← All vessels
FISH CITY PRIDE
Passenger (Inspected) · Passenger Ship class · Built 1980s · USCG Southeast District (CGD-SE) · Other hulls named FISH CITY PRIDE
FISH CITY PRIDE is a 1980 passenger vessel (inspected). The Coast Guard has recorded 65 inspections since 1984, most recently in May 2025, along with 165 deficiencies — 1 with no resolution recorded —, 2 operational controls and 1 casualty investigation in 2008.
Records from 1984 to 2025. Most recent: inspection, 8 May 2025.
- Built
- 1980
- Last inspected
- 8 May 2025
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 165 recorded · 1 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 1 investigation · 2008
Identity
627425
WWDJ2144
52313
Flag
UNITED STATES
367031770
Maury page id
psix-52313
Inspections, by type
…with no type recorded4
Years with a record
37 calendar years (1984–2025)
The 65 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)60.0 ft × 18.6 ft × 8.3 ft
Registered tonnagegross 71 / net 48
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderA-1 MARINE INC · PANAMA CITY, FL, UNITED STATES · built 1980
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portPOMPANO BEACH, FL
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 28 May 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it71 - Regulatory (Subpart C or D), Gross Ton
48 - Regulatory (Subpart C or D), Net Ton
48 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDJ2144MMSI 367031770 · active · compulsorily equipped · granted 23 September 2016, expires 23 September 2026
WYQ9289MMSI 367031770 · expired · compulsorily equipped · granted 8 April 2005, cancelled 1 August 2015
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 65
8 May 2025
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8130949
12 August 2024
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7979324
26 January 2024
Administrative Inspection · COI Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7855988
16 January 2024
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7849671
18 December 2023
Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7852412
22 December 2022
Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7611981
14 December 2021
Administrative Inspection · Drydock Exam · Internal Structural Exam · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7368166
12 October 2021
Administrative Inspection · COI Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7331079
27 September 2021
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7321377
21 December 2020
Administrative Inspection · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7114564
20 December 2019
DAPI Audit · Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6876896
10 December 2019
Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6870755
21 December 2018
DAPI Audit · Annual Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6597124
12 January 2018
Annual Inspection · Deficiency Check · Administrative Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6336841
4 January 2018
Internal Structural Exam · Drydock Exam · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6333898
23 September 2016
COI Inspection · Deficiency Check · DAPI Audit · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6007763
15 December 2015
Deficiency Check · Annual Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5782227
4 November 2015
Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5780324
19 December 2011
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4211946
22 September 2011
COI Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4149168
1 December 2010
Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3901774
8 December 2009
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3646748
20 November 2008
Annual Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3363133
14 February 2008
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3154537
10 October 2007
Deficiency Check · Hull Examination · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3075742
21 September 2006
COI Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2782293
21 September 2005
Deficiency Check · Hull Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2498237
10 September 2005
Annual Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2488683
9 September 2004
Deficiency Check · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2190054
29 September 2003
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1916826
15 September 2003
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1905391
13 June 2003
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1816417
5 September 2002
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1671164
27 September 2001
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1074278
18 September 2001
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1422124
4 September 2001
COI Inspection · MARPOL Annex V Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1420578
19 September 2000
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1376319
28 September 1999
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1369361
24 September 1999
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1450348
11 September 1998
COI Inspection · MARPOL Annex V Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 799359
10 October 1997
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1112392
16 September 1997
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1419825
27 September 1996
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1142321
18 September 1996
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1270037
13 September 1996
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 955426
12 January 1996
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1183433
11 September 1995
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1185581
21 January 1994
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1163167
13 January 1994
Hull Examination · Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1162315
17 September 1992
Deficiency Check · COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 962556
30 September 1991
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1245177
18 September 1991
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1244044
5 September 1991
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 940677
5 September 1991
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1245467
10 September 1990
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 929918
29 June 1990
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1222725
18 September 1989
COI Inspection · Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1219214
4 October 1988
Deficiency Check · Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1198711
13 September 1988
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1040261
29 October 1987
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1332224
28 September 1987
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1313792
20 March 1987
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1018577
6 October 1986
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1316965
15 October 1985
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1294322
5 November 1984
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1284445
Deficiency record · 165
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 8 May 2025
No resolution recorded
Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date. Vessel has not undergone an annual inspection within required timeline. Provide Sector Miami with a CG-3752 for a new COI.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 12 August 2024
Resolved
No vessel which is required by § 67.7 to be documented may engage in unlimited coastwise trade or the fisheries without being documented in accordance with the requirements of this part.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 26 January 2024
Resolved
No person may use a vessel to which this part applies unless: (1) It has a number issued on a certificate of number by the issuing authority in the State of principal operation. Vessel owner could not produce a non-expired Florida state registration. Vessel must renew and carry documentation onboard.
