Records from 1981 to 1988. Most recent: inspection, 16 February 1988.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 20
16 February 1988
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1332642
12 May 1987
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1311683
2 October 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1015102
11 June 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 990940
6 June 1986
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1297145
15 October 1985
Credit Drydock
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 988699
26 August 1985
Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1294118
10 June 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 984364
29 May 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 983303
18 April 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 982770
15 April 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1289144
31 August 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1282410
2 March 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1279145
13 December 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 971222
16 November 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 965155
10 November 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1275358
9 August 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1276115
31 March 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 966767
4 March 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 970996
6 March 1981
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 966508
Unknown
Issued 12 May 1987
Resolved
SUBMIT A COPY OF THE MOST RECENT LIFERAFT SERVICING REPORT TO THE OFFICER IN CHARGE OF MARINE INSPECTION, PORT ARTHUR, TEXAS.
Condition: Unknown
Due 12 May 1987
Resolved 12 May 1987
Unknown
Issued 12 May 1987
Resolved
CONDUCT AN ANNUAL SURVEY OF BOTH CRANES AS PER API SPECIFICATIONS BEFORE COMMENCING DRILLING OPERATIONS.
Condition: Unknown
Due 12 May 1988
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 12 May 1987
Resolved
REMOVE THE TEMPORARY ELECTRICAL CONNECTIONS IN THE 120/208V DISTRIBUTION PANEL BOXES IN THE FOLLOWING AREAS: (A) SCR ROOM; (B) COMPRESSOR ROOM; (C) GALLEY DRY STORES; (D) EMERGENCY GENERATOR ROOM SWITCHBOARD. THIS IS TO BE COMPLETED BEFORE COMMENCING DRILLING OPERATIONS.
Condition: Unknown
Due 12 May 1988
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Navigation
Issued 6 June 1986
Resolved
PROVIDE THE RIG WITH APPROVED NAVIGATION SIDE AND STERN LIGHTS.
Condition: Unknown
Due 6 June 1986
Resolved 6 June 1986
Unknown
Issued 6 June 1986
Resolved
REQUIREMENTS #1 TO #6 ARE TO BE CORRECTED PRIOR TO OPERATING THE VESSEL.
Condition: Unknown
Due 6 June 1986
Resolved 6 June 1986
Electrical
Issued 6 June 1986
Resolved
PROVIDE CIRCUIT DIRECTORIES FOR ALL ELECTRICAL PANELBOARDS MOUNTED AT THE REAR OF THE DRILL FLOOR AS REQUIRED BY 46 CFR 111.40-11.
Condition: Unknown
Due 6 June 1986
Resolved 6 June 1986
Electrical
Issued 6 June 1986
Resolved
REPAIR AND THEN TEST TO THE SATISFACTION OF A USCG MARINE INSPECTOR THE DRILLER'S CONSOLE AIR PURGE SYSTEM.
Condition: Unknown
Due 6 June 1986
Resolved 6 June 1986
Documentation
Issued 6 June 1986
Resolved
HAVE ANNUAL CRANE SURVEY CONDUCTED.
Condition: Unknown
Due 6 June 1986
Resolved 6 June 1986
Fire Fighting
Issued 6 June 1986
Resolved
ENSURE THAT ANNUAL INSPECTION OF PORTABLE AND SEMI-PORTABLE FIRE EXTINGUISHERS IS CONDUCTED.
Condition: Unknown
Due 6 June 1986
Resolved 6 June 1986
Electrical
Issued 6 June 1986
Resolved
REPAIR OR REPLACE THE GENERAL ALARM BELL LOCATED ON THE BULKHEAD IN FRONT OF THE SWACO UNIT.
Condition: Unknown
Due 6 June 1986
Resolved 6 June 1986
Construction/Loadline
Issued 26 August 1985
Resolved
MAKE EFFECTIVE RPAIRS TO THE DAMAGE TO THE MAT TANK 4 CTR AND PROVIDE FOR TESTING AND INSPECTION BY A U. S. COAST GUARD MARINE INSPECTOR PRIOR TO RIGMOVEMENT.
Condition: Unknown
Due 26 August 1985
Resolved 26 August 1985
Lifesaving
Issued 15 April 1985
Resolved
PROVIDE SERVICEABLE ORANGE SMOKE DISTRESS SIGNALS FOR BOTH LIFEBOATS IMMEDIATELY. THE RIG SHALL NOT BE MOVED AND DRILLING OPERATIONS SHALL NOT BE CONDUCTED BEFORE THESE ITEMS ARE PLACED ABOARD.
Condition: Unknown
Due 15 April 1985
Resolved 15 April 1985
Construction/Loadline
Issued 15 April 1985
Resolved
ADJUST OR REPLACE THE WARPED WATERTIGHT DOOR BETWEEN THE MUD ROOM AND THE WEATHER DECK ON THE STARBOARD SIDE.
Condition: Unknown
Due 15 April 1985
Resolved 15 April 1985
Electrical
Issued 15 April 1985
Resolved
REPAIR THE STARTING AIR PRESSURE GAUGE ON #2 ELECTRICAL GENERATOR PRIME MOVER.
Condition: Unknown
Due 15 April 1985
Resolved 15 April 1985
Accommodation/Occupational Safety
Issued 15 April 1985
Resolved
REPAIR THE EXHAUST LEAK ON THE EMERGENCY AIR COMPRESSOR DIESEL.
Condition: Unknown
Due 15 April 1985
Resolved 15 April 1985
Fire Fighting
Issued 15 April 1985
Resolved
PROVIDE AN APPROVED FIXED FIRE EXTINGUISHING SYSTEM FOR THE PAINT LOCKER PRIOR TO 29 APRIL 1985.
Condition: Unknown
Due 15 April 1985
Resolved 15 April 1985
Fire Fighting
Issued 15 April 1985
Resolved
AMMEND THE FIRE AND SAFETY PLAN TO REFLECT A FIFTEENTH FIRE HYDRANT.
Condition: Unknown
Due 15 April 1985
Resolved 15 April 1985
Lifesaving
Issued 15 April 1985
Resolved
CONDUCT A FIRE AND BOAT DRILL IMMEDIATELY AFTER CREWING THE RIG.
Condition: Unknown
Due 15 April 1985
Resolved 15 April 1985
Unknown
Issued 31 August 1984
Resolved
REPAIR THE BILGE SYSTEM AS ORIGINAL AND PERFORM AN OPERATIONAL TEST.
Condition: Unknown
Due 31 August 1984
Resolved 31 August 1984
Unknown
Issued 10 November 1983
Resolved
CONDUCT UNDERWATER SURVEY OF THE MAT BOTTOM AND SKIRT PRIOR TO DRILLING AT THE NEXT LOCATION.
Condition: Unknown
Due 10 November 1983
Resolved 10 November 1983
Unknown
Issued 10 November 1983
Resolved
MAKE THE #2 DRILL WATER TANKS, #5 DRILL WATER TANKS, AND THE #8 DRILL WATERTANKS AVAILABLE FOR INSPECTION PRIOR TO DRILLING AT THE NEXT LOCATION.
Condition: Unknown
Due 10 November 1983
Resolved 10 November 1983
Unknown
Issued 10 November 1983
Resolved
THE FOLLOWING DEFICIENCIES ARE FOR THE BROUGHTON II, DN632538.
Condition: Unknown
Due 10 November 1983
Resolved 10 November 1983