MAURY USCG vessel records Sign in
← All vessels

IRVINGTON

IRVINGTON is a 1932 passenger vessel (inspected). The Coast Guard has recorded 65 inspections since 1985, most recently in February 2022, along with 120 deficiencies.

Records from 1985 to 2022. Most recent: inspection, 2 February 2022.

Built
1932
Last inspected
2 February 2022
Documentation
Expired · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDD3002
Flag
UNITED STATES
367122580 (licence lapsed)
Maury page id
psix-52661

Inspections, by type

…with no type recorded2
Years with a record 34 calendar years (1985–2022)
The 65 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)58.4 ft × 29.0 ft × 8.5 ft
Registered tonnagegross 94 / net 64
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
Builderbuilder not recorded · MARINERS HARBOR, NY, UNITED STATES · built 1932
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it94 - Regulatory (Subpart C or D), Gross Ton
64 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDD3002MMSI 367122580 · expired · voluntarily equipped · granted 21 April 2016, cancelled 25 July 2026
WCR6771MMSI not assigned · expired · compulsorily equipped · granted 18 May 1995, cancelled 23 July 2005
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 65

2 February 2022 Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7389622
3 May 2021 Administrative Inspection · Drydock Extension
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7188384
16 April 2021 Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7176340
27 January 2020 DAPI Audit · Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6883149
1 May 2019 Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6674494
14 March 2019 Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6634191
25 February 2019 Examination of Repairs
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6648776
19 February 2019 Examination of Repairs
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6629484
29 November 2018 In-Service Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6589200
27 March 2018 Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6366075
26 May 2017 Inclining Experiment
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6155502
26 May 2017 Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6155530
27 February 2017 Plan Review "T" Boat
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6095324
8 December 2016 Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6054365
29 November 2016 In-Service Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6052473
20 April 2016 Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5858559
4 January 2011 Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3919574
9 December 2010 Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3907579
3 March 2010 COI Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3687654
3 March 2010 Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3732650
8 April 2009 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3448855
26 November 2008 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3369904
16 April 2008 Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3185182
28 February 2008 Internal Structural Exam · Annual Inspection · Examination of Repairs · Drydock Extension
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3155099
30 January 2008 Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3138999
15 May 2007 Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2931021
16 May 2006 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2653513
20 March 2006 Hull Examination · Welding Related Inspections Qualification Testing · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2605571
24 March 2005 COI Inspection · Deficiency Check
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 2307524
3 January 2005 Internal Structural Exam · Hull Examination
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 2268040
9 June 2004 MARPOL Annex V Examination · Annual Inspection
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 2078170
18 August 2003 Deficiency Check
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1879506
29 June 2003 Deficiency Check
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1829630
18 June 2003 Annual Inspection · MARPOL Annex V Examination
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1819160
25 June 2002 Re-Inspection · MARPOL Annex V Examination
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1635518
19 February 2002 Internal Structural Exam · Hull Examination
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1487262
31 May 2001 Deficiency Check · Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1451731
4 May 2001 Re-Inspection · Deficiency Check · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1470029
14 April 2000 MARPOL Annex V Examination · Deficiency Check · COI Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1361393
14 April 1999 Re-Inspection · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1413537
3 March 1999 Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 800569
24 December 1998 Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1388678
29 April 1998 MARPOL Annex V Examination · Re-Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 795316
3 February 1998 Examination of Repairs
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1467530
24 April 1997 MARPOL Annex V Examination · COI Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1102548
25 May 1996 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1085815
22 May 1996 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1085097
20 May 1996 Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1081630
26 April 1995 COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 877084
6 January 1995 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 859429
14 February 1994 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 865113
28 April 1993 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 848793
23 December 1992 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1132618
4 April 1992 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 959048
4 December 1991 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1254390
12 April 1991 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 942000
3 May 1990 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 908726
13 December 1989 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 931913
5 April 1989 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1194793
28 December 1988 Hull Examination · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 887297
28 April 1988 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1198916
29 April 1987 Hull Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1008890
12 December 1986 Drydock Extension
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1001279
