Records from 1985 to 2025. Most recent: inspection, 23 July 2025.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 67
23 July 2025
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8185726
7 July 2025
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8178567
10 April 2025
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8109047
1 August 2023
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7757746
19 April 2023
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7671679
19 May 2022
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7460592
21 April 2022
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7435200
24 August 2021
Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7284367
21 September 2020
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7284349
29 April 2020
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6945874
19 September 2019
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6815927
31 July 2018
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6496279
9 May 2018
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6409797
14 August 2017
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6240124
24 June 2016
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5915314
23 March 2016
Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5838725
24 February 2016
Plan Review "T" Boat
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5821340
5 June 2012
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4334387
1 December 2011
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4199095
4 October 2010
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3863862
28 July 2009
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3554554
22 July 2008
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3280974
23 April 2008
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3190327
24 July 2007
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3005144
24 July 2006
COI Inspection · Deficiency Check · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2723306
24 April 2006
Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2634986
20 September 2005
MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2497108
29 November 2004
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2249879
26 July 2004
Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2145194
16 April 2004
Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2045095
21 July 2003
Annual Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1852560
2 July 2002
Annual Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1650487
17 April 2002
Deficiency Check · Hull Examination · Internal Structural Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1605831
23 July 2001
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1450658
31 July 2000
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1415418
19 April 2000
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1426366
3 August 1999
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1372710
23 April 1999
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1369138
11 February 1999
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 792991
5 September 1998
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 797891
23 July 1998
Hull Examination · MARPOL Annex V Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1130631
15 October 1997
MARPOL Annex V Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 775693
8 October 1996
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 839161
22 July 1996
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1089165
4 April 1996
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1079510
11 July 1995
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1186396
15 August 1994
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 861079
30 March 1994
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1167475
8 July 1993
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 843263
23 July 1992
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1270242
5 March 1992
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1260646
22 July 1991
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1249563
18 April 1991
Hull Examination · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1045172
19 July 1990
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1238500
4 May 1990
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 926199
4 May 1990
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1216013
10 April 1990
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 916706
13 July 1989
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1206510
1 May 1989
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1030783
29 July 1988
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1341970
14 April 1988
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1339606
18 June 1987
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1311785
27 April 1987
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1013836
15 July 1986
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1305525
24 April 1986
Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1292580
27 August 1985
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 989467
30 April 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 981875
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 7 July 2025
Resolved
"Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date." Vessel did not complete annual inspection within 3 months of anniversary date of AUG 30; last annual inspection was 01 AUG 23. Complete a US Coast Guard inspection prior to the carriage of passengers.
46 CFR 176.500(b)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 July 2025
Resolution: Cleared per COI activity
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 1 August 2023
Resolved
At each initial and subsequent inspection for certification, the owner or managing operator must be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment including the following...For fixed gas fire extinguishing systems, the inspections and tests required by Table 176.810(b), in addition to 46 CFR 147.60 and 147.65. At the time of inspection, vessel was unable to test pre engineered fixed fire suppression system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 August 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 1 August 2023
Resolved
All vessels shall be provided with bilge pumps in accordance with Table 182.25-10(a). At the time of inspection, vessel could not demonstrate operation of bilge system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 August 2023
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 August 2023
