GSF HIGH ISLAND II

GSF HIGH ISLAND II is a 1979 mobile offshore drilling unit. The Coast Guard has recorded 90 inspections since 1981, most recently in May 2006, along with 102 deficiencies and 1 casualty investigation in 1994.

Records from 1981 to 2006. Most recent: inspection, 24 May 2006.

Built
1979
Last inspected
24 May 2006
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8751394 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
VANUATU
—
Maury page id
psix-52639

Inspections, by type

…with no type recorded18
Years with a record 23 calendar years (1981–2006)
The 90 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 20 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it3861 - Regulatory (Subpart C or D), Net Ton
4825 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WQZ5068MMSI not assigned · expired · voluntarily equipped · granted 2 November 1994, cancelled 13 November 2004 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 90

24 May 2006 COC-MODU Renew
Type not classified · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2659680
26 August 2005 COC-MODU Annual
Type not classified · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2475320
24 November 2004 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2295248
20 May 2004 Certificate of Compliance
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2061881
22 October 2003 Deficiency Check · Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1917470
5 August 2003 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1937520
24 October 2002 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1713853
27 September 2002 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1682018
15 July 2002 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1646709
24 February 2002 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1488775
23 February 2002 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1488693
27 January 2002 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1481643
26 August 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1073183
13 August 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1070178
1 August 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1070966
5 July 2001 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1432550
16 June 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1065176
26 September 2000 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 167627
30 August 2000 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1410408
14 June 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1050901
7 June 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1050880
3 May 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1049266
30 November 1999 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 812480
30 September 1999 Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1452566
9 July 1999 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1466629
8 April 1999 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 786702
17 December 1998 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1399009
5 November 1998 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 805117
27 July 1998 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1471161
22 June 1998 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1427521
4 May 1998 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1126818
1 May 1998 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1399006
9 April 1998 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 788363
19 March 1998 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1111694
16 December 1997 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 780211
16 October 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 69219
24 September 1997 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1438648
23 July 1997 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1458444
16 July 1997 Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1114116
7 February 1997 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 762182
3 February 1997 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 208148
27 January 1997 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1100921
18 October 1996 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1156698
8 October 1996 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1150693
29 July 1996 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1447606
25 July 1996 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1087982
28 June 1996 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1249399
18 January 1996 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1190699
3 October 1995 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1430066
8 August 1995 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1440961
8 June 1995 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1188933
24 April 1995 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 861696
4 April 1995 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1150920
19 January 1995 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 55842
3 September 1994 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1401924
2 September 1994 Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 870608
2 September 1994 Examination of Repairs
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1469777
13 June 1994 Permit to Proceed
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1017394
1 June 1994 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 30792
23 May 1994 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 859400
19 April 1994 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1170447
10 March 1994 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 855385
17 February 1994 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 852928
15 December 1993 Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1370749
19 August 1993 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1465114
19 October 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 960252
9 September 1992 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1266836
20 May 1992 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 656026
9 May 1992 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 158185
6 December 1991 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1254968
19 November 1991 Deficiency Check · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1250833
12 November 1991 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 941375
6 November 1991 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 936707
6 November 1991 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1248538
30 August 1991 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1244964
31 January 1991 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1215124
31 January 1991 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1218999
27 November 1990 Re-Inspection · Drydock Extension
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 910453
4 October 1989 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1338420
29 August 1989 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1201317
12 June 1989 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1206508
17 November 1988 Hull Examination · Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1339537
26 May 1988 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 887851
1 June 1987 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1028284
14 April 1987 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1022227
26 November 1986 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1327266
23 October 1986 Drydock Extension
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1018525
12 February 1986 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 998636
14 December 1984 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 985999
10 November 1981 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 964822

Deficiency record · 102

Lifesaving › Lifeboat › Fire Protection (water spray system)
Issued 24 May 2006 Resolved
prove proper operation of water spray systems on #1 and #2 lifeboats.
Condition: Unknown
Due 29 May 2006
Resolved 29 May 2006
Resolution: sent photos proving proper operation
Lifesaving › Launching Appliances › Lines
Issued 24 May 2006 Resolved
Provide original design limit switches on #1 and #2 lifeboat davits.
Condition: Unknown
Due 8 June 2006
Resolved 7 June 2006
Resolution: New limit switches installed.
Lifesaving › Inflatable Liferafts › Markings
Issued 24 May 2006 Resolved
Properly label all liferaft stations.
