MAURY USCG vessel records
← All vessels

CALYPSO QUEEN

Built
1980
Last inspected
8 June 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 8 June 2026
…with no type recorded2
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDE7196
Flag
UNITED STATES
Maury page id
psix-51980

Documentation record

Registered dimensions (L × B × D)64.9 ft × 28.0 ft × 7.2 ft
Registered tonnagegross 88 / net 60
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderINGRAM & WINDLER BOAT CO · FT LAUDERDALE, FL, UNITED STATES · built 1980
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portCLEARWATER, FL
Endorsements, as the file codes themcw_un
DocumentationValid · issued 15 May 2026 · expires 30 June 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it88 - Regulatory (Subpart C or D), Gross Ton
60 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 21 inspections, each with its date, unit and type; 32 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 21

8 June 2026 Deficiency Check · COI Inspection · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8344905
9 September 2025 Hull Examination · Internal Structural Exam · Annual Inspection · Deficiency Check · Drydock Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8207324
19 August 2024 Annual Inspection · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7984416
20 July 2024 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7981621
26 January 2024 Administrative Inspection · Damage Survey · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7856406
12 June 2023 Hull Examination · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7713363
16 May 2023 In-Service Inspection · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7691349
13 January 2023 In-Service Inspection · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7621144
11 August 2022 Deficiency Check · Internal Structural Exam · Examination of Repairs · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7517681
20 May 2022 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7455254
15 March 2022 Administrative Inspection · In-Service Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7412388
24 August 2021 Deficiency Check · Hull Examination · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7246757
8 June 2021 COI Inspection · DAPI Audit · Deficiency Check · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7194113
10 March 2021 Examination of Repairs · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7153425
21 September 2020 Annual Inspection · DAPI Audit
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7049446
10 September 2019 Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6746900
4 September 2019 Deficiency Check · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6790842
11 September 2018 Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6514184
29 August 2017 Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6237203
26 June 2017 Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6173738
21 June 2016 COI Inspection · DAPI Audit
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5906352

