Inspection history · 51
27 October 2014
MTSA Verification · COI Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5012657
30 July 2014
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4939064
9 July 2013
Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4648472
27 November 2012
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4491495
11 October 2012
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4461641
5 July 2012
Internal Structural Exam · Drydock Exam · Cargo Tank Internal
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4368391
11 June 2012
Administrative Inspection
Administrative · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4341064
15 May 2012
Deficiency Check
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4330384
26 March 2012
Administrative Inspection · COI Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4275449
1 December 2010
COI Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3912686
7 September 2010
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3844212
23 March 2009
Periodic Inspection · MTSA Verification
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3438723
11 July 2007
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 2991665
31 May 2007
Examination of Repairs · Cargo Tank Internal · MTSA Verification · COI Inspection · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 2947316
14 November 2005
COI Inspection · MTSA Verification
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 2534552
19 April 2005
MTSA Verification
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 2338024
28 February 2005
Periodic Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 2356550
4 October 2004
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 2215642
1 July 2004
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 2117459
6 February 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2004658
20 November 2003
Periodic Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1951648
18 November 2002
Deficiency Check · Periodic Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1707034
20 May 2002
Hull Examination · Cargo Tank Internal · Internal Structural Exam
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1618917
7 December 2001
Deficiency Check
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 773014
9 November 2001
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 772633
15 December 2000
Deficiency Check
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1057404
15 November 2000
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1435110
6 January 2000
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1420256
21 December 1998
Deficiency Check
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 809374
20 November 1998
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1461927
23 January 1998
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1400708
28 May 1997
Hull Examination
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1414812
21 November 1996
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1430311
17 January 1996
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1402229
21 November 1994
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1172339
11 January 1994
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1438136
19 November 1992
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1440648
22 April 1992
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 645537
2 April 1992
Re-Inspection · Hull Examination
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 957161
21 November 1990
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 906316
19 January 1989
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 896866
14 November 1988
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1208865
27 January 1988
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1016290
18 November 1987
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1026017
17 November 1986
Drydock Extension · COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1333413
24 January 1986
Re-Inspection · Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1300559
17 January 1985
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1286452
24 July 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1280733
21 April 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1278208
21 April 1983
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1280996
27 March 1981
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 966732
Construction/Loadline › Hull › Hull Plating
Issued 11 June 2012
Resolved
Prior to conducting cargo operations; complete the required dry-dock.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 July 2012
Pollution Prevention/Response › Prevention Equipment › Drains/Scuppers (means of closure)
Issued 11 June 2007
Resolved
Install drain plugs into both Independent tanks at bottom on each drain valve.
Action required: 705 - Other - as specified
Due 11 July 2007
Resolved 11 July 2007
Resolution: Drain plugs installed.
Engineering › Diesel Engine (auxiliary) › Air Cleaner
Issued 31 May 2007
Resolved
Prove cargo pump engine engine gauge/tach, battery/wiring harness and start switch installations are approved for the hazardous location they are in. Reference D8 Policy letter 02-2005, [name withheld] e-mail 26MAY2006 and 46CFR111.105-31(l).
Action required: 705 - Other - as specified
Due 11 August 2007
Resolved 3 December 2010
Resolution: Observed an pneumatic starter had been installed.
Documentation › Markings/Placards › Warning Signs
Issued 31 May 2007
Resolved
Mark each cargo tank access "DANGER KEEP OUT" inaccordance with 46CFR35.05-15(b)(3)(ii).
Action required: 705 - Other - as specified
Due 11 July 2007
Resolved 11 July 2007
Resolution: Stencils done.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 14 November 2005
Resolved
Provide evidence of Vessel Response Plan approval letter from the USCG.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 November 2005
Resolution: Provided evidence of the Vessel Response Plan.
Deck/Cargo › Vapor Control Systems › Flame Screens
Issued 14 November 2005
Resolved
Replace all flame screens on No.1, No.2, No.3, and No.4 cargo tank P/V valves.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 May 2007
Resolution: All sat cleared old 835.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 28 February 2005
Resolved
Fixed Containment need to be Installed on Port and STBD slop tanks.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 November 2005
Resolution: Containment fixed prior to 11/14/2005. Def cleared.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 28 February 2005
Resolved
Guard for PTO shaft was missing.
