Internal Structural Exam · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8376427
20 May 2025
Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8140448
13 February 2025
Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8075003
29 May 2024
Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7897601
24 May 2023
Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7685167
9 March 2023
Internal Structural Exam · Plan Review (Other than "T") · Examination of Repairs · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7642822
1 August 2022
In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7521935
1 March 2022
Deficiency Check · Internal Structural Exam · COI Inspection · Administrative Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7396712
9 October 2021
In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7331159
18 May 2021
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7199913
22 December 2020
Drydock Exam · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7103993
27 August 2020
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7043645
28 May 2020
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6962764
20 March 2020
Drydock Extension
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6929438
1 November 2019
In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6847165
11 April 2019
Annual Inspection · MTSA Verification
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6660603
10 September 2018
Deficiency Check · Administrative Inspection
Physical examination · Navigation Center · Activity 6537102
8 September 2018
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6536194
19 April 2018
MTSA Verification · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6394539
29 March 2018
Internal Structural Exam · Hull Examination
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6372477
3 March 2017
COI Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6097245
25 March 2016
Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5842960
8 March 2016
Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 5828970
3 March 2016
MTSA Verification · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5826411
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 20 May 2025
Resolved
Shutoff valves, installed so as to close against the fuel flow must be manually operable from outside the compartment in which the valve is located. The shutoff valves could not be closed during testing without the retrieval of a wrench from another space. Temporary solution was provided by leaving a wrench at each of the two valve shutoff locations. Conduct permanent repairs to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 May 2025
Resolution: Operator fixed valve
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 20 May 2025
Resolved
Fire extinguishing equipment installed on a vessel in excess of the requirements must be designed, constructed, installed, and maintained in a manner acceptable to the Commandant. The smoke detectors in the engine room and bridge were expired. Replace to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 May 2025
Resolution: Operator replaced smoke detectors.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 May 2025
Resolved
Each item of lifesaving equipment carried on board a vessel but not required under this part, must be of an approved type. The water light on the ring life buoy located on the aft main deck was inoperable. Repair/replace to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 May 2025
Resolution: Operator replaced water light
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 20 May 2025
Resolved
Each life float must be fitted with a lifeline, pendants, two paddles, a painter, and a light. 01 life float waterlight was cracked. Replace to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 May 2025
Resolution: Operator replaced water light
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 20 May 2025
Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. Placards were missing from several of the accommodation spaces. Add placards to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 May 2025
Resolution: Operator added appropriate number of placards.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 May 2024
Resolved
At all inspections the attending marine inspector shall ensure that all observed unsafe practices are corrected. 02 electrical junction boxes were found to be missing protective covers. O/O is to repair or replace junction box covers to satisfaction of attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 June 2024
Resolved 26 June 2024
Resolution: Operator installed protective covers
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 May 2024
Resolved
Gauges to indicate engine cooling water discharge temperature and lubricating oil pressure shall be provided for all propulsion engines and located so as to be in the view of the operator. Oil pressure gauges for both main diesel engines at the operating station were inoperable. O/O is to provide working oil pressure gauges at operating station to the satisfaction of attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 June 2024
Resolved 26 June 2024
Resolution: Gauge was replaced
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 29 May 2024
Resolved
Rails or equivalent protection shall be installed near the periphery of all weather decks accessible to passengers and crew. Second deck port side mid-ship access fence was torn open causing a potential falling hazard/unsafe condition. O/O is to repair or replace fence rail guard to satisfaction of attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 June 2024
Resolved 26 June 2024
Resolution: Operator repaired rail.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 24 May 2023
Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board an FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. EPIRB was found with expired batteries. Vessel is restricted to 3 NM from coastline until fully operational EPIRB is onboard.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 June 2023
Resolved 7 June 2023
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 24 May 2023
Resolved
Gauges to indicate engine revolutions per minute (RPM), jacket water discharge temperature, and lubricating oil pressure must be provided for all propulsion engines installed in the vessel. The gauges must be readily visible at the operating station. Lube oil and jacket water gauges were found inoperable in the pilot house.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 June 2023
Resolved 7 June 2023
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 24 May 2023
Resolved
A door in a stair tower, stairway, and main vertical zone bulkhead must be of the self-closing type capable of closing against a 3.5 list of the vessel. One door was found with a broken latch and could not close securely.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 June 2023
Resolved 7 June 2023
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 24 May 2023
Resolved
A door in a stair tower, stairway, and main vertical zone bulkhead must be of the self-closing type capable of closing against a 3.5 list of the vessel. One door was found unable to securely close.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 24 May 2023
Resolution: Self-closing devices loosed so door closes completely.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 24 May 2023
Resolved
Each item of survival craft equipment must be of good quality, and efficient for the purpose it is intended to serve. Each item of equipment carried must be secured properly. One water-light holder was found broken.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 24 May 2023
