Records from 2005 to 2026. Most recent: inspection, 12 February 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the recorded names, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 6 May 2025
Resolved
The owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector. Portable fire extinguishers are past due for annual inspection.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 May 2025
Resolved 5 June 2025
Resolution: Annual servicing completed.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 10 April 2025
Resolved
"A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural examination at least once every two years." Vessel exceeded 2 year dry dock requirement. Prior to carriage of passengers, vessel must be given credited drydock prior to carriage of passengers.
46 CFR 115.600(c)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 May 2025
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 27 March 2024
Resolved
All rugs and carpets shall be of wool or other material having equivalent fire resistive qualities. Must prove rugs installed meet regulations. (Flame spread rating 75 & smoke developing rating not to exceed 100; ASTM E701-84)
46CFR177.10-5
46CFR72.05-55
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2024
Resolved 18 December 2024
Resolution: approved carpet was installed
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 March 2024
Resolved
AN ADULT LIFE JACKET MUST BE PROVIDED FOR EACH PERSON CARRIED ON BOARD A VESSEL. IN ADDITION, A NUMBER OF CHILD-SIZE LIFE JACKETS EQUAL TO AT LEAST 10% OF THE NUMBER OF PERSONS PERMITTED ON BOARD MUST BE PROVIDED...
VSL HAS 07 ADULT AND 02 CHILD LIFE JACKETS NO LONGER SERVICEABLE. PASSENGER CARRIAGE RESTRICTED TO 392 ADULT AND 35 CHILD UNTIL SUFFICIENT NUMBER OF SERVICEABLE LIFE JACKETS IS RESTORED.
46CFR117.71
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 April 2024
Resolution: New life jackets on board
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 27 March 2024
Resolved
VSL IS REQUIRED TO CARRY / HAVE POSTED AT CONTROL POINT, REQUIRED FCC BRIDGE-TO-BRIDGE RADIOTELEPHONE ACT CERTIFICATE AND FCC SAFETY RADIOTELEPHONY SAFETY CERTIFICATE.
47CFR80.901
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 June 2024
Resolution: New FCC licence on board
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 27 March 2024
Resolved
AS APPROPRIATE FOR THE INTENDED VOYAGE, VESSEL MUST CARRY ADEQUATE AND UP-TO-DATE; CHARTS OF LARGE ENOUGH SCALE TO MAKE SAFE NAVIGATION POSSIBLE...
46CFR121.420
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 April 2024
Resolution: New charts on board
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 27 March 2024
Resolved
ALL VSLS MUST HAVE NAVIGATION LIGHTS IN COMPLIANCE WITH INTERNATIONAL AND INLAND NAVIGATION RULES, AND ON VSL MORE THAN 65FT MUST MEET UL 1104 OR OTHER COMMANDANT SPECIFIED STANDARD. REPAIR / REPLACE STERN LIGHT PRIOR TO NIGHT-TIME OR REDUCED VISIBILITY OPERATIONS.
46CFR120.420
705-C - NO NIGHT OPERATIONS OR DURING REDUCED VISIBILITY
Action required: 705 - Other - as specified
Resolved 17 April 2024
Resolution: Stern light bulb replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 27 March 2024
Resolved
MACHINERY IS REQUIRED TO BE INSTALLED AND MAINTAINED IN A MANNER TO PROTECT AGAINST FIRE, EXPLOSION, MACHINERY FAILURE, AND PERSONNEL INJURY. STARBOARD GENERATOR (GEN SET) EVIDENCED A SUBSTANTILA CRANK-CASE BREATHER EXHAUST LEAK AND OIL SOAKED GEN SET WINDINGS. MAKE PROPER REPAIRS.
46CFR182.01-5 (OLD-T)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 June 2024
Resolution: New rear main seal in place, test ran gen set, all sat
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 27 March 2024
Resolved
All bulkheads and decks shall be classed as A-60, A-30, A-15, A-0, B-15, B-0, or C, depending upon the type of space on each side of the bulkhead or above and below the deck. Vessel 2nd deck has been enclosed (canvas and plastic windows) thus changing its space designation which changes its Structural Fire Protection requirements, must remove enclosure or submit plans to MSC for approval to enclose the upper deck.
46CFR177.10-5
46CFR72.05-10(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 July 2024
Resolved 8 August 2024
Resolution: Canvas enclosure removed from upper deck.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 March 2024
Resolved
Vessel has installed new LED lights on the main deck to include fixtures and strip lighting, all Interior and exterior lighting on a vessel must meet UL595 marine type.
