MAURY USCG vessel records
← All vessels

EL REY

Built
1979
Last inspected
14 March 2019
Documentation
No record in the NVDC file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 7 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 14 March 2019
…with no type recorded15
Operational controls None recorded without a removal date
Years with a record 34 calendar years (1985–2019)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8642452
Flag
UNITED STATES
Maury page id
psix-52134

Documentation record

Tonnage as PSIX records it7771 - Regulatory (Subpart C or D), Gross Ton
27271 - Convention (Subpart B), Gross Ton
7771 - Regulatory (Subpart C or D), Net Ton
10848 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
The full record for this vessel

Behind this panel: 81 inspections, each with its date, unit and type; 116 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 3 other vessels inspected with it; no other recorded names; no NVDC documentation record for this Official Number. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 3

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

PUNTA BORINQUEN Towing Vessel · MISLE 89514 · 24 February 2012 · activity 4252892PATRIARCH Towing Vessel · MISLE 146017 · 24 February 2012 · activity 4252892SENTINEL Towing Vessel · MISLE 141878 · 6 May 2010 · activity 3732160SENTINEL Towing Vessel · MISLE 141878 · 15 November 1996 · activity 129748

Inspection history · 81

14 March 2019 Administrative Inspection · Load Line/Change of Employment
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6642263
13 June 2018 MARPOL Annex I Examination · Annual Inspection · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6441173
21 June 2017 Deficiency Check · Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6182884
1 June 2017 MARPOL Annex I Examination · Deficiency Check · Internal Structural Exam · COI Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6163258
28 April 2016 Deficiency Check · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5862351
2 November 2015 Hull Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5755345
21 May 2015 Administrative Inspection · MARPOL Annex I Examination · Internal Structural Exam · Annual Inspection · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5131150
3 July 2014 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4909238
27 June 2014 Annual Inspection · MARPOL Annex I Examination · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4899272
24 July 2013 Ballast Water Examination · Annual Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4664249
5 March 2012 Hull Examination · Administrative Inspection · COI Inspection · Internal Structural Exam · MARPOL Annex I Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4264956
24 February 2012 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4252892
10 January 2012 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4222022
14 November 2011 Periodic Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4191620
3 December 2010 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3908095
4 November 2010 MTSA/ISPS Verification · MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3884567
6 May 2010 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3732160
12 April 2010 Examination of Repairs · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3716486
14 November 2008 MARPOL Annex I Examination · MTSA Verification · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3362207
17 April 2008 MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3185539
2 November 2007 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3091684
7 June 2007 Examination of Repairs · Annual Inspection · Hull Examination · MARPOL Annex I Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2953946
28 March 2007 Administrative Inspection · Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2897071
26 May 2006 MTSA Verification · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2659862
19 September 2005 Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2493052
4 August 2005 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2451150
14 July 2005 Internal Structural Exam
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2426336
6 July 2005 Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2417321
21 June 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2397464
31 May 2005 MTSA Verification
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2374643
17 May 2005 MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2359946
14 January 2005 In-Service Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2278889
18 June 2004 COI Inspection · Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2102896
6 February 2004 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2003598
30 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1978222
22 August 2003 Annual Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1883783
14 August 2002 Internal Structural Exam · Hull Examination
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1661525
18 April 2002 Annual Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1606096
31 March 2001 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1470010
16 May 2000 Hull Examination · Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1471580
14 June 1999 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1452519
5 April 1999 Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1121299
24 June 1998 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1127691
27 June 1997 Administrative
Administrative · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1113817
27 June 1997 Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1465920
25 June 1997 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 778024
6 February 1997 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1104362
12 January 1997 Hull Examination · COI Inspection
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1421261
18 December 1996 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1092812
15 November 1996 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 129748
14 November 1996 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 874349
14 April 1996 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 94773
11 January 1996 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 195222
11 January 1996 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 752457
11 January 1996 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1182097
26 January 1995 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1136385
10 November 1994 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1175575
18 October 1994 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 868175
9 June 1994 Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1354811
29 March 1994 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1166425
22 April 1993 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 827294
11 February 1993 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1141908
16 April 1992 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 644500
6 April 1992 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 525867
21 February 1992 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 951702
3 January 1992 Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 950016
17 February 1991 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1226134
14 March 1990 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1232932
6 September 1989 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1201095
11 July 1989 Hull Examination · Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 894083
2 March 1989 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1196813
29 December 1988 Damage Survey
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1039154
6 December 1988 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1208163
6 April 1988 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 993914
18 February 1987 Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1017012
18 February 1987 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1323168
19 August 1986 COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1019149
30 July 1986 Deficiency Check · Examination of Repairs
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1305757
4 June 1986 Examination of Repairs
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 998808
6 April 1986 Damage Survey
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 999882
3 September 1985 Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 987361

Deficiency record · 116

Deck/Cargo › Holds/Tanks › Scuttle
Issued 13 June 2018 Resolved
All 04 forepeak void scuttle dogs were bent or broken. Replace and demonstrate the scuttle can be properly secured.
