Records from 1981 to 2012. Most recent: inspection, 18 July 2012.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 56
18 July 2012
Internal Structural Exam · Annual Inspection · DAPI Audit
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4383104
12 July 2012
Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4376667
28 July 2009
Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3548910
26 August 2008
Annual Inspection · Drydock Exam
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3308975
11 July 2007
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2991815
12 October 2006
Annual Inspection · Hull Examination
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2798783
14 October 2005
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2570010
27 September 2004
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2206387
24 June 2003
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1828412
15 October 2002
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1686562
16 July 2002
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1647877
9 July 2001
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1451785
17 October 2000
Re-Inspection · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1456900
29 July 1999
Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1108818
15 July 1999
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1103791
28 February 1999
Type not recorded
No type recorded · Station Port OConnor · USCG Heartland District (CGD-H) · Activity 1510960
5 October 1998
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1392992
30 September 1998
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 801593
15 July 1998
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1441399
24 July 1997
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1371939
11 October 1996
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1446406
29 July 1996
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1363741
27 July 1995
COI Inspection · Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1360293
15 December 1994
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1149944
7 December 1994
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1459138
20 October 1994
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1394204
31 August 1994
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1183047
9 August 1994
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1469437
26 August 1993
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 835510
10 August 1993
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1389683
11 December 1992
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 830327
17 August 1992
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 957356
20 August 1991
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 941456
26 June 1991
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 933884
29 January 1991
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 917741
11 October 1990
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1224549
6 September 1990
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 921798
13 February 1990
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1232974
18 January 1990
Drydock Extension
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 913338
12 September 1989
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1044539
25 October 1988
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 893818
20 September 1988
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1200193
30 August 1988
Deficiency Check · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1200188
24 September 1987
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1014540
25 August 1987
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1002819
3 October 1986
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1008214
22 January 1986
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 997496
5 December 1985
Credit Drydock
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 989276
22 October 1985
Credit Drydock · COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 993560
27 November 1984
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1284543
22 October 1984
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 974606
30 May 1984
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1285079
26 October 1983
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1273945
8 March 1983
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1273157
2 November 1982
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1272370
16 November 1981
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 967391
Construction/Loadline › Penetrations › Pipe Flange
Issued 28 July 2009
Resolved
Properly install metallic piping where systems penetrate water tight bulkheads, or provide proper penetrations IAW 46 CFR 182.40-1.
Action required: 705 - Other - as specified
Due 28 August 2009
Resolved 3 September 2009
Resolution: [name withheld] verified complete
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 28 July 2009
Resolved
Install flame screen on port side diesel fuel vent pipe
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 28 August 2009
Resolved 1 September 2009
Resolution: [name withheld] verified complete
Construction/Loadline › Hull › Weld
Issued 28 July 2009
Resolved
Re weld about 40 fractured welds in every void throughout vessel.
Action required: 705 - Other - as specified
Due 28 August 2009
Resolved 1 September 2009
Resolution: [name withheld] verified complete
Engineering › Feedwater/Condensate Water System › Piping
Issued 26 August 2008
Resolved
Replace clamps on sea water flex lines to engine cooling.
Action required: 705 - Other - as specified
Due 28 September 2008
Resolved 10 October 2008
Engineering › Fuel Oil Service System › Filter
Issued 26 August 2008
Resolved
Replace plugs to fuel oil filter bowls on all main engines.
Action required: 705 - Other - as specified
Due 28 September 2008
Resolved 10 October 2008
Electrical › Electric Generation Source (service) › Generator
Issued 26 August 2008
Resolved
Properly terminate sliced wire on fwd part of port generator
Action required: 705 - Other - as specified
Due 28 September 2008
Resolved 10 October 2008
Electrical › Electric Generation Source (service) › Grounding Conductor
Issued 26 August 2008
Resolved
Resecure ground on fwd part of stbd generator
Action required: 705 - Other - as specified
Due 28 September 2008
Resolved 10 October 2008
Engineering › Bilge Water Management System › Pump
Issued 26 August 2008
Resolved
Properly secure bilge pump.
Action required: 705 - Other - as specified
Due 28 September 2008
Resolved 10 October 2008
Electrical › Electrical Distribution System (service) › Wiring
Issued 26 August 2008
Resolved
Properly repack wiring terminal blocks in engine room & port void space.
Action required: 705 - Other - as specified
Due 28 September 2008
Resolved 10 October 2008
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 26 August 2008
Resolved
Relocate work vests away from life vests prior to carrying passengers.
Action required: 705 - Other - as specified
Due 28 September 2008
Resolved 10 October 2008
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 26 August 2008
Resolved
Replace anchor lights prior to getting underway.