11 June 1986 Re-Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1307886
12 June 1985 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 984643

Deficiency record · 120

11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 January 2020 Resolved
Life ring on board was purchased without retro reflective tape. vessel rep had purchased a new roll of solas approved retro tape and installed as required.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 27 January 2020
Resolved 27 January 2020
Resolution: Instaled retro-reflective tape as required
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 January 2020 Resolved
Floating electric water light was found missing a screw cap, securing the light to the casing and ensuring water tight integrity.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 27 January 2020
Resolved 27 January 2020
Resolution: Found screw securing the top of the floating electric water light to the case in the vicinity of the light housing. Reinstalled screw and tested; all sat
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 27 January 2020 Resolved
Survival craft was secured to the vessel with the floating electric water light wrapped around the bracket. This would've prevented the life float from floating free if the vessel had sunk.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 27 January 2020
Resolved 27 January 2020
Resolution: Survival craft was and floating electric marker light line was reconfigured to allow for the life float to float free.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 27 January 2020 Resolved
Floating electric water light was found inoperable for the survival craft.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 27 January 2020
Resolved 27 January 2020
Resolution: Vessel rep stated he tested the light prior to the inspection where the light was all sat. Cleaned the contacts and re-tested the light. All SAT
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 27 January 2020 Resolved
Portable fire extinguisher guage inspected, where the guage was found in the discharged zone of the guage.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 27 January 2020
Resolved 27 January 2020
Resolution: Company had spare fire extinguishers inspected and available for in-service. replaced the expended extinguisher.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 27 January 2020 Resolved
Identified 2 areas on the FRP life float with water intrusion caused by delamination. Issued 01 requirement to repair the life float IAW manufactures recommended repair method of replace the life float with an approved buoyant apparatus.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 February 2020
Resolved 5 February 2020
Resolution: A new life float was purchased and installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 January 2020 Resolved
Breakers in the primary operating station need to be labled
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 February 2020
Resolved 5 February 2020
Resolution: Breakers labled in the pilot house
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 January 2020 Resolved
Wiring in the machinery space was spliced using "twist on" type wire connectors for a lighting circuit. remove twist on wire splicing and install IAW 46 CFR 183.340
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 February 2020
Resolved 5 February 2020
Resolution: Wiring in the machinery space was removed and new lighting fixtures were installed and wired using approved butt connections.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 January 2020 Resolved
Lighting fixture damaged. MISLE keeps crashing, so further details can be found on the CG-835V.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 February 2020
Resolved 5 February 2020
Resolution: Lighting fixture was replaced with new class 1 div 3 type lighting fixtures and wired appropriately.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 January 2020 Resolved
Throw line affixed to the life ring; type IV PFD around the equidistant grab lines. throw line must be affixed around the body of the life ring.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 27 January 2020
Resolved 27 January 2020
Resolution: Life ring recnfigured and corrected on the spot
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 27 January 2020 Resolved
Vessel's rescue platform designed and configured in a way that would not allow for the recovery of a "helpless" PIW IAW 46 CFR 180.120(a)(2), for vessels not required to have a rescue boat
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 February 2020
Resolved 5 February 2020
Resolution: MOB rescue platform was reconfigured with hooked mounting points to allow for rapid deployment and an effectivbe way to recover a helpless victim IAW CFR
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 18 May 2017 Resolved
Vessel must demonstrate a condition of operational readiness, seaworthiness, and the elimination of safety hazards prior to departing SEC NY AOR.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 May 2017
Documentation › Certificates/Documents › Certificate of Inspection
Issued 18 May 2017 Resolved
Vessel must conduct its 2017 annual inspection prior to operating in service.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2017
Resolved 26 May 2017
Resolution: MI attended vessel and completed a reinspection.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 January 2011 Resolved
Recently completed insert at E/R aft BHD found not completely welded on the E/R side. It appears not enough of the fixed cement ballast was removed to provide full access for welding. Remove fixed ballast to gain access. Grind out weld & reweld. Perform a hose test to verify BHD is watertight prior to ballast renewal.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 January 2011
Resolved 13 January 2011
Resolution: Repaired sat & passed hose test.
Lifesaving › Lifefloat › Platform
Issued 4 January 2011 Resolved
Repaint, remark, renew pendants and associated lines/ pendants.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 23 March 2011
Resolution: L/R satisfactorily refurbished.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 22 December 2010 Resolved
Vessel must conduct sea trial with a CG Marine Inspector to ensure the proper operation of newly installed cutless bearings and propellers prior to carrying cargo.
Action required: 705 - Other - as specified
Resolved 4 January 2011
Resolution: All propulsion machinery operated ahead and astern at varying speeds & loads. All shafts ran smooth.
Engineering › Fuel Oil Storage/Transfer System › Filter/Strainer
Issued 9 December 2010 Resolved
Install flame shield on aft engine racor assembly
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 December 2010
Resolution: Flame shield installed on raycor filters.