Action required: 10 - Deficiency Rectified
Resolved 13 June 2018
Resolution: Dogs were replaced and scuttle secured.
Construction/Loadline › Hull › Hull Plating
Issued 13 June 2018 Resolved
Deck plating at stern was severely wasted. Several holes approx. 1" in diameter were found in two locations. Restore watertight envelope.
Action required: 10 - Deficiency Rectified
Resolved 13 June 2018
Resolution: Doubler plates installed in way of holes. Permanent repairs to be undertaken at next drydock.
Construction/Loadline › Hull › Weld
Issued 21 June 2017 Resolved
Prove structural integrity of watertight bulkhead between tanks 8 and 9 port side.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 June 2017
Resolved 23 June 2017
Resolution: Checked the main deck, #9 port void and #8 port ballast tanks. Damage is present but welds are intact and WTB was not breached. Permanent repairs will be complete before next ABS intermediate survey, May 2018.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 1 June 2017 Resolved
Expired COI and ISE
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 1 June 2017
Resolved 9 June 2017
Resolution: Valid COI and International Structural Exam completed.
Construction/Loadline › Penetrations › Weld
Issued 1 June 2017 Resolved
Make permanent repairs to holes in main deck above voids 1, 2, ballast tank #6 & frame 23 between voids 3 & 4 as marked and discusses to the satisfaction of the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 July 2017
Resolved 24 June 2017
Resolution: ABS witnessed permanent repairs and tested via vac box test. All sat.
Construction/Loadline › Hull › Weld
Issued 1 June 2017 Resolved
Complete permanent repairs for work list dated 07JUN17 items found during ISE.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 July 2017
Resolved 21 July 2017
Resolution: USCG Marine Inspectors and the attending ABS surveyor witnessed satisfactory NDT via, vac box and soap and blow on the inserts. All items cleared from the worklist.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 28 April 2016 Resolved
The following junction boxes require repair: main deck, frame 41, frame 49, frame 54, 2nd deck, frame 15, 35, 50, 59, 3rd deck, stand 7 in lane 12
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 20 May 2016
Construction/Loadline › Structures › Deck Plating
Issued 28 April 2016 Resolved
Remove doublers in following locations: main deck frame 32, 3rd deck row H, row F, row L.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 20 May 2016
Electrical › Electrical Distribution System (service) › Wiring
Issued 28 April 2016 Resolved
main deck: Port side wire bundle needs to be reattached between frame 9-10, frame 45-46 port side electrical panel needs locking devices.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 20 May 2016
Electrical › Lighting (service) › Outlet Box
Issued 28 April 2016 Resolved
2nd deck bow light is missing on port side and wires are exposed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 20 May 2016
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 28 April 2016 Resolved
Main deck: frame 53 embarkation area access ladder handrail at the bottom mounts are corroded.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 20 May 2016
Construction/Loadline › Hull › Longitudinal Frame
Issued 28 April 2016 Resolved
Frame 41 second side long is cracked and needs to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 20 May 2016
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 28 April 2016 Resolved
Submit repair proposal for pilot station accomodation ladder.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 May 2016
Resolved 20 May 2016
Construction/Loadline › Hull › Stiffener
Issued 28 April 2016 Resolved
Main deck frame 44 row D diagonal stanchion is wasted at the base.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 20 May 2016
Accommodation/Occupational Safety › Occupational Safety › Storm Rail
Issued 28 April 2016 Resolved
1st-2nd deck ladder well has wasted stanchion and inop light.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 20 May 2016
Construction/Loadline › Structures › Deck Plating
Issued 28 April 2016 Resolved
The following locations have holes in the deck: 2nd deck frame 32 row j, frame 53 row J, 3rd deck frame 54 row H.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 20 May 2016
Construction/Loadline › Hull › Longitudinal Frame
Issued 28 April 2016 Resolved
2nd deck frame 36 flange repair on overhead web frame is corroded and needs to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 20 May 2016