Action required: 17 - Rectify deficiencies prior to departure
Due 28 August 2008
Resolved 28 August 2008
Resolution: Received picture showing proper operation of light.
Stability › Watertight Integrity › General
Issued 26 August 2008
Resolved
Mount permanent wire water tight door indicator on generator space and provide indication on bridge.
Action required: 705 - Other - as specified
Due 28 September 2008
Resolved 10 October 2008
Lifesaving › Lifefloat › Float-free Link
Issued 11 July 2007
Resolved
Properly attach all Life floats to weak link.
Action required: 705 - Other - as specified
Due 12 July 2007
Resolved 12 July 2007
Resolution: Attached life floats IAW 46 CFR.
Construction/Loadline › Hull › Hull Plating
Issued 11 July 2007
Resolved
Repair 1' fracture in STBD stern wrapper IWO deck line.
Action required: 705 - Other - as specified
Due 12 July 2007
Resolved 12 July 2007
Resolution: Welded fracture
Lifesaving › Lifebuoys › Serviceable
Issued 14 October 2005
Resolved
Renew or replace 3 ring bouys due to deteriation.
Condition: Unknown
Action required: 705 - Other - as specified
Due 28 October 2005
Resolved 24 October 2005
Resolution: New ring bouys placed onboard.
Construction/Loadline › Hull › Stiffener
Issued 14 October 2005
Resolved
Gouge and reweld 4 fractures in the forepeak tank as marked.
Condition: Unknown
Action required: 705 - Other - as specified
Due 28 October 2005
Resolved 24 October 2005
Resolution: Fractures repaired.
Construction/Loadline › Hull › Stiffener
Issued 14 October 2005
Resolved
Drill stop, gouge and reweld 6 fractures in vertical side cords at the junction/turn of the bilge on the starboard side.
Condition: Unknown
Action required: 705 - Other - as specified
Due 28 October 2005
Resolved 24 October 2005
Resolution: Fractures repaired.
Construction/Loadline › Hull › Stiffener
Issued 14 October 2005
Resolved
Drill stop, gouge and reweld 2 fractures in vertical side cords at the junction/turn of the bilge on the port side as marked.
Condition: Unknown
Action required: 705 - Other - as specified
Due 28 October 2005
Resolved 24 October 2005
Resolution: Fractures repaired.
Construction/Loadline › Hull › Side Shell
Issued 14 October 2005
Resolved
Gouge and reweld fractured and buckled plate on starboard side of A/C compartment foward.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 28 October 2005
Resolved 24 October 2005
Resolution: Repair completed.
Construction/Loadline › Penetrations › Pipe Flange
Issued 14 October 2005
Resolved
Gouge and reweld fractures in both generator exhaust at the sideshell.
Condition: Unknown
Action required: 705 - Other - as specified
Due 28 October 2005
Resolved 24 October 2005
Resolution: Fractures repaired.
Construction/Loadline › Hull › Side Shell
Issued 14 October 2005
Resolved
Gouge and reweld fracture in lazarette/steering gear room upper starboard corner at deck and transom joint.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 28 October 2005
Resolved 24 October 2005
Resolution: fracture repaired.
Fire Fighting › Fire Main › Condition
Issued 14 October 2005
Resolved
Remove flexible rubber coupling on fire main and replace with hard piping.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 October 2005
Resolution: Coupleing replaced with hard piping.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 27 September 2004
Resolved
Conduct abandon drill upon refloating vessel
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 October 2004
Resolved 14 October 2005
Operations/Management › Drills/Instruction › Fire
Issued 27 September 2004
Resolved
Conduct fire drill upon refloating vessel. Demonstrate proper operation of fire pumps, hoses and fire nozzles.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 October 2004
Resolved 14 October 2005
Operations/Management › Streamlined Inspection Program › VAP Review and Revision
Issued 27 September 2004
Resolved
Up date VAP to include only relavant items pertaining to the MV HAYDEN. Remove old/outdated ICR items. Add detail to unclear/vague inspection ICRs and update manual with revision numbered pages.
Due 29 October 2004
Resolved 14 October 2005
Resolution: Vessel removed from SIP program at owners request.
Engineering › Bilge Water Management System › Valve
Issued 27 September 2004
No resolution recorded
Replace reach rod handle fasteners missing from forward compartment bilge valve reach rod.
Condition: Unknown
Due 29 September 2004 — due date passed with no resolution recorded
Resolution: Corrected by ships crew on the spot- however fact that fasteners missing indicates problem with SIP implementation. Discussed with rep and master.
Engineering
Issued 27 July 1995
Resolved
Provide ASME approved relief valves on air recievers.
