MARPOL Annex VI. Vessel is also not maintaining fuel oil samples to accompany bunker delivery notes with appropriate information, seals, or signatures to verify authenticity.
MARPOL Annex VI, Regulation 18
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2019
Resolved 18 September 2019
Resolution: Bunker delivery notes obtained.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 29 August 2019
Resolved
Vessel is not launching lifeboats every 4 months as per 79 MODU Code.
Panama Rules Technical Note- MODU 1/83 Port B.9.6.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2019
Resolved 18 September 2019
Resolution: Lifeboat was launched, video/pictures sent via email. Valid Marine radio operators permit provided.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificate for medical care
Issued 29 August 2019
Resolved
Certain personnel do not have original credentials and endorsements to meet safe manning documents.
Safe Manning Certificate
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2019
Resolved 18 September 2019
Resolution: Valid Marine radio operators permit provided, along with medical certs.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 29 August 2019
Resolved
Emergency stop on STBD crane is inoperable. Load cell needs calibration, boom lights are burned out, and cabin windows are cracked, impeding operators vision.
Panama Rules Technical Note- MODU 1/83 Port B.6.1.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2019
Resolved 18 September 2019
Resolution: Crane cabin window replaced, boom lights and E-stop repaired. Load cell calibrated.
09 - Working and Living Conditions › 092 - Working Conditions › Other (working space ILO)
Issued 29 August 2019
Resolved
Eye wash stations throughout the rig are inoperable and life ring buoy outside the galley needs to be serviced.
33 CFR 146.15.a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2019
Resolved 18 September 2019
Resolution: Potable water restored throughout rig and eye wash stations flushed and opertional. Ring buoy replaced.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 29 August 2019
Resolved
Fire panel in third party quarters is displaying alarm and crew is unable to reset.
Panama Rules Technical Note- MODU 1/83 Port B.8.5.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2019
Resolved 18 September 2019
Resolution: Fire panel reset and functioning properly.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 10 August 2018
Resolved
The units Oil record book does not contain correct entries as set out in MARPOL Annex I regulation 17.2
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2018
Resolved 20 September 2018
Resolution: ABS sent findings to inspector
14 - Pollution Prevention › 146 - MARPOL Annex VI › Technical files and if applicable, monitoring manual
Issued 10 August 2018
Resolved
Unit could not provide any of the information required by the regulation in regards to the 2 crane engines listed on IAPP, This includes EIAPP's. MARPOL Annex VI Reg 13.8
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2018
Resolved 20 September 2018
Resolution: ABS sent email for clearance
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 August 2018
Resolved
At the time of inspection shut-off arrangements for stand-by generator could not be demostrated.
Panama Tech Note 1/83 reg 6.4
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2018
Resolved 20 September 2018
Resolution: Recieved email from ABS for clearance
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 10 August 2018
Resolved
Unit had preexisting steel shutters covering windows facing drill floor. Crew members could not demostrated proper installation due to multiple seized bolts.
Panama Tech note 1/83 reg 1.3
79 MODU 9.2.13
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2018
Resolved 10 September 2018
Resolution: recieved email from ABS clearing the items
Engineering › Pressure Vessel › Shell Plate
Issued 29 September 2017
Resolved
Shell plate was found with significant piting. When the crew were asked for the last report of testing for this pressure vessel they were unable to demostrate required testing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 October 2017
Resolved 23 October 2018
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 29 September 2017
Resolved
Escape ladders from the deck of the Jack up to the water surface did not get close enough to the water for a resonable escape to take place. Suffieceint means of escape must be provided.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 October 2017
Resolved 2 October 2017
Resolution: ladder extensions installed ladder can now reach the water line.
Construction/Loadline › Structures › Door
Issued 29 September 2017
Resolved
Multiple watertight doors on the main deck that are requried to be closed during transits are worn to a condition that they cannot be properly closed.
Action required: 705 - Other - as specified
Due 29 October 2017
Resolved 2 October 2017
Resolution: repairs completed.
Electrical › Lighting (service) › Conductor
Issued 25 September 2017
Resolved
Outer sheathing on electrical wire is worn through above the mud flats.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 October 2017
Resolved 25 September 2017
Resolution: issue was corrected by vessel crew on the spot to satisfaction of Marine Inspector.
Operations/Management › Drills/Instruction › Launching/Recovery of Survival Craft
Issued 2 August 2016
Resolved
Each lifeboat must be launched with its assigned operating crew aboard, and maneuvered in the water at least once every 3 months, during an abandonment drill. Vessel's crew has not launched and maneuvered any lifeboat in over one year.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 August 2016
Resolution: Vessel's crew lauched and recovered both lifeboats and provided pictures and detail description to inspection team.
Operations/Management › Drills/Instruction › Fire
Issued 2 August 2016
Resolved
Each of the crew members and industrial personnel must participate in at least one abandonment drill and one fire drill every month. Vessel is not fully crewed and has been unable to complete proper drills.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 March 2017
Resolution: Reviewed vessel drill records and spoke with OIM. Vessel has been conducting fire and abandon ship drills during each crew rotation. Witnessed SAT fire and abandon ship drill while on board.
