MAURY USCG vessel records Sign in
← All vessels

RBF 252

RBF 252 is a 1978 mobile offshore drilling unit. The Coast Guard has recorded 78 inspections since 1981, most recently in July 2016, along with 133 deficiencies.

Records from 1981 to 2016. Most recent: inspection, 11 July 2016.

Built
1978
Last inspected
11 July 2016
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

HP7084
Flag
UNITED STATES
—
Maury page id
psix-52724

Inspections, by type

…with no type recorded30
Years with a record 22 calendar years (1981–2016)
The 78 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 10 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it3761 - Regulatory (Subpart C or D), Gross Ton
3761 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

MARKMAN Offshore Supply Vessel · MISLE 47517 · 23 August 1997 · activity 154835

Inspection history · 78

11 July 2016 Loadline Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5936863
3 February 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1058610
19 January 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 825245
8 January 2001 Letter of Compliance (Initial/Renewal)
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1435133
27 September 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 822449
1 August 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 820841
11 January 2000 Letter of Compliance (Initial/Renewal)
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1436322
13 January 1999 Letter of Compliance (Initial/Renewal)
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1421597
17 December 1998 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 808027
23 November 1998 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 806896
19 May 1998 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1126221
26 February 1998 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1116716
30 January 1998 Letter of Compliance (Initial/Renewal)
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1441332
22 October 1997 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1114075
8 October 1997 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 156687
4 October 1997 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 68392
23 August 1997 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 154835
21 August 1997 Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 783699
22 July 1997 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 136405
6 June 1997 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 122185
12 February 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 20500
30 January 1997 Letter of Compliance (Initial/Renewal)
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1385895
25 August 1996 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 27107
15 May 1996 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1083351
21 March 1996 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1078082
9 February 1996 Letter of Compliance (Initial/Renewal)
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1371276
17 January 1996 Letter of Compliance (Initial/Renewal)
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1360377
16 January 1996 Letter of Compliance (Initial/Renewal)
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 884191
17 August 1995 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 875650
29 June 1995 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1191503
23 May 1995 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 75474
19 January 1995 Letter of Compliance (Initial/Renewal)
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1385360
26 October 1994 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 871706
19 September 1994 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 862001
24 February 1994 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1163861
24 January 1994 Letter of Compliance (Initial/Renewal)
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 850539
30 January 1993 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1147441
30 January 1993 Certificate of Compliance
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1320863
4 November 1992 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 945003
12 August 1991 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 940445
17 July 1991 COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1307728
6 November 1990 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 925880
10 October 1990 Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1237557
16 August 1990 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1233230
10 June 1990 Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 986722
21 November 1989 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1214619
13 October 1989 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1349995
13 July 1989 COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1352625
14 December 1988 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1213690
7 December 1988 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 897590
31 October 1988 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 890599
29 September 1988 Hull Examination · Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1201660
22 September 1988 Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1044566
2 December 1987 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1310262
17 July 1987 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1330493
19 May 1987 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1024137
6 March 1987 Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1315225
13 January 1987 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1005767
25 October 1986 Hull Examination · Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1320159
25 March 1986 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 997065
22 October 1985 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1299764
28 August 1985 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1292696
17 July 1985 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1286168
2 March 1985 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 978678
18 January 1985 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1287101
28 November 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 976180
20 August 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1286796
14 August 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 975663
27 October 1983 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 964619
13 October 1983 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1276433
31 August 1983 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 968093
21 July 1983 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 967640
6 May 1983 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 969290
7 December 1982 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1277765
3 August 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 973874
1 July 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 963945
2 June 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 963943
23 July 1981 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 963533

Deficiency record · 133

Unknown
Issued 8 January 2001 Resolved
SUBMIT EEP TO THE [name withheld] FOR REVIEW AND APPROVAL, MAINTAIN AN APPROVED COPY ON BOARD WHILE ON LOCATION IAW 33CFR146.210.
Condition: Unknown
Due 8 January 2001
Resolved 8 January 2001
Lifesaving
Issued 11 January 2000 Resolved
CONDUCT FIRE AND ABANDONMENT DRILLS WITH REGULARLY ASSIGNED CREW IN THE PRESENCE OF A MARINE INSPECTOR PRIOR TO ENGAGING IN DRILLING OPERATIONS.