Construction/Loadline › Hull › Bracket
Issued 28 April 2016 Resolved
1st deck frame 51 row J has tripped gusset.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 20 May 2016
Engineering › Generator (propulsion/auxiliary-electric) › Wiring
Issued 28 April 2016 Resolved
generator #1 has exposed wire over oil sensor, missing bulb on ground fault indicator panel and dead end wires resting on exhaust lagging.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 20 May 2016
Electrical › Electrical Distribution System (service) › Wiring
Issued 28 April 2016 Resolved
2nd deck has dead end wires near bow that need to be removed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 20 May 2016
Construction/Loadline › Hull › Girder
Issued 28 April 2016 Resolved
1st deck: frame 59 row E has broken support beam that is fractured and needs repair. schedule 80 stanchions also have multiple holes and wastage that need to be repaired.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 May 2016
Resolved 20 May 2016
Electrical › Electrical Distribution System (service) › Junction Box
Issued 21 May 2015 Resolved
Make permanent repairs to electrical hazards in way of spliced wiring on port side, unmounted j-box on port side, and numeroud j-box covers all on the third deck.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 21 May 2015
Resolved 21 May 2015
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 21 May 2015 Resolved
Make permanent repairs to 3rd deck hand rails oin way of port forward and pilot station area forward.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 June 2015
Resolved 4 June 2015
Resolution: Repairs witnessed by attending MI.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 21 May 2015 Resolved
Make permanent repairs to both port and starboard ladders assemblies (main deck to thrid deck). The steps sections fastening areas are heavily corroded. Repairs are to include corroed/broken hand rails that are present as well.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 June 2015
Resolved 4 June 2015
Resolution: Repairs witnessed by attending MI.
Electrical › Lighting (service) › Lighting Fixture
Issued 27 June 2014 Resolved
Renew the non-sealable deck light on the Main Deck, Stbd side, in way of the airport.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 June 2014
Resolution: Renewed during this inspection.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 27 June 2014 Resolved
On the 2nd Deck in way of FR.23-1/2, install the missing electrical receptical cover.
Condition: Improper/Lack of Maintenance
Due 4 July 2014
Resolved 3 July 2014
Resolution: Installed by photo.
Construction/Loadline › Hull › Hull Plating
Issued 27 June 2014 Resolved
On the 3rd Deck in way of FR.22-1/2, centerline, crop and renew the deck plate to original scantling with a minimum insert of 18 in. x 18 in.
Due 30 July 2014
Resolved 3 July 2014
Resolution: Repairs shown by photo.
Construction/Loadline › Hull › Stiffener
Issued 27 June 2014 Resolved
On the 2nd Deck in way of FR.58, starboard outboard stantion, crop and renew the top 36 inches to original scantling.
Condition: Improper/Lack of Maintenance
Due 30 July 2014
Resolved 3 July 2014
Resolution: Repairs shown by photo.
Operations/Management › EPA Vessel General Permit (VGP) › 4.1.1.1-Documentation Routine Vessel Inspection
Issued 24 July 2013 Resolved
Provide proof of compliance with Vessel General Permit. VGP 4.1 and 4.2
Action required: 705 - Other - as specified
Due 24 August 2013
Resolved 8 August 2013
Resolution: Provided documention.
Operations/Management › Ballast Water Managment › Mandatory Practices
Issued 24 July 2013 Resolved
Provide and implement Ballast Water Management plan. 33 CFR 151.2035
Action required: 705 - Other - as specified
Due 24 August 2013
Resolved 8 August 2013
Resolution: Provided documentation.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 24 July 2013 Resolved
Repair/ replace top handrail for the docking master's platform on the port side.
Condition: Improper/Lack of Maintenance
Due 24 August 2013
Resolved 8 August 2013
Resolution: Repaired satisfactorily.
Construction/Loadline › Structures › Superstructure
Issued 24 July 2013 Resolved
Repair/ replace 3 stanchions under the pilot house on the 3rd deck as discussed.
Condition: Improper/Lack of Maintenance
Due 24 August 2013
Resolved 8 August 2013
Resolution: Repaired satisfactorily.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 24 July 2013 Resolved
Repair/ replace top handrail on the starboard side at the second stand forward from the stern on the 3rd deck.