Condition: Unknown
Due 24 June 2006
Resolved 29 May 2006
Resolution: Stations properly labeled.
Electrical › Electric Generation Source (emergency) › Power Requirement
Issued 24 May 2006 Resolved
prove proper two(2) hour load test of emergency generator.
Condition: Unknown
Due 8 June 2006
Resolved 7 June 2006
Resolution: 2 hour load test conducted.
Fire Fighting › Fire Main
Issued 22 October 2003 Resolved
Repair leak on fire station #15 on drill floor (leaking). LEGACY COMPONENT DESC: Valves
Condition: Unknown
Due 5 November 2003
Resolved 27 October 2003
Construction/Loadline › Hull
Issued 24 October 2002 Resolved
Issued requirement to complete phase 1 and phase 2 SEILOD. Drydock was due on 24 SEP 02.
Condition: Unknown
Due 28 February 2003
Resolved 17 February 2003
Resolution: Completed
Lifesaving
Issued 5 July 2001 Resolved
Crop and renew port life raft #2 embarkation platform and hand railing to same.
Condition: Unknown
Due 1 August 2001
Resolved 2 August 2001
Lifesaving
Issued 5 July 2001 Resolved
Replace missing life raft at station #3. Maximum personnel allowed onboard will be 74 until life raft is in place.
Condition: Unknown
Due 1 August 2001
Resolved 2 August 2001
Fire Fighting
Issued 5 July 2001 Resolved
Renew paint locker co2 flex loop.
Condition: Unknown
Due 1 August 2001
Resolved 2 August 2001
Lifesaving
Issued 5 July 2001 Resolved
Conduct life boat weight test, or provide documentation of the latest test as conducted by 3rd party or witnessed by USCG inspector. Conduct/provide same for life raft davits.
Condition: Unknown
Due 1 August 2001
Resolved 2 August 2001
Fire Fighting
Issued 5 July 2001 Resolved
Crop and renew wasted fire main riser to helo deck. Hydrostatically test repairs to 1.5 MAWP in the presence of Coast Guard Marine inspector or ABS surveyor.
Condition: Unknown
Due 13 August 2001
Resolved 13 August 2001
Unknown
Issued 30 August 2000 Resolved
HYDRO, UT OR OPEN FOR VISUAL INTERNAL EXAMINATION ALL AIR RECEIVERS AND ALLDRY BULK TANKS. HYDRO OR VISUAL EXAM TO BE WITNESSED BY ABS OR COAST GUARD.UT TO BE CONDUCTED BY LEVEL II UT TECH. FORWARD REPORT TO THE [name withheld].
Condition: Unknown
Due 21 September 2000
Resolved 21 September 2000
Lifesaving
Issued 30 August 2000 Resolved
HAVE BREATHING AIR BOTTLES FOR BOTH LIFEBOATS HYDROSTATICALLY TESTED.
Condition: Unknown
Due 30 August 2000
Resolved 30 August 2000
Construction/Loadline
Issued 30 September 1999 Resolved
CROP AND RENEW OVERHEAD STIFFENERS WHERE WASTED AROUND HATCH COVER IN PRELOAD TANK 29 PORT.
Condition: Unknown
Due 30 September 1999
Resolved 30 September 1999
Construction/Loadline
Issued 30 September 1999 Resolved
CONDUCT PHASE II (UNDERWATER PORTION) OF HULL EXAM. SUBMIT COPY OF DIVERS REPORT & VIDEO TO [name withheld].
Condition: Unknown
Due 30 September 1999
Resolved 30 September 1999
Lifesaving
Issued 9 July 1999 Resolved
CONDUCT 1.1 OPERATIONAL TEST OF ALL LIFEBOAT RELEASE GEAR OR ALTERNATIVE TEST SUBJECT TO COGNIZANT [name withheld] INSTEAD OF QUARTERLY IN-WATER TESTS DURING INTERIM.
Condition: Unknown
Due 9 July 1999
Resolved 9 July 1999
Lifesaving
Issued 9 July 1999 Resolved
CONDUCT 1.1 WEIGHT LOAD TEST ON ALL LIFEBOAT AND LIFERAFT DAVIT FALLS THAT HAVE BEEN RENEWED IN PRESENCE OF MARINE INSPECTOR OR CERTIFIED THIRD PARTY.