Condition: Unknown
Due 11 January 2000
Resolved 11 January 2000
Fire Fighting
Issued 11 January 2000 Resolved
MAKE "A" CLASS BULKHEAD IN GALLEY HAVE PROPER PENETRATIONS, OR REPLACE BULKHEAD.
Condition: Unknown
Due 25 January 2000
Resolved 25 January 2000
Engineering
Issued 11 January 2000 Resolved
REPLACE CHAFFED FUEL OIL LINES ON STAND-BY GENERATOR.
Condition: Unknown
Due 25 January 2000
Resolved 25 January 2000
Unknown
Issued 13 January 1999 Resolved
CROP AND RENEW AS ORGINAL THE PORT SIDE LIGHT SHIELD AND REWORK LIGHT TO SHOW PROPER ARC OF VISIBILITY.
Condition: Unknown
Due 13 January 1999
Resolved 13 January 1999
Unknown
Issued 13 January 1999 Resolved
INSTALL A SAFETY RELIEF VALVE ON THE COLD RIG START AIR COMPRESSOR BETWEEN THE COMPRESSOR DISCHARGE AND ISOLATION VALVE.
Condition: Unknown
Due 13 January 1999
Resolved 13 January 1999
Lifesaving
Issued 13 January 1999 Resolved
REPLACE ALL LIFEBOAT WIRE FALLS AND CONDUCT WEIGHT TESTS. SUBMIT WEIGHT TEST RESULTS TO THE [name withheld].
Condition: Unknown
Due 13 January 1999
Resolved 13 January 1999
Lifesaving
Issued 13 January 1999 Resolved
CONDUCT 1.1 OPERATIONAL TEST OF ALL LIFEBOAT RELEASE GEARS OR ALTERNATE TEST SUBJECT TO THE APPROVAL OF THE LOCAL OCMI.
Condition: Unknown
Due 13 January 1999
Resolved 13 January 1999
Construction/Loadline
Issued 13 January 1999 Resolved
CROP AND RENEW AS ORIGINAL WASTED FRAMES IN THE SHALE SHAKER AREA AS NECESSARY.
Condition: Unknown
Due 13 January 1999
Resolved 13 January 1999
Fire Fighting
Issued 30 January 1998 Resolved
STAIRWELL AUTOMATIC FIREDOOR CLOSURES, NOT ALLOWING DOORS TO CLOSE COMPLETELY. REMOVE SWING BAR ON UPPER DOORWAY TO NAVIGATION HOUSE.
Condition: Unknown
Due 30 January 1998
Resolved 30 January 1998
Construction/Loadline
Issued 30 January 1998 Resolved
MUDPIT EXIT DOOR TO PORT MAIN DECK. UPPER AREA HOLED. MAKE REPAIRS TO THE SATISFACTION OF CLASS.
Condition: Unknown
Due 30 January 1998
Resolved 30 January 1998
Fire Fighting
Issued 30 January 1998 Resolved
REPLACE FLAME VENT SCREEN ON BATTERY COVER.
Condition: Unknown
Due 30 January 1998
Resolved 30 January 1998
Fire Fighting
Issued 30 January 1998 Resolved
REPLACE FLAME SCREEN ON VENT
Condition: Unknown
Due 30 January 1998
Resolved 30 January 1998
Construction/Loadline
Issued 30 January 1998 Resolved
MAKE ADJ ON WTD, INSURE PROPER CLOSURE AND SEAL, PORT FWD BIT AREA
Condition: Unknown
Due 30 January 1998
Resolved 30 January 1998
Construction/Loadline
Issued 30 January 1997 Resolved
REPLACE WASTED SKIRTING ON FORWARD STBD CORNER OF HELO DECK.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Fire Fighting
Issued 30 January 1997 Resolved
REPLACE BUTTERFLY VALVE AT DRILL FLOOR FIRE HYDRANT WITH A GATE VALVE.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Fire Fighting
Issued 30 January 1997 Resolved
CORRECT DEFICIENCY NOTED IN DEC 96 SAFETY CONCEPTS REPORT CONCERNING PAINT LOCKER CO2 CYLINDER AND PIPING.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Lifesaving
Issued 30 January 1997 Resolved
REPAIR PURGE ALARM ON DRILLERS CONSOLE.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Lifesaving
Issued 30 January 1997 Resolved
REPAIR GENERAL ALARM LIGHT IN SHAKER AREA.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Lifesaving
Issued 30 January 1997 Resolved
REPLACE ALL FIRST AID KITS IN EACH LIFEBOAT AND ON THE RIG.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Fire Fighting
