← All vessels
HERCULES 155
HERCULES 155 is a 1980 mobile offshore drilling unit. The Coast Guard has recorded 54 inspections since 1982, most recently in November 2003, along with 92 deficiencies and 1 casualty investigation in 2001.
Records from 1982 to 2003. Most recent: inspection, 17 November 2003.
- Built
- 1980
- Last inspected
- 17 November 2003
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 92 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 1 investigation · 2001
Identity
621912
8750912 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WCE8419
52245
Flag
UNITED STATES
—
Maury page id
psix-52245
Inspections, by type
…with no type recorded9
Years with a record
20 calendar years (1982–2003)
The 54 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 23 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.
Documentation record
Tonnage as PSIX records it1582 - Convention (Subpart B), Net Ton
5274 - Convention (Subpart B), Gross Ton
5274 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
WCE8419MMSI not assigned · expired · voluntarily equipped · granted 29 March 1994, cancelled 30 May 2004 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 54
17 November 2003
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1948935
25 August 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1073152
16 August 2001
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1458910
26 July 2001
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1700224
31 May 2001
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1066112
19 May 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1064012
17 April 2001
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1062503
14 April 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1061591
6 March 2001
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1456945
24 February 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1059459
20 July 2000
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1389141
14 June 2000
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1053270
9 June 2000
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1050480
26 May 2000
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 817821
13 May 2000
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 817775
8 March 2000
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 815439
8 March 2000
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1046112
28 January 2000
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 815279
24 July 1999
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 773398
20 July 1999
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1430797
15 October 1998
Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 801272
28 July 1998
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1130671
25 July 1998
COI Inspection · Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1424626
4 February 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1113019
27 October 1997
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1120472
9 September 1997
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1433256
28 August 1996
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1090319
7 August 1996
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1433087
16 May 1996
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1470416
18 January 1995
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1175654
26 February 1993
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 842804
14 February 1992
Hull Examination · Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1263297
27 June 1991
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 920136
30 April 1991
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 900163
13 March 1991
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 919680
26 September 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1218990
19 July 1990
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 916741
15 June 1990
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 916604
31 March 1990
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 903632
22 September 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1210030
27 June 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 891547
25 May 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 899067
18 May 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1351332
12 March 1989
Hull Examination · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1350306
18 April 1988
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1038795
24 February 1987
Hull Examination
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1016754
3 February 1987
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1016751
25 July 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1304517
1 April 1986
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1298922
23 March 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 986017
2 May 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1281304
30 May 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1276030
17 May 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 964463
17 May 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 971410
Deficiency record · 92
Construction/Loadline
Issued 16 August 2001
Resolved
CROP AND RENEW FRACTURED SEAM PORT FORWARD CORNER OF CONTROL HOUSE WHERE ITMEETS WITH JACKING STRUCTURE.
Construction/Loadline
Issued 6 March 2001
Resolved
CONDUCT PHASE II SEILODD.
Construction/Loadline
Issued 6 March 2001
Resolved
REPLACE DUMP VALVE IN 5-P DUE TO INOPERATIVE SERVICE.
Construction/Loadline
Issued 6 March 2001
Resolved
CROP AND RENEW IN 2-P BOTTOM LONG AND BRACKET FORWARD OUTBOARD SIDE.
Lifesaving
Issued 20 July 2000
Resolved
LAUNCH LIFEBOATS WITH ASSIGNED CREW IN WATER EVERY THREE MONTHS. MAKE A LOGENTRY IF TEST CANNOT BE DONE AND WHY.
Unknown
Issued 20 July 2000
Resolved
MAKE NAME CHANGE TO VESSEL'S LIFESAVING APPLIANCES, HULL AND SAFETY PLAN TOTHE SATISFACTION OF THE [name withheld] ALL CLASSIFICATION CERTIFICATES ARE UPDATED.
Electrical
Issued 20 July 2000
Resolved
RUN EMERGENCY GENERATOR UNDER LOAD FOR TWO HOURS EACH MONTH.