Condition: Unknown
Due 9 July 1999
Resolved 9 July 1999
Lifesaving
Issued 9 July 1999 Resolved
PROVIDE SAFETY RELIEF VALVES OF 100 PSI OR LESS FOR HOT WATER HEATERS.
Condition: Unknown
Due 9 August 1999
Resolved 9 August 1999
Engineering
Issued 9 July 1999 Resolved
REPLACE FUEL OIL SUPPLY AND RETURN LINES ON CEMENT UNIT SO THEY DO NOT EXCEED 30 INCHES IN LENGTH.
Condition: Unknown
Due 9 August 1999
Resolved 25 July 1999
Unknown
Issued 27 July 1998 Resolved
INSTALL GASKET TO MAIN DECK HATCH TO THE ENGINE ROOM.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Unknown
Issued 27 July 1998 Resolved
REPAIR DAMAGE ON MAIN DECK SACK ROOM WATERTIGHT HATCH LOCATED AT THE LOWERLEFT SIDE.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Lifesaving
Issued 27 July 1998 Resolved
LABEL THE GENERAL ALARM SWITCH ON THE DRILL FLOOR.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Unknown
Issued 27 July 1998 Resolved
CONDUCT HYDRO TEST ON THE FUEL OIL TRANSFER HOSE AS PER 33CFR155.800.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Lifesaving
Issued 27 July 1998 Resolved
INSTALL A GENERAL ALARM SIGN IN THE SUPPLY ROOM.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Lifesaving
Issued 27 July 1998 Resolved
SECURE THE STEEL AIR BOTTLE IN THE CO2 BOTTLE AREA.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Lifesaving
Issued 27 July 1998 Resolved
REPLACE THE LINE THROWING GUN CHARGES.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Lifesaving
Issued 27 July 1998 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Lifesaving
Issued 27 July 1998 Resolved
REPLACE ALL CLOUDED OR OBSTRUCTED WINDOWS ON BOTH LIFE BOATS.
Condition: Unknown
Due 27 July 1998
Resolved 27 July 1998
Construction/Loadline
Issued 24 September 1997 Resolved
Repair dogs on hatch to #21 forward preload tank.
Condition: Unknown
Due 24 September 1997
Resolved 24 September 1997
Construction/Loadline
Issued 24 September 1997 Resolved
Find & repair leak from change room to heavy store room (overhead of heavy store room).
Condition: Unknown
Due 24 September 1997
Resolved 24 September 1997
Construction/Loadline
Issued 24 September 1997 Resolved
Repair/replace dogs on porthole of weathertight door opening to stbd boat #1 embarkation area.
Condition: Unknown
Due 24 September 1997
Resolved 24 September 1997
Construction/Loadline
Issued 24 September 1997 Resolved
Repair/weld missed welds in void 27 where storeroom was constructed, aft borrom bulkhead & deck of storeroom.
Condition: Unknown
Due 24 September 1997
Resolved 24 September 1997
Construction/Loadline
Issued 24 September 1997 Resolved
Complete phase II of SEILOD (underwater portion) and submit report to [name withheld].
Condition: Unknown
Due 24 September 1997
Resolved 24 September 1997
Construction/Loadline
Issued 24 September 1997 Resolved
Replace doubler plate with proper permanent repair on 12in preload piping in heavy store room forward.
Condition: Unknown
Due 24 September 1997
Resolved 24 September 1997
Construction/Loadline
Issued 24 September 1997 Resolved
Guage & send report to [name withheld], #1 drill water tank pitted areas, fwd outboard bulkhead between 5th & 7th longitudinals.
Condition: Unknown
Due 24 September 1997
Resolved 24 September 1997
Construction/Loadline
Issued 24 September 1997 Resolved
Provide plans to USCG [name withheld], for storeroom constructed out of void 27.
Condition: Unknown
Due 27 October 1997
Resolved 3 November 1997
Construction/Loadline
Issued 24 September 1997 Resolved
Weld insert between 23P drill water tank & engine room.
Condition: Unknown
Due 24 September 1997
Resolved 24 September 1997
Fire Fighting
Issued 23 July 1997 Resolved
CALIBRATE OXYGEN / EXPLOSIVE METERS FOR FIREMAN'S OUTFITS.
Condition: Unknown
Due 23 July 1997
Resolved 23 July 1997
Engineering
Issued 23 July 1997 Resolved
REPAIR OVERSPEED SHUT-DOWN ON #3 GENERATOR.
