MAURY USCG vessel records
← All vessels

M O C I

M O C I is a 1949 freight barge. The Coast Guard has recorded 80 inspections since 1981, most recently in August 2004, along with 70 deficiencies.

Records from 1981 to 2004. Most recent: inspection, 10 August 2004.

Built
1949
Last inspected
10 August 2004
Documentation
No Operation - PM · documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 22 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 10 August 2004
…with no type recorded40
Operational controls None recorded without a removal date
Years with a record 23 calendar years (1981–2004)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

Flag
UNITED STATES
Maury page id
psix-52936

Documentation record

Registered dimensions (L × B × D)264.2 ft × 50.2 ft × 10.6 ft
Registered tonnagegross 1,143 / net 1,143
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderNASHVILLE BRIDGE CO · NASHVILLE TN, UNITED STATES · built 1949
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portCORPUS CHRISTI, TX
Trade endorsementsCoastwise, unrestricted
DocumentationNo Operation - PM · issued 21 July 2010 · expires 31 August 2011
Service, as the file records itFreight Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1143 - Regulatory (Subpart C or D), Gross Ton
1143 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 80

10 August 2004 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2162252
20 November 2002 Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1707232
28 August 2002 Annual Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1665133
26 February 2002 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1489242
19 July 2001 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1431077
31 January 2001 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 534957
22 August 2000 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1450514
24 January 2000 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 814868
30 November 1999 Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1442919
18 June 1999 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1386527
20 May 1999 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 440949
19 April 1999 Examination of Repairs
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1454663
3 December 1998 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 528444
9 June 1998 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1472327
3 March 1998 Damage Survey
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 784337
24 November 1997 Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1383713
19 June 1997 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1380910
19 June 1996 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1457357
6 April 1996 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1078667
3 April 1996 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 201756
3 April 1996 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 756858
19 June 1995 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1420994
13 April 1995 Examination of Repairs
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 854268
28 November 1994 Hull Examination · Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1438256
1 July 1993 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1157841
23 June 1993 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1423790
16 November 1992 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1132860
20 October 1992 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 941938
14 September 1992 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 643558
9 September 1992 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 936999
2 September 1992 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 527887
29 July 1992 Re-Inspection · Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1249887
28 May 1992 Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1268330
3 October 1991 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 643559
27 September 1991 Damage Survey
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1391747
4 September 1991 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 643573
29 August 1991 Examination of Repairs
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1353275
12 August 1991 Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1245066
8 August 1991 Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1252878
18 July 1991 Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1249593
27 June 1991 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1229717
25 June 1991 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 910503
23 February 1991 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 469817
19 December 1990 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 341069
20 November 1990 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 494019
16 September 1990 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 468762
16 September 1990 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 921880
14 August 1990 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 911669
24 July 1989 COI Inspection · Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1209383
3 May 1989 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1343535
25 April 1989 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1033416
1 March 1988 Hull Examination · COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1333264
27 August 1987 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1034990
30 January 1987 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1012676
13 January 1987 Examination of Repairs
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1005340
3 January 1987 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 524230
30 December 1986 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 504562
30 December 1986 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1001835
10 October 1986 Examination of Repairs
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1007257
30 September 1986 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 436631
12 August 1986 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 490246
8 July 1986 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1306614
18 June 1986 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1303371
12 May 1986 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 308907
4 May 1986 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 467825
4 May 1986 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1297498
21 February 1986 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 485373
22 January 1986 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 505019
7 November 1985 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 526618
13 August 1985 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 496898
15 May 1985 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 980043
21 February 1985 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1289672
15 February 1984 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1283396
6 February 1984 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 481173
31 January 1984 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1280182
19 January 1984 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1280174
28 January 1983 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1272939
5 January 1983 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1277967
8 November 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 965412
9 November 1981 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 966131