Unknown
Issued 20 July 2000
Resolved
PROVE STABILITY TEST WAS CONDUCTED BY CLASS OR USCG FOR WEIGHT CHANGE VIA NVIC 10-92 TO [name withheld] NO TEST WAS CONDUCTED, CONDUCT A STABILITY TEST TO THE SATISFACTION OF USCG OCMI AND CLASS.
Lifesaving
Issued 20 July 2000
Resolved
RENEW WASTED DECK GRATINGS AT LIFERAFT STATION ON PORT SIDE.
Electrical
Issued 20 July 2000
Resolved
CONDUCT SEMI-ANNUAL LOAD TEST OF EMERGENCY BATTERIES.
Unknown
Issued 20 July 2000
Resolved
CONDUCT ANNUAL TESTING OF ALL SAFETY RELIEF VALVES ON DRY BULK TANKS AND AIR RECEIVERS.
Unknown
Issued 20 July 2000
Resolved
REVISE MARINE OPERATIONS MANUAL TO REFLECT MODIFICATIONS TO HELODECK, FIREMAIN PIPING, ELECTRICAL SYSTEMS, ESD SYSTEM, EMERGENCY GENERATOR AND ANY OTHER EQUIPMENT CHANGE MADE IN 1997-1998. SUBMIT TO USCG MSC FOR_x001C_ APPROVAL ALONG WITH REVISED STABILITY DATA.
Fire Fighting
Issued 20 July 2000
Resolved
PROVIDE FIRE DOOR AT GALLEY / HALLWAY. INSTALL CLOSURE DEVICES AS NECESSARY. ENSURE ALL FIRE DOORS ARE SELF CLOSING AND LATCHING.
Engineering
Issued 20 July 2000
Resolved
RE-CONFIGURE FUEL OIL SUPPLY AND RETURN LINES BETWEEN CEMENT SKID UNIT AND FUEL OIL DAY TANK. NO SECTION OF NON-METALIC FUEL LINE TO EXCEED 30 INCHES IN LENGTH.
Unknown
Issued 20 July 2000
Resolved
CONDUCT ABS ANNUAL CRANE SURVEYS DUE APRIL 2000. REPAIR PORT AND STARBOARD CRANES AS PER THIRD PARTY INSPECTION REPORT DATED 21MAY00 TO THE SATISFACTION OF CLASS SOCIETY.
Fire Fighting
Issued 20 July 2000
Resolved
CROP AND RENEW WASTED FIREMAIN PIPING AT HELODECK FIRE STATION AND HYDRO INTHE PRESENCE OF A ABS SURVEYOR OR USCG MARINE INSPECTOR.
Lifesaving
Issued 20 July 2000
Resolved
LOG THE LOWERING OF LIFEBOATS AT EACH DRILL.
Lifesaving
Issued 20 July 2000
Resolved
CONDUCT FIRE FIGHTING APPLIANCE TRAINING FOR REGULAR CREW AND INDUSTRIAL HANDS AT THE SAME INTERVAL AS DRILLS OR EVERY TWO MONTHS.
Electrical
Issued 20 July 1999
Resolved
Provide proper operation of emergency generator automatic bus transfer (ABT) upon loss of electrical potential from main bus.
Lifesaving
Issued 20 July 1999
Resolved
Conduct 110 percent full load release gear testing of port and stbd lifeboats inaw 46 CFR 109.301(i)(5).
Lifesaving
Issued 20 July 1999
Resolved
Submit liferaft davit hook releases (both davits) for annual servicing and testing iaw manufacturer's instruction per 46 CFR 109.301.
Lifesaving
Issued 20 July 1999
Resolved
Redesign mud pit room loss-of-ventilation alarm system so that it properly detects loss of relative negative pressure differential between mud pit room and adjacent port and stbd vestibules just outside mud pit room doors.Must work properly under every configuration of supply/exhaust fan operatio
Lifesaving
Issued 25 July 1998
Resolved
MAKE REPAIRS AND PROVE PROPER OPERATION OF GENERAL ALARM WARNING LIGHT BEHIND SWITHBOARD LOCATED IN THE MAIN MACHINERY SPACE. 46CFR 113.25-10 (a)
Navigation
Issued 25 July 1998
Resolved
PROVE PROPER OPERATION OF FOG HORN SIGNAL. SIGNAL WAS VERY WEEK. _x001C_ 72 COLREGS ANNEX III.