Condition: Improper/Lack of Maintenance
Due 24 August 2013
Resolved 8 August 2013
Resolution: Repaired satisfactorily.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 24 July 2013 Resolved
Provide an interlock on the circuit breaker to prevent the generator and shore power from operating simultaneously.
Due 24 August 2013
Resolved 8 August 2013
Resolution: Repaired satisfactorily.
Deck/Cargo › Ballast › Piping
Issued 24 July 2013 Resolved
Repair/ replace the wasted ballast piping on the #1 overboard discharge line.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 August 2013
Resolved 8 August 2013
Resolution: Repaired satisfactorily.
Construction/Loadline › Hull › Weld
Issued 15 November 2011 Resolved
Main Deck Stbd side curtain at frame 31 - drill stop crack at the end and gouge & reweld fracture
Action required: 705 - Other - as specified
Due 15 January 2012
Resolved 10 January 2012
Construction/Loadline › Hull › Weld
Issued 15 November 2011 Resolved
Main Deck lane F/G frame 45 - Crop and renew lower 4 feet of diagonal
Action required: 705 - Other - as specified
Due 15 January 2012
Resolved 10 January 2012
Construction/Loadline › Hull › Weld
Issued 15 November 2011 Resolved
Main Deck lane F/G frame 37 - gouge and weld pitted area of diagonal to deck connection
Action required: 705 - Other - as specified
Due 15 January 2012
Resolved 10 January 2012
Construction/Loadline › Hull › Weld
Issued 15 November 2011 Resolved
Main Deck lane D/E frame 27 - gouge and reweld fractured diagonal
Action required: 705 - Other - as specified
Due 15 January 2012
Resolved 10 January 2012
Construction/Loadline › Hull › Weld
Issued 15 November 2011 Resolved
Main Deck Port side frame 2 - gouge and reweld #1,#2 and #3 side long
Action required: 705 - Other - as specified
Due 15 January 2012
Resolved 10 January 2012
Construction/Loadline › Hull › Weld
Issued 15 November 2011 Resolved
Main Deck Port Side frame 3 - gouge and reweld #2 side long
Action required: 705 - Other - as specified
Due 15 January 2012
Resolved 10 January 2012
Construction/Loadline › Hull › Weld
Issued 15 November 2011 Resolved
Main Deck Stbd side frame 2 - gouge and reweld #5 side long at gusset and #4 side long at frame
Action required: 705 - Other - as specified
Due 15 January 2012
Resolved 10 January 2012
Construction/Loadline › Hull › Weld
Issued 15 November 2011 Resolved
Main Deck Stbd side frame 3 - gouge and reweld #2 side long
Action required: 705 - Other - as specified
Due 15 January 2012
Resolved 10 January 2012
Construction/Loadline › Hull › Weld
Issued 15 November 2011 Resolved
2nd deck lane H/I frame 38 crop and renew lower 30" of diagonal
Action required: 705 - Other - as specified
Due 15 January 2012
Resolved 10 January 2012
Construction/Loadline › Hull › Weld
Issued 15 November 2011 Resolved
2nd deck lane D/E frame 52 crop and renew lower 30" of diagonal
Action required: 705 - Other - as specified
Due 15 January 2012
Resolved 10 January 2012
Construction/Loadline › Hull › Weld
Issued 15 November 2011 Resolved
3rd deck lane K/L frame 6 crop and renew 5'x4'x1/2" deck insert
Action required: 705 - Other - as specified
Due 15 January 2012
Resolved 10 January 2012
Engineering › Fuel Oil Service System › Hose
Issued 14 November 2008 Resolved
Prove fuel hose on #2 gen is in compliance w/ 56.60-25(b) SAE J 1942.
Action required: 705 - Other - as specified
Due 14 December 2008
Resolved 29 November 2008
Resolution: Witnessed new hose.
Construction/Loadline › Hull › Stiffener
Issued 14 November 2008 Resolved
Submit repair proposal for wasted deck beam on 3rd deck IWO stbd fwd ladder.
Action required: 705 - Other - as specified
Due 14 December 2008
Resolved 29 November 2008
Resolution: Recieved verbal proposal, followed up with written proposal.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 14 November 2008 Resolved
Repair rails 3rd deck stbd side aft.
Action required: 705 - Other - as specified
Due 14 December 2008
Resolved 29 November 2008
Resolution: Witnessed repaired rail.