33 CFR 173.15(a)
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 26 January 2024
Resolved
Marine employers must ensure that data submitted by a consortium or other employer representative … is correct. Vessel does not have a copy of the most recent Management Information System (MIS) report onboard and thus cannot verity that their consortium submitted correctly. Vessel must obtain and verity MIS report.
46 CFR 16.500(b)(4)
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 26 January 2024
Resolved
A durable placard must be posted next to all radiotelephone installations with the emergency broadcast instructions and information, specific to the individual vessel. Vessel did not have a placard posted to radiotelephone installation with emergency broadcast instructions/information. Vessel must create and post placard.
46 CFR 184.506
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 26 January 2024
Resolved
A ship, … , must have a placard of at least 5 by 8 inches, made of durable material fixed in a conspicuous place in each machinery space, … , stating the following: DISCHARGE OF OIL PROHIBITED... . Vessel is missing its oil discharge placard. Vessel must create/install in approprate spaces.
33 CFR 155.450(a)
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 26 January 2024
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: (1) Charts. Vessel did not have up-to-date charts on board. Vessel must update charts.
46 CFR 184.420(a)
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 26 January 2024
Resolved
An adult life jacket must be provided for each person carried on board a vessel. Vessel is certified to carry 50 persons on board, but the vessel only had 48 onboard that were in good condition. Vessel must purchase 2 adult lifejackets.
46 CFR 180.71(a)
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 26 January 2024
Resolved
The grab line shall be 3/8-inch diameter polyethylene, polypropylene, or other suitable buoyany type synthetic material having a minimum breaking strength of 1,350 pounds. MIs observed grab line break at the splice. Vessel must replace or re-splice grab line to attain minimum breaking strength.
46 CFR 160.050-3(c)
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage management plan
Issued 26 January 2024
Resolved
The master or person in charge of a ship to which this section applies shall ensure that the ship is not operated unless a garbage management plan meeting paragraph (b) of this section is on the ship and that each person handling garbage follows the plan. Vessel does not have a garbage management plan onboard. Vessel must create and maintain a garbage management plan onboard at all times.
33 CFR 151.57(a)
11 - Life Saving Appliances › N/A - No Subsystem › Radio life-saving appliances
Issued 26 January 2024
Resolved
Each disposable hydrostatic release unit must be marked with an expiration date of two years after the date on which the unit is installed. Vessel’s disposable hydrostatic release unit was past its expiration date. Vessel must purchase and install a new hydrostatic release unit.
46 CFR 185.740(b)
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 26 January 2024
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules. Vessel’s starboard navigation light is inop. Vessel must replace bulb. In addition, vessel’s port and starboard navigation lights are open and exposed to weather. Make proper repairs.
46 CFR 183.420
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 26 January 2024
Resolved
A vessel must carry either a first-aid-kit approved under approval series 160.041 or a kit with equivalent contents and instructions. Vessel operator presented a first aid kit that has expired. Provide a first aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions.
46 CFR 184.710
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 26 January 2024
Resolved
Each watertight bulkhead must be of sufficient strength to be capable of remaining watertight with a head of water to the top of the bulkhead. Found a hole in aft bulkhead of #2 Void. Make proper repairs.
46 CFR 179.320(a)
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 26 January 2024
Resolved
All electrical installations shall be to the satisfactio of the OCMI. Found two rusted out junction box for light switches in #2 Void, located in the overhead position in way of entrance hatch. Replace corroded out junction boxes.
