Records from 2017 to 2022. Most recent: inspection, 24 August 2022.
Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.
Professional
Detail on this page
6 inspections, each with its date, unit and type; 12 deficiencies with the resolution recorded against each; the documentation record, as PSIX holds it. The counts in the summary above are the same
counts, and they are free.
$39 a month or $299 a year, every vessel page, cancel any time.
Founding rate $19.99 a month for life, for the first 200 subscribers.
Plans
Sign in
Maury does not score, rate or grade vessels, at any price.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 16 May 2019
Resolved
Unit is not documenting required weekly soundings in Oil Record Book.
MARPOL 73/78 Reg. 17
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 June 2019
Resolved 1 July 2019
Resolution: Oil Record Book was reviewed by OCS Inspector. All sat. Training conducted for WFD 300 crew.
09 - Working and Living Conditions › 092 - Working Conditions › Emergency cleaning devices
Issued 16 May 2019
Resolved
Eye wash stations in engineering spaces are not producing clean water.
33 CFR 146.15
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2019
Resolved 1 July 2019
Resolution: Eye wash stations fitted with filters and cleaned out. Pictures sent to OCS inspector. All sat.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 16 May 2019
Resolved
Alarm panel on emergency generator is not operating when starting on air.
33 CFR 146.15
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 June 2019
Resolved 17 May 2019
Resolution: Power was supplied to alarm panel-operator error during test.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 16 May 2019
Resolved
OIM does not have Liberian endorsement onboard. OIM submitted request to Enterprise on 13 JUN 2017.
46 CFR 11.470
STCW Reg. II/2
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 June 2019
Resolved 17 May 2019
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 24 October 2017
Resolved
Every oil tanker of 150 gross tons and above and every ship other than an oil tanker of 400 gross tons and above shall carry on board a shipboard oil pollution emergency plan approved by the administration. The plan must meet the guidelines of MEPC 54(32. Initially, when asked, the OIM was unable to present an approved SOPEP. When a SOPEP was presented, Annex II of the plan (points of contact) was not current.
Due 26 October 2017
Resolved 26 October 2017
Resolution: Company supplied updated Points of Contacts and they were printed and put into the plan.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 24 October 2017
Resolved
The operator of each manned OCS facility shall develop an Emergency Evacuation Plan (EEP) for the facility. Initially, OIM was unable to provide an approved EEP. When an approved EEP was presented, the USCG approval letter made mention that the EEP was approved when evacuation via helicopter procedures was added to the plan. The plan presented did not have helicopter evacuation procedures.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 November 2017
Resolved 8 June 2018
Resolution: Inspected by [name withheld] on subsequent inspection.
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 24 October 2017
Resolved
Where pressure indicating gages are used, they are chosen to be compatible with the pressure to be indicated. In no case, shall the upper range of the gage be less than 1.2 times nor more than 2 times the pressure at which the relieving device is set to function. Attending MODU examiners examined 4 newly installed ASME approved air receivers. 3 out of 4 air receivers had an MAWP of 200 psi, relief valves set at 150 psi, and gages that maxed at 160 psi. Lifeboat air pressure gages were also found faulty. Replace to the satisfaction of the USCG.
Action required: 705 - Other - as specified
Due 24 November 2017
Resolved 8 June 2018
Resolution: Inspected by [name withheld] on subsequent inspection.
Documentation › Logs/Records › Logbook (official)
Issued 24 October 2017
Resolved
Each lifeboat must be launched with its assigned operating crew aboard and manuevered in the water at least once every 3 months, during an abandonment drill. At the time of the exam, the cerw was in excess of 3 months since the last time each lifeboat was launched. Lower all lifeboats within 30 days to the satisfaction of USCG.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 November 2017
Resolved 8 June 2018
Resolution: Inspected by [name withheld] on subsequent inspection.
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 14 June 2017
Resolved
Each fire detection system and each smoke detection system on a unit must: Have a visual alarm and an audible alarm in the pilothouse or at a normally manned control station for the system. 2 tested smoke detectors did not have alarm at the control panel. 46 CFR 108.405(a)(2)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 July 2017
Resolved 20 June 2017
Resolution: Vessel rep provided statement from on board electrician about inoperable smoke detectors. All SAT.
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 5 June 2017
Resolved
Each Fire Detection system and each smoke detection system on a unit must: Have a chart or diagram next to the alarm that shows the location of the zones in the system and that containd the instructions for operating and testing the system. Fire detection panel did not have a diagram or instructions for testing. 46 CFR 108.405(c)(1)
Condition: Improper Installation
Due 14 July 2017
Resolved 19 June 2017
Resolution: Vessel rep provided pictures of diagrams for the fire detection panel. ALL SAT.
Engineering › Pressure Vessel › Maximum Allowable Working Pressure
Issued 5 June 2017
Resolved
ASME Code pressure vessels must be tested and examined in accordance with the requirements in 46 CFR 61.10-5. Every 5 years. Pressure vessels have not been tested. 46 CFR 61.10-5
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 July 2017
Resolved 20 June 2017
Resolution: Vessel rep provided ABS report showing acceptable pressure vessel test. All SAT.
Lifesaving › Launching Appliances › Release Mechanism
Issued 5 June 2017
Resolved
Persons responsible for actual operations, including owners, operators, contractors, and subcontractors shall ensure that unit is free of recognized hazards. The units lifeboats do not installed "white listed" release hooks as per IMO MSC/CIRC 1392. USCG CG-ENG policy letter 01-14 has identified non "white listed" hooks to pose an additional hazard to vessel personnel. 33 CFR 142.4(c)(1)
Action required: 705 - Other - as specified
Due 8 August 2018
Resolved 24 October 2017
Resolution: Company has made arrangments to change lifeboats and release mechanisms.