Construction/Loadline › Hull › Stiffener
Issued 28 March 2007 Resolved
Center stbd void #1, fractured weld on diagonal vertical deck support frame #7 at bulkhead on outboard side. Repair fractures as marked.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 April 2007
Resolution: All weld repairs made in the stbd #1 void as marked by USCG. Several welds undercut and some pitting. Barge may sail with welds as temporary repairs with permanent repairs to be completed prior to getting credit for ISE.
Construction/Loadline › Penetrations › Gasket
Issued 18 June 2004 Resolved
Show proper operation of all securing devices on the port side 2nd deck fwd water tight door.
Due 18 July 2004
Resolved 2 July 2004
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Governor
Issued 18 June 2004 Resolved
Demonstrate the proper operation of the #2 Generator (inboard) to include start-up and electrical load.
Due 18 July 2004
Resolved 2 July 2004
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 18 June 2004 Resolved
Provide electrical grade rubber matting for the deck in front of the electrical switch board.
Due 18 July 2004
Resolved 2 July 2004
Electrical › Electric Generation Source (service) › Ground Detection
Issued 18 June 2004 Resolved
Repair the ground fault indicators on the 450v, 240v, and 120v distribution panels.
Due 18 July 2004
Resolved 7 July 2004
Construction/Loadline › Structures › Superstructure
Issued 18 June 2004 Resolved
Repair by welding, a crack at the top gusset support, last vertical deck support beam on the 2nd deck stbd side.
Due 18 July 2004
Resolved 2 July 2004
Electrical
Issued 12 January 1997 Resolved
REPLACE WASTED BOLTS ON GENERATOR EXHAUST FLANGES ON THE PORT BOW WEATHER_x001C_ DECK.
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Electrical
Issued 12 January 1997 Resolved
THOROUGHLY CLEAN OR REPLACE THE DIELECTRIC MATTING AT GENERATORS AND ELECTRICAL PANELS.
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW BUCKLED DECK AT FRAME 25-29P ON MAIN DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Electrical
Issued 12 January 1997 Resolved
REPAIR GOVERNOR ON #1 GENERATOR AND TEST OVERSPEED TRIP WITH USCG INSPECTORPRESENT.
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Navigation
Issued 12 January 1997 Resolved
REPLACE THE PORT AND STBD RUNNING LIGHT WIRES.
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Accommodation/Occupational Safety
Issued 12 January 1997 Resolved
REPLACE WASTED RAIL ON PORT SIDE THIRD DECK.
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Electrical
Issued 12 January 1997 Resolved
MOUNT J-BOX TO SIDE SHELL AT STBD FORWARD SPOTLIGHT ON THIRD DECK.
Condition: Unknown
Due 11 February 1997
Resolved 11 February 1997
Engineering
Issued 12 January 1997 Resolved
RENEW GENERATOR EXHAUST GUARD ON THE THIRD DECK PORT SIDE.
Condition: Unknown
Due 11 February 1997
Resolved 11 February 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW VERTICAL SIDE STIFFENERS 26-28 IN #4 STBD TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW WATER TIGHT BULKHEAD AT FRAME 11 IN #2 PORT 6-8 FEET DOWN FROM THE MAIN DECK TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Engineering
Issued 12 January 1997 Resolved
REPAIR OIL LEAK (FORWARD SEAL) ON INBOARD GENERATOR AND CONDUCT OPERATIONALTEST OF GENERATOR FOR USCG INSPECTOR.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
SAND BLAST AND GAUGE BOTTOMS OF ALL WASTED SIDE STIFFENERS ON MAIN AND SECOND DECKS.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW #1 SIDE LONGITUDINGAL AT FRAME 28-29P SECOND DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW CURTAINS FRAMES 28-35P SECOND DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW #1 SIDE LONGITUDINAL AT FRAME 30-31P SECOND DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW #1 SIDE LONGITUDINALS AT FRAMES 33-34, 32-33, & 31-32S SECOND DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Electrical
Issued 12 January 1997 Resolved
RECONNECT J-BOX TO SIDE SHELL AT FRAME 32S SECOND DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW CURTAIN AND WASTED SIDE SHELL IN WAY OF CURTAIN AT FRAME 31-32S SECOND DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW #1 SIDE LONG AT FRAME 27-28S SECOND DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
SAND BLAST AND GAUGE DECKS IN CURTAIN SECTIONS ON MAIN AND SECOND DECKS.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
REPAIR FRACTURE IN WAY OF SIDE CURTAIN AT FRAME 33P ON MAIN DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW BUCKLED DECK AT FRAME 51-52P ON MAIN DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Unknown
Issued 12 January 1997 Resolved
REPAINT NAME ON PORT AND STBD BOWS.