46 CFR 183.01-15(a)
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 26 January 2024
Resolved
Rails or equivalent protection shall be installed near the periphery of all weather decks accessible to passengers and crew. Plastic rail siding along portside midship was found with a crack. Make proper repairs to rail siding.
46 CFR 177.35-1(a)
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 26 January 2024
Resolved
The visual bilge high level alarm for lazareet in way of operating station is extinguished. Replace bulb for visual bilge high level alarm.
46 CFR 177.35-1(a)
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 26 January 2024
Resolved
Insure that the scantlings, material, fastenings, workmanship and arrangement of each vessel are such as to provide for safe operation of vessel. Found in #2 Void two overhead transverse frames in way of hatch opening completely cracked through and or severely damaged by wood rot. Make proper repairs to two overhead transverse frames.
46 CFR177.01-5(a)
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 26 January 2024
Resolved
Insure that the scantlings, material, fastenings, workmanship and arrangement of each vessel are such as to provide for safe operation of vessel. Found in #2 Void along portside two overhead transverse frames with sever wood rot. Remove wood rot and make proper repairs to the transverse overhead frames.
46 CFR 177.01-5(a)
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 26 January 2024
Resolved
All electrical installations shall be to the satisfaction of the [name withheld] engine room, found electrical wiring spliced improperly (spliced outside a junction box). Make proper electrical wire connections using a junction box in way of the sea strainer located on the port side of the engine room.
46 CFR 183.01-15(a)
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 26 January 2024
Resolved
Insure that the scantlings, material, fastenings, workmanship and arrangement of each vessel are such as to provide for safe operation of vessel. Observed during steering gear test in lazarette, sea water leaking through in way of both port and starboard rudder posts. Make proper repairs to ensure watertight integrity.
46 CFR 177.01-5(a)
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 26 January 2024
Resolved
Shutoff valves, installed so as to close against the fuel flow, shall be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank shall be operable from outside the tank compartment. The emergency fuel shutoff valve for the service generator did not work as the securing band around the remote reach rod was loose, causing a free spin of the reach rod without closing the valve. Tighten down securing band and ensure emergency fuel shutoff valve works properly.
46 CFR 182.20-40(b)(3)
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 26 January 2024
Resolved
Insure that the scantlings, material, fastenings, workmanship and arrangement of each vessel are such as to provide for safe operation of vessel. Found multiple holes in side shell of lazarette, porside and a single hole in forward bulkhead, portside in lazarette. Make proper repairs to ensure compartment is watertight.
46 CFR 177.01-5(a)
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 January 2024
Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 1 inch high indicating purpose of the valve and direction of operation. Did not find markings for remote fuel shutoffs. Make proper markings for remote fuel shutoffs.
46 CFR 185.608
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 January 2024
Resolved
Rigid non-metallic materials are acceptable for use in bilge. Found non-metallic hose in bilge piping and pin hole in the metal bilge piping within engine room. Replace non-metallic hose with rigid non-metallic hose and make proper repairs to pin hole leak in the metal bilge piping.
46 CFR 182.40-5
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 16 January 2024
Resolved
To maintain a valid Certificate of Inspection, you must complete your annual inspection within the periods specified in 176.500(b)(1) [annual inspection within 3 months before or after each anniversary date] and your Certificate of Inspection must be endorsed. Vessel is outside of three month window for Inspection and is not permitted to operate until annual inspection has been completed.46CFR176.502 / 701 c
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 December 2022
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. Seal port and starboard rubber post leaks.
46 CFR 177.100
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 22 December 2022
Resolved
On a vessel of at least 26 feet, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces. High water alarms for the forward and aft compartments were inoperable.
46 CFR 182.530
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 December 2022
Resolved
Propulsion machinery shall be suitable in type and design for the propulsion requirements of the hull in which it is installed and capable of operating at constant marine load. Repair port engine alternator and tighten belt.
46 CFR 182.05-1
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 December 2022
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. Cap unused through-hull valves. Seal bulkhead penetrations.