Lifesaving › Buoyant Apparatus › Approval
Issued 9 December 2010 Resolved
Replace BA with approved life float.
Action required: 705 - Other - as specified
Due 3 March 2011
Resolved 3 March 2011
Resolution: Examined current L/F. Found approval status listed in MISLE as "Former-May use". L/F will be examined at visit to witness hose test
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 December 2010 Resolved
Vessel must go through all spaces and ensure all wires are collected and hung per regulations
Action required: 705 - Other - as specified
Due 1 February 2011
Resolved 4 January 2011
Resolution: Metal wire hangers refitted to overhead and wiring secured in place.
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 December 2010 Resolved
Vessel is to go through all spaces and remove dead end wires.
Action required: 705 - Other - as specified
Due 1 February 2011
Resolved 4 January 2011
Resolution: Master & crew removed unused wiring as far as practicable. Some wiring would be a hardship to remove and were gathered, bound and secured out of the way IAW ABYC guidance.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 9 December 2010 Resolved
Properly bond fuel tank to vessel and bond fuel fill to tank.
Action required: 705 - Other - as specified
Due 29 December 2010
Resolved 4 January 2011
Resolution: Fuel tank bonding wire renewed and fill pipe bonding completed..
Construction/Loadline › Hull › Stiffener
Issued 9 December 2010 Resolved
FWD strake structural frames are wasted, crop and renew wasted material as discussed and marked prior to carrying cargo on vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 January 2011
Resolution: Wasted sections of underdeck stantions and stiffeners C&R. 2.5 X 2.5 X .25 angle used. Repairs completed satisfactorily.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 9 December 2010 Resolved
Port wing tank space aft bulkhead lower amidships 4" from bottom seam a 2" hole fill / repair as discussed / marked
Action required: 705 - Other - as specified
Due 1 February 2011
Resolved 4 January 2011
Resolution: 6" spigot insert fitted in this non-watertight BHD. Repair satisfactory.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 9 December 2010 Resolved
Aft strake transverse bulkhead to engine room, fwd portside 6" up from bilge bottom has a 3" hole and six inches to stb a 1" hole, fill / repair holes as discussed / marked
Action required: 705 - Other - as specified
Due 1 February 2011
Resolved 4 January 2011
Resolution: 1.5'' X 2.0'' .25" plate insert w/ rounded corners fitted to the aft transverse WTBHD of the machine space IWO the lower edge at the bottom of the port side E/R access trunk.
Engineering › Shafting/Propeller Arrangements › Strut Bearing
Issued 9 December 2010 Resolved
Vessel must v-groove and re-weld fwd shaft cutless bearing tube as discussed prior to credit dry dock.
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 13 December 2010
Resolution: Forward shaft cutless bearing tube grooved and welded properly.
Construction/Loadline › Hull › Bottom Plating
Issued 9 December 2010 Resolved
Vessel must clean all growth from bottom to facilitate inspection of hull plating prior to credit dry dock.
Action required: 705 - Other - as specified
Resolved 13 December 2010
Resolution: Hull examined and no discrepancies found.
Engineering › Shafting/Propeller Arrangements › Strut Bearing
Issued 9 December 2010 Resolved
Vessel must crop and renew aft cutless bearing tube to original standards as discussed prior to credit dry dock.
Action required: 705 - Other - as specified
Resolved 22 December 2010
Resolution: New aft cutless bearing tube installed.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 9 December 2010 Resolved
Vessel must make available both shafts, cutless bearings and propellers for inspection prior to credit dry dock.
Action required: 705 - Other - as specified
Resolved 22 December 2010
Resolution: Both cutless bearings and propellers installed properly.
Fire Fighting › Fire Pumps › Casing
Issued 3 March 2010 Resolved
Vessel owner replace fire pump in kind prior to exam. Verified correct installation and witnessed a satisfactory test.
Due 3 March 2010
Resolved 3 March 2010
Resolution: WORK COMPLETED PRIOR TO EXAM.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 1 March 2010 Resolved
Install an approved remote control pull box on the end of the pull cable for the CO2 fixed system. Locate the pull box high on the inside of the entrance way to the engine room so that it will not be damaged or accidently activated by normal activities of maintenance & entrance to engine room. Note the cable tube will need to be extended & cable lengthened.