Condition: Unknown
Due 23 July 1997
Resolved 23 July 1997
Fire Fighting
Issued 23 July 1997 Resolved
PROVIDE HYDRO DATES FOR FIBERGLASS SPUN SCBA BOTTLES, HYDROSTATICALLY TEST,OR REPLACE.
Condition: Unknown
Due 23 July 1997
Resolved 23 July 1997
Electrical
Issued 23 July 1997 Resolved
ADD SEMIANNUAL EMERGENCY BATTERY 2 HR LOAD TEST TO PMS SYSTEM, CONDUCT TESTS, AND LOG.
Condition: Unknown
Due 23 July 1997
Resolved 23 July 1997
Accommodation/Occupational Safety
Issued 23 July 1997 Resolved
PROVIDE LIGHT BULBS AND LIGHT COVERS FOR BUNK LIGHTS.
Condition: Unknown
Due 23 July 1997
Resolved 23 July 1997
Fire Fighting
Issued 23 July 1997 Resolved
PROVIDE CURRENT HYDROSTATICALLY TESTED TIME DELAY CYLINDER FOR FIXED CO2 SYSTEM.
Condition: Unknown
Due 23 July 1997
Resolved 23 July 1997
Documentation
Issued 23 July 1997 Resolved
REVISE POLICY TO COMPLY WITH THE APPLICABLE PORTIONS OF THE REVISIONS TO 46CFR 107-109. REFERENCE FEDERAL REGISTER VOL. 61, NO. 98, DATED MAY 20, 1996.
Condition: Unknown
Due 23 July 1997
Resolved 23 July 1997
Engineering
Issued 23 July 1997 Resolved
CONDUCT SATISFACTORY TESTS OF OVERSPEED AND LOW LUBE OIL SHUT-DOWNS FOR #1 AND #2 GENERATORS.
Condition: Unknown
Due 23 July 1997
Resolved 23 July 1997
Lifesaving
Issued 23 July 1997 Resolved
CONDUCT SATISFACTORY TEST OF EMERGENCY RIG SHUT-DOWNS.
Condition: Unknown
Due 23 July 1997
Resolved 23 July 1997
Electrical
Issued 23 July 1997 Resolved
CONDUCT MONTHLY 2 HR LOAD TEST OF EMERGENCY GENERATOR AND LOG.
Condition: Unknown
Due 23 July 1997
Resolved 23 July 1997
Lifesaving
Issued 23 July 1997 Resolved
TEST BREATHING AIR SYSTEM IN LIFEBOAT #1 FOR LEAKS AND REPAIR AS NECESSARY.
Condition: Unknown
Due 23 July 1997
Resolved 23 July 1997
Electrical
Issued 8 October 1996 Resolved
PROVE PROPER OPERATION OF LOW LUBE OIL SHUTDOWN ON #3 MAIN GENERATOR.
Condition: Unknown
Due 8 October 1996
Resolved 8 October 1996
Electrical
Issued 29 July 1996 Resolved
REPAIR OR REPLACE ENGINE TACH. ON #2 S/S GEN.
Condition: Unknown
Due 29 July 1996
Resolved 29 July 1996
Lifesaving
Issued 29 July 1996 Resolved
PROVIDE 12 HAND-HELD PARACHUTE FLARES.
Condition: Unknown
Due 29 July 1996
Resolved 29 July 1996
Electrical
Issued 29 July 1996 Resolved
PROVE PROPER OPERATION OF #3 S/S GEN.
Condition: Unknown
Due 29 July 1996
Resolved 29 July 1996
Accommodation/Occupational Safety
Issued 29 July 1996 Resolved
INSTALL LATCHES ON STAIRTOWER DOORS.
Condition: Unknown
Due 29 July 1996
Resolved 29 July 1996
Lifesaving
Issued 29 July 1996 Resolved
REPAIR COMPASS, L/B #2.
Condition: Unknown
Due 29 July 1996
Resolved 29 July 1996
Lifesaving
Issued 29 July 1996 Resolved
SERVICE PFD'S: PROVIDE WATERLIGHTS, WHISTLES, RETROFLECTIVE TAPE, ETC. AS NEC.
Condition: Unknown
Due 29 July 1996
Resolved 29 July 1996
Fire Fighting
Issued 3 September 1994 Resolved
Renew corroded Nitrogen bottles at the two Helo Deck BV fire stations.