46 CFR 177.100
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 22 December 2022
Resolved
The general construction of a vessel must be such as to minimize fire hazards insofar as reasonable and practicable. Clean engine room bilges and remove excess oil which represents a fire hazard.
46 CFR 177.405
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 December 2022
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. Tighten starboard shaft seal packing.
46 CFR 177.100
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 22 December 2022
Resolved
All vessels shall be provided with an approved adult type life preserver for each person carried. In addition, there shall be provided a number of approved life preservers suitable for children up to 10% of the total persons carried. Replace 06 adult lifejackets and 03 child life-jackets.
46 CFR 180.25-5
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 December 2022
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. Replace missing railing bolts and seal to ensure weather-tightness. Make proper repairs to missing starboard forward cleat.
46 CFR 177.100
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 22 December 2022
Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment under all practical conditions. Remount bilge high water alarms in all spaces to appropriate heights.
46 CFR 182.25-1
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 22 December 2022
Resolved
All electrical installations shall be to the satisfaction of the Office in Charge, Marine Inspection. Add junction boxes to wiring where needed, clean wiring behind the bridge panel.
46 CFR 183.01-15
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 22 December 2022
Resolved
Electrical equipment on a vessel must be installed and maintained to: protect passengers, crew, other persons, and the vessel from electrical hazards. Replace corroded battery connections.
46 CFR 183.210
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 October 2021
Resolved
Each bilge high level alarm must have a visual indicator at the operating station to indicate when any automatic bilge pump is operating. Aft compartment bilge alarm light isn't working properly. Repair/replace. 46 CFR 182.530(c)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 14 October 2021
Resolved
Moving belts on aux engines must have a guard around them to protect from slips,trips or falls that could result in serious injury if a person would to come in contact with the belts. Replace guard around aux engine in engine room. 46 CFR 182.310
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 October 2021
Resolved
A number of child life jackets equal to 10% of total number of persons permitted must be supplied. Replace 01 missing child life jacket. 46 CFR 180.71(b)
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 27 September 2021
Resolved
To maintain a valid Certificate of Inspection, you must complete your annual inspection within the periods specified in 176.500(b)(1) [annual inspection within 3 months before or after each anniversary date] and your Certificate of Inspection must be endorsed. Vessel is outside of three month window for Inspection and is not permitted to operate until annual inspection has been completed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 22 December 2020
Resolved
Each life ring buoy must be an approved type and constructed iaw 46CFR160.050.
Replace retroreflective material on life ring.
46CFR180.30-1
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 22 December 2020
Resolved
Vessel must carry either a first aid kit approved under 46CFR160.041 or equivalent.
46CFR184.710
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 22 December 2020
Resolved
Vessel must be equipped with properly operating bilge pump iaw 46CFR182.520(a) Vessel at least 26ft of length must have visual and audible alarms.
Demonstrate pump and alarms are working properly.
46CFR182.530
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 22 December 2020
Resolved
Diesel engine exhaust cooling shall be installed iaw 46CFR182.15-15.
Replace generator exhaust cooling valve coupling.
46CFR182.20-15
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 20 December 2019
Resolved
Vessel required 6 red flares and 6 orange flares. Vessel has only 8 flares onboard. 4 more flares required.
46CFR180.68(a)
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 20 December 2019
Resolved
Battery on EPIRB is expired. Replace battery for EPIRB. Vessel restricted to no more then 3 NM from shore.
46CFR180.64
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 21 December 2018
Resolved
Provide 08 more flares, vessel only had 4 onboard.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 21 December 2018
Resolved
Make repairs where the deck and sideshell meet on the port bow.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 21 December 2018
Resolved
Provide current epirb registration.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 24 January 2018
Resolved
Vessel did not have valid COD.
Lifesaving › Lifefloat › Serviceable
Issued 24 January 2018
Resolved
Life float requires vessel name, retroreflective tape and weak link.
Communications › Radio Communications › EPIRB
Issued 24 January 2018
Resolved
Vessel's EPIRB hydrostatic release was expired.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 12 January 2018
Resolved
Vessel required to complete annual inspection prior to carrying pax.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 4 January 2018
Resolved
46 CFR 176.600: Vessel must undergo a drydock and internal structural exam prior to carrying passengers.
Navigation › Piloting/Steering › Marine Charts
Issued 26 September 2016
Resolved
Charts were found outdated. Provide updated charts.
