Records from 1981 to 2000. Most recent: inspection, 4 October 2000.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 42
4 October 2000
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1361756
10 November 1999
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 806179
9 November 1999
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 808853
4 October 1999
COI Inspection · Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1352032
19 August 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1445517
21 May 1999
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1381545
25 September 1998
Damage Survey · Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1126412
5 June 1998
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1651
20 April 1998
Hull Examination · COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1124116
8 December 1997
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 100392
1 October 1997
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 8285
30 September 1997
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1434632
8 August 1996
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1435797
27 July 1995
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1463912
30 May 1995
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1367376
20 December 1994
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1156102
19 October 1994
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1183676
14 October 1994
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 5429
11 August 1994
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1414342
25 January 1994
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 852627
3 January 1994
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1463065
15 December 1993
Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1446038
22 May 1993
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1450772
25 February 1993
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1147866
11 February 1993
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1139865
25 November 1992
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1466831
27 July 1992
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 954206
1 July 1992
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1453983
6 August 1991
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 939593
1 August 1990
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 903533
3 July 1990
Hull Examination · MARPOL Annex II Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1234229
1 December 1988
Administrative
Administrative · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 895266
16 December 1987
Administrative
Administrative · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1008259
3 February 1986
Credit Drydock · COI Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1298115
3 October 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1301785
26 March 1985
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1286632
4 May 1984
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 973290
16 September 1983
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 968445
25 March 1983
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 963228
25 March 1983
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 970965
25 March 1983
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 973402
26 March 1981
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1279691
Fire Fighting
Issued 4 October 2000
Resolved
PROVE PROPER OPERATION OF PUMP ROOM CO2 SYSTEM AS EVIDENCED BY MASTERS STATEMENT ACCOMPANIED BY A FIRE SERVICING REPORT IAW NFPA 12 AS REQ'D BY 46CFR.
Condition: Unknown
Due 5 October 2000
Resolved 21 October 2000
Lifesaving
Issued 4 October 2000
Resolved
PROVIDE CURRENT HYDRO STATIC RELEASE FOR EPIRB AND MASTERS STATEMENT ATTESTING TO PROPER INSTALLATION OF THE SAME PRIOR TO SAILING.
Condition: Unknown
Due 5 October 2000
Resolved 21 October 2000
Navigation
Issued 4 October 2000
Resolved
RELOCATE AFT ANCHOR LIGHT TO ALL VISIBILITY AS REQUIRED BY COL. REGS. OR REMOVE CONTAINERS OBSTRUCTING VIEW.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Documentation
Issued 4 October 2000
Resolved
PROVIDE APPROVED AUTOMATION TEST PROCEDURES VESSEL.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Accommodation/Occupational Safety
Issued 4 October 2000
Resolved