Deficiency record · 32

10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 8 June 2026 Resolved
A vessel at anchor shall exhibit where it can best be seen: an all-round white light. MI observed the all-round anchor light was inoperable. Until rectified, vessel is restricted to daylight operations only and limited to minimum visibility of 2 Nautical Miles. 33CFR83.30 705c
Action required: 705 - Other - as specified
Due 8 June 2026
Resolved 9 June 2026
Resolution: Received satisfactory photo evidence of working anchor light.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 8 June 2026 Resolved
On a vessel of not more than 19.8 meters (65 feet) in length carrying more than 49 passengers the minimum capacity of the fire pump must be 50 gallons per minute at a pressure of not less than 60 psi at the pump outlet. The pump outlet must be fitted with a pressure gauge. MI observed that the pressure gauge fitted to the fire pump was reading inaccurately. Replace and calibrate. 46CFR181.300 (b) 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2026
Resolved 9 June 2026
Resolution: Received satisfactory photo evidence of new installed fire pump gauge.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 8 June 2026 Resolved
Gears, couplings, flywheels, and all rotating machinery capable of injuring personnel must be provided with adequate covers or guards. MI observed that protective guards were missing around the fire pump. 46CFR182.100 46CFR58.01-20 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2026
Resolved 13 June 2026
Resolution: Received satisfactory photo evidence of fabricated safety cover for fire pump shaft.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 August 2024 Resolved
STBD fuel emergency shut off valve did not fully close when pulled. This was adjusted and working properly before the inspection was complete. 46 CFR 182.455
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 27 August 2024
Resolved 27 August 2024
Resolution: Connection was adjusted and valve fully closed prior to inspection completion.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 August 2024 Resolved
Life Jackets were found with floatation foam deterioration. These were destroyed in MIs presence. New life jackets were purchased and labeled prior to inspection completion. 46 CFR 180.71
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 27 August 2024
Resolved 27 August 2024
Resolution: Life jackets were purchased and labeled prior to inspection completion.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 27 August 2024 Resolved
Damaged extension cord was found powering a drink dispensing machine. Remove extension cord and install an outlet to power the dispenser. 46 CFR 183.340
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 September 2024
Resolved 29 August 2024
Resolution: An outlet was properly installed eliminating the need for an extension cord.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 January 2024 Resolved
At each inspection the vessel shall be ready for machinery inspections to include operation of the main propulsion machinery both ahead and astern. The propulsion running gear was damaged when vessel grounded. Assess damage and make repair proposal to the [name withheld] must be verified and an operational test completed to the Coast Guards satisfaction, prior to carrying passengers. 46 CFR 176.804
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 January 2024
Resolved 30 January 2024
Resolution: Repairs were completed, operational test SAT.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Freeboard marks
Issued 11 August 2022 Resolved
A vessel with more than 1 deck above the bulkhead deck must have hull markings IAW 46 CFR 185.30-3(b). The vessel is missing the required hull markings matching the dimensions listed on the stability letter. 46 CFR 185.30-3(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2022
Resolved 6 September 2022
Resolution: The operator painted a loading mark that matches the dimensions specified on the stability letter.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 11 August 2022 Resolved
Penetrations and openings in watertight bulkheads must have means to make them watertight. MI observed 3 holed cable penetrations at the top of the watertight bulkhead at frame 22. Penetration is not watertight. 46 CFR 171.114(a)(2)
Action required: 705 - Other - as specified
Due 18 August 2022
Resolved 16 August 2022
Resolution: The operator plugged the penetrations in the WTB at frame 22 using a 3M Marine Adhesive Sealant that is rated as an underwater sealant.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 August 2022 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] observed 2 wasted rubber mounts underneath the port generator. 46 CFR 176.700(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2022
Resolved 6 September 2022
Resolution: The operator replaced the rubber mounts underneath the port generator like and in kind.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 11 August 2022 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] observed a 1" hole due to corrosion in the engine room overhead above the hot water heater. 46 CFR 176.700(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2022
Resolved 6 September 2022
Resolution: The operator cropped and renewed the aluminum plate for the 1" hole found in the engine room overhead above the hot water heater. Repairs to the overhead were completed like and in kind to original construction.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 August 2022 Resolved
Where a flexible fill pipe section is necessary, suitable flexible tubing or hose having high resistance to salt water, petroleum oils, heat. and vibration, may be used. Such hose shall overlap metallic pipe ends at least 1 and 1/2 times the pipe diameter and shall be secured at each end by two clamps of corrosion resistant metal. The flexible section sha11 be accessible and as near the upper end of the filling pipe as practicable. When the flexible section is a nonconductor of electricity, the metallic sections of the filling pipe separated thereby shall be joined by a conductor for protection against static. The conductor is missing in the flexible section between the metallic sections of the filling pipe. 46 CFR 182.20-30 (d)
Action required: 705 - Other - as specified
Due 18 August 2022
Resolved 16 August 2022
Resolution: The operator installed a single 12 AWG marine grade conductor to both sides of the metal piping at the flexible fitting on the fuel fill pipe.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 11 August 2022 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] construction plans for the vessel require a secondary overhead means of escape from the spaces below the main deck. The emergency escape hatch is located between frame 12 and frames 13, forward of the engine room on the starboard side. The emergency escape hatch was found blocked above by the carpet and table installation on the main deck and is not properly labeled as an emergency exit. 46 CFR 176.700(a)
Action required: 10 - Deficiency Rectified
Due 11 August 2022
Resolved 11 August 2022
Resolution: The operator found the emergency escape hatch blocked above by the installation of carpet and a fixed table for dining. The operator removed the carpet and table. The operator labeled the space for emergency escape and cleared an egress above the space.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 15 March 2022 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions against fire, means of escape in case of a sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. Vessel was involved in a collision. Must undergo appropriate inspection by USCG marine inspector. 46 CFR 177.100
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 March 2022
Resolved 16 March 2022