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 14 April 2010
Resolution: Pull cable, ridged piping for cable & pull box replaced w/ approved parts by certified service company. Tested & left watching properly by fire equipment service company.
Documentation › Logs/Records › Drug Test Records
Issued 1 March 2010 Resolved
Present drug screening records for audit.
Action required: 705 - Other - as specified
Due 31 March 2010
Resolved 5 March 2010
Resolution: Drug screening records found sat.
Lifesaving › Lifejacket/PFD (Type I) › Marking
Issued 1 March 2010 Resolved
Three PFDs remarked. Note owner renewed eight PFDs prior to exam.
Action required: 705 - Other - as specified
Due 3 March 2010
Resolved 3 March 2010
Resolution: Corrected date of exam.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 8 April 2009 Resolved
Provide 6 adult PFD's. Passenger count reduced accordingly until cleared.
Action required: 705 - Other - as specified
Due 8 May 2009
Resolved 15 April 2009
Lifesaving › Hand Flares › Expired
Issued 8 April 2009 Resolved
Provide 3 red and 3 orange flares, prior to operating.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 May 2009
Resolved 15 April 2009
Operations/Management › Drills/Instruction › Making Voice Radio Distress Call
Issued 8 April 2009 Resolved
fill out and post emergency radio (MAYDAY) instructions.
Due 8 May 2009
Resolved 15 April 2009
Construction/Loadline › Structures › Rake
Issued 26 November 2008 Resolved
In the aft rake, renew wasted framing iwo hatch-port side, and renew wasted framing iwo the STBD side rudder post.
Condition: Unknown
Due 6 February 2009
Resolved 9 April 2009
Engineering › Fuel Oil Service System › Hose
Issued 26 November 2008 Resolved
Renew fuel fill piping flex hose connections and grounding straps in the aft rake.
Condition: Unknown
Due 6 February 2009
Resolved 9 April 2009
Construction/Loadline › Hull › Bottom Plating
Issued 16 April 2008 Resolved
Vessel must complete credit drydock prior to carrying passengers for hire. Drydock must be completed NLT October 2008.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 October 2008
Resolved 2 January 2009
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 28 February 2008 Resolved
Provide serviceing report for all portable fire extinguishers. (Expire as of 1 March 2008)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 March 2008
Resolution: Provided proof of servicing report for all portable fire extinguishers to Coast Guard.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 28 February 2008 Resolved
Vessel must either remove out of service crane entirely from deck, or at a minimum, ensure that all hydrolic oil is removed from the system.
Due 28 March 2008
Resolved 28 February 2008
Lifesaving › Lifefloat › Lifeline
Issued 28 February 2008 Resolved
Replace worn grab lines for lifefloat arrangement and patch and repair lifefloat itself.
Due 28 March 2008
Resolved 13 March 2008
Resolution: Replaced old worn grab lines on sides of lifefloat with new ones, and made necessary repairs and patches to body of life float.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 28 February 2008 Resolved
Place vessel name in bold highly visible letters on lifering.
Due 28 March 2008
Resolved 10 March 2008
Resolution: Placed vessel name in bold highly visible letters on lifering.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 28 February 2008 Resolved
Notify Coast Guard inspector when fixed CO2 firefighting system is being serviced. CG inspector must be present and witness servicing and test of system.
Due 28 March 2008
Resolved 12 March 2008
Resolution: On Wednesday 12 March 2008 fire servicing company attended vessel to test fixed CO2 system. CG inspector was present to witness testing of system. All sat.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 28 February 2008 Resolved
Place insulation on new exhaust pipe for aft MDE, current pipe has no insulation.
Due 28 March 2008
Resolved 13 March 2008
Resolution: Provided insulation for new exhaust pipe for aft MDE.
Documentation › Certificates/Documents › FCC SSL
Issued 28 February 2008 Resolved
Provide proof of valid safety radio certificate to Coast Gaurd inspector.
Due 15 March 2008
Resolved 10 March 2008
Resolution: Faxed proof of valid safety radio certificate to the Coast Guard on 10 March 2008.
Engineering › Steering Gear System › Pin
Issued 28 February 2008 Resolved
Repair or replace pins and bushing's on both steering grear arrangements.
Due 15 March 2008
Resolved 10 March 2008
Resolution: Replaced pins and bushing''s on both steering grear arrangements.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 28 February 2008 Resolved
Fix exhaust leek coming from new exhaust pipe installation for aft MDE.