Resolved
Chemical testing of personnel must be conducted as required by this subpart and in accordance with the procedures detailed in 49 CFR part 40. At the time of inspection, the vessel was not found in compliance with the above regulation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 August 2023
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 August 2023
Resolved
Except as otherwise provided in this section, all vessels shall carry pyrotechnic distress signals as follows: 6 red flare distress signals and 6 hand orange smoke distress signals or, 12 hand combination flare and smoke distress signals. Vessel's pyrotechnics were expired at the time of inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 August 2023
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 1 August 2023
Resolved
Vessel's shall be equipped with a suitable number of portable battery lights. At the time of inspection, the vessel did not have working portable lights.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 August 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 1 August 2023
Resolved
Life preserves shall be distributed through the upper part of the vessel in protected places convenient to the persons on board. Vessel's life perseveres were not stored in an accessible location to passengers.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 August 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 1 August 2023
Resolved
All life preservers shall be marked with the vessel's name. A number of life-jackets on board the vessel were inaccurately labeled.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 August 2023
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 1 August 2023
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 August 2023
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 30 April 2020
Resolved
Vessel’s fwd area of bench seat was broken IWO it’s attachment to the forward bulkhd, this needs to repaired to like new condition and a written repair proposal submitted for approval to the Coast Guard Marine Inspector prior to repair being done.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 March 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 30 April 2020
Resolved
Engine room hatch gasket must be replaced to be water tight as designed.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 March 2021
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 30 April 2020
Resolved
The deck support stanchion (2x4) on the port and stbd side IWO engine room is rotten and needs to be replaced to like new condition. A written repair proposal listing material to be used and drawing of the area must be submitted for approval prior to repairs being started.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 March 2021
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 29 April 2020
Resolved
Engine room compartment IWO first stringer/engine bed outboard sides port & stbd has some material that is built up making it flush with the stringer, this material is coming loose, must investigate this area and possibly remove and repair to like new condition.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 March 2021
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 31 July 2018
Resolved
A vessel must have a visual and audible alarm at the operating station to indicate high water level in unmanned spaces. The bilge alarm at the control station must be replaced. 46 CFR 182.530(a)
Action required: 705 - Other - as specified
Due 7 August 2018
Resolved 6 August 2018
Resolution: Bilge alarm was replaced and function checked.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 31 July 2018
Resolved
The vessel may be inspected in accordance with standards
acceptable to the cognizant OCMI as good marine
practices. Covers must be obtained for the engine space ventilation. 46 CFR 176.800(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2018
Resolved 6 August 2018
Resolution: Ventilation covers were obtained and function tested.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 31 July 2018
Resolved
The vessel may be inspected in accordance with standards
acceptable to the cognizant OCMI as good marine
practices. The gasket on the hatch for the engine space must be replaced. 46 CFR 176.800(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2018
Resolved 6 August 2018
Resolution: Gasket was replaced resulting in a good seal.
Construction/Loadline › Hull › Hull Plating
Issued 23 March 2016
Resolved
SH01: Provide repair proposal for damage to bow fiberglass noted.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 23 April 2016
Resolved 10 May 2016
Resolution: Approved repair proposal was submitted to [name withheld].
Construction/Loadline › Structures › End Bulkhead
Issued 23 March 2016
Resolved
SH02: Re-pack stuffing tube in forward compartment for cable run.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 April 2016
Resolved 7 June 2016
Resolution: Cable stuffing tube to was repacked.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 23 March 2016
Resolved
SH03: Repair area around STBD vent in forward compartment.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 April 2016
Resolved 7 June 2016
Resolution: STBD vent area was reapired.
Engineering › Diesel Engine (propulsion-direct drive) › Exhaust Manifold
Issued 5 June 2012
Resolved
Provide additional metal clamp on wet exhaust hose for main diesel engine.
Action required: 705 - Other - as specified
Due 19 June 2012
Resolved 5 June 2012
Lifesaving › Lifebuoys › Serviceable
Issued 5 June 2012
Resolved
Replace life buoy.
Action required: 705 - Other - as specified
Due 19 June 2012
Resolved 26 June 2012
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 4 October 2010
Resolved
Repair or replace siezed fuel shutoff valve.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 October 2010
Resolution: Fuel shutoff valve was repaired.
Engineering › Diesel Engine (propulsion-electric) › Piping (exhaust)
Issued 28 July 2009
Resolved
Replace two (02) sections of the wet exhaust hose. The first is as the exhaust exits the stern of the vessel and the other just aft of the hydrolift muffler. In addition, properly support section of exhaust hose in the lazarette to prevent chaffing and interference with the steering gear.
Action required: 705 - Other - as specified
Due 28 August 2009
Resolved 14 August 2009
Resolution: Vessel representative replace two sections of the wet exhaust hose and observed to be satisfactory.
Engineering › Bilge Water Management System › Hose
Issued 28 July 2009
Resolved
Provide a discharge hose of suitable length for the portable hand bilge pump.