Issued 30 January 1997 Resolved
OBTAIN PROPER PANT FOR EACH FIREMAN'S OUTFIT.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Lifesaving
Issued 30 January 1997 Resolved
REPLACE BOTH LIFE RING BUOYS BY LIFEBOAT #2 AND FORWARD BUOY BY LIFEBOAT # 1.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Lifesaving
Issued 30 January 1997 Resolved
REPAIR AND TEST TOTAL RIG SHUTDOWN PRIOR TO NEXT RIG MOVE.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Electrical
Issued 30 January 1997 Resolved
RESTRAP ALL WIRES UNDERNEATH EACH LIFEBOAT EMBARKATION PLATFORM.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Lifesaving
Issued 30 January 1997 Resolved
REPLACE FADED TABLE OF LIFESAVING SIGNALS IN BOTH LIFEBOATS.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Lifesaving
Issued 30 January 1997 Resolved
TROUBLE SHOOT POLLUTION SHEEN CAUSED BY ENGINE EXHAUST IN EACH LIFEBOAT.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Lifesaving
Issued 30 January 1997 Resolved
REPLACE EXPENDED FIRE EXTINGUISHER IN LIFEBOAT #2.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Lifesaving
Issued 30 January 1997 Resolved
HYDROSTATICALLY TEST ALL BREATHING AIR BOTTLES IN EACH LIFEBOAT.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Lifesaving
Issued 30 January 1997 Resolved
REPLACE CRACKED WINDOWS IN LIFEBOAT #1 FORWARD AND AFT; LIFEBOAT #2 AFT- MOST AND PORT FORWARD MOST.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Lifesaving
Issued 30 January 1997 Resolved
REMOVE AIR BUBBLE IN LIFEBOAT #2 COMPASS.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Lifesaving
Issued 9 February 1996 Resolved
CORRECT DISCREPANCIES IN LIFEBOAT #1: INSTALL LIFELINE AROUND PERIMETER OF BOAT, PROVIDE EQUIPMENT INVENTORY.
Condition: Unknown
Due 9 February 1996
Resolved 9 February 1996
Accommodation/Occupational Safety
Issued 9 February 1996 Resolved
REWELD BROKEN LADDER RUNGS ON ESCAPE LADDERS.
Condition: Unknown
Due 9 February 1996
Resolved 9 February 1996
Lifesaving
Issued 9 February 1996 Resolved
CORRECT DISCREPANCIES IN LIFEBOAT #2: REPAIR/REPLACE COMPASS, PROVIDE BAILER, PROVIDE 2 MONKEY FISTS, PROVIDE EQUIPMENT INVENTORY.
Condition: Unknown
Due 9 February 1996
Resolved 9 February 1996
Electrical
Issued 9 February 1996 Resolved
MOUNT JUNCTION BOXES ON STBD SIDE OF DERRICK AND ON TOP OF SHAKER HOUSE.
Condition: Unknown
Due 9 February 1996
Resolved 9 February 1996
Electrical
Issued 9 February 1996 Resolved
SECURE ALL CABLES ON DERRICK.
Condition: Unknown
Due 9 February 1996
Resolved 9 February 1996
Fire Fighting
Issued 9 February 1996 Resolved
PROVE PROPER OPERATION OF MSA O2/COMBUSTIBLE GAS INDICATOR.
Condition: Unknown
Due 9 February 1996
Resolved 9 February 1996
Construction/Loadline
Issued 9 February 1996 Resolved
MAKE PIT ROOM DOOR TO ENGINE ROOM SELF CLOSE GAS TIGHT.
Condition: Unknown
Due 9 February 1996
Resolved 9 February 1996
Electrical
Issued 9 February 1996 Resolved
PROVE PROPER OPERATION OF STANDBY GENERATOR OVERSPEED TRIP AND LOW LUBE OILSHUT DOWN.
Condition: Unknown
Due 9 February 1996
Resolved 9 February 1996
Lifesaving
Issued 19 January 1995 Resolved
Ensure port and starboard lifeboat air bottles are hydro-tested and stampedwith date.
Condition: Unknown
Due 19 January 1995
Resolved 19 January 1995
Electrical
Issued 19 January 1995 Resolved
Test reverse current relays and low lub oil pressure alarms on No.1, No.3 and No.4 generators.
