← All vessels
WEEKS 532
Industrial Vessel · Miscellaneous Vessel class · Built 1950s · USCG Heartland District (CGD-H) · Other hulls named WEEKS 532
WEEKS 532 is a 1956 industrial vessel. The Coast Guard has recorded 44 inspections since 1982, most recently in March 2024, along with 70 deficiencies.
Records from 1982 to 2024. Most recent: inspection, 25 March 2024.
- Built
- 1956
- Last inspected
- 25 March 2024
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 70 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
271727
WBY8074
52329
Flag
UNITED STATES
366053000
Maury page id
psix-52329
Inspections, by type
…with no type recorded5
Years with a record
26 calendar years (1982–2024)
The 44 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Miscellaneous Vessel class in Maury's sources begin in 1979.
Documentation record
Registered dimensions (L × B × D)300.0 ft × 90.0 ft × 17.0 ft
Registered tonnagegross 4,207 / net 4,207
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
Builderbuilder not recorded · NEW ORLEANS, LA, UNITED STATES · built 1956
Hull materialSteel
PropulsionNot recorded
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 1 September 2026 · expires 30 September 2027
Service, as the file records itIndustrial Vessel
Hull formunknown (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it4207 - Regulatory (Subpart C or D), Gross Ton
4207 - Regulatory (Subpart C or D), Net Ton
4207 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDK5161MMSI 366053000 · active · compulsorily equipped · granted 13 October 2018, expires 13 October 2028
WBY8074MMSI 367365330 · expired · compulsorily equipped · granted 26 June 2008, cancelled 24 November 2018
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 44
25 March 2024
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7884843
9 July 2019
MARPOL Annex I Examination · MARPOL Annex VI Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6742994
12 September 2018
Uninspected Other
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6538944
8 February 2018
Administrative Inspection · MARPOL Annex VI Survey · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6351704
14 June 2017
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6175522
10 March 2016
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5840531
10 September 2015
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 5721248
13 March 2014
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4814803
20 December 2011
Internal Structural Exam · MTSA Verification · Administrative Inspection · Hull Examination · Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4211350
19 November 2008
In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3366277
28 October 2008
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3366270
10 July 2008
Administrative Inspection · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3263341
7 February 2008
Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3143369
12 May 2006
Internal Structural Exam · Hull Examination · COI Inspection · Administrative Inspection · Drydock Extension
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2647750
17 May 2005
MARPOL Annex I Examination · Annual Inspection · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2360533
20 December 2004
MARPOL Annex I Examination · Administrative Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2260457
9 March 2004
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2153598
15 May 2003
COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1906996
13 June 2002
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1630296
8 November 1999
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 802992
19 January 1999
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1472922
31 October 1997
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 776161
6 February 1997
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1437198
7 February 1996
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 873175
18 December 1995
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1427148
22 November 1995
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1360313
17 August 1995
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 875651
12 January 1995
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 880082
14 November 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1189369
24 September 1994
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1449724
25 June 1993
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1440690
31 July 1992
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1415762
24 July 1992
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1448394
2 July 1992
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1261744
15 May 1992
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 957702
4 March 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1316814
12 February 1992
Hull Examination · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1269767
1 May 1990
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 929977
10 August 1988
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1198195
3 February 1987
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1311963
22 February 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 977942
8 February 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 976417
11 January 1985
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1284979
12 March 1982
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 971213
Deficiency record · 70
Pollution Prevention/Response › Response Equipment › Protective Clothing
Issued 10 March 2016
Resolved
Protective clothing required in response barrels was used for deck work and not replaced.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 10 March 2016
Resolved
Buoyant lifeline not properly attached to lifebuoys
Lifesaving › Lifebuoys › Serviceable
Issued 10 March 2016
Resolved
Reflective tape worn and needed to be replaced
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 10 September 2015
Resolved
Bulkhead between two port fwd ballast tanks found to be fractured (4")
Pollution Prevention/Response › Prevention Equipment › Standard Discharge Connection
Issued 28 October 2008
Resolved
No Standard Discharge Connection on board
Lifesaving › Immersion Suits › Serviceable
Issued 7 March 2007
Resolved
Repair jammed zippers for two faulty immersion suits or replace suits prior to manned operation with greater than 10 personnel onboard.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 7 March 2007
Resolved
Provide proof of operation of fixed CO2 extinguishing system prior to commercial operations
Engineering › Generator (propulsion/auxiliary-electric) › Wiring
Issued 7 March 2007
Resolved
Prove proper operation of auxiliary generator prior to conducting manned operations
Engineering › Steam Boiler (auxiliary/waste heat) › Combustion Chamber
Issued 17 May 2005
Resolved
Combuation chamber not sealed properly IWO burner mounting plate alowing large amounts of smoke to enter the machinery space during startup and shut down. Renew gasket.