Action required: 705 - Other - as specified
Due 28 August 2009
Resolved 14 August 2009
Resolution: A new portable hand bilge pump with sufficient hose length was provided.
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 24 July 2006
Resolved
Replace retro-reflective material on 04 adult life jackets. Total number of persons onboard reduced to 15 until requirement is met.
Action required: 705 - Other - as specified
Due 31 July 2006
Resolved 31 July 2006
Resolution: Received fax attesting to replacement of retro-reflective tape on adult lifejackets.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 20 September 2005
Resolved
Clean oil out of bilge and dispose of properly.
Condition: Unknown
Due 21 October 2005
Resolved 26 September 2005
Resolution: Bilges cleared of oil, sorbents, duct tape, etc.
Communications › Alarms/Indicators › Bilge Alarm
Issued 20 September 2005
Resolved
Prove proper operation of bilge high level alarm
Condition: Unknown
Due 28 September 2005
Resolved 26 September 2005
Resolution: High level alarm repaired. Visual and audible alarm in place.
Fire Fighting › Fire Bucket › Availability
Issued 20 September 2005
Resolved
Provide 03 - 2.5 gallon firebuckets with lanyard and label
Condition: Unknown
Due 21 October 2005
Resolved 31 October 2005
Resolution: Provided.
Accommodation/Occupational Safety › Ventilation › General
Issued 20 September 2005
Resolved
Replace rusted sections of ventilation piping in forepeak.
Condition: Improper/Lack of Maintenance
Due 21 October 2005
Resolved 31 October 2005
Resolution: Repaired.
Engineering › Diesel Engine (propulsion-direct drive) › Bearing
Issued 21 April 2004
Resolved
Renew cutlass bearing. LEGACY COMPONENT DESC: Bearing
Due 12 November 2004
Resolved 29 November 2004
Resolution: Cutlass bearing removed and new cutlass bearing installed.
Lifesaving › Lifebuoys
Issued 21 July 2003
Resolved
Place 3' to 6' waterlight lanyard on lifebuoy. LEGACY COMPONENT DESC: Self-igniting Lights
Due 31 July 2003
Resolved 27 July 2003
Operations/Management › Drug and Alcohol Testing
Issued 2 July 2002
Resolved
Provide proof of employer policy in regard to Employee Assistance Program. LEGACY COMPONENT DESC: EAP Training Requirements
Due 23 July 2002
Resolved 30 September 2002
Resolution: Proof of EAP policy provided.
Operations/Management › Drug and Alcohol Testing
Issued 2 July 2002
Resolved
Provide proof of 60 minute supervisory training in regard to Employee Assistance Program. LEGACY COMPONENT DESC: EAP Training Requirements
Due 23 July 2002
Resolved 30 September 2002
Resolution: Proof of 60 minute training provided.
Accommodation/Occupational Safety › Medical/First Aid
Issued 2 July 2002
Resolved
Provide first aid kiet with contents listed at 46CFR160.041. LEGACY COMPONENT DESC: Medicine Chest
Due 23 July 2002
Resolved 30 September 2002
Resolution: First aid kit provided
Engineering › Bilge Water Management System
Issued 2 July 2002
Resolved
Install positive stop closure valve to electrical submersible bilge pump discharge hose at sideshell penetration. LEGACY COMPONENT DESC: Valve
Due 23 July 2002
Resolved 30 September 2002
Resolution: Positive stop closure device installed.
Engineering › Fuel Oil Service System
Issued 2 July 2002
Resolved
Install bonding strap between fuel fill & fuel tank top. LEGACY COMPONENT DESC: Piping
Due 23 July 2002
Resolved 30 September 2002
Resolution: Bonding strap installed.
Fire Fighting › Ventilation Systems
Issued 2 July 2002
Resolved
Install vent closures to E/R vents. LEGACY COMPONENT DESC: Ducts
Due 23 July 2002
Resolved 30 September 2002
Resolution: Vent closures installed.
Fire Fighting › Fixed Gas Fire Extinguishing System
Issued 2 July 2002
Resolved
Make E/R forward bulkhead penetrations vapor tight.