Resolution: Water-light holder was replaced with new.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 24 May 2023
Resolved
Each ring life buoy with a floating water-light must be secured around the body of the ring life buoy. Life ring on the second deck starboard side was found secured to lifeline.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 24 May 2023
Resolution: Water-light line secured around the body of life-ring.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 24 May 2023
Resolved
Each ring life buoy must be marked with Type II retroreflective material approved in 46CFR164.018 in subchapter Q of this chapter or other standard specified by the Commandant. The arrangement of the retroreflective material applied after March 11, 1996, must be as specified by IMO Resolution A.658(16). Ring Buoy reflective tape damaged on port pilot house life ring buoy.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 24 May 2023
Resolution: Renewed retro-reflective tape.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 24 May 2023
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. First-aid kit contains multiple expired products.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 24 May 2023
Resolution: Expired meds replaced with new meds.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 1 March 2022
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules. The forward mast navigation light was inoperable.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 March 2022
Resolved 10 March 2022
Resolution: Operator submitted photo of mast light operational at dusk.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 1 March 2022
Resolved
A door in a stairtower or stairway must be of the self-closing type capable of closing against a 3.5 list of the vessel. The port side fire door in the forward stairtower on the main deck, was not latching properly.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Resolved 1 March 2022
Resolution: Corrected on the spot
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 1 March 2022
Resolved
Each vessel operating on a limited coastwise or lakes, bays and sounds route in cold water, must be provided with life floats of an aggregate capacity that will accommodate at least 100% of person on board. Two of the vessel's buoyant apparatuses were taken out of service. Vessel is restricted to the carriage of 474 total persons when on such routes until replacements have been satisfactorily verified by a marine inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 27 May 2022
Resolution: Operator replaced two out of service bouyant apparatus' with two brand new Life-Floats.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead strength
Issued 22 December 2020
Resolved
Provide documentation from Naval Architect that the vertical stiffeners in the wet and dry compartments do not have to be welded to the bottom hull plate or re-weld/weld all that are not welded completely or with cracked welds properly to the bottom hull plate. Snipe back bulkhead stiffeners as per bulkhead stifferner dwg. See attached.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 December 2020
Resolved 18 May 2021
Resolution: Inspected installation of stiffeners as per bulkhead stiffener dwg.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 December 2020
Resolved
Laz port fwd bulkhead, hydraulic line leaking at coupling, steering system. Make repairs.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 December 2020
Resolved 18 May 2021
Resolution: Inspected installation of new piping in affected area in kind, sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 22 December 2020
Resolved
Aft superstructure bulkhead port and starboard corners wasted thru IWO main deck, not weather tight. Make repairs.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 December 2020
Resolved 18 May 2021
Resolution: Cropped/renewed in kind, sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 22 December 2020
Resolved
Starboard fuel/oil containment drain, leaking at union into void space, termination penetrates transverse WT Bulkhead IWO Engine room, need to terminate pipe by welding or install a valve to maintain transverse bulkhead WT integrity.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 December 2020
Resolved 18 May 2021
Resolution: valve and cap, installed and inspected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 December 2020
Resolved
Start air center receiver PRV leaking by replace. Inboard and outboard start air tank pressure gauges not operational, replace or repair.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 December 2020
Resolved 18 May 2021
Resolution: Inspected installation of all 3 pressure vessel releive valves and gauges, sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 22 December 2020
Resolved
Engine room; Acrylic sight glass on the lube oil tank spliced with plastic hose, valves on tank are not automatic-closing. Replace with glass properly guarded sight glass and self-closing valve assembly.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 December 2020
Resolved 18 May 2021
Resolution: Inspected site glass installation, sat.
09 - Working and Living Conditions › 091 - Living Conditions › Access/structure
Issued 28 May 2020
Resolved
Repairs or alterations to the hull, machinery, or
equipment that affect the safety of the vessel must not
be made without the approval of the cognizant OCMI,
Noted wasted decking and a wasted centerline
longitudinal frame underneath the vessels walk in
refrigerator. Determine extent of material defect and
submit repair proposal to Marine Inspector for
approval
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2020
Resolved 18 May 2021
Resolution: replaced in kind; decking and frame.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 20 March 2020
Resolved
THE INTERVALS BETWEEN DRYDOCK AND INTERNAL STRUCTURAL EXAMINATIONS SPECIFIED IN 46CFR115.600 MAY BE EXTENDED BY THE COGNIZANT OCMI. THE VESSEL IS GRANTED A 7-MONTH EXTENSION OF ITS NEXT CREDIT DRYDOCK EXAM DUE DATE; NEXT CREDIT DRYDOCK EXAM DUE NO LATER THAN OCTOBER 31, 2020.
Action required: 705 - Other - as specified
Due 31 October 2020
Resolved 27 August 2020
Resolution: Issued no-sail deficiency to complete credit hull exam prior to carrying passengers.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 10 September 2018
Resolved
Vsl is broadcasting invalid MMSI and Invalid Call Sign
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 11 September 2018
Resolution: Received e-mail from vsl rep stating vsl information was updated. Checked in VIVS that AIS was broadcasting properly.
Engineering › Bilge Water Management System › Pump
Issued 3 March 2017
Resolved
Vessel rep. had bilge pump out for servicing. Prove proper operation of PTO bilge pump.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 March 2017
Resolution: Rep stated hand valves were repaired and operate properly now. PTO driven fire pump was tested in place SAT 60PSI+, pump was removed and overhauled, reviewed parts list with rep.
Engineering › Pressure Vessel › Shell Plate
Issued 3 March 2017
Resolved
Conduct 1.25 x MAWP hydrostatic test on 03 air receivers.
Condition: Invalid
Action required: 705 - Other - as specified
Due 17 March 2017
Resolved 15 March 2017
Resolution: All (3) air receivers were pressed up to 350PSI hydro with hand water pump and new 0 - 400PSI installed inline, PSI for 10 minutes, visual inspection of all fittings and welds SAT.