Condition: Unknown
Due 3 August 1995
Resolved 18 October 1995
Lifesaving
Issued 27 July 1995
Resolved
Repair or replace deteriorated life floats on portside. Until repairs are made the total number of persons allowed is reduced to 36.
Condition: Unknown
Due 27 August 1995
Resolved 18 October 1995
Lifesaving
Issued 27 July 1995
Resolved
Post the emergency check off list in passenger lounge.
Condition: Unknown
Due 3 August 1995
Resolved 18 October 1995
Construction/Loadline
Issued 27 July 1995
Resolved
Make repairs to overboard discharge piping for bilge pump.
Condition: Unknown
Due 3 August 1995
Resolved 18 October 1995
Construction/Loadline
Issued 27 July 1995
Resolved
Make repairs to cracked frames in way of forepeak at web.
Condition: Unknown
Due 3 August 1995
Resolved 18 October 1995
Construction/Loadline
Issued 20 October 1994
Resolved
MAKE PERMENT REPAIR TO FOUR(4) PIN HOLES AT TOP OF BULKHEAD, LAZZERATE TO GENERATOR ROOM. CONDUCT HOSE TEST 30PSI>.
Condition: Unknown
Due 20 October 1994
Resolved 20 October 1994
Fire Fighting
Issued 10 August 1993
Resolved
PROVIDE ONBOARD ONE 50 FOOT LENGTH OF 1 1/2" FIRE HOSE.
Condition: Unknown
Due 26 August 1993
Resolved 10 September 1993
Lifesaving
Issued 10 August 1993
Resolved
PROVIDE ONBOARD ONE RED HAND HELD FLARE AND 2 ORANGE HAND HELD SMOKE.
Condition: Unknown
Due 26 August 1993
Resolved 10 September 1993
Navigation
Issued 20 August 1991
Resolved
HAVE RADIOS CHECKED OUT BY FCC TO VERIFY THAT THEY WILL TRANSMIT AND RECEIVE 200 MILES. SEND THE TEST REPORT TO THE [name withheld], TEXAS OR THE APPROPRIATE MARINE SAFETY OFFICE.
Condition: Unknown
Due 20 August 1991
Resolved 20 August 1991
Unknown
Issued 6 September 1990
Resolved
CONDUCT SATISFACTORY TEST OF ENGINE ROOM EXHAUST BLOWERS EMERGENCY SHUTDOWNS IN PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
CONDUCT SATISFACTORY OPERATIONAL TEST OF AC EMERGENCY BLOWER SHUTDOWN IN PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REPLACE 10 PADDLES FOR LIFE FLOATS.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Navigation
Issued 20 September 1988
Resolved
PROVIDE UP TO DATE PUBLICATIONS OF: COAST PILOT, TIDE TABLES, TIDAL CURRENT& LIGHT LIST IN ACCORDANCE WITH 46CFR185.20-35.
Condition: Unknown
Due 20 September 1988
Resolved 20 September 1988
Deck/Cargo
Issued 20 September 1988
Resolved
MAKE DECK WINCH FULLY OPERATIONAL.
Condition: Unknown
Due 20 September 1988
Resolved 20 September 1988
Fire Fighting
Issued 20 September 1988
Resolved
HAVE FIRE FIGHTING FOAM TESTED BY A COMPETENT CHEMIST. FURNISH ANALYSIS TO COGNIZANT INSPECTOR.
Condition: Unknown
Due 20 September 1988
Resolved 20 September 1988
Documentation
Issued 5 December 1985
Resolved
PROVIDE DOCUMENTATION TO THIS OFFICE OF CURRENT CERTIFICATE OF DOCUMENTATION.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Construction/Loadline
Issued 5 December 1985
Resolved
MAKE PERMANENT REPAIRS TO FOREPEAK FILL SUCTION LINE AT OUTER UPPER 90 DEG.BEND 18" FWD OF COLLISION BULKHEAD.
Condition: Unknown
Due 5 December 1985
Resolved 5 December 1985
Construction/Loadline
Issued 2 November 1982
Resolved
MAKE PERMANENT REPAIRS TO BROKEN WINDOW IN DOOR LEADING AFT TO MAIN DECK FROM PASSENGER ACCOMODATIONS.
Condition: Unknown
Due 2 November 1982
Resolved 2 November 1982
Unknown
Issued 2 November 1982
Resolved
MAKE PERMANENT REPAIRS TO THE VENT HOUSING PORT SIDE AFT, MAIN DECK, WHERE DAMAGED.
Condition: Unknown
Due 2 November 1982
Resolved 2 November 1982