Due 23 July 2002
Resolved 30 September 2002
Resolution: Bulkhead penetrations made vapor tight.
Engineering › Steering Gear System
Issued 17 April 2002
Resolved
Repair or replace broken steering cable support bracket. LEGACY COMPONENT DESC: Bracket/Clamp
Condition: Unknown
Due 2 May 2002
Resolved 3 May 2002
Resolution: Bracket renewed; operational test sat.
Engineering › Fuel Oil Storage/Transfer System
Issued 17 April 2002
Resolved
Replace fuel tank vent screen with 30x30 mesh. LEGACY COMPONENT DESC: Vent Pipe
Condition: Unknown
Due 2 May 2002
Resolved 3 May 2002
Resolution: Vent screen renewed.
Fire Fighting
Issued 23 April 1999
Resolved
Submit plans for review and approval for the installation of a Fixed Fire Fighting System in the machinery spaces in accordance with 46 CFR 181.115(b) and 46 CFR 181.400
Condition: Unknown
Due 27 April 1999
Resolved 27 April 1999
Fire Fighting
Issued 23 April 1999
Resolved
Vessel is not to be operated with passengers for hire after March 11, 1999,until the above requirements have been cleared to the satisfaction of an attending U.S. Coast Guard Marine Inspector.
Condition: Unknown
Due 27 April 1999
Resolved 27 April 1999
Fire Fighting
Issued 23 April 1999
Resolved
Install a Fixed Fire Fighting System in machinery spaces in accordance withU.S. Coast Guard approved plans.
Condition: Unknown
Due 27 April 1999
Resolved 27 April 1999
Construction/Loadline
Issued 23 July 1998
Resolved
Make suitable repairs to minor cracks in hull gel coat as necessary during normal vsl winter haulout.
Condition: Unknown
Due 23 July 1998
Resolved 23 July 1998
Engineering
Issued 23 July 1998
Resolved
Tighten engine water cooled exhaust elbow.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Engineering
Issued 23 July 1998
Resolved
Renew raw water intake hose.
Condition: Unknown
Due 23 July 1998
Resolved 31 July 1998
Engineering
Issued 23 July 1998
Resolved
Renew propulsion shaft cutlass bearing during normal vsl winter haulout.
Condition: Unknown
Due 23 July 1998
Resolved 23 July 1998
Navigation
Issued 23 July 1998
Resolved
Prove proper operation of red/green nav light. Vsl is limited to daytime operations until repaired.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Construction/Loadline
Issued 23 July 1998
Resolved
Tighten towing bitt bolts at base.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Engineering
Issued 23 July 1998
Resolved
Tighten engine bed bolts as needed.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Fire Fighting
Issued 23 July 1998
Resolved
Provide specifications for an installed fixed fire fighting system in engine space. Plan approval is required by OCMI prior to installation.
Condition: Unknown
Due 23 July 1998
Resolved 23 July 1998
Construction/Loadline
Issued 23 July 1998
Resolved
Install seal and latch on engine compartment hatch.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Documentation
Issued 23 July 1998
Resolved
Vessel is restricted from operating unless an individual with the appropriate license is in control of the vessel.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Documentation
Issued 15 October 1997
Resolved
ESTABLISH DECK LOG FOR DRILLS AND TRAINING
Condition: Unknown
Due 16 October 1997
Resolved 16 October 1997
Navigation
Issued 15 October 1997
Resolved
PROVIDE DOUBLE NUT, NY-LOC, OR COTTER PIN ARRANGEMENT ON LINKAGE HOUSING INSTEERING SPACE
Condition: Unknown
Due 16 October 1997
Resolved 16 October 1997
Electrical
Issued 15 October 1997
Resolved
PROVIDE PROPER ELECTRICAL CONNECTION FOR GROUND WIRE IN STEERING SPACE
Condition: Unknown
Due 16 October 1997
Resolved 16 October 1997
Lifesaving
Issued 15 October 1997
Resolved
PROVIDE FIRST AID KIT
Condition: Unknown
Due 16 October 1997
Resolved 16 October 1997
Lifesaving
Issued 15 October 1997
Resolved
PROVIDE EMERGENCY INSTRUCTIONS FOR FIRE AND MAN OVERBOARD
Condition: Unknown
Due 16 October 1997
Resolved 16 October 1997
Engineering
Issued 15 October 1997
Resolved
PLACE DOUBLE HOSE CLAMPS ON VARIOUS FLEXIBLE CONNECTIONS ON ENGINE
Condition: Unknown
Due 16 October 1997
Resolved 16 October 1997
Documentation
Issued 15 October 1997
Resolved
OBTAIN COPY OF APPLICABLE CFR.