Engineering
Issued 25 July 1998
Resolved
FUEL OIL BUNKER STATION CATCHMENT HAS A HOLE IN THE AFTER LOWER SIDE. MAKEPERMENANT REPAIRS.
Accommodation/Occupational Safety
Issued 25 July 1998
Resolved
MAKE HOSPITAL SPACE PRESENTABLE FOR INSPECTION AND PROVIDE A POTABLE WATER CONNECTION TO HE SINK AS REQUIRED. 46 CFR 108.209
Navigation
Issued 25 July 1998
Resolved
RENEW NAVIGATION LIGHT LENSES AS EXISTING ONES ARE FADED AND EXCESSIVIELY WEATHERED. COLREGS 72 RULE 22._x001C_ _x001C_ _x001C_
Unknown
Issued 9 September 1997
Resolved
PROVIDE DOCUMENTATION THAT THE SAFETY RELIEF VALVE FOR THE AIR RECEIVER LOCATED ON THE DRILL FLOOR HAS BEEN PROPERLY TESTED AND FOUND SATISFACTORY.
Unknown
Issued 9 September 1997
Resolved
MAKE PERMANENT REPAIRS TO ALARM FOR LOSS OF VENTILATION TO MUD PIT ROOM.
Accommodation/Occupational Safety
Issued 9 September 1997
Resolved
PROPERLY INSTALL TWO ELECTRICAL WIRE RUNS TO DRYERS IN LAUNDRY ROOM.
Accommodation/Occupational Safety
Issued 9 September 1997
Resolved
PROPERLY LABEL EMERGENCY ESCAPE LOCATED IN CREW CHANGE ROOM.
Unknown
Issued 9 September 1997
Resolved
MAKE PERMANENT REPAIRS TO FLIGHT DECK. SUBMIT PLANS FOR APPROVAL IF OTHER THAN ORIGINAL TYPE CONSTRUCTION. NO FLIGHTS UNTIL REPAIRS ARE COMPLETED.
Documentation
Issued 7 August 1996
Resolved
UPDATE/REVISE OPERATIONS MANUAL, OIL TRANSFER PROCEDURE, FIRE/SAFETY PLAN AND HAZARDOUS LOCATION PLAN TO REFLECT ANY CHANGES, NEW OWNER/OPERATOR AND RIG NAME.
Documentation
Issued 7 August 1996
Resolved
PROVIDE ONBOARD AN "APPROVED" SOPEP PRIOR TO HAVIND THE MODU BARGE HULL WATERBORNE.
Documentation
Issued 7 August 1996
Resolved
SUBMIT TO [name withheld], COPIES OF RIG PERSONNEL TRAINING CERTIFICATES AND COMPANY AUTHORITY TO ACT AS COMPETENT PERSON.
Deck/Cargo
Issued 7 August 1996
Resolved
PROVE PROPER OPERATION OF BOW, PORT AND STBD ANCHOR WINDLASS OR REMOVE FROMMODU.
Engineering
Issued 14 February 1992
Resolved
RENEW DOMESTIC HOT WATER HEATER TEMP/PRES RELIEF VALVES (2EA) WITH ANSI/UL 174 APPROVED VALVES W/ MAXIMUM VALUES OF 100PSI/210 F
Electrical
Issued 14 February 1992
Resolved
CORRECT MISALIGNMENT AND REPLACE NO. 2 GENERATOR COOLING WATER EXPANSION JOINT.