Due 15 March 2008
Resolved 10 March 2008
Resolution: Fixed exhaust leek coming from new exhaust pipe installation for aft MDE.
Stability › Incline Test › General
Issued 30 January 2008 Resolved
Conduct stability test
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 1 January 2010
Resolved 3 March 2010
Resolution: Not required. Maximum load & route covered on COI in conditions of operation. Vessel is former Sub H ro-ro ferry and has a sister vessel with the same stability ltr.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 15 May 2007 Resolved
Repair exhaust leak on aft MDE.
Due 25 May 2007
Resolved 25 May 2007
Resolution: Repaired exhaust leak on aft MDE.
Lifesaving › Lifefloat › Painter
Issued 15 May 2007 Resolved
Replace lifefloat painter with 110ft. of floatable line.
Due 25 May 2007
Resolved 25 May 2007
Resolution: Replaced lifefloat painter with 110ft. of floatable line.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 16 May 2006 Resolved
Provide waterlight for ring buoy prior to night operations.
Action required: 705 - Other - as specified
Resolved 26 May 2006
Resolution: Per fax ltr from O/O, ltr scanned into documents for this activity.
Construction/Loadline › Structures › Superstructure
Issued 16 May 2006 Resolved
Renew after platform on pilothouse.
Due 30 May 2006
Resolved 26 May 2006
Resolution: Per fax ltr from O/O, ltr scanned into documents for this activity.
Lifesaving › Lifefloat › Retroreflective Material
Issued 16 May 2006 Resolved
Apply new retro-reflective tape to lifefloat.
Due 30 May 2006
Resolved 26 May 2006
Resolution: Per fax ltr from O/O, ltr scanned into documents for this activity.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 16 May 2006 Resolved
Provide new first aid kit.
Due 30 May 2006
Resolved 26 May 2006
Resolution: Per fax ltr from O/O, ltr scanned into documents for this activity.
Documentation › Certificates/Documents › FCC SSL
Issued 16 May 2006 Resolved
Provide FCC radio license.
Due 30 May 2006
Resolved 26 May 2006
Resolution: Per fax ltr from O/O, ltr scanned into documents for this activity.
Lifesaving › Lifefloat › Serviceable
Issued 24 March 2005 Resolved
Service lifefloat, apply new retro-reflective tape, tie up tag lines and renew any weatherd lines.
Due 2 April 2005
Resolved 5 April 2005
Resolution: Completed.
Construction/Loadline › Hull › Side Shell
Issued 3 January 2005 Resolved
Hose test the insert portside forward around the forward engine exhaust.
Due 1 March 2005
Resolved 16 February 2005
Resolution: Hose test witnessed by [name withheld].
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 3 January 2005 Resolved
Repair or straighten deck rails aft on the stbd side aft and wasted rail stbd side forward.
Due 1 March 2005
Resolved 16 February 2005
Resolution: Cleared by [name withheld].
Engineering › Bilge Water Management System › Piping
Issued 9 June 2004 Resolved
Provide proper operation of the bilge system inb port, starboard and forward compartments prior to operating.
Due 9 June 2004
Resolved 9 June 2004
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 9 June 2004 Resolved
Provide proper fire extinguiosher brackets for loaner extinguishers or re-install originals when serviced until either is completed no vessel operations are permitted.
Due 9 June 2004
Resolved 9 June 2004
Engineering › Diesel Engine (propulsion-reduction gear) › Silencer (exhaust)
Issued 9 June 2004 Resolved
Repair exhaust leak on forward main engine exhaust in port compartment.
Due 16 June 2004
Resolved 1 July 2004
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 9 June 2004 Resolved
Provide two (2) child lifejackets, until provided no children may be carried.
Due 16 June 2004
Resolved 1 July 2004
Engineering › Bilge Water Management System › Piping
Issued 9 June 2004 Resolved
Install check valves in bilge piping system for each compartment.
Due 16 June 2004
Resolved 1 July 2004
Engineering
Issued 18 June 2003 Resolved
Repair emergency fuel shut-off prior to operating.
Due 18 June 2003
Resolved 27 June 2003
Navigation
Issued 18 June 2003 Resolved
Repair/replace bow steering ram starboard side due to excessive leakage.
Due 10 July 2003
Resolved 18 August 2003
Navigation
Issued 18 June 2003 Resolved
Renew forward steering pump hydraulic line above forward engine.
Due 25 June 2003
Resolved 27 June 2003
Electrical
Issued 18 June 2003 Resolved
Repair engine room lighting system.