Condition: Unknown
Due 3 September 1994
Resolved 3 September 1994
Construction/Loadline
Issued 3 September 1994 Resolved
Prior to departure, provide U/T results in way of effectiveness of bonding between cladding repairs and parent metal in Drill Water tanks #1, #7, #17,#23 and #24.
Condition: Unknown
Due 3 September 1994
Resolved 22 September 1994
Documentation
Issued 3 September 1994 Resolved
Submit to USCG Marine Safety Center for review/approval design and installation of refitted Top Drive assembly and derrick tower modifications, "As Built".
Condition: Unknown
Due 3 September 1994
Resolved 3 September 1994
Documentation
Issued 3 September 1994 Resolved
Submit to USCG Marine Safety Center for approval/review stabiity calculations in consideration of refitted Top Drive assembly and associatedstructural modifications, generator cooling system modifications and all other weight alterations affecting stability.
Condition: Unknown
Due 3 September 1994
Resolved 3 September 1994
Construction/Loadline
Issued 3 September 1994 Resolved
Crop and renew those areas of deteriorated bottom plating in Drill Water Tank #7-P previously subjected to unauthorized cladding repairs: specific scope and extent of required repairs to be determined by attending Marine Inspector.
Condition: Unknown
Due 3 September 1994
Resolved 3 September 1994
Construction/Loadline
Issued 3 September 1994 Resolved
Prior to departure, provide report on methods and procedures employed in way of cladding effected in bottom plating for Drill Water tanks #1, #7, #17, #23 and #24.
Condition: Unknown
Due 3 September 1994
Resolved 6 September 1994
Construction/Loadline
Issued 3 September 1994 Resolved
Prior to departure, provide report describing original conditions encountered in way of shell plating of Drill Water tanks #1, #7, #17, #23 and #24 leading to the cladding repairs subsequently effected.
Condition: Unknown
Due 3 September 1994
Resolved 26 September 1994
Lifesaving
Issued 3 September 1994 Resolved
Prior to departure, effect permanent repairs to parted remote release mechanism cable for port lifeboat.
Condition: Unknown
Due 3 September 1994
Resolved 6 September 1994
Construction/Loadline
Issued 3 September 1994 Resolved
Crop and renew two improperly templated inserts presently installed at Drill Water tank #23 Centerline bulkhead, one of approximately 3.5 ft by 4.0 ft, and one of approximately 4.0 ft by 4.0 ft.
Condition: Unknown
Due 3 September 1994
Resolved 3 September 1994
Construction/Loadline
Issued 3 September 1994 Resolved
Crop and renew with properly radiused and templated inserts of 1.5 ft by 1.5 ft minimum dimension, those damaged areas at bottom plating in way of sounding tube striker surfaces in Drill Water tanks #7, #17, #23 and #24.
Condition: Unknown
Due 3 September 1994
Resolved 3 September 1994
Construction/Loadline
Issued 3 September 1994 Resolved
Crop and renew those areas of deteriorated bottom plating in Drill Water Tank #24-S previously subjected to unauthorized cladding repairs: specific scope and extent of required repairs to be determined by attending Marine Inspector.
Condition: Unknown
Due 3 September 1994
Resolved 3 September 1994
Construction/Loadline
Issued 3 September 1994 Resolved
Prior to departure, effect gauging as required on bottom plating for Drill Water tanks #1, #7, #17, #23 and #24.
Condition: Unknown
Due 3 September 1994
Resolved 6 September 1994
Construction/Loadline
Issued 3 September 1994 Resolved
Crop and renew those areas of deteriorated bottom plating in Drill Water Tank #23-P previously subjected to unauthorized cladding repairs: specific scope and extent of required repairs to be determined by attending Marine Inspector.
Condition: Unknown
Due 3 September 1994
Resolved 3 September 1994
Construction/Loadline
Issued 3 September 1994 Resolved
Submit to USCG Marine Safety Center for approval/review plans indicating materials, locations and means/methods of installation of all tank drain mechanisms penetrating bottom the bottom shell plating.
Condition: Unknown
Due 3 September 1994
Resolved 3 September 1994
Deck/Cargo
Issued 3 September 1994 Resolved
Prior to commencing operations, renew failed relief valves on Bulk Tanks #13042 and #13044.
Condition: Unknown
Due 3 September 1994
Resolved 3 September 1994
Construction/Loadline
Issued 15 December 1993 Resolved
COMPLETE UNDERWATER HULL INSPECTION AS PER GLOBAL MARINE DRILLING COMPANY PROPOSAL DATED 06DEC93.