Deficiency record · 70

Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 28 August 2002 Resolved
Renew flame screen on #1 Starboard tank. LEGACY COMPONENT DESC: Flame Screens
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 August 2002
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 28 August 2002 Resolved
Repack all loose cargo valves.
Due 28 September 2002
Resolved 10 August 2004
Resolution: COI surrendered 20NOV02.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pressure/Vacuum Relief Valve
Issued 28 August 2002 Resolved
Complete permanent repairs for temporary repair on #2 port and #4 port P/V piping at next drydock. Temp repairs authorized by CORMS CID for [name withheld] zone only.
Due 1 December 2002
Resolved 10 August 2004
Resolution: COI surrendered 20NOV02.
Deck/Cargo › Cargo Stowage › General
Issued 28 August 2002 Resolved
Renew "danger keep out" signs.
Due 28 September 2002
Resolved 10 August 2004
Resolution: COI surrendered 20NOV02.
Deck/Cargo › Cargo Heating › General
Issued 28 August 2002 Resolved
Provide documentation on test of steam relief valve, set pressure and pop pressure.
Due 28 September 2002
Resolved 10 August 2004
Resolution: COI surrendered 20NOV02.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 28 August 2002 Resolved
Secure machinery guard on linkage for port cargo pump.
Due 28 September 2002
Resolved 10 August 2004
Resolution: COI surrendered 20NOV02.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pressure/Vacuum Relief Valve
Issued 28 August 2002 Resolved
Repair #3 Starboard P/V Pipe.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 August 2002
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 28 August 2002 Resolved
Renew starboard suction valve handle.
Due 28 September 2002
Resolved 10 August 2004
Resolution: COI surrendered 20NOV02.
Deck/Cargo › Holds/Tanks › Independent Tank
Issued 28 August 2002 Resolved
Make permanent repairs to hydraulic tank. Temporary repair authorized by CORMS CID for [name withheld] zone only.
Due 1 December 2002
Resolved 10 August 2004
Resolution: COI surrendered 20NOV02.
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 28 August 2002 Resolved
Remove piping from starboard pump discharge and blank flange or make permanent repairs.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 August 2002
Resolution: Pipe removed.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 28 August 2002 Resolved
Prepair deck drains for inspection.
Due 28 September 2002
Resolved 10 August 2004
Resolution: COI surrendered 20NOV02.
Deck/Cargo
Issued 22 August 2000 Resolved
IAW 46 CFR 56.20-9, THIS VESSEL MUST HAVE VALVE INDICATING DEVICES ON ALL CARGO VLAVES NOT LATER THAN NEXT CARGO TANK INTERNAL EXAM.
Condition: Unknown
Due 22 August 2000
Resolved 22 August 2000
Construction/Loadline
Issued 22 August 2000 Resolved
REPAIR SMALL DECK CRACK ON THE #1 STARBOARD CARGO TANK JUST FORWARD OF THE ULLAGE OPENING, 10 FT FROM CENTERLINE.
Condition: Unknown
Due 25 August 2000
Resolved 25 August 2000
Construction/Loadline
Issued 22 August 2000 Resolved
PLACE TEMP REPAIR PATCH ON SMALL DECK CRACK ON THE #5 STARBOARD CARGO TANK ADJACENT TO CARGO PIPING SUPPORT BRACKET 5 FT FROM CENTERLINE.
Condition: Unknown
Due 25 August 2000
Resolved 25 August 2000
Deck/Cargo
Issued 30 November 1999 Resolved
INSTALL HIGH LEVEL INDICATORS FOR EACH CARGO TANK.
Condition: Unknown
Due 30 November 1999
Resolved 30 November 1999
Construction/Loadline
Issued 24 November 1997 Resolved
#1 Starboard Cargo Tank, Crop out and replace centerline bulkhead inserts as marked, 3 total centerline inserts, when repairs are complete inserts must be air tested to 2 PSI.