Due 25 July 2003
Resolved 18 August 2003
Lifesaving
Issued 18 June 2003 Resolved
Provide waterlight and clip for ring bouy.
Due 19 June 2003
Resolved 27 June 2003
Fire Fighting
Issued 18 June 2003 Resolved
Provide proof of servicing for fixed and portable firefighting system.
Due 20 June 2003
Resolved 27 June 2003
Lifesaving › Buoyant Apparatus
Issued 25 June 2002 Resolved
Add 50 feet to seapainter for life float and attach to vessel.
Condition: Improper Installation
Due 14 July 2002
Resolved 27 June 2002
Resolution: 50 feet added.
Lifesaving › Buoyant Apparatus
Issued 25 June 2002 Resolved
Renew wasted tag lines on life floats.
Due 14 July 2002
Resolved 27 June 2002
Resolution: Tag lines replaced.
Lifesaving › Lifebuoys
Issued 25 June 2002 Resolved
Mount waterlight for ring buoy. LEGACY COMPONENT DESC: Self-igniting Lights
Condition: Improper Installation
Due 14 July 2002
Resolved 27 June 2002
Resolution: Bracket mounted.
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 25 June 2002 Resolved
Mount all fire extinguishers. LEGACY COMPONENT DESC: Mounting Bracket
Condition: Improper Installation
Due 27 June 2002
Resolved 27 June 2002
Resolution: Brackets purchased and mounted.
Lifesaving › Lifejacket/PFD (Type I)
Issued 25 June 2002 Resolved
Renew 1 adult PFD. Vessel restricted to carrying 14 people until corrected. LEGACY COMPONENT DESC: Condition
Due 14 July 2002
Resolved 27 June 2002
Resolution: New life jacket purchased.
Lifesaving › Buoyant Apparatus
Issued 25 June 2002 Resolved
Replace line for waterlight to life float IAW 46 CFR 180.175.
Due 14 July 2002
Resolved 27 June 2002
Resolution: Floatable line purchased and added.
Communications › Radio Communications
Issued 25 June 2002 Resolved
Provide and post emergency broadcast placard.
Condition: Improper/Lack of Maintenance
Due 14 July 2002
Resolved 27 June 2002
Resolution: Provided and posted.
Lifesaving › Buoyant Apparatus
Issued 25 June 2002 Resolved
Mark vessel's name on oars for life float.
Due 14 July 2002
Resolved 27 June 2002
Resolution: Name stenciled.
Engineering › Shafting/Propeller Arrangements
Issued 25 June 2002 Resolved
Repair leak from forward shaft packing. LEGACY COMPONENT DESC: Propeller Shaft
Condition: Improper/Lack of Maintenance
Due 27 June 2002
Resolved 27 June 2002
Resolution: Repacked shaft
Engineering › Fuel Oil Storage/Transfer System
Issued 25 June 2002 Resolved
Renew fuel tank fill hose. LEGACY COMPONENT DESC: Hose
Condition: Improper/Lack of Maintenance
Due 27 June 2002
Resolved 27 June 2002
Resolution: Renewed with SAE J1942 approved hose.
Engineering › Fuel Oil Service System
Issued 25 June 2002 Resolved
Renew bonnet for fuel filter on forward filter. LEGACY COMPONENT DESC: Filter
Condition: Improper/Lack of Maintenance
Due 14 July 2002
Resolved 27 June 2002
Resolution: New filter assembly added.
Engineering
Issued 25 June 2002 Resolved
Remove oil from bilges under engines.
Condition: Improper/Lack of Maintenance
Due 27 June 2002
Resolved 27 June 2002
Resolution: Removed.
Accommodation/Occupational Safety › Medical/First Aid
Issued 25 June 2002 Resolved
Provide first aid kit IAW 46 CFR 184.710. LEGACY COMPONENT DESC: Medicine Chest
Condition: Improper/Lack of Maintenance
Due 14 July 2002
Resolved 27 June 2002
Resolution: Added w/ current contents.
Documentation › Certificates/Documents
Issued 25 June 2002 Resolved
Provide radiotelephone safety certificate.
Condition: Improper/Lack of Maintenance
Due 14 July 2002
Resolved 27 June 2002
Resolution: FCC inspection held and provided.
Construction/Loadline › Structures
Issued 19 February 2002 Resolved
C & R WASTED SECTION OF SUPPORTS FOR BOW RAMP GANTRY.