Condition: Unknown
Due 19 January 1995
Resolved 19 January 1995
Lifesaving
Issued 19 January 1995 Resolved
Replace brace on No.1 lifeboat davit and weight test boat after repairs in the presence of the cognizant Coast Guard authority.
Condition: Unknown
Due 19 January 1995
Resolved 19 January 1995
Electrical
Issued 19 January 1995 Resolved
Replace exhaust manifold on left bank of emergency generator or repair the crack in the existing exhaust manifold.
Condition: Unknown
Due 19 January 1995
Resolved 19 January 1995
Documentation
Issued 24 February 1994 Resolved
Submit Operating Manual to cognizant OCMI for approval after ABS approval is obtained.
Condition: Unknown
Due 24 February 1994
Resolved 24 February 1994
Fire Fighting
Issued 24 January 1994 Resolved
Repair or replace fixed and portable fire extinguishers that were noted in Safety Concepts Rpt #F2544 as needing hydros, hose replacements and new brackets or are condemmed.
Condition: Unknown
Due 8 February 1994
Resolved 25 January 1994
Lifesaving
Issued 24 January 1994 Resolved
Provide quick releases for liferings with smoke attached.
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Fire Fighting
Issued 24 January 1994 Resolved
Provide positive means to close all ventilation intakes and exhaust on maindeck.
Condition: Unknown
Due 25 January 1994
Resolved 27 February 1994
Engineering
Issued 24 January 1994 Resolved
Clean or replace flame screens on port side contaiment area
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Accommodation/Occupational Safety
Issued 24 January 1994 Resolved
Replace missing bunk light covers throughout berthing areas.
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Fire Fighting
Issued 24 January 1994 Resolved
Provide stowage plans and three cell flashlights for fireman outfits.
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Electrical
Issued 24 January 1994 Resolved
Cover open breaker slot in aux machinery dist panel #2._x001C_
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Engineering
Issued 24 January 1994 Resolved
Demonstrate operation of reverse power and overspeed trips on #1-4 service generators
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Engineering
Issued 24 January 1994 Resolved
Make permanent repair to overspeed trip and shut downs on stand by generator.
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Engineering
Issued 24 January 1994 Resolved
Make permanent repairs to fuel filters and hand priming pumps on generators#1-4.
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Electrical
Issued 24 January 1994 Resolved
Renew spliced battery cables on standby generator.
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Electrical
Issued 24 January 1994 Resolved
Remount water tight plug receptacle in stand by generator room.
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Electrical
Issued 24 January 1994 Resolved
Permanently wire in battery charger in stand by generator room.
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Lifesaving
Issued 24 January 1994 Resolved
Demonstrate proper operation of air receiver and dry bulk tank releif valves.
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Unknown
Issued 24 January 1994 Resolved
Demonstrate operation of emergency drilling operation shut down.
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Lifesaving
Issued 24 January 1994 Resolved
Provide tongue guards on shop bench grinder and remove tool rest on wire brush wheel end
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Construction/Loadline
Issued 24 January 1994 Resolved
Prior to moving. Repair all watertight and weather tight doors so they close and seal properly. Chalk test to be conducted in presents of cogizant Coast Guard Inspector
Condition: Unknown
Due 25 January 1994
Resolved 27 February 1994
Lifesaving
Issued 24 January 1994 Resolved
Prior to moving vessel repair all wasted hand rails through out the vessel
Condition: Unknown
Due 25 January 1994
Resolved 27 February 1994
Lifesaving
Issued 24 January 1994 Resolved
Replace life ring at #1 lifeboat including life line
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Lifesaving
Issued 24 January 1994 Resolved
Install life line on life ring located port side
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Lifesaving
Issued 24 January 1994 Resolved
Provide 406 mhz EPIRB
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Lifesaving
Issued 24 January 1994 Resolved
Make all eye wash stations operational.
Condition: Unknown
Due 15 February 1994
Resolved 27 February 1994
Navigation
Issued 17 July 1991 Resolved
PROVE PROPER OPERATION OF ALL (05) AIR RECEIVER RELIEF VALVES
Condition: Unknown
Due 17 July 1991
Resolved 17 July 1991
Navigation
Issued 17 July 1991 Resolved
DRAIN, OPEN AND PRESENT TO A C.G. MARINE INSPECTOR ALL (05) AIR RECEIVERS.