Condition: Improper/Lack of Maintenance
Due 28 March 2005
Resolved 14 November 2005
Resolution: Def never cleared.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 20 November 2003
Resolved
Draft marks not visible LEGACY COMPONENT DESC: Draft Marks/Indicating System
Condition: Improper/Lack of Maintenance
Due 20 December 2003
Resolved 14 November 2005
Resolution: Def never cleared draft marks visible.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 20 November 2003
Resolved
Markings not visible LEGACY COMPONENT DESC: Vessel Name/Home Port
Condition: Improper/Lack of Maintenance
Due 20 December 2003
Resolved 14 November 2005
Resolution: Def cleared.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 20 November 2003
Resolved
Required labeling missing LEGACY COMPONENT DESC: Transfer Hose
Due 20 December 2003
Resolved 14 November 2005
Resolution: Def cleared. Never cleared in system.
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 18 November 2002
Resolved
Conduct hydrostatic test of all transfer hoses in accordance with 33 CFR 156.70 LEGACY COMPONENT DESC: Transfer Hose
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 November 2002
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 18 November 2002
Resolved
Conduct test of pressure relief valve in accordance with 33 CFR 156.70 LEGACY COMPONENT DESC: Relief Valve
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 November 2002
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 18 November 2002
Resolved
Provide on board a total of two B-2 portable fire extinguishers in accordance with Certificate of Inspection LEGACY COMPONENT DESC: Number
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 November 2002
Engineering › Lubricating Oil Storage/Transfer System
Issued 18 November 2002
Resolved
Remove portable fuel tank or install in accordance with 46 CFR 32 LEGACY COMPONENT DESC: Tank
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 November 2002
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 18 November 2002
Resolved
Remove portable cargo pump or install in accordance with 346 CFR 32 LEGACY COMPONENT DESC: Cargo Pump
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 November 2002
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 18 November 2002
Resolved
Provide and install a cover over the cargo pump engine iaw 46 CFR 32.35-5 LEGACY COMPONENT DESC: Cargo Pump Engine Cover
Condition: Improper Installation
Due 18 December 2002
Resolved 10 December 2002
Resolution: Cover installed SAT.
Construction/Loadline › Hull
Issued 20 May 2002
Resolved
Crop and renew as original the wasted plate steel in way of the transverse bulhead between the bow void and the #1 C.T. Crop and renew from the port to starboard side shell from bottom plating up to good steel, but no less than 12 inches.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 May 2002
Resolution: 90 square feet of plate steel renewal satisfactory air-test observed.
Deck/Cargo
Issued 9 November 2001
Resolved
Prior to conducting cargo operations, replace the pressure gauge on the cargo line. 46 CFR Part 32.50-5.
Condition: Unknown
Due 10 November 2001
Resolved 13 November 2001
Deck/Cargo
Issued 9 November 2001
Resolved
Prior to conducting cargo operations, provide on board Discharge Removal Equipment.
Condition: Unknown
Due 9 November 2001
Resolved 13 November 2001
Deck/Cargo
Issued 9 November 2001
Resolved
Prior to conducting cargo operations, provide a test affidavit attesting tothe satisfactory results of the cargo pipng hydrostatic test.
Condition: Unknown
Due 10 November 2001
Resolved 13 November 2001
Deck/Cargo
Issued 9 November 2001
Resolved
Prior to conducting cargo operations, provide a affidavit attesting to the satisfactory results of the cargo pump relief valve.
Condition: Unknown
Due 10 November 2001
Resolved 13 November 2001
Engineering
Issued 9 November 2001
Resolved
Prior to conducting cargo operations, replace the flame screen in way of the cargo pump's diesel engine fuel tank vent.
Condition: Unknown
Due 10 November 2001
Resolved 13 November 2001
Deck/Cargo
Issued 9 November 2001
Resolved
Provide and install an sign over the cargo pump's Emergency Shutdown in accordance with 46 CFR Part 32.50-35.
Condition: Unknown
Due 9 November 2001
Resolved 9 November 2001
Fire Fighting
Issued 9 November 2001
Resolved
Prior on board two B-II fire extinguishers in accordance with the vessel's Certificate of Inspection.