Condition: Unknown
Due 24 November 1997
Resolved 25 November 1997
Construction/Loadline
Issued 24 November 1997 Resolved
#3 Port Cargo Tank, repair cracked welds at 3rd and 4th transverse frames as marked, 4 total, and insert 16' X 50' deck plating as marked, all insetrs to be air tested to 2 PSI when repairs are complete.
Condition: Unknown
Due 24 November 1997
Resolved 25 November 1997
Construction/Loadline
Issued 24 November 1997 Resolved
#1 Port Cargo Tank, repair 3 cracked welds at 4th bottom long and_x001C_ 3 cracked welds #5 transverse on bottom long as marked.
Condition: Unknown
Due 24 November 1997
Resolved 25 November 1997
Construction/Loadline
Issued 24 November 1997 Resolved
#3 Starboard Cargo Tank, Crop out and replace three centerline bulkhead inserts as marked. Three total centerline inserts. Inserts to be air testedto 2 PSI when repairs are complete.
Condition: Unknown
Due 24 November 1997
Resolved 25 November 1997
Construction/Loadline
Issued 24 November 1997 Resolved
Aft Rake, replace 16"X16" of wrap around, port side as marked, to be hose tested when repairs are complete. Remove all water and excess rust for inspection to continue.
Condition: Unknown
Due 24 November 1997
Resolved 25 November 1997
Construction/Loadline
Issued 24 November 1997 Resolved
#5 Port Cargo Tank, Centerline bulkhead insert as marked, 1 total, 16"X16" insert at side/deck plate wrap around as marked, pickup welds at 2nd and 3rd transverses outboard side as marked and plug hole in cargo pump containment. Insert repairs to be air tested to 2 PSI.
Condition: Unknown
Due 24 November 1997
Resolved 25 November 1997
Construction/Loadline
Issued 24 November 1997 Resolved
#4 Port Cargo Tank, Replace centerline bulkhead insert as marked, 1 total, and air test when repairs are complete to 2 PSI.
Condition: Unknown
Due 24 November 1997
Resolved 25 November 1997
Deck/Cargo
Issued 19 June 1997 Resolved
VESSEL BOOM SHALL BE MARKED WITH SAFE WORKING LOAD AND MINIMUM ANGLE FOR WHICH THE GEAR IS DESIGNED, PER 46 CFR 31.37-45.
Condition: Unknown
Due 1 July 1997
Resolved 1 July 1997
Construction/Loadline
Issued 6 April 1996 Resolved
CARGO TANK #5 STARBOARD HAS A 12" X 1/8" CRACK IN TOP KNUCKLE APPARENTLY RESULTING FROM CORROSION IN AN AREA OF PRIOR DAMAGE (DENT).
Condition: Unknown
Due 6 April 1996
Resolved 6 April 1996
Engineering
Issued 23 June 1993 Resolved
Replace fuel and oil lines on forward port cargo pump.
Condition: Unknown
Due 8 July 1993
Resolved 8 July 1993
Engineering
Issued 23 June 1993 Resolved
Properly stencil cargo piping and cargo hose service intended and max allowable working pressure (mawp).
Condition: Unknown
Due 8 July 1993
Resolved 8 July 1993
Documentation
Issued 23 June 1993 Resolved
Provide valid CFR before operating commences.
Condition: Unknown
Due 8 July 1993
Resolved 8 July 1993
Construction/Loadline
Issued 23 June 1993 Resolved
Repair foward hatch hinges, both hatches.
Condition: Unknown
Due 8 July 1993
Resolved 8 July 1993
Deck/Cargo
Issued 23 June 1993 Resolved
Support forward portion of steam lines.
Condition: Unknown
Due 8 July 1993
Resolved 8 July 1993
Deck/Cargo
Issued 23 June 1993 Resolved
Clean Flame screens
Condition: Unknown
Due 8 July 1993
Resolved 8 July 1993
Deck/Cargo
Issued 23 June 1993 Resolved
Clean seating surfaces of P.V. Valves
Condition: Unknown
Due 8 July 1993
Resolved 8 July 1993
Construction/Loadline
Issued 20 October 1992 Resolved
REWELD BROKEN WELDS AS MARKED IN CARGO TANK #5 PORT & STBD IN WAY OF VERT_x001C_ CHANNEL TO SIDE LONGITUDINAL FRAMING CONNECTION.
Condition: Unknown
Due 17 November 1992
Resolved 17 November 1992
Construction/Loadline