46 CFR 400
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 26 September 2016
Resolved
Provide most recent MIS report. 46 CFR 16.260
Lifesaving › Lifefloat › Serviceable
Issued 26 September 2016
Resolved
Found cracked/holed and wasted but in serviceable condition. Repair as original.
Electrical › Electrical Distribution System (service) › Cable
Issued 26 September 2016
Resolved
Multiple dead-end wires found under bridge console.
Electrical › Electrical Distribution System (service) › Cable
Issued 26 September 2016
Resolved
Main generator cable found chaffed; repair and provide chaffing gear.
Engineering › Fuel Oil Service System › Valve
Issued 23 September 2016
Resolved
Generator fuel supply shut off valve found not working.
Engineering › Diesel Engine (propulsion-reduction gear) › Gear/Clutch Starter (hydraulic)
Issued 23 September 2016
Resolved
Hydraulic pump on port engine found leaking.
Engineering › Freshwater System (jacketwater cooling) › Valve Manifold
Issued 23 September 2016
Resolved
Leak found on starboard main engine.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 23 September 2016
Resolved
Distribution panels (3) in pilothouse found unapproved and in poor condition. Unable to properly close.
Construction/Loadline › Hull › Transverse Frame
Issued 23 September 2016
Resolved
Deck beam in forward compartment (third back on port side) found in early stages of rot. Prior to credit dry-dock (2017) provide repair proposal to this office.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 15 December 2015
Resolved
provide updated COD.
Documentation › Certificates/Documents › FCC SSL
Issued 15 December 2015
Resolved
provide updated FCC station license.
Navigation › Piloting/Steering › Marine Charts
Issued 15 December 2015
Resolved
Provide updated chart.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 15 December 2015
Resolved
Renew first aid kit.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (air intake)
Issued 15 December 2015
Resolved
Replace broken hose clamps on the PMDE.
Electrical › Electric Generation Source (service) › Conductor
Issued 15 December 2015
Resolved
Remove wire nuts from the SSDG.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 4 November 2015
Resolved
Replace both shaft cutlass bearings.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 4 November 2015
Resolved
Repair/mount the port side railings.
Engineering › Fuel Oil Service System › Valve
Issued 4 November 2015
Resolved
Repair/replace all emergency fuel shutoffs.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 4 November 2015
Resolved
Replace stbd pilothouse window.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 1 December 2010
Resolved
Replace wasted bridge distribution panel covers.
Communications › Radio Communications › EPIRB
Issued 1 December 2010
Resolved
Replace EPIRB antenna prior to operation more than 3miles from shore.
Lifesaving › Lifefloat › Lifeline
Issued 1 December 2010
Resolved
Prior to carriage past 3miles from shore, properly service life floats (wasted grab lines, painter attachment fabric loops, 4ft oars) IAW mfg instructions.
Engineering › Bilge Water Management System › Piping
Issued 1 December 2010
Resolved
Replace bilge piping with proper/approved pipe or rigid material IAW approved plans.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 1 December 2010
Resolved
Provide machinery guards for both MDE fly wheels.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Remote Pulls
Issued 1 December 2010
Resolved
Provide cover and properly mark remote fire pull station, and provide op's instructions at CO2 cylinder.
Engineering › Bilge Water Management System › Piping
Issued 1 December 2010
Resolved
Provide metallic valve for drain through hole at transom.
Construction/Loadline › Hull › Hull Plating
Issued 20 November 2008
Resolved
Make proper repair to fiberglass on port bow approximately 10'' from deck and approximately 4-5'' from bow.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 20 November 2008
Resolved
Provide alcohol test kits onboard.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 20 November 2008
Resolved
Replace port and starboard running lights lens covers.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 20 November 2008
Resolved
Provide guards on lights exterior port side.
Engineering › Steering Gear System › Ram Seal
Issued 20 November 2008
Resolved
Repair/tighten port rudder post stuffing.