REPAIR FLUSH VALVE ON WATER CLOSET IN HEAD ON FOCSLE DECK.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Accommodation/Occupational Safety
Issued 4 October 2000
Resolved
DISABLE DRYER OR PROVIDE VENTING FOR DRYER LOCATED IN AFT MAIN DECK MACHINERY ROOM.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Engineering
Issued 4 October 2000
Resolved
PROVE PROPER OPERATION OF #1 SHIP SERVICE GENERATOR OVERSPEED DEVICE.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Engineering
Issued 4 October 2000
Resolved
RESEARCH PROPER PRESSURE SETTING FOR #1 AND #2 PITCH PRESSURE LOW ALARMS AND SET ALARMS FOR AUTOMATION AS SUCH. VESSEL TO MAINTAIN 24 HOUR ENGINEROOM WATCH UNTIL ALARMS SET PROPERLY.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Engineering
Issued 4 October 2000
Resolved
MAKE PERMANENT REPAIRS TO #1 MAIN ENGINE CLUTCH ENGAGEMENT MECHANISM. - ENGINEROOM TO BE MANNED 24 HOURS WHILE ENGINES ARE RUNNING.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Engineering
Issued 4 October 2000
Resolved
MAKE REPAIRS TO #1 MAIN ENGINE EXHAUST MANIFOLD TO TURBOCHARGER EXHAUST LEAK.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Engineering
Issued 4 October 2000
Resolved
MAKE REPAIRS TO #1 MAIN ENGINE FUEL LEAK AT #4 CYLINDER HEAD FUEL NOZZLE.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Electrical
Issued 4 October 2000
Resolved
PROVE PROPER OPERATION OF #1 AND #2 SHIP SERVICE GENERATORS REVERSE POWER RELAYS.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Electrical
Issued 4 October 2000
Resolved
REPLACE LIGHT COVER IN PORT SIDE OF RUDDER COMPARTMENT.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Construction/Loadline
Issued 4 October 2000
Resolved
MAKE REPAIRS TO #3 PORT FUEL OIL TANK REMOTE REACH ROD ASSEMBLY.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Engineering
Issued 4 October 2000
Resolved
MAKE REPAIRS TO PORT MAIN ENGINE LOCAL OPERATING STATION RPM GAGE.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Construction/Loadline
Issued 4 October 2000
Resolved
MAKE PROPER ADJUSTMENTS/REPAIRS TO WATERTIGHT DOOR LEADING TO TUNNEL FROM MESS ROOM. DOOR WILL NOT DOG PROPERLY.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Engineering
Issued 4 October 2000
Resolved
INSTALL PLUGS OR VALVES WITH PLUGS TO #1 MAIN ENGINE AND #2 MAIN ENGINE FUEL STRAINERS.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Construction/Loadline
Issued 4 October 2000
Resolved
REWELD BALLAST FILL LINE RETAINING BRACKET TO OVERHEAD-AFT OF FORWARD WATERTIGHT DOOR IN TUNNEL.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Engineering
Issued 4 October 2000
Resolved
REPAIR OIL LEAKS ON #1 SHIPS SERVICE GENERATOR GOVERNOR AND ASSOCIATED PIPING.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Lifesaving
Issued 4 October 2000
Resolved
PROVIDE ASME APPROVED RELIEF VALVES FOR DISCHARGE LINE OF EACH AIR COMPRESSOR. - INSTALLED VALVES ARE NOT ASME APPROVED.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Navigation
Issued 4 October 2000
Resolved
INSTALL RETAINING PIN IN STARBOARD STEERING RAM TO TILLER ARM CONNECTION.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Engineering
Issued 4 October 2000
Resolved
REPAIR FUEL LEAKS ON #1 AND #2 MAIN ENGINES FUEL OIL PUMPS.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Documentation
Issued 4 October 2000
Resolved
PROVIDE ONBOARD AN APPROVED FIRE AND SAFETY PLAN. PLAN WAS APPROVED LAST YEAR BY [name withheld].
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Lifesaving
Issued 4 October 2000
Resolved
REMOVE EXCESS FUEL OIL AND LUBE OIL FROM ENGINEROOM BILGES.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Engineering
Issued 4 October 2000
Resolved
PROVE PROPER OPERATION OF STARBOARD SHAFT PITCH INDICATORS AT FORE AND AFT CONTROL STATIONS CLUTCH ENGAGE/DISENGAGE LAMPS PORT AND STARBOARD AND PROVEOPERATION OF ENGAGE/DISENGAGE CONTROLS.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Fire Fighting
Issued 4 October 2000
Resolved
PROVIDE CURRENT FIRE SERVICING REPORT AND MASTERS STATEMENT ATTESTING TO THE SAME FOR ALL PORTABLE FIRE EXTINGUISHERS LOCATED ONBOARD.
Condition: Unknown
Due 5 October 2000
Resolved 21 October 2000
Fire Fighting
Issued 4 October 2000
Resolved
PROVE PROPER OPERATION OF ENGINEROOM FIXED CO2 SYSTEM AS EVIDENCED BY MASTERS STATEMENT ACCOMPANIED BY A FIRE SERVICING REPORT IAW NFPA 12 AS REQ'D BY 46CFR OR PROVIDE 6EA BII CURRENT PORTABLES MOUNTED IN ENGINEROOM.