Communications › Alarms/Indicators › General Alarm
Issued 2 August 2016
Resolved
Internal means of communication should be available for transfer of information between all spaces where action may be necessary in case of emergency. The General Alarm bell in the portable quarters module did not sound.
Action required: 705 - Other - as specified
Due 9 August 2016
Resolved 2 August 2016
Resolution: Vessel electrian repaired general alarm bell.
Unknown
Issued 16 October 1990
Resolved
REPLACE ONE DEFECTIVE DRY BULK TANK RELIEF VALVE AND PROVIDE DOCUMENTATION OF PROPER PRESSURE SETTING & OPERATION.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Unknown
Issued 16 October 1990
Resolved
MAKE PERMANENT REPAIRS TO LEAK IN FIRE MAIN LOCATED IN OVERHEAD OF MUD PUMPROOM AND CONDUCT WORKING PRESSURE HYDROSTATIC TEST IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Unknown
Issued 16 October 1990
Resolved
REINSTALL LID ON MSD HOLDING TANK.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Unknown
Issued 16 October 1990
Resolved
OPERATIONALLY TEST BOTH LIFEBOATS IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Unknown
Issued 16 October 1990
Resolved
PROVIDE BOARDING LADDERS FOR BOTH LIFEBOATS AND TWELVE HANDHELD FLARES FOR THE #2 LIFEBOAT.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Unknown
Issued 16 October 1990
Resolved
RESTENCIL HELIPORT WITH CURRENT NAME OF VESSEL.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Unknown
Issued 16 October 1990
Resolved
CONDUCT FIRE AND BOAT DRILL IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Unknown
Issued 16 October 1990
Resolved
PROVIDE ON BOARD AN APPROVED OXYGEN AND EXPLOSIVE GAS DETECTOR FOR THE FIREMEN'S OUTFIT LOCATED IN CONTROL ROOM.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Unknown
Issued 16 October 1990
Resolved
PROVIDE NAMEPLATE FOR AIR RECEIVER LOCATED ON OPEN DECK NEXT TO BOW LEG.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Unknown
Issued 16 October 1990
Resolved
OPEN THE AIR RECEIVER LOCATED ON THE OPEN DECK NEXT TO THE BOW LEG FOR INTERNAL EXAMINATION BY A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Unknown
Issued 16 October 1990
Resolved
REPLACE OR REPAIR AIR BOTTLE TO REGULATOR SUPPLY HOSE FOR SCBA LOCATED IN CONTROL ROOM.
Condition: Unknown
Due 16 October 1990
Resolved 16 October 1990
Unknown
Issued 2 May 1990
Resolved
COMPLETE UNDERWATER SURVEY ON MAT AND LEGS TO THE SATISFACTION OF COGNIZATE OCMI.
Condition: Unknown
Due 2 May 1990
Resolved 2 May 1990
Fire Fighting
Issued 20 November 1989
Resolved
REMOVE RECALLED B-V HOSE LOCATED ON PORT SIDE OF THE HELO DECK.
Condition: Unknown
Due 20 November 1989
Resolved 20 November 1989
Engineering
Issued 20 November 1989
Resolved
LABEL FUEL OIL CUT VALVES TO DENOTE THE LOCATION (BEHIND SWITCHBOARD).
Condition: Unknown
Due 20 November 1989
Resolved 20 November 1989
Electrical
Issued 20 November 1989
Resolved
INSTALL GUARDS AS NECESSARY ON #2 GENERATOR AND REMOVE DEAD ENDED CABLE.
Condition: Unknown
Due 20 November 1989
Resolved 20 November 1989
Lifesaving
Issued 20 November 1989
Resolved
PROVIDE FISHING KIT FOR PORT LIFEBOAT.
Condition: Unknown
Due 20 November 1989
Resolved 20 November 1989
Engineering
Issued 20 November 1989
Resolved
REPAIR AND TEST FOR CG OVERSPEED TRIP OF #2 MUD PUMP PRIME MOVER.
Condition: Unknown
Due 20 November 1989
Resolved 20 November 1989
Electrical
Issued 20 November 1989
Resolved
REMOVE PARTIAL GROUNDS FROM SWITCHBOARDS, REMOVE DUST AND MATERIALS FROM BEHIND MAIN SWITCHBOARD.
Condition: Unknown
Due 20 November 1989
Resolved 20 November 1989
Engineering
Issued 20 November 1989
Resolved
RELABEL AND CLEAN LABELS AS NEEDED FOR THE DRILL WATER/SALT WATER (BILGE AND FIRE MAIN) SYSTEMS.
Condition: Unknown
Due 20 November 1989
Resolved 20 November 1989
Lifesaving
Issued 20 November 1989
Resolved
REPLACE OR REPAIR COMPASS ON STARBOARD SIDE LIFEBOAT.
Condition: Unknown
Due 20 November 1989
Resolved 20 November 1989
Unknown
Issued 17 October 1988
Resolved
CONDUCT TEST OF EMERGENCY GENERATOR LOW LUBE OIL ALARM.