Engineering › Diesel Engine (propulsion-direct drive) › Injector (fuel injection)
Issued 20 November 2008
Resolved
Replace oil filter hose on starboard side of port engine with approved SAE J1942 hose.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 20 November 2008
Resolved
Repair exhaust lagging on starboard engine.
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 November 2008
Resolved
Properly dead end wires on port engine in proper box.
Documentation › Markings/Placards › Warning Signs
Issued 20 November 2008
Resolved
Post emergency broadcast placard at operating station.
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 November 2008
Resolved
Remove dead end wires under operating station or properly terminate in a box.
Construction/Loadline › Hull › Hull Plating
Issued 20 November 2008
Resolved
Repair or replace rotted wood at: aft laz hatch box longitudinal on inboard side; eng room 1st & 2nd transverse under deck beam IWO fwd vents; eng room longitudinal & transverse (stbd and fwd side) under deck beam box for stack/exhaust pipes aft.
Engineering › Bilge Water Management System › Pump
Issued 10 October 2007
Resolved
Properly mount all electrical submersible pumps.
Accommodation/Occupational Safety › Ventilation › General
Issued 10 October 2007
Resolved
Remove plastic vent hose throughout vessel and replace with corrugated metal.
Construction/Loadline › Hull › Longitudinal Frame
Issued 10 October 2007
Resolved
Crop and renew wasted beam in engine room by way of port forward ventilation. Remove surface rot from remaining beams and seal.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 10 October 2007
Resolved
Provide means to determine sewage tank 3/4 full.
Engineering › Steering Gear System › Rudder Stock
Issued 10 October 2007
Resolved
Provide rudder stop starboard rudder.
Navigation › Piloting/Steering › Marine Charts
Issued 10 October 2007
Resolved
Provide updated charts.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 10 October 2007
Resolved
Prove proper operation of stern light.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 10 October 2007
Resolved
Properly repair electrical plug at stern light.
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 10 October 2007
Resolved
Provide platform for rescue platform.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 10 October 2007
Resolved
Update emergency procedures to reflect one deck hand.
Fire Fighting › Fire Bucket › Capacity
Issued 21 September 2006
Resolved
Provide 03 2.5 fire buckets onboard.
Operations/Management › Drug and Alcohol Testing › Testing, Substances
Issued 21 September 2006
Resolved
Provide means to perform alcohol testing within two hours.
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 21 September 2006
Resolved
Perform Drug Testing Background checks.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 21 September 2006
Resolved
Post EAP information.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 21 September 2006
Resolved
Provide gross and tare weights on fixed co2 cylinders.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 21 September 2006
Resolved
Provide 53 Adult and 6 Child size life jackets onboard. Properly mark and stow.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 21 September 2005
Resolved
Found both tanks severely corroded. The starboard tank was found to have numerous patches and repairs which appeared to have been on the tanks for several years. A puddy compound was scraped of a corner weld of the starboard tank and a large pit/hole in the weld allowed diesel fuel to pour into the bilge. A requirement was issued to remove both fuel tanks and replace with approved tanks.
Engineering › Fuel Oil Service System › Filter
Issued 8 September 2005
Resolved
Repair oil leaks near starboard oil filter.
Engineering › Sea-water System (primary cooling) › Piping
Issued 8 September 2005
Resolved
Repair water leak near heat exchanger, located on the starboard side/raw water cooling area.
Lifesaving › Lifejacket/PFD (Type II) › Retroreflective Material
Issued 8 September 2005
Resolved
Replace all retroreflective tape on all lifejackets. (Adult/Child)
Engineering › Freshwater System (jacketwater cooling) › Storage Tank
Issued 8 September 2005
Resolved
Repair support bracket on fresh water tank, located up forward store.
Navigation › Piloting/Steering › Marine Charts
Issued 8 September 2005
Resolved
Update all charts (applicable to route). Also, provide proof of corrections being completed.
Communications › Alarms/Indicators › Bilge Alarm
Issued 9 September 2004
Resolved
Properly repair bow bilge alarm indicator light.