Condition: Unknown
Due 15 December 1993
Resolved 15 December 1993
Fire Fighting
Issued 9 September 1992 Resolved
RENEW 20 SEC TIME DELAY ON MUD PIT ROOM FIXED CO2 SYSTEM.
Condition: Unknown
Due 9 September 1992
Resolved 9 September 1992
Deck/Cargo
Issued 9 September 1992 Resolved
INSTALL API CRANE HAND SIGNALS PLACARDS ON CRANES (3 EA).
Condition: Unknown
Due 9 September 1992
Resolved 9 September 1992
Electrical
Issued 9 September 1992 Resolved
RENEW RAW WATER EXPANSION JOINTS ON #2 AND #4 DIESEL GENERATOR SETS.
Condition: Unknown
Due 9 September 1992
Resolved 9 September 1992
Accommodation/Occupational Safety
Issued 9 September 1992 Resolved
INSTALL PRESSURE/TEMP RELIEF VALVES ON HOT WATER HEATERS (3 EA) WITH UNITS TO COMPLY WITH UL 174 (LESS THAN 100 PSI/LESS THAN 210 F) OR MAKE PRESSURE VESSELS AVAILABLE FOR INTERNAL INSPECTION.
Condition: Unknown
Due 9 September 1992
Resolved 9 September 1992
Construction/Loadline
Issued 19 November 1991 Resolved
CONDUCT EXAM OF SPUD CANS AND CAN-TO-CHORD WELD CONNECTIONS IN ACCORDANCE WITH APPROVED PROCEDURE AT NEXT RIG MOVE.
Condition: Unknown
Due 31 January 1992
Resolved 31 January 1992
Electrical
Issued 30 August 1991 Resolved
PROVIDE APPROVED CL I DIV I WIRE FOR ALL DIV I LOCATIONS: SHALE SHAKER, PAINT LOCKER, AND DRILL FLOOR. THE DRILL FLOOR CAN BE RECLASSIFIED AS A DIVII AREA ON HAZARDOUS LOCATION PLANS EXCEPT FOR 5 FT AROUND ROTARY.
Condition: Unknown
Due 15 November 1991
Resolved 12 November 1991
Deck/Cargo
Issued 30 August 1991 Resolved
CONDUCT INTERNAL EXAM ON DRILL FLOOR AIR RECEIVER.
Condition: Unknown
Due 30 August 1991
Resolved 30 August 1991
Lifesaving
Issued 30 August 1991 Resolved
PROVIDE PROPER CALIBRATION GAS FOR EXPLOSIVE METERS.
Condition: Unknown
Due 23 October 1991
Resolved 23 October 1991
Engineering
Issued 30 August 1991 Resolved
VERIFY THAT HOSE FOR FUEL OIL TRANSFER IS SUITABLE FOR OIL SERVICE.
Condition: Unknown
Due 23 October 1991
Resolved 23 October 1991
Fire Fighting
Issued 30 August 1991 Resolved
ON #1 FIRE PUMP PIPING, REPAIR LEAK IN PRESSURE GAUGE LINE TO PIPE CONNECTION AND REPAIR HOLED PIPING UNDER DOUBLER PATCH ABOVE THE PUMP.
Condition: Unknown
Due 15 November 1991
Resolved 20 November 1991
Electrical
Issued 30 August 1991 Resolved
TEST MAIN GENERATOR REMOTE SHUTDOWN AND TOTAL RIG SHUTDOWN.
Condition: Unknown
Due 15 November 1991
Resolved 20 November 1991
Electrical
Issued 30 August 1991 Resolved
REPLACE CRACKED EXPANSION JOINTS ON #1, #2, AND #4 MAIN GENERATOR COOLING SYSTEMS.
Condition: Unknown
Due 23 October 1991
Resolved 23 October 1991
Accommodation/Occupational Safety
Issued 30 August 1991 Resolved
REPAIR HOLED PIPING ON FLUSHING WATER SYSTEM IN MUD PUMP ROOM.
Condition: Unknown
Due 23 October 1991
Resolved 23 October 1991
Electrical
Issued 30 August 1991 Resolved
PROPERLY HANG ALL WIRING ALONG PORT CORNER OF MUD PITS OVERHEAD RUNNING UP ALONG MIDDLE SUPPORT BEAM.