Engineering › Steam Boiler (auxiliary/waste heat) › Shell
Issued 17 May 2005
Resolved
Portions of the boiler shell are missing insulation. Re-install missing insulation.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 17 May 2005
Resolved
Vessels battery powered emergency lighting was intentionaly disabled for lay up. Prove proper operation of the emergency lighting system prior to operating with persons in accomodation.
Fire Fighting › Fire Hoses › Location
Issued 17 May 2005
Resolved
Vessels fire hoses removed during layup and not in place for inspection. Provide fire fighting equipment IAW USCG aproved plan.
Engineering › Fuel Oil Storage/Transfer System › Filter/Strainer
Issued 17 May 2005
Resolved
Vessels F/O transfer system strainer is leaking and fuel is allowed to accumulate.
Electrical › Electric Supply System (service) › Cable
Issued 17 May 2005
Resolved
Large industrial clothes dryer has exposed, improperly spliced electrical cable. Properly splice and box electrical connections.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 17 May 2005
Resolved
Large industrial clothes dryer has exposed rotating machinery. Properly guard rotating machinery.
Engineering › Fuel Oil Service System › Hose
Issued 17 May 2005
Resolved
F/O supply to 500KW generator is leaking IWO remote shut off valve. Repair leaks.
Engineering › Diesel Engine (auxiliary) › Governor
Issued 17 May 2005
Resolved
500KW generator govenor control wiring improperly spliced and exposed. Properly splice and box wiring.
Construction/Loadline › Penetrations › Pipe Flange
Issued 17 May 2005
Resolved
Wire run stuffing tubes IWO QAWTD to laundry missing plug. Properly plug open stuffing tubes.
Fire Fighting › Fire Hoses › Condition
Issued 9 March 2004
Resolved
Replace holed fire hose.
Stability › Watertight Integrity › General
Issued 9 March 2004
Resolved
Adjust water tight doors as necessary
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 15 May 2003
Resolved
Clean and make habitable
Engineering › Steam Boiler (auxiliary/waste heat) › Steam Drum
Issued 15 May 2003
Resolved
Prior to operating boiler, complete repairs and hydrostatically test, in the presence of a CG Marine Inspector, to I 1/2 MAWP. LEGACY COMPONENT DESC: Tube Sheet
Lifesaving
Issued 6 February 1997
Resolved
CROP & RENEW SIDE SHELL IWO DAMAGE W/ APPROX. 8' x 5' IN TOP STRAKE. C/R SIDE SHELL LONG #1 IWO 6' X 4' X 1/2 X 8; C/R SIDE WEB FRAME IW W/ 22" X 30" X 1/2" PLATE.
Documentation
Issued 22 November 1995
Resolved
Provide OCMI copy of oil transfer procedures.
Engineering
Issued 22 November 1995
Resolved
Provide new name plate data for Aux. Boiler. Attach data plate to boiler above existing plate.
Engineering
Issued 22 November 1995
Resolved
Conduct overspeed trip test on all S/S Gens & provide test results from Cat. rep to OCMI.
Accommodation/Occupational Safety
Issued 22 November 1995
Resolved
Repair or replace knife edge combing on natural vent on starboard side of doghouse.
Accommodation/Occupational Safety
Issued 22 November 1995
Resolved
Repair or replace kinfe edge combing on natural vent forward of crane tub on portside of barge approx. 20 ft. from centerline.