Condition: Unknown
Due 9 November 2001
Resolved 9 November 2001
Construction/Loadline
Issued 9 November 2001
Resolved
Paint the draft marks and vessel name in a contrasting color on the exterior hull.
Condition: Unknown
Due 9 November 2001
Resolved 9 November 2001
Documentation
Issued 9 November 2001
Resolved
Provide on board the orignal copy of the Certificate of Inspection.
Condition: Unknown
Due 9 December 2001
Resolved 16 November 2001
Engineering
Issued 15 November 2000
Resolved
Replace supply/return fuel lines to prime mover to the satisfation of attending Marine Inspector prior to 14 DEC 00.
Condition: Unknown
Due 15 November 2000
Resolved 15 November 2000
Deck/Cargo
Issued 20 November 1998
Resolved
REPLACE WORN/DETERIORATED FLEXIBLE FUEL HOSE ON CARGO PUMP ENGINE.
Condition: Unknown
Due 20 November 1998
Resolved 20 November 1998
Navigation
Issued 20 November 1998
Resolved
REMOVE UNUSED NAV LIGHT SCREEN OR PAINT FLAT BLACK.
Condition: Unknown
Due 20 November 1998
Resolved 20 November 1998
Deck/Cargo
Issued 20 November 1998
Resolved
REPLACE FLAME SCREEN WITH PROPER TYPE/SIZE ON P/V VALVE FOR #2 CARGO TANK.
Condition: Unknown
Due 20 November 1998
Resolved 20 November 1998
Deck/Cargo
Issued 20 November 1998
Resolved
CLEAN INTERNALS OF P/V VALVE ON #4 CARGO TANK.
Condition: Unknown
Due 20 November 1998
Resolved 20 November 1998
Engineering
Issued 20 November 1998
Resolved
INSTALL FLAME SCREEN ON FUEL TANK FOR CARGO PUMP ENGINE.
Condition: Unknown
Due 20 November 1998
Resolved 20 November 1998
Deck/Cargo
Issued 21 November 1990
Resolved
DEMONSTRATE PROPER OPERATION OF CARGO PUMP ENGINE REMOTE SHUTDOWN.
Condition: Unknown
Due 21 November 1990
Resolved 21 November 1990
Deck/Cargo
Issued 21 November 1990
Resolved
PROVIDE PROPER TRANSFER PROCEDURES DOCUMENTS FOR VSL.
Condition: Unknown
Due 21 November 1990
Resolved 21 November 1990
Deck/Cargo
Issued 21 November 1990
Resolved
REPAIR/RENEW #2 AND #3 CARGO TANK FLAME SCREENS WITH PROPER FLAME SCREEN MATERIAL.
Condition: Unknown
Due 21 November 1990
Resolved 21 November 1990
Deck/Cargo
Issued 21 November 1990
Resolved
INSTALL PLUG AT CONTAINMENT VALVE OUTLET.
Condition: Unknown
Due 21 November 1990
Resolved 21 November 1990
Construction/Loadline
Issued 24 January 1986
Resolved
RESTENCIL DRAFT MARKS, HAILING PORT, AND VESSELS NAME ON HULL.
Condition: Unknown
Due 24 January 1986
Resolved 24 January 1986
Deck/Cargo
Issued 24 January 1986
Resolved
REPLACE VENT SCREEN ON DIESEL OIL DAY TANK.
Condition: Unknown
Due 24 January 1986
Resolved 24 January 1986
Fire Fighting
Issued 24 January 1986
Resolved
REPAIR OR REPLACE TWO FIRE EXTINGUISHER BRACKETS.
Condition: Unknown
Due 24 January 1986
Resolved 24 January 1986
Deck/Cargo
Issued 24 January 1986
Resolved
PERFORM HYDROSTATIC TEST 11/2 TIMES MAXIMUM ALLOWABLE WORKING PRESSURE ON CARGO PIPING, HOSE, TEST RELIEF VALVE, AND GAUGE.
Condition: Unknown
Due 24 January 1986
Resolved 24 January 1986
Deck/Cargo
Issued 24 January 1986
Resolved
INSTALL SANITATION SCREENS ON VENTS ON TWO POTABLE WATER TANKS.
Condition: Unknown
Due 24 January 1986
Resolved 24 January 1986