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Construction/Loadline
Issued 12 January 1997 Resolved
REPAIR FRACTURE AT FREEING PORT FRAME 42P ON MAIN DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
REPAIR FRACTURE AT FREEING PORT AT FRAME 53S MAIN DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
REPAIR FRACTURES AT CURTAINS AT FRAME 31-33S MAIN DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW SIDE LONG AT FRAME 54-55S MAIN DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
REPAIR FRACTURE AT FREEING PORT AT FRAME 53S MAIN DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
SAND BLAST AND GAUGE AREAS IN WAY OF ALL MOORING BITTS ON MAIN DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW PORT AFT LOG PLATE, LOG DIAPHRAGM PLATE AND SIDE SHELL TO SATISFACTION OF COGNIZANT OCMI.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW VERTICAL SIDE STIFFENERS 56 AND 57 AT #9 PORT TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW STBD AFT LOG, LOG DIAPHRAGM PLATE AND SIDE SHELL TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW LOG PLATE, MAIN DECK CENTERLINE AFT AS WELL AS UPPER SECTIONOF CVK AS NEEDED.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW VERTICAL SIDE STIFFENERS #18 1/2 & 19 IN #3 STBD TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW VERTICAL SIDE STIFFENERS 31, 32, & 33 IN #5 STBD TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Electrical
Issued 12 January 1997 Resolved
REPLACE SPOTLIGHT LENSE COVER AT FRAME 59S SECOND DECK.
Condition: Unknown
Due 11 February 1997
Resolved 11 February 1997
Electrical
Issued 12 January 1997 Resolved
REPLACE MISSING SCREWS IN J-BOX AT FRAME 50P OVERHEAD.
Condition: Unknown
Due 11 February 1997
Resolved 11 February 1997
Electrical
Issued 12 January 1997 Resolved
REPAIR CHAFED ELECTRICAL CABLE AT FRAME 29P MAIN DECK.
Condition: Unknown
Due 11 February 1997
Resolved 11 February 1997
Construction/Loadline
Issued 12 January 1997 Resolved
REPLACE BENT #1 SIDE LONG AND WASTED SIDE SHELL FROM MAIN DECK UP TO SEAM AT FRAME 24-25P.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
REPLACE SIDE LONGITUDINALS #1 AND 2 AT FRAME 38-39P ON MAIN DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
REPAIR FRACTURES IN CURTAIN AT FRAME 31 (2 BOTTOM AND 1 TOP) ON MAIN DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
REPAIR/REPLACE BOW WATERTIGHT DOORS.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
REPAIR FRACTURES IN WAY OF SIDE CURTAINS ON MAIN DECK AT FRAME 34-37P.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 12 January 1997 Resolved
CROP AND RENEW #1 SIDE LONG AT FRAME 27-28P SECOND DECK.
Condition: Unknown
Due 12 January 1997
Resolved 12 January 1997
Construction/Loadline
Issued 18 October 1994 Resolved
VEE AND WELD FRACTURED WELD AT FOURTH FRAME AFT IN WAY OF INBOARD BULKHEAD IN NO. 6 STARBOARD BALLAST TANK.
Condition: Unknown
Due 18 October 1994
Resolved 18 October 1994
Construction/Loadline
Issued 18 October 1994 Resolved
VEE AND WELD FRACTURED WELD AT FRAME 13 IN WAY OF BOTH LONGITUDINAL BULKHEADS IN NO. 2 CENTER VOID.
Condition: Unknown
Due 18 October 1994
Resolved 18 October 1994
Construction/Loadline
Issued 9 June 1994 Resolved
VEE & WELD FRACTURED WELD AT FOURTH FRAME AFT IN WAY OF INBOARD BULKHEAD INNO. 6 STARBOARD BALLAST TANK.
Condition: Unknown
Due 9 June 1994
Resolved 9 June 1994
Construction/Loadline
Issued 9 June 1994 Resolved
VEE & WELD FRACTURED WELDS AT FRAMES 13, 14, 15 AND 16 IN WAY OF INBOARD BULKHEAD IN NO 2 PORT VOID.