Construction/Loadline
Issued 14 February 1992
Resolved
FWD COPY OF OCEANEERING INC. DIVE RPT & MPT TEST RESULTS ALONG WITH REPAIR PROPOSAL FOR CRACKS DETECTED ON THE PORT LEG. IN REPAIR PROPOSALS DETERMINEIF OPERATION OF PINNING 1 LEG NEEDS ADDRESSED IN CURRENT OPERATIONS MANUAL.PROPOSAL TO OCMI, NEW ORLEANS MARINE SAFETY OFFICE.
Construction/Loadline
Issued 14 February 1992
Resolved
COMPLETE PERM REPAIRS TO THE PORT LEG IAW AN APPROVED REPAIR PROPOSAL. ALL REPAIRS TO BE COMPLETED IAW CONSTRUCTION PORTFOLIO WELD PROCEDURES AND CLASSIFICATION SOCIETY STANDARDS. ALL REP'S TO SAT. OF ATTENDING CG INSPECTOR OR AS APPV'D BY OCMI, NEW ORLEANS MARINE SAFETY OFFICE.
Engineering
Issued 13 March 1991
Resolved
RENEW AND TEST THE SAFETY RELIEF VALVE FOR THE HEATING BOILER IN ACCORDANCEWITH 46CFR53.05 AND 46CFR61.05-20. SUBMIT TEST RESULTS AND NAMEPLATE DATA TO MSO NEW ORLEANS WITH VERIFICATION LETTER FROM OIM. BOILER IS NOT TO BE PLACED IN SERVICE UNTIL SAFETY RELIEF VALVE IS REPLACED.
Lifesaving
Issued 13 March 1991
Resolved
RENEW THE EMERGENCY DRINKING WATER IN BOTH SURVIVAL CAPSULES IN ACCORDANCE WITH 46CFR108.503 AND 46CFR94.20-10.
Fire Fighting
Issued 13 March 1991
Resolved
PROVIDE FIRE FIGHTING FOAM ANYLSIS IN ACCORDANCE WITH 46CFR107.235.
Electrical
Issued 13 March 1991
Resolved
RENEW OR REPAIR THE SHIP SERVICE GENERATOR ENGINE TACHOMETERS (3).
Electrical
Issued 13 March 1991
Resolved
PROPERLY INSTALL ACCEPTABLE FLAME SHIELDS ON THE RACOR FUEL FILTERS FOR THETHREE (3) SHIP SERVICE GENERATOR ENGINES.
Lifesaving
Issued 31 March 1990
Resolved
REPLACE FOUR (4) KILGORE ROCKETS FOR LINE THROWING GUN.
Lifesaving
Issued 31 March 1990
Resolved
REPLACE WATER-ACTIVATED LIGHTS ON ALL 58 SURVIVAL SUITS.
Lifesaving
Issued 31 March 1990
Resolved
REPLACE ONE (1) SMOKE FLARE ON STARBOARD RING BOUY.
Fire Fighting
Issued 27 June 1989
Resolved
PROVIDE SAMPLE TEST RESULTS OF PREMIXED FIREFIGHTING FOAM.
Fire Fighting
Issued 12 March 1989
Resolved
PROVIDE SAMPLE TEST RESULTS OF PREMIXED FIRE-FIGHTING FOAM IN ACCORDANCE WITH 46CFR107.231.
Electrical
Issued 12 March 1989
Resolved
MAKE REPAIRS TO NO. 2 GENERATOR AND PROVE SATISFACTORY OPERATIONAL TEST OF PARALLEL OPERATIONS, REVERSE-POWER RELAY TRIP, OVERSPEED TRIP OF PRIME MOVER, LOSS OF LUB OIL PRESSURE TRIP AND HIGH COOLING WATER TEMPERATURE TRIP IN ACCORDANCE WITH 46CFR111.12.
Unknown
Issued 1 April 1986
Resolved
RENEW FIREBRICK INSIDE BOILER FIRESIDE DRUM.
Unknown
Issued 1 April 1986
Resolved
REPLACE SAFETY VALVE ON BOILER WITH AN APPROVED ASME VALVE SET 15 PSC.
Unknown
Issued 1 April 1986
Resolved
REPLACE BEARING ON SHAFT FOR NO.2 LIFEBOAT AND TEST ENGINE IN WATER.