Condition: Unknown
Due 15 November 1991
Resolved 20 November 1991
Lifesaving
Issued 30 August 1991 Resolved
REVISE HAZARDOUS LOCATION PLAN TO INDICATE THE PAINT LOCKER IS CLASS I DIV I AREA.
Condition: Unknown
Due 23 October 1991
Resolved 23 October 1991
Electrical
Issued 30 August 1991 Resolved
PROVIDE GUARDS ON ALL SPOTLIGHTS UNDER DRILL FLOOR.
Condition: Unknown
Due 15 November 1991
Resolved 20 November 1991
Electrical
Issued 30 August 1991 Resolved
PROPERLY HANG WIRING ALONG STBD SIDE UNDER DRILL FLOOR.
Condition: Unknown
Due 15 November 1991
Resolved 20 November 1991
Unknown
Issued 27 November 1990 Resolved
REPAIR RELIEF VALVES FOR FIREPUMPS AND TEST WITH A PRESSURE GAUGE THAT HAS BEEN RECENTLY CALIBRATED.
Condition: Unknown
Due 27 November 1990
Resolved 27 November 1990
Unknown
Issued 27 November 1990 Resolved
REPLACE ALL RUNNING/NAVIGATION LIGHT BULB WITH MARINE/USCG APPROVED TYPE.
Condition: Unknown
Due 27 November 1990
Resolved 27 November 1990
Unknown
Issued 27 November 1990 Resolved
PROVIDE 2 OPERATIONAL O2 METERS FOR FIREMANS OUTFITS.
Condition: Unknown
Due 27 November 1990
Resolved 27 November 1990
Unknown
Issued 27 November 1990 Resolved
CLEARLY LABEL ALL VOID AND INTERGAL TANK VENTS ON MAIN AND UPPER DECKS.
Condition: Unknown
Due 27 November 1990
Resolved 27 November 1990
Unknown
Issued 27 November 1990 Resolved
REPAIR PIT ROOM DOOR FROM HEAVY STORE ROOM SO THAT IT WILL LATCH SHUT.
Condition: Unknown
Due 27 November 1990
Resolved 27 November 1990
Unknown
Issued 27 November 1990 Resolved
REPAIR WALKIN FREEZER ANTI-LOCK IN DEVICE SO THAT IT DOES NOT FREEZE UP.
Condition: Unknown
Due 27 November 1990
Resolved 27 November 1990
Unknown
Issued 27 November 1990 Resolved
FLEXIBLY MOUNT FIRE PUMPS AS PER TABLE 56.60-25(C) IN 46 CFR.
Condition: Unknown
Due 27 November 1990
Resolved 27 November 1990
Engineering
Issued 29 August 1989 Resolved
REPAIR OR REPLACE BOTH BILGE PUMPS TO ENSURE ADEQUATE PUMPING OUTPUT.
Condition: Unknown
Due 29 August 1989
Resolved 29 August 1989
Fire Fighting
Issued 29 August 1989 Resolved
REMOVE NON-METALLIC EXPANSION JOINTS FROM SUCTION AND DISCHARGE SIDE OF BOTH FIRE PUMPS OR INSTALL SHOCK MOUNTS FOR PUMPS.
Condition: Unknown
Due 29 August 1989
Resolved 29 August 1989
Lifesaving
Issued 12 February 1986 Resolved
PROVIDE 12 EACH SIGNAL ROCKETS IN EACH LIFEBOAT.
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986
Lifesaving
Issued 12 February 1986 Resolved
PROVIDE BUOYANT ORANGE LINE FOR LIFELINE FOR ONE RING BUOY ON EACH SIDE OF VESSEL.
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986
Deck/Cargo
Issued 12 February 1986 Resolved
PROVIDE SAFETY DEVICE (SAFETY RAIL) FOR LADDER TO CASING STABBING BOARD.
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986
Lifesaving
Issued 12 February 1986 Resolved
PROVIDE ADEQUATE ROCKETS AND CARTRIDGES FOR LINE THROWING APPLIANCE.
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986
Fire Fighting
Issued 12 February 1986 Resolved
PROVIDE ONE FULLY CHARGED 100 LB CO2 BOTTLE ENGINE ROOM FIXED SYSTEM TO COMPLETE REQUIRED AMOUNT.
Condition: Unknown
Due 12 February 1986
Resolved 12 February 1986

Casualty record · 1

1 June 1994Major Marine Casualty · role: Involved in a Marine Casualty · activity 30792
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.