46CFR183.10-20(k)(1)
46CFR120.410(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 June 2024
Resolution: UL approved.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 March 2024
Resolved
Distribution panel in the engine room, engine room need circuits properly labeled.
46CFR183.01-15
IEEE
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 June 2024
Resolution: New label attached
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 27 March 2024
Resolved
Furniture such as chairs, sofas, and similar items are tested and meet the requirements in UL 1056 “Fire Test of Upholstered Furniture,” or meet the requirements in § 72.05–55 in subchapter H of this chapter. MI doubts the fire resistance of furnishings observed on main deck and upper deck. Operator will provide proof that installed all furnishings are of an approved type and in accordance with the vessel's SFP Plan or regulation.
46CFR116.423(a)(1)
46CFR177.10-5
46CFR72.05
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 June 2024
Resolution: Metal chairs and tables now on board
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 March 2024
Resolved
The vessel has new A/C units on the top deck running to air blowers/temperature controllers (4)on the main deck, these units are not on the approved electrical drawing from 2018, electrical load analysis, and penetrations are through fire boundaries. Must submit plans for approval to (MSC) and complete a Coast Guard inspection of this system. (These units are located in a type 5 space and are not considered non combustible)
46CFR115.700
46CFR176.20-1
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 June 2024
Resolution: Submitted to local OCMI, reviewed in house. Documents loaded into MISLE, fire stop installed.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 1 July 2019
Resolved
Vessel did not have the latest updated nvaigational charts. Provide updated navigational charts.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 July 2019
Resolution: Vessel purchased and have onboard current charts.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 July 2019
Resolved
Observed lube oil leak from the starboard main engine throttle assembly. Tighten fittings to prevent lube oil leak.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 July 2019
Resolution: Fixed leak, did not observe further lube oil leak from throttle assembly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 1 July 2019
Resolved
Observed water leak within bilge piping system at the bilge manifold in the engine room. Tighten fittings to prevent water leak in bilge piping.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 July 2019
Resolution: Fixed leak by tigtening fittings on bilge piping system.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 1 July 2019
Resolved
All watertight hatch covers are missing securing devices. Install securing devices to hatch covers to prevent its loss.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 July 2019
Resolution: Installed securing devices on all hatch covers.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 July 2019
Resolved
Both port and starboard main engines are missing machinery guards. Install machinery guards around rotating machinery hazards.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 July 2019
Resolution: Properly installed machinery guards on port and starboard main engines.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 July 2019
Resolved
Vessel does not have ground detection. Install ground detection in compliance with 46 CFR 183.324.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 July 2019
Resolution: Vessel installed ground detection.
02 - Structural Conditions › N/A - No Subsystem › Loading/Ballast condition
Issued 1 July 2019
Resolved
Found the port quarter cleat wasted, Repair/replace cleat for service.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 July 2019
Resolution: Installed new cleat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 July 2019
Resolved
Vessel installed non approved strobe lights and entertainment lights on 2nd deck using plastic ties for wire support. Replace all plactic ties with metal wire supports and provide light/wire specs to provide proof system are in compliance.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 July 2019
Resolution: Operator removed all non approved wires/lights and wire supports.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 10 May 2019
Resolved
CROP/RENEW Rudder Post support on starboard side in Lazzarete.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 17 May 2019
Resolution: Installed new rudder posts.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 10 May 2019
Resolved
INSTALL missing insulation in E/R.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 17 May 2019
Resolution: Installed missing insulation.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 10 May 2019
Resolved
CROP/RENEW corroded piping in way of crews quarters area.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 17 May 2019
Resolution: Replaced corroded piping.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 10 May 2019
Resolved
Clean drainage piping in overhead of 2nd deck on Port/Starboard side.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 17 May 2019
Resolution: Verified overhead drainage was free of obstructions.
Engineering › Bilge Water Management System › Pump
Issued 22 May 2018
Resolved
Vessel is required to have two bilge pumps, only one pump works and the engine driven does not due to broken clutch.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 May 2018
Lifesaving › Lifebuoys › Serviceable
Issued 22 May 2018
Resolved
Vessel must provide 3 life bouys, all three on board are dry rotten exposing them to the weather inside.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 May 2018
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 22 May 2018
Resolved
Vessel has only 363 adult jackets, must provide 48 adult jackets and until provided passenger count is restricted to 363 adults.