Engineering › Diesel Engine (propulsion-reduction gear) › Pump, Positive Displacement
Issued 9 September 2004
Resolved
Properly repair/replace hydrulic oil leak on starboard MDE transmission pump.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 9 September 2004
Resolved
Replace expired items in first aid kit.
Navigation › Piloting/Steering › Inland Navigation Rules
Issued 9 September 2004
Resolved
Provide updated copy of Nav. Rules.
Navigation › Piloting/Steering › Compass Deviation Table
Issued 9 September 2004
Resolved
Provide compass deviation table.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 9 September 2004
Resolved
Properly mark breakers in pilot house panel.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 9 September 2004
Resolved
Properly mount solinoid on prot MDE.
Engineering › Freshwater System (cylinder head cooling) › Piping
Issued 9 September 2004
Resolved
Double clamp jacket water system on both MDEs.
Electrical › Electrical Distribution System (service) › Grounding Conductor
Issued 9 September 2004
Resolved
Properly repair broken ground wire in engine room.
Electrical › Electric Supply System (service) › Battery Charger
Issued 9 September 2004
Resolved
Properly wire battery charger in engine room.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 9 September 2004
Resolved
Provide proper cover for outlet box.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 5 September 2002
Resolved
Crew not able to demonstrate satisfactory recovery of MOB
Communications › Radio Communications
Issued 5 September 2002
Resolved
EPIRB battery is expired LEGACY COMPONENT DESC: EPIRB
Electrical › Electric Generation Source (service)
Issued 5 September 2002
Resolved
Vessel's generator is not rated for 50deg ambient temperature LEGACY COMPONENT DESC: Generator
Fire Fighting › Ventilation Systems
Issued 5 September 2002
Resolved
E/R ventilation Closures require locking devices to remain in the closed position
Lifesaving
Issued 4 September 2001
Resolved
Prior to operation on the high-seas greater than 3 nautical miles, replace the EPIRB hydrostatic release._x001C_ _x001C_ _x001C_
Documentation
Issued 4 September 2001
Resolved
Provide a waste management plan and waste log._x001C_ _x001C_ _x001C_ _x001C_
Documentation
Issued 4 September 2001
Resolved
Provide a bridge log with all required entries._x001C_ _x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 4 September 2001
Resolved
Provide securing and retaining mechanism for forward hatch cover._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 4 September 2001
Resolved
Provide access to the life floats._x001C_ _x001C_ _x001C_ _x001C_
Navigation
Issued 4 September 2001
Resolved
Provide a current Coast Pilot and Light List._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 4 September 2001
Resolved
Provide CPR cards for 50% of the crew._x001C_ _x001C_ _x001C_ _x001C_
Engineering
Issued 4 September 2001
Resolved
Provide and install belt guards on both main engines._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 19 September 2000
Resolved
Prior to 26SEP00, rewrite emergency instructions attesting to the use of your FFFE system with Masters permission.
Navigation
Issued 19 September 2000
Resolved
Prior to 26SEP00, provide publications and charts IAW 46CFR185.20-35.
Construction/Loadline
Issued 19 September 2000
Resolved
Prior to 26SEP00, label bilge high level alarm lights on bridge.
Construction/Loadline
Issued 24 September 1999
Resolved
PROVIDE A COMPLETE HIGH BILGE LEVEL ALARM SYSTEM.
Unknown
Issued 13 September 1996
Resolved
IMPROVE THE MAN OVERBOARD PROCEDURE. CONDUCT U/W TRAINING, PROVIDE BETTER GEAR.
Unknown
Issued 13 September 1996
Resolved
COMPLY WITH 46 CFR, PART 16, DRUG TESTING PROGRAM.
Lifesaving
Issued 13 January 1994
Resolved
RENEW REFLECTIVE TAPE ON ALL LIFEJACKETS. DEFICIENCY IS TO BE CLEARED PRIORTO CARRYING PASSENGERS FOR HIRE.
Electrical
Issued 13 January 1994
Resolved
PROVIDE MEANS TO MEASURE FREQUENCY OF INSTALLED SHIPS SERVICE GENERATOR AS PER 46 CFR 183.10-1(g).