Condition: Unknown
Due 17 October 1988
Resolved 17 October 1988
Unknown
Issued 17 October 1988
Resolved
INSTALL PROPER NAVIGATION LIGHT BULBS AND MOUNTS WITH PROPER FOCAL HEIGHTS IN ALL NAVIGATION LIGHTS.
Condition: Unknown
Due 17 October 1988
Resolved 17 October 1988
Unknown
Issued 17 October 1988
Resolved
PROVIDE CONSTRUCTION PORTFOLIO ONBOARD RIG.
Condition: Unknown
Due 17 October 1988
Resolved 17 October 1988
Unknown
Issued 17 October 1988
Resolved
REPAIR GROUND ON 480V SYSTEM FOR EMERGENCY SWITCHBOARD.
Condition: Unknown
Due 17 October 1988
Resolved 17 October 1988
Construction/Loadline
Issued 4 December 1987
Resolved
MAKE MAT SIDES AND BOTTOM AVAILABLE FOR VISUAL (VIDEO) EXAMINATION AT THE NEXT RIG MOVE.
Condition: Unknown
Due 4 December 1987
Resolved 4 December 1987
Lifesaving
Issued 1 September 1987
Resolved
CONDUCT FIRE AND BOAT DRILL
Condition: Unknown
Due 1 September 1987
Resolved 1 September 1987
Electrical
Issued 1 September 1987
Resolved
REPAIR OR REPLACE 3 INOP EMERGENCY LIGHTS
Condition: Unknown
Due 1 September 1987
Resolved 1 September 1987
Unknown
Issued 1 September 1987
Resolved
REPLACE PLASTIC TUBING IN LUBE OIL AND DIESEL OIL TANKS IN ENGINE ROOM AND ON DRILL FLOOR WITH HEAT RESISTANT MATERIAL
Condition: Unknown
Due 1 September 1987
Resolved 1 September 1987
Engineering
Issued 1 September 1987
Resolved
REPLACE MISSING FLAME SHIELD ON RAYCOR FUEL FILTER ON PORT THRUSTER ENGINE
Condition: Unknown
Due 1 September 1987
Resolved 1 September 1987
Electrical
Issued 11 February 1985
Resolved
PROVIDE EVIDENCE THAT LOGGING EQUIPMENT IN THE MUD PIT ROOM AND SHALE SHA- KER AREA ARE UL, FM, OR CSA APPROVED FOR HAZARDOUS LOCATIONS.
Condition: Unknown
Due 11 February 1985
Resolved 11 February 1985
Unknown
Issued 26 January 1984
Resolved
MAKE THE FOLLOWING PLATFORM TANKS AVAILABLE FOR INTERNAL INSPECTION: #1 PORT, #1 CENTER, #3 STBD AND #10 STBD.
Condition: Unknown
Due 26 January 1984
Resolved 26 January 1984
Unknown
Issued 26 January 1984
Resolved
THE FOLLOWING DEFICIENCY IS FOR THE J STORM VI, DN587412.
Condition: Unknown
Due 26 January 1984
Resolved 26 January 1984
Unknown
Issued 26 January 1984
Resolved
OPERATE BOTH CAPSULES IN THE WATER AND TEST THE WATER SPRAY SYSTEM.
Condition: Unknown
Due 26 January 1984
Resolved 26 January 1984
Unknown
Issued 26 January 1984
Resolved
CONDUCT A FIRE AND ABANDON RIG DRILL.
Condition: Unknown
Due 26 January 1984
Resolved 26 January 1984
Unknown
Issued 26 January 1984
Resolved
PROVIDE THE FOLLOWING REQUIRED CREW ON BOARD: TWO ABLE SEAMEN/LIFEBOATMEN AND ONE ORDINARY SEAMAN.
Condition: Unknown
Due 26 January 1984
Resolved 26 January 1984
Unknown
Issued 26 January 1984
Resolved
THE FOLLOWING DEFICIENCIES ARE FOR THE J STORM VI, DN587412.
Condition: Unknown
Due 26 January 1984
Resolved 26 January 1984
Unknown
Issued 26 January 1984
Resolved
PROVIDE AN APPROVED CONSTRUCTION PORTFOLIO AS REQUIRED BY THE CERTIFICATE OF INSPECTION.
Condition: Unknown
Due 26 January 1984
Resolved 26 January 1984
Unknown
Issued 26 January 1984
Resolved
CONDUCT THE REQUIRED FOUR MONTH TESTING OF THE LINE THROWING APPLIANCE AND LOG SAME.
Condition: Unknown
Due 26 January 1984
Resolved 26 January 1984
Documentation
Issued 24 November 1981
Resolved
CONDUCT A DRYDOCK EXAMINATION FOR CREDIT DURING THE NEXT RIG MOVE BUT NOT LATER THAN 1 APRIL 1982.
Condition: Unknown
Due 30 April 1982
Resolved 24 November 1981
Documentation
Issued 24 November 1981
Resolved
CONDUCT AN ANNUAL LOAD-LINE SURVEY PRIOR TO NEXT RIG MOVE.
Condition: Unknown
Due 30 April 1982
Resolved 24 November 1981