Lifesaving
Issued 22 November 1995
Resolved
Provide and install new liferaft launching procedures for station No. 1.
Lifesaving
Issued 22 November 1995
Resolved
Provide all staterooms with copy of lifejacket donning procedures.
Construction/Loadline
Issued 22 November 1995
Resolved
Repair or replace water tight scuttles (hatches) leading to port and starboard motor rooms.
Lifesaving
Issued 22 November 1995
Resolved
Obtain servicing for life rafts. Replace missing life rafts to proper locations & send servicing reports to OCMI.
Engineering
Issued 22 November 1995
Resolved
Repair or replace blower motor foundation driving squirrel cage on Aux. Boiler.
Engineering
Issued 22 November 1995
Resolved
Repair refactory in burner cone of Aux Boiler. Send shipyard doctumention stating extent of repairs and results of operational testing.
Engineering
Issued 22 November 1995
Resolved
Install overspeed trip reset cables on S/S Gens No. 1 & 2.
Engineering
Issued 22 November 1995
Resolved
Replace high water Temp gauge on No. 3 S/S Gen.
Lifesaving
Issued 24 September 1994
Resolved
Provide quantity of ring buoys in accordance with certificate of inspectionfor manned barge and mount in locations in accordance with CG approved Fire/Safety Plan (12 total; half with lights, half with lines). Three of five bouys currently on vsl must be renewed due to deteriorated lifelines.
Documentation
Issued 24 September 1994
Resolved
Provide documentation of annual crane examination and quadrennial weight test by third party accepted by Coast Guard; i.e., ABS, ICGB. Any other party must have written approval by CG.
Electrical
Issued 24 September 1994
Resolved
Replace missing or broken light lenses (covers/globes) on all flourescent and incandescent lights throughout vessel.
Construction/Loadline
Issued 24 September 1994
Resolved
Reweld overhead structural members that were cut to remove machinery and replaced but never rewelded (four welds over boiler feedwater tank port side crane house).
Lifesaving
Issued 24 September 1994
Resolved
Submit all three liferafts for annual servicing at CG authorized servicing facility. Non-disposable hydrostatic release on stbd bow Viking raft must be serviced also.
Construction/Loadline
Issued 24 September 1994
Resolved
Make operational and provide adequate sealing of forward house watertight door (into office).
Deck/Cargo
Issued 24 September 1994
Resolved
Extend pollution (spill) containment to include area under fuel oil vent atforward stbd side of crane base.
Accommodation/Occupational Safety
Issued 24 September 1994
Resolved
Remove hard-piped compressed air piping to boiler potable water supply tank(located over tank #38). Air lines must be either of the quick-connect type or if hard piped, air supply must be less than 15 psi.
Fire Fighting
Issued 24 September 1994
Resolved
All portable fire extinguishers in quarters areas to have annual servicing completed by third party certified facility.
Engineering
Issued 24 September 1994
Resolved
Repair cracks in boiler refractory around burner.
Fire Fighting
Issued 24 September 1994
Resolved
All fixed fire fighting systems (CO2) must be serviced by certified third party facility and servicing report must be submitted to [name withheld].
Accommodation/Occupational Safety
Issued 24 September 1994
Resolved
All recently installed sanitary and potable water tanks (4 total) must eachhave pressure relief valve installed (100psi or less).
Accommodation/Occupational Safety
Issued 24 September 1994
Resolved
Electric hot water heaters must have pressure/temperature relief valves rated at 100psi or less and 210 degrees F. Currently installed valves are 150 psi/210F.
Electrical
Issued 24 September 1994
Resolved
Make operational all emergency lights throughout vessel.
Engineering
Issued 24 September 1994
Resolved
Renew boiler safety relief valve vent piping (leaks at wasted areas near valve flange)
Documentation
Issued 24 September 1994
Resolved
Provide manning aboard barge in accordance with Certificate of Inspection; three (3) lifeboatment which may include the required two (2) AB seamen andone (1) ordinary seaman with lifeboatman endorsement.