Due 31 May 2002
Resolved 20 May 2002
Lifesaving
Issued 4 May 2001 Resolved
PROVIDE AN ACCEPTABLE STOWAGE SYSTEM FOR L/F.
Condition: Unknown
Due 11 May 2001
Resolved 20 June 2001
Lifesaving
Issued 4 May 2001 Resolved
PROVIDE A PERMANT MOUNT FOR L/F WATERLIGHT.
Condition: Unknown
Due 11 May 2001
Resolved 20 June 2001
Navigation
Issued 4 May 2001 Resolved
PROVE OPERATION OF MASTHEAD LIGHT.
Condition: Unknown
Due 11 May 2001
Resolved 20 June 2001
Lifesaving
Issued 4 May 2001 Resolved
PROVE A PERMANT MOUNT FOR RING BUOY WATERLIGHT.
Condition: Unknown
Due 11 May 2001
Resolved 20 June 2001
Electrical
Issued 14 April 2000 Resolved
RENEW WIRING SERVING RUNNING LIGHT, PORTSIDE.
Condition: Unknown
Due 30 April 2000
Resolved 26 April 2000
Fire Fighting
Issued 14 April 2000 Resolved
HYDROSTATICALLY TEST THE CO2 CYLINDER SERVING E/R.
Condition: Unknown
Due 30 April 2000
Resolved 14 April 2000
Electrical
Issued 14 April 2000 Resolved
CORRECT LOW VOLTAGE PROBLEM ON VESSEL.
Condition: Unknown
Due 30 April 2000
Resolved 26 April 2000
Construction/Loadline
Issued 14 April 1999 Resolved
INSTALL BILGE LEVEL ALARM IN E/R.
Condition: Unknown
Due 21 April 1999
Resolved 19 May 1999
Deck/Cargo
Issued 14 April 1999 Resolved
REPAIR HYDRAULIC LEAKS ON CRANE.
Condition: Unknown
Due 21 April 1999
Resolved 19 May 1999
Lifesaving
Issued 14 April 1999 Resolved
PROVIDE AND POST EMERGENCY BROADCAST PLACARD NEXT TO R/T EQUIPMENT.
Condition: Unknown
Due 21 April 1999
Resolved 19 May 1999
Lifesaving
Issued 14 April 1999 Resolved
PROVIDE AND POST PFD DONNING PLACARD FOR BOTH TYPES OF PFDS.
Condition: Unknown
Due 21 April 1999
Resolved 19 May 1999
Construction/Loadline
Issued 14 April 1999 Resolved
REPAIR LEAKING VALVE/PIPING IN E/R SERVING BILGE/FIRE PUMP.
Condition: Unknown
Due 21 April 1999
Resolved 19 May 1999
Construction/Loadline
Issued 24 December 1998 Resolved
V AND WELD AS NEEDED ALL CRACKED WELDS ON OVERHEAD, PORTSIDE VOID ADJACENT TO E/R.
Condition: Unknown
Due 24 December 1998
Resolved 24 December 1998
Construction/Loadline
Issued 24 December 1998 Resolved
CROP AND RENEW #2 BOTTOM LONGITUDINAL, PORTSIDE IN LAZ.
Condition: Unknown
Due 24 December 1998
Resolved 24 December 1998
Construction/Loadline
Issued 24 December 1998 Resolved
CLEAN BILGES THROUGHOUT VESSEL.
Condition: Unknown
Due 24 December 1998
Resolved 24 December 1998
Construction/Loadline
Issued 24 December 1998 Resolved
CROP AND RENEW WASTED UNDERDECK STANCHIONS IN FORWARD COMPT.
Condition: Unknown
Due 24 December 1998
Resolved 24 December 1998
Construction/Loadline
Issued 24 December 1998 Resolved
CROP AND RENEW #1, #2, AND #3 BOTTOM LONGITUDINALS, STBD SIDE FWD COMPT. & # 1 PORT SIDE BOTTOM LONG.
Condition: Unknown
Due 24 December 1998
Resolved 24 December 1998
Fire Fighting
Issued 29 April 1998 Resolved
SERVICE FIXED SYSTEM.
Condition: Unknown
Due 21 July 1998
Resolved 21 July 1998
Lifesaving
Issued 29 April 1998 Resolved
PROVIDE 3 ORANGE SMOKE SIGNALS.