Unknown
Issued 1 April 1986
Resolved
HAVE ABS CONDUCT ANNUAL LOADLINE SURVEY.
Unknown
Issued 1 April 1986
Resolved
HYDRO TEST ALL MSIT BREATHING APPARATUS BOTTLES.
Documentation
Issued 23 March 1985
Resolved
PROVIDE EVIDENCE TO THE OFFICER IN CHARGE MARINE INSPECTION NEW ORLEANS THAT THE COAST GUARD APPROVED CONSTRUCTION PORTFOLIO IS ON BOARD THE RIG IFTHERE IS NO APPROVED PORTFOLIO, SUBMIT ONE TO THE EIGHT COAST GUARD DIS- TRICT MMT OFFFICE FOR APPROVAL.
Unknown
Issued 23 March 1985
Resolved
THE FOLLOWING DEFICIENCY PERTAIN TO THE VESSEL, DIAMOND M. MAGALLANES DN621912.
Unknown
Issued 2 May 1984
Resolved
PROVIDE ASME APPROVED 40 PSI RELIEF VALVE AT BULK AIR COMPRESSOR. 46 CFR 54.15-5
Unknown
Issued 2 May 1984
Resolved
PROVIDE ASME APPROVED RELIEF VALVE WITH HAND RECEIVING GEAR TO DRILL FLOOR AIR RECEIVER. 46 CFR 54.15-5
Unknown
Issued 2 May 1984
Resolved
ON THE DIESEL TANK IN GENERATOR ROOM, PROVIDE SIGHT GLASS OF HEAT RESISTANTMATERIAL AND INSTALL PROTECTION FOR THE SIGHT GLASS. 46 CFR 58.10
Unknown
Issued 2 May 1984
Resolved
THE FOLLOWING DEFICIENCIES PERTAIN TO THE M/V DIAMOND M. MAGALLANES, O.N. 621912.
Lifesaving
Issued 2 May 1984
Resolved
PROVIDE INSTRUCTIONS FOR INFLATING AND LAUNCHING OF LIFERAFTS. INSTRUC- TIONS TO BE POSTED AT EACH RAFT STATION. 46 CFR 108.655
Accommodation/Occupational Safety
Issued 30 May 1983
Resolved
MAKE SIX (6) BULK TANKS, NUMBER 11988,11986,11989,11987,11990 AND 11985 AVAILABLE FOR INTERNAL EXAM OR HYDROSTATIC TEST.
Fire Fighting
Issued 30 May 1983
Resolved
PROVIDE A THREE (3) CELL EXPLOSION PROOF FLASHLIGHT FOR EACH FIREMAN OUTFIT.
Fire Fighting
Issued 30 May 1983
Resolved
REPLACE DRY CHEMICAL IN 2500# UNIT ON DECK.
Electrical
Issued 30 May 1983
Resolved
PROVIDE EMERGENCY LIGHTING TO ILLUMINATE CAPSULES AND RAFTS FROM STOWED LOCATION TO WATER.
Construction/Loadline
Issued 30 May 1983
Resolved
COMPLETED SPECIAL EXAM IN LIEU OF DRYDOCKING WITHIN NINETY (90) DAYS.
Unknown
Issued 30 May 1983
Resolved
THE FOLLOWING DEFICIENCIES PERTAIN TO THE MODU DIAMOND M. MAGALLANES, DN621912.
Electrical
Issued 30 May 1983
Resolved
PROVIDE EMERGENCY LIGHTS IN PORT AND STARBOARD JACKHOUSES.
Unknown
Issued 30 May 1983
Resolved
WITHIN THIRTY (30) DAYS SUBMIT, FOR RENEWAL, A CONSTRUCTION PORTFOLIO SHOW-ING LOCATIONS OF SPECIAL STEELS AND APPROPRIATE REPAIR PROCEDURES.
Documentation
Issued 30 May 1983
Resolved
HAVE ANNUAL LOADLINE SURVEY CONDUCTED BY ABS.