Issued 20 October 1992 Resolved
RENEW HORIZONTAL 3" ANGLE IN CARGO TANK #5 PORT AS MARKED.
Condition: Unknown
Due 17 November 1992
Resolved 17 November 1992
Construction/Loadline
Issued 20 October 1992 Resolved
CROP & RENEW WASTED TRANSVERSE BULKHEAD STIFFENERS & BOTTOM BRACKETS, BOT-_x001C_TOM LONGITUDINAL FRAMING, STERNLOG HORIZ ANGLES, UPPER 12" CHANNEL STIFFEN-ERS, LONGITUDINAL BULKHEADS AS MARKED AND LADDER IN AFT BOX VOID.
Condition: Unknown
Due 17 November 1992
Resolved 17 November 1992
Construction/Loadline
Issued 20 October 1992 Resolved
MAKE PERMANENT REPAIRS TO LEAK THROUGH TRANSVERSE BULKHEAD BETWEEN STERN_x001C_ VOID AND #5 PORT CARGO TANK AT INBOARD CORNER WELD SEAM IN WAY OF LOCKING PIN RECESS BOX.
Condition: Unknown
Due 17 November 1992
Resolved 17 November 1992
Construction/Loadline
Issued 20 October 1992 Resolved
MAKE PERMANENT REPAIRS TO HOLE WASTED THROUGH DECK AT INSIDE OF STERNLOG AND DECK EDGE ON PORT SIDE OVER STERN VOID.
Condition: Unknown
Due 17 November 1992
Resolved 17 November 1992
Construction/Loadline
Issued 20 October 1992 Resolved
GAUGE STERN VOID BOTTOM SHELL PLATING BETWEEN EVERY OTHER LONGITUDINAL FR._x001C_BAY. (APPROX 3' BETWEEN READINGS).
Condition: Unknown
Due 17 November 1992
Resolved 17 November 1992
Deck/Cargo
Issued 29 July 1992 Resolved
REPLACE GASKET ON NO. 5 PORT CARGO TANK ULLAGE OPENING.
Condition: Unknown
Due 29 July 1992
Resolved 29 July 1992
Engineering
Issued 29 July 1992 Resolved
INSTALL SPARK ARRESTING MUFFLER ON FORWARD CARGO PUMP DIESEL ENGINE._x001C_ _x001C_
Condition: Unknown
Due 29 July 1992
Resolved 29 July 1992
Engineering
Issued 29 July 1992 Resolved
REPLACE FUEL LINE ON FORWARD CARGO PUMP DIESEL PUMP._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 July 1992
Resolved 29 July 1992
Lifesaving
Issued 29 July 1992 Resolved
INSTALL FLAME SCREENS ON BOW AND STERN VOID GOOSENECK VENTS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 July 1992
Resolved 29 July 1992
Construction/Loadline
Issued 27 September 1991 Resolved
GOUGE AND REWELD BUTT WELD (2 FOOT SECTION) ALONG BILGE KNUCKLE OF STARBOARD CARGO TANK 4._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 31 December 1999
Resolved 9 October 1991
Construction/Loadline
Issued 27 September 1991 Resolved
CROP AND RENEW THE FOLLOWING SECTIONS OF STARBOARD BILGE KNUCKLE: A) 13 FOOT BY 36 INCH SECTION ALONG STARBOARD CARGO TANK 3 AND B) 8 FOOT BY 36 INCH SECTION ALONG STARBOARD CARGO TANK 5._x001C_ _x001C_
Condition: Unknown
Due 31 December 1999
Resolved 9 October 1991
Deck/Cargo
Issued 25 June 1991 Resolved
REMOVE ALL OILY WASTES FROM DRIP PANS AND PRIME MOVER CONTAINMENTS PRIOR TONEXT TRANSFER.
Condition: Unknown
Due 25 June 1991
Resolved 25 June 1991
Deck/Cargo
Issued 25 June 1991 Resolved
MAKE PERMANENT REPAIRS TO OR REPLACE #1P, 2P/S, 3P, 4P/S AND 5P ULLAGE PORTCOVERS PRIOR TO NEXT TRANSFER.
Condition: Unknown
Due 25 June 1991
Resolved 25 June 1991
Construction/Loadline
Issued 25 June 1991 Resolved
REMOVE ALL DEBRIS FROM DECK DRAINS TO CARGO TANKS AND DEMONSTRATE PROPER OPERATION OF VALES PRIOR TO NEXT TRANSFER.
Condition: Unknown
Due 25 June 1991
Resolved 25 June 1991
Construction/Loadline
Issued 25 June 1991 Resolved
MAKE PERMANENT REPAIRS TO 1/2 INCH PUNCTURE ON MAIN DECK, PORT SIDE BOW RAKE AT NEXT DRYDOCK.
Condition: Unknown
Due 25 June 1991
Resolved 25 June 1991
Deck/Cargo
Issued 25 June 1991 Resolved
RENEW ALL FLAME SCREENS FOR ULLAGE PORT OPENINGS, CARGO TANK VENTS, AND CARGO HATCH OPENGINGS PRIOR TO NEXT TRANSFER. _x001C_ _x001C_
Condition: Unknown
Due 25 June 1991
Resolved 25 June 1991
Construction/Loadline
Issued 14 August 1990 Resolved