Condition: Unknown
Due 17 July 1991
Resolved 17 July 1991
Construction/Loadline
Issued 10 October 1990 Resolved
PRESENT FOR COAST GUARD INSPECTION THE UNDERSIDE OF THE MAT.
Condition: Unknown
Due 10 October 1990
Resolved 10 October 1990
Construction/Loadline
Issued 10 October 1990 Resolved
OPEN AND PRESENT FOR INSPECTION THE MUD PIT DUMP VALVES.
Condition: Unknown
Due 10 October 1990
Resolved 10 October 1990
Electrical
Issued 10 June 1990 Resolved
MAKE WATERTIGHT THE STUFFING BOX LOCATED IN THE STARBOARD LEG HOUSE ON THE DECK.
Condition: Unknown
Due 10 June 1990
Resolved 10 June 1990
Electrical
Issued 10 June 1990 Resolved
RENEW/REPLACE ALL MISSING WIRE RUN SUPPORTS IN THE MUD PIT ROOM.
Condition: Unknown
Due 10 June 1990
Resolved 10 June 1990
Electrical
Issued 10 June 1990 Resolved
RENEW STBD AFT OBSTRUCTION LIGHT WIRE FROM DECK STUFFING TUBE TO THE LIGHT.
Condition: Unknown
Due 10 June 1990
Resolved 10 June 1990
Deck/Cargo
Issued 13 July 1989 Resolved
PROVE PROPER OPERATION OF THE RELIEF VALVES AND OPEN FOR CG INSPECTION ALL AIR RECEIVERS.
Condition: Unknown
Due 13 July 1989
Resolved 13 July 1989
Lifesaving
Issued 13 July 1989 Resolved
CONDUCT, IN THE PRESENCE OF A CG INSPECTOR, THE WEIGHT TESTS OF THE #1 & #2 LIFEBOATS.
Condition: Unknown
Due 13 July 1989
Resolved 13 July 1989
Construction/Loadline
Issued 29 September 1988 Resolved
INTERNALLY EXAMINE SEA VALVES.
Condition: Unknown
Due 29 September 1988
Resolved 29 September 1988
Documentation
Issued 22 September 1988 Resolved
SUMIT NO LESS THAN THREE (3) COPIES OF THE RIG FIRE CONTROL PLAN REFLECTINGTHE CURRENT MODIFICATIONS.
Condition: Unknown
Due 22 September 1988
Resolved 22 September 1988
Fire Fighting
Issued 22 September 1988 Resolved
REPLACE THE PKP POWDER IN THE 150 LB DRY CHEMICAL UNIT, IN THE MOTOR ROOM, WITH NEW DRY POWDER.
Condition: Unknown
Due 22 September 1988
Resolved 22 September 1988
Unknown
Issued 17 July 1987 Resolved
ADJUST/REPAIR THE REVERSE POWER RELAY FOR STANDBY/AUXILIARY GENERATOR.
Condition: Unknown
Due 17 July 1987
Resolved 17 July 1987
Unknown
Issued 17 July 1987 Resolved
MAKE LOSS OF VENTILATION ALARM ON THE DRILL FLOOR OPERABLE.
Condition: Unknown
Due 17 July 1987
Resolved 17 July 1987
Unknown
Issued 17 July 1987 Resolved
TEST THE REVERSE POWER RELAY, LOW LUBE OIL PRESSURE SHUTDOWN, AND OVERSPEEDTRIP SHUTDOWN ON THE #4 GENERATOR.
Condition: Unknown
Due 17 July 1987
Resolved 17 July 1987
Unknown
Issued 17 July 1987 Resolved
MAKE PERMANENT REPAIR TO DEFORMATIONS AT ELEVATION 253.3' ON COLUMNS #1 AND#2 AT THE NEXT SCHEDULED DRYDOCK EXAMINATION OR PRIOR TO OPERATING AT AN ELEVATION AT OR NEAR 253.3'.
Condition: Unknown
Due 17 July 1987
Resolved 17 July 1987
Unknown
Issued 17 July 1987 Resolved
PROVIDE DOCUMENTATION VERIFYING THAT THE CABLE BEING REPLACED IN THE MUD PIT MEETS COAST GUARD/IEEE45 STANDARDS FOR A CLASS I DIVISION II LOCATION.