Condition: Unknown
Due 16 October 1997
Resolved 16 October 1997
Lifesaving
Issued 15 October 1997
Resolved
PROVIDE LANYARD AND CORROSION RESISTANT CLIP FOR WATERLIGHT
Condition: Unknown
Due 16 October 1997
Resolved 16 October 1997
Lifesaving
Issued 15 October 1997
Resolved
PROVIDE REQUIRED LINE FOR RING BOUY
Condition: Unknown
Due 16 October 1997
Resolved 16 October 1997
Engineering
Issued 15 October 1997
Resolved
PROPERLY LABEL FUEL CUT-OUT VALVES
Condition: Unknown
Due 16 October 1997
Resolved 16 October 1997
Electrical
Issued 22 July 1996
Resolved
RE-ATTACH GROUNDING WIRE ON RUDDER POST.
Condition: Unknown
Due 22 July 1996
Resolved 22 July 1996
Lifesaving
Issued 22 July 1996
Resolved
PURCHASE FLARES AND INSTALL IN A BRIGHTLY COLORED WATERTIGHT CONTAINER.
Condition: Unknown
Due 22 July 1996
Resolved 22 July 1996
Engineering
Issued 22 July 1996
Resolved
RE-DIRECT EXHAUST HOSE BELOW STEERING GEAR TO ARREST CHAFFING.
Condition: Unknown
Due 22 July 1996
Resolved 22 July 1996
Lifesaving
Issued 22 July 1996
Resolved
REPLACE LIFE RING AND INSTALL RETRO-REFLECTIVE TAPE.
Condition: Unknown
Due 22 July 1996
Resolved 22 July 1996
Electrical
Issued 22 July 1996
Resolved
PROVIDE AND INSTALL BATTERY CASE.
Condition: Unknown
Due 22 July 1996
Resolved 22 July 1996
Construction/Loadline
Issued 30 March 1994
Resolved
REPAIR TRANSVERSE DECK STIFFENER ON AFTER SIDE OF ENGINE COMPT HATCH COAMING.
Condition: Unknown
Due 30 March 1994
Resolved 30 March 1994
Engineering
Issued 30 March 1994
Resolved
INSTALL FLAME SCREEN FOR FUEL TANK VENT.
Condition: Unknown
Due 30 March 1994
Resolved 30 March 1994
Construction/Loadline
Issued 30 March 1994
Resolved
REPAIR DELAMINATED FRP IN STBD BILGE AREA OF ENGINE COMPT TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 30 March 1994
Resolved 30 March 1994
Engineering
Issued 30 March 1994
Resolved
PROVIDE FLAME PAN FOR RACOR FILTER.
Condition: Unknown
Due 30 March 1994
Resolved 30 March 1994
Construction/Loadline
Issued 30 March 1994
Resolved
REPAIR FRP JOINING AFTER SIDE OF STBD ENGINE COMPT BLKHD TO HULL.
Condition: Unknown
Due 30 March 1994
Resolved 30 March 1994
Construction/Loadline
Issued 30 March 1994
Resolved
REPAIR DELAMINATION OF DECK ON PORT SIDE.
Condition: Unknown
Due 30 March 1994
Resolved 30 March 1994
Electrical
Issued 10 April 1990
Resolved
PROVIDE LEAD OR FIBERGLASS LINED BATTERY BOX FOR ENGINES STARTING BATTERY.
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990
Engineering
Issued 10 April 1990
Resolved
PROVIDE CORROSION RESISTANT SECURING DEVICE FOR CLUTCH LINKAGE AT CLUTCH LINKAGE CENTER.
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990