Condition: Unknown
Due 21 July 1998
Resolved 21 July 1998
Lifesaving
Issued 29 April 1998 Resolved
PROVIDE 1 ADDIT5IONAL R/B.
Condition: Unknown
Due 21 July 1998
Resolved 21 July 1998
Navigation
Issued 29 April 1998 Resolved
COMPLETE REPLACEMENT OF SIDE LIGHT SCREEN.
Condition: Unknown
Due 21 July 1998
Resolved 21 July 1998
Lifesaving
Issued 24 April 1997 Resolved
RENEW PENDANTS ON LIFE FLOAT. (USE 12' LINES AND BEND IN HALF TO MAKE 2X6'LONG PENDANTS.)
Condition: Unknown
Due 16 June 1997
Resolved 16 June 1997
Lifesaving
Issued 24 April 1997 Resolved
RENEW REFLECTORS ON LIFE FLOAT.
Condition: Unknown
Due 16 June 1997
Resolved 16 June 1997
Electrical
Issued 24 April 1997 Resolved
REPLACE WORN SHORE TIE CABLE AND INSTALL OVER CURRENT PROTECTION AT THE BOAT END.
Condition: Unknown
Due 16 June 1997
Resolved 16 June 1997
Lifesaving
Issued 24 April 1997 Resolved
CLEAN PFD's AND RENEW RETRO TAPE AS NEEDED.
Condition: Unknown
Due 16 June 1997
Resolved 16 June 1997
Lifesaving
Issued 24 April 1997 Resolved
REPLACE SHORT LINE ON RING BUOY WITH A 6' LINE AND A SNAP ON THE END.
Condition: Unknown
Due 16 June 1997
Resolved 16 June 1997
Fire Fighting
Issued 24 April 1997 Resolved
SERVICE FIXED CO2 FIRE EXTINGUISHING SYSTEM. REPAIR WORN AFAIRLEAD TUBE ATENTRANCE TO ENGINE ROOM, ENSURE TABLE AND INSTRUCTIONS FOR SYS ARE POSTED.
Condition: Unknown
Due 16 June 1997
Resolved 16 June 1997
Deck/Cargo
Issued 6 January 1995 Resolved
CROP OUT AND INSERT WITH NEW STEEL THE WORN PADEYES ON THE BOW RAMP LIFTINGMAST IN WAY OF THE SAFETY CHAINS.
Condition: Unknown
Due 6 January 1995
Resolved 6 January 1995
Deck/Cargo
Issued 6 January 1995 Resolved
RENEW WASTED UNDERDECK STIFFENERS ON BOW LOADING RAMP.
Condition: Unknown
Due 6 January 1995
Resolved 6 January 1995
Construction/Loadline
Issued 6 January 1995 Resolved
CROP OUT WASTED PLATES ON SUPERSTRUCTURE AND INSERT WITH NEW STEEL AS PER ORIGINAL CONSTRUCTION.
Condition: Unknown
Due 6 January 1995
Resolved 6 January 1995
Electrical
Issued 6 January 1995 Resolved
REPLACE RUSTED ELECTRICAL BOXES FOR 110 VAC SHORE TIE CONNECTIONS.
Condition: Unknown
Due 6 January 1995
Resolved 6 January 1995
Construction/Loadline
Issued 28 April 1988 Resolved
REPAIR ACCESS HATCH TO AFT RUDDERPOST AT NEXT DRY DOCKING.
Condition: Unknown
Due 28 April 1988
Resolved 28 April 1988
Fire Fighting
Issued 11 June 1986 Resolved
PROVIDE PROOF OF HYDROSTATIC TEST OF CO2 CYLINDER FOR FIXED FIRE PROTECTIONSYSTEM.
Condition: Unknown
Due 11 June 1986
Resolved 11 June 1986
Fire Fighting
Issued 11 June 1986 Resolved
PROPERLY TEST PIPING FOR FIXED CO2 SYSTEM.
Condition: Unknown
Due 11 June 1986
Resolved 11 June 1986
Navigation
Issued 11 June 1986 Resolved
PROPERLY SUPPORT HYDRAULIC LINE TO STEERING RUDDER IN RAKE END.
Condition: Unknown
Due 11 June 1986
Resolved 11 June 1986
Fire Fighting
Issued 11 June 1986 Resolved
WEIGH CO2 CYLINDER FOR FIXED FIRE PROTECTION SYSTEM.
Condition: Unknown
Due 11 June 1986
Resolved 11 June 1986

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.