Documentation
Issued 30 May 1983
Resolved
HAVE ABS OR ICGB CONDUCT ANNUAL INSPECTION OF CRANES.
Navigation
Issued 17 May 1982
Resolved
PROVIDE SHIP'S BELL (72 COLREG'S).
Lifesaving
Issued 17 May 1982
Resolved
PROVIDE AN IMPULSE TYPE LINE THROWING APPARATUS (46 CFR 108.517 (A)).
Fire Fighting
Issued 17 May 1982
Resolved
PROVIDE MARINE BRACKETS FOR ALL PORTABLE FIRE EXTINGUISHERS.
Electrical
Issued 17 May 1982
Resolved
PROVIDE AUDIBLE ALARMS FOR LOW LUBE OIL TRIPS AND HIGH JACKEY TEMP. CONDIT-ION ON THE EMERGENCY DIESEL GENERATOR (46 CFR 112.50)
Electrical
Issued 17 May 1982
Resolved
PROVIDE AUDIBLE ALARMS FOR OVERSPEED AND LOW LUBE OIL TRIPS ON MAIN GENERATORS.
Unknown
Issued 17 May 1982
Resolved
MODIFY EXHAUST SYSTEMS ON HALLIBURTON DIESELS TO PREVENT DISCHARGING ON TO LIFERAFT STATION.
Unknown
Issued 17 May 1982
Resolved
PROVIDE A LOSS OF VENTILATION ALARM FOR THE MUD PIT ROOM (46 CFR 108.185).
Fire Fighting
Issued 17 May 1982
Resolved
PROVIDE ONE B-V SEMI-PORTABLE EXTINGUISHER FOR THE FOILER ROOM (46 CFR 108.495 (A) )
Electrical
Issued 17 May 1982
Resolved
REPAIR EMERGENCY VENTILATION SHUTDOWN CIRCUIT BREAKER.
Unknown
Issued 17 May 1982
Resolved
PROVIDE A PRESSURE RELIEF DEVICE MFG. IN ACCORDANCE WITH 46 CFR 54.15 FOR PRESSURE VESSEL NAT.L' BD #27347.
Lifesaving
Issued 17 May 1982
Resolved
PROVIDE THE FOLLOWING EQUIPMENT FOR LIFEBOATS: BOAT NO.1-10 CANS OF WATER AND 12 HAND HELD FLARES BOAT NO. 2-6 CANS OF WATER.
Navigation
Issued 17 May 1982
Resolved
REPAIR FOG HORN (33 CFR 67)
Accommodation/Occupational Safety
Issued 17 May 1982
Resolved
REPLACE BROKEN WINDOW IN CONTROL ROOM.
Unknown
Issued 17 May 1982
Resolved
HAVE VESSEL REGISTRY ENDORSED FOR CHANGE OF MASTER AND DESIGNATE PERSONS-INCHARGE.
Unknown
Issued 17 May 1982
Resolved
SUBMIT TO [name withheld] A RIG FIRE CONTROL PLAN FOR APPROVAL AND POST ONBOARD AFTER APPROVED PLAN IS RECEIVED.
Unknown
Issued 17 May 1982
Resolved
SUBMIT A HAZARDOUS LOCATIONS PLAN TO [name withheld] AND PROVIDE TO RIG AFTER APPROVAL (46 CFR 111.05-5(D)(22)).
Unknown
Issued 17 May 1982
Resolved
HAVE ANNUAL CRANE AND CLASS SURVEYS CONDUCTED BY ABS.
Unknown
Issued 17 May 1982
Resolved
REPAIR AIR PURGE SYSTEM FOR DRILLER'S CONSOLE FOR PROPER OPERATION.
Unknown
Issued 17 May 1982
Resolved
PROVIDE VESSEL WITH CONSTRUCTION PORTFOLIO (46 CFR 107.305 (H).)
Casualty record · 1
26 July 2001Significant Marine Casualty · role: Involved in a Marine Casualty · activity 1700224
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Recorded names · 1
RBF 155 (2001). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.