Action required: 705 - Other - as specified
Due 6 July 2018
Resolved 17 May 2019
Resolution: received documentation for acquisition of additional lifejackets.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 22 May 2018
Resolved
Fwd fuel tank space bulkhd has holes in it and this needs to be water tight.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 May 2018
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 22 May 2018
Resolved
Both bar refridgerators are moldy, must be cleaned and sanitized. Due 29May2018
Action required: 705 - Other - as specified
Resolved 25 May 2018
Stability › Incline Test › General
Issued 27 July 2017
Resolved
Vessel has undergone numerous modifications & alterations since 2013 which changed the lightship aggregate weight as per MSC letter dated May 2013, therefore a deadweight survey is required to be submitted to MSC for approval.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 April 2018
Resolution: New stability letter issued
Electrical › Electric Supply System (service) › Cable
Issued 27 July 2017
Resolved
Vessel has conducted modifications & alterations on the 1st deck (main deck), 2nd deck to include the awning, structure, bar/snack area, electrical circuts, and lighting must submit one-line electrical drawing, load analysts, material list (manufacture data)and a general arraingnment drawing to Sector NY and possibly MSC for approval.
Due 27 August 2017
Resolved 22 May 2018
Electrical › Electrical Distribution System (service) › Ground Indicator
Issued 27 July 2017
Resolved
Vessels main distribution panel amp meter shows 6 amps of unwanted current to the hull, must find source of ground and repair, vessel must clear ground fault to protect crew.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Electrical › Electric Generation Source (service) › Generator
Issued 27 July 2017
Resolved
Both port & stbd generator windings are oil soaked and create a fire and electrical hazard, windings must be cleaned to like new condition
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Electrical › Electric Generation Source (service) › Generator
Issued 27 July 2017
Resolved
Vessels stbd gen set is leaking oil from the front inboard side, must find cause of the leak and repair.
Due 10 August 2017
Resolved 22 May 2018
Deck/Cargo › Holds/Tanks › Hatch
Issued 27 July 2017
Resolved
Make all hatches water tight and prove to a CGMI
Due 10 August 2017
Resolved 22 May 2018
Electrical › Electric Supply System (service) › Battery Charger
Issued 27 July 2017
Resolved
The battery charger on the bridge and port gen set does not have an amp meter as required, provide correct battery charger to meet the regulations.
Due 10 August 2017
Resolved 22 May 2018
Electrical › Electrical Distribution System (service) › Junction Box
Issued 27 July 2017
Resolved
All electrical equipment exposed to the weather must be watertight.
Due 10 August 2017
Resolved 22 May 2018
Electrical › Electric Supply System (service) › Cable
Issued 27 July 2017
Resolved
All plugs must have a grounding pole and grounding conductor for equipment that operates at 100 volts or more
Due 10 August 2017
Resolved 22 May 2018
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 27 July 2017
Resolved
All metallic enclosures and frames must be permanently grounded to the hull
Due 10 August 2017
Resolved 22 May 2018
Electrical › Electrical Distribution System (service) › Cable
Issued 27 July 2017
Resolved
All connections must be made in an enclosure
Due 10 August 2017
Resolved 22 May 2018
Electrical › Electric Supply System (service) › Cable
Issued 27 July 2017
Resolved
Vessel has new electrical drawings and approval for Rev B, two items were found to be non-compliant must submit as built drawing for approval to MSC.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 May 2018
Navigation › Piloting/Steering › Coast Guard Light List
Issued 1 June 2017
Resolved
AG01: Provide 2017 versions of Light List and Coast Pilot publications.
Due 30 June 2017
Resolved 27 June 2017
Resolution: Received photo documentation of receipts and new 2017 versions of Light List and Coast Pilot publications.
Documentation › Logs/Records › Logbook (official)
Issued 1 June 2017
Resolved
AG03: Provide drill logbooks for all required quarterly drills.
Due 30 June 2017
Resolved 22 June 2017
Resolution: Received documentation of required drills in logbook.
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 April 2017
Resolved
Vessel's owner/operator is conducting work on the 1st and 2nd deck during yard period. Must submit one-line electrical drawing, load analysis, material list, for all work being done for approval by the U.S. Coast Guard Sector New York.
Action required: 705 - Other - as specified
Resolved 24 May 2018
Resolution: Approval received by MSC
Stability › Incline Test › General
Issued 20 April 2017
Resolved
Work on 2nd deck canopy must be approved by U.S. Coast Guard Sector New York for approval. Must provide drawing, materials list, and before and after pictures of all work being done.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 May 2017
Resolution: Replacement was in kind. Materials submitted- SAT
Stability › Incline Test › General
Issued 13 April 2017
Resolved
Vessel's owner/operator must submit drawings, material list, and before and after pictures to U.S. Coast Guard Sector New York for approval of all work/additions on 2nd deck aft bar/snack station.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 May 2017
Resolution: Replacement was in kind.