Condition: Unknown
Due 17 July 1987
Resolved 17 July 1987
Construction/Loadline
Issued 25 October 1986 Resolved
CONDUCT EXAMINATION ON THE BOTTOM OF THE MAT AT THE NEXT RIG MOVE IN THE PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Construction/Loadline
Issued 25 October 1986 Resolved
MAKE THE DEFORMED PINHOLE CASTINGS ON THE THREE LEGS AVAILABLE FOR COAST GUARD INSPECTION.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Fire Fighting
Issued 25 October 1986 Resolved
CONDUCT ANNUAL SERVICING OF ALL FIRE EXTINGUISHING EQUIPMENT.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Electrical
Issued 25 October 1986 Resolved
TEST STAND-BY GENERATOR OVERSPEED TRIP IN THE PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Electrical
Issued 25 October 1986 Resolved
REPAIR BATTERY CHARGER FOR STAND-BY GENERATOR STARTING BATTERIES.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Electrical
Issued 25 October 1986 Resolved
TEST NUMBER 2 GENERATOR LOW LUBE OIL SHUTDOWN IN THE PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Electrical
Issued 25 October 1986 Resolved
TEST THE REMOTE FUEL OIL SHUT DOWN VALVES ON THE PORT AND STARBOARD SIDE OFTHE MUD PUMP ROOM IN THE PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Electrical
Issued 25 October 1986 Resolved
POUR EYS FITTING FOR THE LIGHT FIXTURE LOCATED IN THE PAINT LOCKER.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Electrical
Issued 25 October 1986 Resolved
POUR EYS FITTING FOR THE AFT CONTROL BOX LOCATED ON THE DRILL FLOOR.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Accommodation/Occupational Safety
Issued 25 October 1986 Resolved
REPAIR (1X2) FOOT HOLE IN VENTILATION DUCT LOCATED IN THE SWITCHBOARD ROOM.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Construction/Loadline
Issued 25 October 1986 Resolved
REPAIR OR ADJUST WATERTIGHT DOORS AS NEEDED.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Unknown
Issued 25 October 1986 Resolved
PROVIDE RIG WITH SERVICEABLE WINDSOCK AND "BEWARE OF TAILROTOR" SIGN FOR STARBOARD HELIPORT ACCESS.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Lifesaving
Issued 25 October 1986 Resolved
PROVIDE THE RIG WITH 6 ADDITIONAL LIFE JACKETS.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Lifesaving
Issued 25 October 1986 Resolved
PROVIDE NUMBER 1 LIFEBOAT WITH A SERVICEABLE INTERIOR LIGHT, 12 RED FLARES,SERVICEABLE WATER, AND CONDUCT ANNUAL FUEL CHANGE.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Lifesaving
Issued 25 October 1986 Resolved
PROVIDE NUMBER 2 LIFEBOAT WITH 12 SERVICEABLE RED FLARES, SERVICEABLE WATERAND CONDUCT ANNUAL FUEL CHANGE.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Navigation
Issued 25 October 1986 Resolved
REPAIR THE INOPERATIVE STARBOARD RUNNING LIGHT.
Condition: Unknown
Due 25 October 1986
Resolved 25 October 1986
Accommodation/Occupational Safety
Issued 22 October 1985 Resolved
INSTALL AT LEAST ONE RELIEF VALVE OF SUFFICIENT RELIEVING CAPACITY FOR ALL THREE RIG SERVICE AIR RECEIVERS IN THE AIR COMPRESSOR ROOM, AND TEST THE SAME IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 22 October 1985
Resolved 22 October 1985
Lifesaving
Issued 17 July 1985 Resolved
PROVIDE THE #2 LIFEBOAT STATION WITH A MEANS OF EMBARKATION.
Condition: Unknown
Due 17 July 1985
Resolved 17 July 1985
Fire Fighting
Issued 17 July 1985 Resolved
INSTALL CLASS B CLOSURE DEVICES ON THE ACCOMMODATION SPACE STAIRWAY BULK- HEAD LOUVERS.
Condition: Unknown
Due 17 July 1985
Resolved 17 July 1985
Lifesaving
Issued 17 July 1985 Resolved
ON TWO RING BUOYS INSTALL BUOYANT LINES AND RENEW LINES TO LIGHTS AS NEEDED.