RENEW GASKETS ON BOW AND STERN VOID DECK HATCHES. (3 TOTAL).
Condition: Unknown
Due 14 August 1990
Resolved 14 August 1990
Engineering
Issued 14 August 1990 Resolved
RENEW LEAKING FUEL LINE ON AFT PUMP DIESEL ENGINE.
Condition: Unknown
Due 14 August 1990
Resolved 14 August 1990
Construction/Loadline
Issued 14 August 1990 Resolved
PROVIDE FLAME SCREENS ON BOW & STERN VOID GOOSENECK VENTS BEFORE ANY CARGO OPERATIONS.
Condition: Unknown
Due 14 August 1990
Resolved 14 August 1990
Deck/Cargo
Issued 25 April 1989 Resolved
PROVIDE DOCUMENTATION FOR LATEST CARGO HOSE HYDRO TEST AND CARGO PUMP RE- LIEF VALVE TEST.
Condition: Unknown
Due 25 April 1989
Resolved 25 April 1989
Documentation
Issued 25 April 1989 Resolved
PROVIDE & INSTALL POLLUTION PLACARD ON BARGE.
Condition: Unknown
Due 25 April 1989
Resolved 25 April 1989
Deck/Cargo
Issued 30 December 1986 Resolved
REPLACE GASKETS ON ALL ULLAGE OPENINGS.
Condition: Unknown
Due 30 December 1986
Resolved 30 December 1986
Deck/Cargo
Issued 30 December 1986 Resolved
PROPERLY INSTALL FLAME SCREEN TO FUEL TANK.
Condition: Unknown
Due 30 December 1986
Resolved 30 December 1986
Construction/Loadline
Issued 30 December 1986 Resolved
PROVIDE LEGIBLE DRAFT MARKS AND VESSEL'S NAME ON HULL.
Condition: Unknown
Due 30 December 1986
Resolved 30 December 1986
Navigation
Issued 30 December 1986 Resolved
PROVIDE NAVIGATIONAL LIGHTS - EITHER PORTABLE OR FIXED WIRING, THAT ARE AN APPROVED TYPE.
Condition: Unknown
Due 30 December 1986
Resolved 30 December 1986
Construction/Loadline
Issued 10 October 1986 Resolved
PINHOLE LEAK IN PORT AFT CORNER AT UNLOADED WATERLINE APROX 1' FROM CORNER MAKE PERMANENT REPAIRS
Condition: Unknown
Due 10 October 1986
Resolved 10 October 1986
Deck/Cargo
Issued 18 June 1986 Resolved
CLEAN ALL EXCESS OIL FROM FIXED CONTAINMENT
Condition: Unknown
Due 18 June 1986
Resolved 18 June 1986
Navigation
Issued 18 June 1986 Resolved
STBD RUNNING LIGHT SCREEN IS BENT STRAIGHTEN
Condition: Unknown
Due 18 June 1986
Resolved 18 June 1986
Deck/Cargo
Issued 18 June 1986 Resolved
CARGO HOSE AND MANIFOLD REQUIRE 225 PSI HYDRO TEST
Condition: Unknown
Due 18 June 1986
Resolved 18 June 1986
Deck/Cargo
Issued 18 June 1986 Resolved
REPLACE MISSIN GASKETS ON ULLAGE STANDPIPES
Condition: Unknown
Due 18 June 1986
Resolved 18 June 1986
Deck/Cargo
Issued 18 June 1986 Resolved
REPLACE NON OPERATING PRESSURE GAUGE ON CARGO MANIFOLD
Condition: Unknown
Due 18 June 1986
Resolved 18 June 1986
Deck/Cargo
Issued 18 June 1986 Resolved
DUE TO FADING REPAINT RED FLAG
Condition: Unknown
Due 18 June 1986
Resolved 18 June 1986
Deck/Cargo
Issued 18 June 1986 Resolved
REPAIR DUE TO CORROSION FWD PUMP ENGIN EMERGENCY SHUTDOWN
Condition: Unknown
Due 18 June 1986
Resolved 18 June 1986
Deck/Cargo
Issued 18 June 1986 Resolved
REPAINT DUE TO FADING DANGER DO NOT ENTER ON CARGO DOMES
Condition: Unknown
Due 18 June 1986
Resolved 18 June 1986
Deck/Cargo
Issued 18 June 1986 Resolved
REPAIR FLAME SCREEN ON DIESEL OIL TANK WHERE IT HAS TORN LOOSE
Condition: Unknown
Due 18 June 1986
Resolved 18 June 1986
Deck/Cargo
Issued 4 May 1986 Resolved
CG-835:"MAKE PERMANENT REPAIRS TO THE GUARD COVERING THE STBD CARGO PUMP DRIVE SHAFT."
Condition: Unknown
Due 4 May 1986
Resolved 4 May 1986
Deck/Cargo
Issued 19 January 1984 Resolved
PROVIDE EVIDENCE THAT CARGO HEADER GUAGE IS CORRECTLY CALIBERATED.
Condition: Unknown
Due 19 January 1984
Resolved 19 January 1984
Deck/Cargo
Issued 19 January 1984 Resolved
UPDATE OIL TRANSFER PROCEDURES TO REFLECT PRESENT METHODS FOR DISCHARGING/ LOADING OF HEAVY OIL CARGOES.
Condition: Unknown
Due 19 January 1984
Resolved 19 January 1984

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.