Lifesaving
Issued 24 September 1994
Resolved
Procure and install two paddles for bow mounted lifefloat and replace weak link on lifefloat with link rated for more than 20 person capacity. Currently installed weaklink is rated for floats with 11-20 man capacity; rafts capacity is 22 man.
Lifesaving
Issued 24 September 1994
Resolved
Replace missing lights and/or expired batteries on all lifejackets (amount required by COI for manned barge). Batteries must be replaced annually.
Engineering
Issued 12 February 1992
Resolved
PRIOR TO OPERATION OF AUXILARY BOILER, CONDUCT OPERATIONAL TESTS OF AUTOMATION SHUTDOWNS AND DEMONSTRATE PROPER OPERATION OF SAFETY RELIEF VALVE(S) TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Engineering
Issued 12 February 1992
Resolved
PROVE PROPER OPERATION OF AUXILARY GENERATOR LOW LUBE OIL SHUTDOWN.
Engineering
Issued 12 February 1992
Resolved
PRIOR TO OPERATION OF AUXILIARY BOILER, CONDUCT 1.25 TIMES MAWP HYDROSTATICTEST OF BOILER TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Documentation
Issued 12 February 1992
Resolved
PRIOR TO USE OF CRANE, PROVIDE COGNIZANT OCMI WITH CRANE LOAD TEST CERTIFICATE.
Engineering
Issued 12 February 1992
Resolved
REPLACE EXISTING AUXILARY GENERATOR FUEL LINES WITH HARD PIPING AND NO GREATER THAN 30" IN LENGTH OF APPROVED FLEXIBLE FUEL HOSE AND PROVE PROPER OPERATION OF REMOTE FUEL SHUTOFF.
Lifesaving
Issued 12 February 1992
Resolved
PRIOR TO OPERATION OF CRANE AND AIR COMPRESSOR FOR AIR CONTROLS, PROVE THATAIR RECIEVER MEETS ASME "U" CODE OR REPLACE WITH APPROVED/CERTIFIED AIR RECIEVER.
Fire Fighting
Issued 8 February 1985
Resolved
PROVIDE ONBOARD TWO (2) FIREMAN'S OUTFITS.
Electrical
Issued 8 February 1985
Resolved
REPAIR THE REGULATORS AND THE OVERSPEED TRIPS ON THE TWO CAT-375 SHIPS SERVICE GENERATORS.
Deck/Cargo
Issued 8 February 1985
Resolved
REPAIR THE SHACKLE PIN IN THE MARKED ANCHOR LOCATED ON DECK.
Construction/Loadline
Issued 8 February 1985
Resolved
PAINT THE HELICOPTER LANDING DECK WITH THE VESSEL'S IDENTIFICATION, A LAND-ING CIRCLE, AND A CONTINUOUS 16" WIDE LINE AROUND THE PERIMETER.
Construction/Loadline
Issued 8 February 1985
Resolved
PROVIDE RECESSED TIEDOWNS ON THE LANDING DECK OF THE HELIPORT.
Construction/Loadline
Issued 8 February 1985
Resolved
PROVIDE AN EMERGENCY ACCESS/EGRESS LADDER FROM THE LANDING DECK OF THE HELIPORT.
Construction/Loadline
Issued 8 February 1985
Resolved
PROVIDE ALTERNATING YELLOW AND BLUE LIGHTS AROUND THE PERIMETER OF THE HELICOPTER DECK AT INTERVALS OF NOT MORE THAN TEN (10) FEET.
Construction/Loadline
Issued 8 February 1985
Resolved
REMOVE THE SECTION OF ACCESS LADDER RAILING THAT PROTRUDES ABOVE THE LAND- ING DECK LEVEL OF THE HELICOPTER DECK.
Construction/Loadline
Issued 8 February 1985
Resolved
REPAIR THE SAFETY NET AROUND THE PERIMETER OF THE HELICOPTER DECK.
Fire Fighting
Issued 8 February 1985
Resolved
REPAIR AS ORIGINAL OR REPLACE THE NUMBER TWO FIRE PUMP.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.