Condition: Unknown
Due 17 July 1985
Resolved 17 July 1985
Fire Fighting
Issued 17 July 1985 Resolved
PERMANENTLY SECURE IN PLACE THE B-V FIRE EXTINGUISHERS AT FIRE STATIONS 3, 4 AND 5.
Condition: Unknown
Due 17 July 1985
Resolved 17 July 1985
Unknown
Issued 17 July 1985 Resolved
REPAIR THE INOPERATIVE FUEL OIL REMOTE CLOSURE VALVES FOR THE MAIN FUEL OILTANK HIGH AND LOW LEVEL SUCTIONS.
Condition: Unknown
Due 17 July 1985
Resolved 17 July 1985
Electrical
Issued 17 July 1985 Resolved
RENEW THE WOODEN SUPPORTS AND MAKE WATERTIGHT THE LEAD LINING ON THE EMER- GENCY GENERATOR BATTERY BOX.
Condition: Unknown
Due 17 July 1985
Resolved 17 July 1985
Lifesaving
Issued 17 July 1985 Resolved
PROVIDE THE LINE THROWING GUN WITH TWO SERVICE LINES AND ONE AUXILIARY LINE.
Condition: Unknown
Due 17 July 1985
Resolved 17 July 1985
Construction/Loadline
Issued 17 July 1985 Resolved
ADJUST WATERTIGHT DOORS #11 AND #16 TO ENSURE COMPLETE CLOSURE AND ENSURE ALL WORKING SURFACES AND GASKETS ARE CLEAN.
Condition: Unknown
Due 17 July 1985
Resolved 17 July 1985
Unknown
Issued 17 July 1985 Resolved
PROVIDE FOR AN INTERNAL INSPECTION OF ALL OF THE RIG'S PRESSURE VESSELS AND TESTING OF THEIR RELIEF VALVES TO BE WITNESSED BY A U. S. COAST GUARD MARINE INSPECTOR AT THE NEXT RIG MOVE.
Condition: Unknown
Due 17 July 1985
Resolved 17 July 1985
Unknown
Issued 17 July 1985 Resolved
PROVIDE FOR A U. S. COAST GUARD MARINE INSPECTOR TO WITNESS A TEST OF THE RELIEF VALVE ON THE BOP KOOMEY UNIT AT THE NEXT RIG MOVE.
Condition: Unknown
Due 17 July 1985
Resolved 17 July 1985
Unknown
Issued 17 July 1985 Resolved
MODIFY THE PORT AND STARBOARD FUEL OIL MANIFOLD DRIP PANS TO BE UNDER CONNECTION.
Condition: Unknown
Due 17 July 1985
Resolved 17 July 1985
Fire Fighting
Issued 17 July 1985 Resolved
REPAIR THE FLOW INDICATOR ON THE O2/COMBUSTIBLE GAS METER.
Condition: Unknown
Due 17 July 1985
Resolved 17 July 1985
Fire Fighting
Issued 20 August 1984 Resolved
REPAIR THE GENERAL ALARM SWITCH ON THE RIG FLOOR AND THE ALARM BELLS IN THEAIR COMPRESSOR ROOM AND THE LIGHTS IN THE GENERATOR ROOM AND PUMP ROOM.
Condition: Unknown
Due 20 August 1984
Resolved 20 August 1984
Unknown
Issued 20 August 1984 Resolved
CONDUCT AN UNDERWATER SURVEY OF THE MAT AT THE NEXT RIG MOVE; ALSO, MAKE THE MUD PIT DUMP VALVE AVAILABLE FOR EXAMINATION.
Condition: Unknown
Due 20 August 1984
Resolved 20 August 1984
Electrical
Issued 20 August 1984 Resolved
REPAIR AND TEST THE REVERSE POWER RELAYS.
Condition: Unknown
Due 20 August 1984
Resolved 20 August 1984
Fire Fighting
Issued 20 August 1984 Resolved
STENCIL THE SCBA LOCKER IN THE CONTROL ROOM.
Condition: Unknown
Due 20 August 1984
Resolved 20 August 1984
Electrical
Issued 20 August 1984 Resolved
INSTALL LIGHT COVERS ON THE LIGHT IN THE CONTROL ROOM, THE LIGHT IN THE LOWER QUARTERS HEAD AND THE BUNK LIGHT IN ROOM 42.
Condition: Unknown
Due 20 August 1984
Resolved 20 August 1984
Fire Fighting
Issued 20 August 1984 Resolved
INSTALL A PROPER COUNTERWEIGHT ON THE PAINT LOCKER VENT COVER.