Condition: Unknown
Due 9 June 1994
Resolved 9 June 1994
Construction/Loadline
Issued 9 June 1994 Resolved
VEE AND WELD FRACTURES AT FIRST AND FOURTH FRAMES AFT IN WAY OF STARBOARD LONGITUDINAL BULKHEAD IN NO. 6 CENTER PORT BALLAST TANK.
Condition: Unknown
Due 9 June 1994
Resolved 9 June 1994
Construction/Loadline
Issued 9 June 1994 Resolved
CROP AND RENEW TO ORIGINAL DAMAGE TO FRAME 10 @ THE 3RD SIDE LONG (FROM TOP) IN NO. 1 PORT WING TANK.
Condition: Unknown
Due 9 June 1994
Resolved 9 June 1994
Construction/Loadline
Issued 9 June 1994 Resolved
VEE & WELD FRACTURED WELDS AT FRAMES 13, 15 AND 16 IN WAY OF INBOARD BULKHEAD IN NO. 2 STARBOARD VOID.
Condition: Unknown
Due 9 June 1994
Resolved 9 June 1994
Construction/Loadline
Issued 9 June 1994 Resolved
VEE & WELD FRACTURED WELDS AT FRAMES 13, 14, 15 AND 16 IN WAY OF BOTH LONG-ITUDINAL BULKHEADS IN NO. 2 CENTER VOID.
Condition: Unknown
Due 9 June 1994
Resolved 9 June 1994
Accommodation/Occupational Safety
Issued 11 February 1993 Resolved
Install intermediate rail courses in the four (4) sections where missing, upper deck starboard side.
Condition: Unknown
Due 11 February 1993
Resolved 11 February 1993
Construction/Loadline
Issued 11 February 1993 Resolved
Make permanent repair to cracked/wasted sideshell openings port side main deck as follows: between frames 33-32; between frames 32-31; between frames30-29; door reinforcement between frames 17-16.
Condition: Unknown
Due 11 February 1993
Resolved 11 February 1993
Electrical
Issued 11 February 1993 Resolved
Renew light globe and electrical kick pipe at starboard forward ladder, upper deck.
Condition: Unknown
Due 11 February 1993
Resolved 11 February 1993
Engineering
Issued 11 February 1993 Resolved
Repair, mark and demonstrate remote shutoff reach rod for diesel oil tank.
Condition: Unknown
Due 11 February 1993
Resolved 11 February 1993
Electrical
Issued 11 February 1993 Resolved
Renew electrical kick pipe port forward ladder, upper deck.
Condition: Unknown
Due 11 February 1993
Resolved 11 February 1993
Construction/Loadline
Issued 29 December 1988 Resolved
MAKE PERMENANT REPAIRS TO STARBOARD SKEG AND HULL BOTTOM AND ASSOCIATED INTERNAL FRAMING ALONG SKEG ATTACHMENT TO HULL. APPOXIMATELY 8 FT BY 30 FT AREA AFFECTED. TO BE COMPLETED DURING NEXT DRYDOCKING BUT NO LATER THAN 31 AUGUST 89. TEMP REPAIRS SUBJECT TO PERIODIC SURVEYS BY MSO SAN JUAN, PR
Condition: Unknown
Due 29 December 1988
Resolved 29 December 1988
Construction/Loadline
Issued 29 December 1988 Resolved
PERIODIC SURVEYS REQUIRED FOR TEMPORARY REPAIRS TO VESSELS INTERNAL FRAMING IN AREA OF STARBOARD SKEG ATTACHMENT. NEXT SURVEY REQUIRED NO LATER THAN 30 MARCH 1989.
Condition: Unknown
Due 29 December 1988
Resolved 29 December 1988
Construction/Loadline
Issued 6 April 1986 Resolved
MAKE PERMANT REPAIRS TO SUPERSTRUCTURE ON MAIN DECK AND 02 DECK PORT SIDE IN WAY OF COLLISION DAMAGE.
Condition: Unknown
Due 6 April 1986
Resolved 6 April 1986
Accommodation/Occupational Safety
Issued 3 September 1985 Resolved
REPAIR HAND RAIL ON THE UPPER DECK BETWEEN FRAMES 28 AND 29.
Condition: Unknown
Due 3 September 1985
Resolved 3 September 1985

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.