Documentation
Issued 13 January 1994
Resolved
PROVIDE PROOF OF CURRENT FCC STATION AND MARINE OPERATORS LISC.
Lifesaving
Issued 17 September 1992
Resolved
INSTALL FLOAT FREE LINK AND PAINTER OR PROVIDE A CONNECTING PAINTER BETWEENBOTH BUOYANT APPARATUS.
Construction/Loadline
Issued 17 September 1992
Resolved
REMOVE FUEL OIL/LUBE OIL FROM THE ENGINE COMPARTMENT BILGES.
Engineering
Issued 17 September 1992
Resolved
REPAIR THE STBD MAIN DIESEL ENGINE INBOARD MANIFOLD IN WAY OF THE FWD JACKET WATER LEAK. PORT MDE OIL PSI DRIVE GAUGE NOT OPERATING.
Accommodation/Occupational Safety
Issued 17 September 1992
Resolved
MSD SYSTEM: REPAIR/REWEN THE TOILET BOWL FLANGE ON THE MENS TOILET, SECURE THE MSD HOLDING TANK LOCATED IN THE STEERING COMPARTMENT, PROVIDE A VENT FOR THE HOLDING TANK, AND REPAIR THE SEWAGE LEAK ON THE PORT LINE.
Electrical
Issued 17 September 1992
Resolved
SHIP SERVICE DIESEL GENERATOR: REPAIR THE SEAWATER COOLING WATER LINE AND LEAKING FUEL OIL INJECTOR/TUBING.
Accommodation/Occupational Safety
Issued 17 September 1992
Resolved
REPAIR THE WOOD FACING AROUND THE MACHINERY ACCESS DOOR IN THE PASSENGER CABIN.
Construction/Loadline
Issued 17 September 1992
Resolved
SECURE ALL 24V BILGE PUMPS AND PROVE PROPER OPERATION OF ALL BILGE FLOAT ALARMS.
Lifesaving
Issued 4 October 1988
Resolved
RENEW GRABLINE AROUND PERIMETER OF STARBOARD BUOYANT APPARATUS.
Lifesaving
Issued 4 October 1988
Resolved
PROVIDE USCG APPROVED WATERLIGHTS FOR EACH BUOYANT APPARATUS.
Engineering
Issued 4 October 1988
Resolved
PROVIDE DETAILS OF FUEL SYSTEM MODIFICATIONS FOR REVIEW AND APPROVAL. PROVIDE DETAILED INFORMATION ON HOSE TYPE AND MANUFACTURER.
Electrical
Issued 4 October 1988
Resolved
REMOVE UNUSED ELECTRICAL WIRING FROM LAZARETTE AND ENGINE COMPARTMENTS.
Documentation
Issued 28 September 1987
Resolved
NO VALID FCC SAFETY CERTIFICATE.
Documentation
Issued 28 September 1987
Resolved
NO OIL DISCHARGE PLACARD IN ENGINEROOM.
Accommodation/Occupational Safety
Issued 28 September 1987
Resolved
MSD INSTALLED BUT NOT PROPERLY CONNECTED. TOILETS STILL DISCHARGE OVER SIDE.
Lifesaving
Issued 28 September 1987
Resolved
INSTALL APPROVED FLOAT-FREE LINK ON LIFEFLOAT PAINTER.
Construction/Loadline
Issued 28 September 1987
Resolved
SKIN VALVE PORT SIDE OF ENGINEROOM, MIDSHIPS, AT THE TURN OF THE BILGE IS UNUSED BUT IS NOT PROPERLY PLUGGED OR CAPPED.
Electrical
Issued 28 September 1987
Resolved
REPLACE HOUSEHOLD FIXTURES IN ER OVERHEAD WITH APPROVED TYPE.
Construction/Loadline
Issued 28 September 1987
Resolved
MAIN DECK WATERTIGHT HATCHES DO NOT HAVE LANYARDS TO ATTACH COVER TO HULL.
Casualty record · 1
14 February 2008Routine · role: Involved in a Marine Casualty · activity 3154537
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.