Condition: Unknown
Due 20 August 1984
Resolved 20 August 1984
Fire Fighting
Issued 20 August 1984 Resolved
INSTALL RELIEF VALVES SET AT 125 PSI ON THE FIRE PUMP DISCHARGE LINES.
Condition: Unknown
Due 20 August 1984
Resolved 20 August 1984
Unknown
Issued 20 August 1984 Resolved
POST THE MANUFACTURER'S INSTRUCTIONS ON THE RED FOX MSD UNIT.
Condition: Unknown
Due 20 August 1984
Resolved 20 August 1984
Unknown
Issued 20 August 1984 Resolved
POST WIRING DIAGRAMS IN ALL MOTOR CONTROLLERS.
Condition: Unknown
Due 20 August 1984
Resolved 20 August 1984
Electrical
Issued 20 August 1984 Resolved
INSTALL EMERGENCY LIGHTING TO SUFFICIENTLY ILLUMINATE THE CAPSULE WHILE LAUNCHING.
Condition: Unknown
Due 20 August 1984
Resolved 20 August 1984
Lifesaving
Issued 20 August 1984 Resolved
PROVIDE 3 QUARTS OF WATER PER PERSON IN EACH CAPSULE (150 QUARTS PER CAPSULE).
Condition: Unknown
Due 20 August 1984
Resolved 20 August 1984
Electrical
Issued 20 August 1984 Resolved
REPAIR THE EMERGENCY LIGHT IN THE STAIRWELL OUTSIDE OF THE CONTROL ROOM.
Condition: Unknown
Due 20 August 1984
Resolved 20 August 1984
Unknown
Issued 20 August 1984 Resolved
INSTALL CONTAINMENT AROUND THE FUEL OIL MANIFOLDS ON BOTH SIDES OF THE RIG.
Condition: Unknown
Due 20 August 1984
Resolved 20 August 1984
Lifesaving
Issued 20 August 1984 Resolved
PROVIDE 12 HAND HELD PARACHUTE FLARES AND PLACE IN THE CONTROL ROOM.
Condition: Unknown
Due 20 August 1984
Resolved 20 August 1984
Construction/Loadline
Issued 14 August 1984 Resolved
COMPLETE THE UNDERWATER EXAMINATION AT THE TIME OF THE NEXT RIG MOVE. ALSOMAKE ALL TANKS IN UPPER HULL (EXCEPT FULL TANKS) AVAILABLE FOR INTERNAL EXAMINATION.
Condition: Unknown
Due 14 August 1984
Resolved 14 August 1984
Unknown
Issued 21 July 1983 Resolved
REPAIR THE STARBOARD GENERATOR TO GOOD OPERATING CONDITION AND TEST THE OVERSPEED TRIP.
Condition: Unknown
Due 21 July 1983
Resolved 21 July 1983
Unknown
Issued 21 July 1983 Resolved
INSTALL VENT SCREENS OF 30 X 30 MESH ON THE OIL TANK VENTS ON THE MAIN DECK.
Condition: Unknown
Due 21 July 1983
Resolved 21 July 1983
Unknown
Issued 21 July 1983 Resolved
THE FOLLOWING DEFICIENCIES ARE FOR THE MODU TELEDYNE 19, DN598819.
Condition: Unknown
Due 21 July 1983
Resolved 21 July 1983
Unknown
Issued 21 July 1983 Resolved
CONDUCT A FIRE AND BOAT DRILL WITH A FULL CREW IN THE PRESENCE OF A U. S. COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 21 July 1983
Resolved 21 July 1983
Unknown
Issued 21 July 1983 Resolved
REPAIR ALL OF THE WATER TIGHT DOORS TO GOOD WORKING ORDER.
Condition: Unknown
Due 21 July 1983
Resolved 21 July 1983
Unknown
Issued 21 July 1983 Resolved
REPAIR THE AUTOMATIC DOOR CLOSURES TO THE MUD PITS.
Condition: Unknown
Due 21 July 1983
Resolved 21 July 1983
Lifesaving
Issued 3 August 1982 Resolved
PROVIDE ONE (1) SEA ANCHOR EACH FOR TWO (2) 50 MAN CAPSULES.
Condition: Unknown
Due 3 August 1982
Resolved 3 August 1982

Ownership record