Resolution: MI observed two cosmetic scrapes on port side of hull. No internal damage.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 8 June 2021 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the [name withheld] weld found at starboard longitudinal frame #1 in compartment number one. Make satisfactory repairs and match weld profile to existing welds on frames in this space. 46 CFR 176.700
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 July 2021
Resolved 8 July 2021
Resolution: The operator hired a third party welder to complete repairs. A photo of the completed weld was sent to Sector St. Pete. The weld matches the existing weld profile for the frame.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 June 2021 Resolved
All electrical installations shall be to the satisfaction of the OCMI. Identified a 110V electrical outlet installed in the air duct on #2 deck without electrical plan approval and temporarily mounted. Multi-outlet adapters (power strips) may not be connected to other adapters (“daisy-chained”), or otherwise used in a manner that could overload the capacity of a receptacle. Identified 15 surge protective devices daisy chained to an electrical outlet on deck 2 in the vicinity of the "DJ" station. The operator removed the surge protector daisy chain and the unapproved 110V electrical outlet in the air duct. 46 CFR 183.01-15
Action required: 10 - Deficiency Rectified
Due 8 June 2021
Resolved 8 June 2021
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 September 2019 Resolved
All electrical equipment and circuits must be clearly marked and identified. 46CFR183.220(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 September 2019
Resolved 10 September 2019
Resolution: All circuits marked and identified.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 September 2019 Resolved
Cap dead end wires in engine room and have wires terminate in a junction box. 46CFR183.200(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 September 2019
Resolved 10 September 2019
Resolution: All dead end wires capped and terminated in junction box.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 11 September 2018 Resolved
The cognizant OCMI determines that the vessel is designed, arranged, or involved in operations so that the vessel itself cannot serve as an adequate rescue craft. Repair or replace rescue platform prior to carrying passengers. IAW: 46CFR180.210 (b) (2)
Action required: 10 - Deficiency Rectified
Due 11 September 2018
Resolved 11 September 2018
Resolution: Vessel O/O fabricated new rescue platform.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 September 2018 Resolved
The material specification shall show that the rigid nonmetallic material possesses characteristics adequate for it intended service and environment and shall be approved for use by the Officer in Charge, Marine Inspection. Replace starboard engine lube oil hose. IAW: 46cfr 182.40-1
Action required: 10 - Deficiency Rectified
Due 11 September 2019
Resolved 11 September 2018
Resolution: O/O replaced engine lube oil hose.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 September 2018 Resolved
All wiring and cables shall be suitable for marine service and for the particular installation use. MI found unsafe splices throughout vessel, specifically in galley and 03 deck. Repair/replace were necessary. IAW: 46 CFR 183.10-20 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2018
Resolved 17 October 2018
Resolution: Splices replaced w/ approved wiring.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 September 2018 Resolved
Auxiliary machinery shall be suitable in type and design intended. MI observed excessive crankcase exhaust in engine room due to improper installation. Provide repair plan for generator crankcase exhaust. IAW: 46 CFR 182.10-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 September 2018
Resolved 7 March 2019
Resolution: Verified installation of crankcase breather unit for both generators.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 September 2018 Resolved
Each collision bulkhead required by §179.210, must be constructed in accordance with §179.320, except that a collision bulkhead, must not be fitted with any type of penetration or opening except penetrations may be made if they are located as high and as far inboard as practicable and they have a means to make them watertight. MI observed wire running along overhead in forward peak compartment through collision bulkhead. Remove wire if not in use and repair penetration in bulkhead. IAW: 46CFR179.310 (a) (2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2018
Resolved 17 October 2018
Resolution: Wiring removed and watertight integrity of collision bulkhead sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 September 2018 Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. MI observed oil spray accumulation in electrical outlets and unsatisfactory wire run supports in ER. Clean outlets & replace plastic wire supports w/ metallic. IAW: 46CFR183.01-15 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2018
Resolved 17 October 2018
Resolution: Metallic wire ties installed throughout ER and oil removed from electrical outlets.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 11 September 2018 Resolved
The portable hand bilge pump shall be provided with suitable hoses for pumping bilges on the suction and discharge end. MI observed that hand pump located in engine room did not have adequate hose length to de-water all vessel compartments. IAW: 46CFR182.25-10 (e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 October 2018
Resolved 17 October 2018
Resolution: Hose added to pump to satisfy all compartments.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 11 September 2018 Resolved
Each water light must be of an approved automatic electric type constructed in accordance with subpart 161.010 of this chapter. MI observed ring life buoy water light to be inadequate in operation, replace. IAW: 46CFR180.30-1 (b) IAW:
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 October 2018
Resolved 17 October 2018
Resolution: Water light replaced.
Engineering › Bilge Water Management System › Piping
Issued 29 August 2017 Resolved
Remove flex hose connection on bilge piping servicing forward compartment and replace as original. 46 CFR 182.40-5 (Old T)
Action required: 705 - Other - as specified
Due 5 September 2017
Resolved 5 September 2017
Construction/Loadline › Structures › Transverse Bulkhead
Issued 29 August 2017 Resolved
Provide repair proposal addressing use of non-metallic piping materials penetrating MTWB at frames 10, 16, and 22. 46 CFR 182.40-1
Action required: 705 - Other - as specified
Due 6 September 2017
Resolved 5 September 2017
Resolution: Received repair proposal from operator.
Operations/Management › Drills/Instruction › Not Conducted
Issued 28 June 2017 Resolved
Complete all drills with crewmembers IAW 46 CFR 185.25-10
Due 12 July 2017
Resolved 17 July 2017
Resolution: Witnessed satisfactory drills.
Fire Fighting › Fire Main › Condition
Issued 27 June 2017 Resolved
Pitting and holes located in suction end of fire main piping. Must repair prior to carrying passengers IAW 46 CFR 181.10-1.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 June 2017
Resolution: Aluminum piping replaced, all sat.
Stability › Watertight Integrity › General
Issued 27 June 2017 Resolved
Replace gasket in fwd watertight door IAW 46 CFR 170.270(b).
Action required: 705 - Other - as specified
Due 27 July 2017
Resolved 17 July 2017
Resolution: Verified replacement.
Lifesaving › Embarkation Appliances/Stations › Steps
Issued 21 June 2016 Resolved
Complete repairs to man overboard rescue platform IAW 46 CFR 185.520
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2016
Resolution: Replaced bracket.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.