Condition: Unknown
Due 5 October 2000
Resolved 21 October 2000
Deck/Cargo
Issued 4 October 2000
Resolved
INSTALL 30X30 MESH WIRE ON ALL FLAMMABLE LIQUID VENTS.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Engineering
Issued 19 August 1999
Resolved
MAKE ADDITIONS, DELETIONS AND AMENDMENTS TO PREVIOUSLY SUBMITTED AUTOMATIONTEST PROCEDURES TO INCLUDE CHECKSHEET WITH SETPOINTS.
Condition: Unknown
Due 19 August 1999
Resolved 19 August 1999
Engineering
Issued 19 August 1999
Resolved
PROVIDE LOW LUBE OIL PRESSURE ALARM CIRCUIT FOR PITCH CONTROL AS REQUIRED BY TEST PROCEDURES AND NAVIC 1-78.
Condition: Unknown
Due 19 August 1999
Resolved 19 August 1999
Documentation
Issued 21 May 1999
Resolved
UPDATE AND SUBMIT FOR APPROVAL AND VERIFICATION FIRE AND SAFETY PLAN.
Condition: Unknown
Due 21 May 1999
Resolved 21 May 1999
Engineering
Issued 21 May 1999
Resolved
PRIOR TO SAILING, PROVE OPERATION OF PORT MAIN ENGINE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 21 May 1999
Resolved 14 July 1999
Navigation
Issued 21 May 1999
Resolved
VESSEL IS TO COMPLETE REPAIRS TO THE RUDDERS PORT AND STBD. VESSEL IS TO SUBMIT ALL ABS REPORTS REGARDING PRELIMINARY SURVEYS THIS WEEK AND FINAL REPORT OF REPAIRS FOLLOWING DRY DOCKING.
Condition: Unknown
Due 9 June 1999
Resolved 13 July 1999
Engineering
Issued 21 May 1999
Resolved
REPAIR EXHAUST LEAKS ON PORT MAIN ENGINE TURBOCHARGER (UPPER SECTION).
Condition: Unknown
Due 21 May 1999
Resolved 21 May 1999
Lifesaving
Issued 21 May 1999
Resolved
PROVIDE 100 PSI RELIEF VALVE (ASME) ON WATER HEATER OR OPEN WATER HEATER FOR INSPECTION.
Condition: Unknown
Due 21 May 1999
Resolved 21 May 1999
Documentation
Issued 21 May 1999
Resolved
PROVIDE USCG APPROVED AUTOMATION TEST PROCEDURES AND TEST IN ACCORDANCE WITH AUTOMATION PROCEDURE IN THE PRESENCE OF CG MARINE INSPECTOR. VESSEL IS TO MAN ENGINE ROOM 24 HRS. A DAY WHILE MACHINERY IS IN OPERATION.
Condition: Unknown
Due 21 May 1999
Resolved 21 May 1999
Engineering
Issued 21 May 1999
Resolved
PRIOR TO SAILING, PROVE ALL FUEL LEAKS IN ENGINE ROOM HAVE BEEN HALTED.
Condition: Unknown
Due 21 May 1999
Resolved 14 July 1999
Lifesaving
Issued 21 May 1999
Resolved
PROVIDE SUITABLE RESCUE BOAT AND DAVIT AND/OR SUITABLE ALTERNATIVE WHICH COMPLIES WITH [name withheld] DISTRICT POLICY LETTER 16613 DATED 12 NOVEMBER 1998. COPY OF LETTER PROVIDED TO VESSEL.
Condition: Unknown
Due 21 May 1999
Resolved 14 July 1999
Construction/Loadline
Issued 21 May 1999
Resolved
PROVIDE PROPER GASKETS FOR WTD'S AND HATCHES THROUGHOUT VESSEL. NO SOFT FOAM.
Condition: Unknown
Due 21 May 1999
Resolved 21 May 1999
Deck/Cargo
Issued 21 May 1999
Resolved
PROVIDE ASME APPROVED 42PSI POPOFFS FOR BULK TANKS, 50 PSI FOR BULK COMPRESSOR. NO USE OF DRY BULK TANKS IS ALLOWED UNTIL THIS ITEM IS CLEARED.
Condition: Unknown
Due 21 May 1999
Resolved 21 May 1999
Lifesaving
Issued 8 August 1996
Resolved
PROVIDE RETRO-REFLECTIVE TAPE FOR RESCUE BOAT AND ALL RING BUOYS
Condition: Unknown
Due 8 August 1996
Resolved 8 August 1996
Engineering
Issued 8 August 1996
Resolved
MAKE #3 PORT F/O TANK REACH ROD ACCESSIBLE TO T-WRENCH CONNECTION_x001C_
Condition: Unknown
Due 8 August 1996
Resolved 8 August 1996
Engineering
Issued 8 August 1996
Resolved
MAKE PERMANENT REPAIRS TO DIESEL OIL HAND PUMP IN STBD FWD ENGINE ROOM
Condition: Unknown
Due 8 August 1996
Resolved 8 August 1996
Electrical
Issued 8 August 1996
Resolved
PROVE PROPER OPERATION OF RESPONSE GENERATOR OVERSPEED TRIP
Condition: Unknown
Due 8 August 1996
Resolved 8 August 1996
Engineering
Issued 8 August 1996
Resolved
INSTALL SIGHT GLASS GUARDS ON CONTROLLABLE PITCH SERVO HEAD TANKS AND RESPONSE GENERATOR FUEL OIL TANK SIGHT GLASS
Condition: Unknown
Due 8 August 1996
Resolved 8 August 1996
Construction/Loadline
Issued 8 August 1996
Resolved
RENEW GASKETS AND CHALK TEST WATERTIGHT DOORS LEADING TO ENGINE ROOM ESCAPETRUNKS AND ESCAPE HATCHES
Condition: Unknown
Due 8 August 1996
Resolved 8 August 1996
Electrical
Issued 8 August 1996
Resolved
INSTALL REACH ROD FOR RESPONSE GENERATOR FUEL OIL SUPPLY VALVE
Condition: Unknown
Due 8 August 1996
Resolved 8 August 1996
Navigation
Issued 8 August 1996
Resolved
PROVIDE CURRENT U.S. COAST PILOT (VOL. 5)
Condition: Unknown
Due 8 August 1996
Resolved 8 August 1996
Unknown
Issued 25 November 1992
Resolved
SUBMIT OPERATIONS MANUAL FOR REVIEW TO MSD HOUMA SUPERVISOR.
Condition: Unknown
Due 25 November 1992
Resolved 25 November 1992
Navigation
Issued 25 November 1992
Resolved
PROVIDE DEVIATION CARD FOR COMPASS.
Condition: Unknown
Due 25 November 1992
Resolved 25 November 1992
Fire Fighting
Issued 25 November 1992
Resolved
PROVE PROPER OPERATION OF NEWLY INSTALLED FIRE MONITOR SYSTEM.
Condition: Unknown
Due 25 November 1992
Resolved 25 November 1992
Deck/Cargo
Issued 26 March 1985
Resolved
PROVIDE DOCUMENTATION TO THIS OFFICE OF HOSE ASSEMBLES MEETING REQURIEMENTSOF AND CABELING IAW 33 CFR 154.500.
Condition: Unknown
Due 26 March 1985
Resolved 26 March 1985
Deck/Cargo
Issued 26 March 1985
Resolved
PROVIDE DOCUMENTATION TO THIS OFFICE OF TESTING OF OIL TRANSFER HOSES AND PRESSURE GUAGE IAW 33 CFR 156.170
Condition: Unknown
Due 26 March 1985
Resolved 26 March 1985