Records from 1985 to 2026. Most recent: inspection, 13 April 2026.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 70
13 April 2026
Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8346804
23 July 2025
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8185741
7 July 2025
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8178608
22 August 2024
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7986277
1 August 2023
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7758086
19 May 2022
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7460604
21 April 2022
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7435202
24 August 2021
Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7284374
4 June 2021
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7215621
21 September 2020
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7062011
29 April 2020
Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6945878
19 September 2019
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6816420
31 July 2018
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6496280
20 April 2018
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6395408
25 July 2017
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6220013
24 June 2016
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5915330
23 March 2016
Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5843948
24 February 2016
Plan Review "T" Boat
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5821327
5 June 2012
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4334404
1 December 2011
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4199083
4 October 2010
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3869183
28 July 2009
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3633051
7 August 2008
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3296328
22 July 2008
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3281381
23 April 2008
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3190331
24 July 2007
Annual Inspection · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3005151
24 July 2006
COI Inspection · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2723323
25 April 2006
Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2633849
20 September 2005
MARPOL Annex V Examination · Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2497140
26 July 2004
Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2145273
16 April 2004
Hull Examination · Internal Structural Exam · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2045108
21 July 2003
Annual Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1852562
2 July 2002
Deficiency Check · Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1650509
17 April 2002
Internal Structural Exam · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1605798
23 July 2001
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1366488
31 July 2000
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1365898
19 April 2000
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1426368
3 August 1999
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1361032
23 April 1999
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1378658
11 February 1999
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 793014
5 September 1998
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 797894
23 July 1998
COI Inspection · MARPOL Annex V Examination · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1130068
7 July 1997
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1114497
8 October 1996
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1149490
22 July 1996
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1091121
4 April 1996
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1079516
19 October 1995
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1191755
11 July 1995
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1186395
15 August 1994
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1171131
30 March 1994
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1167474
2 December 1993
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 847716
8 July 1993
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1157969
25 June 1992
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 942987
5 March 1992
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 943503
6 May 1991
Hull Examination · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 921907
8 November 1990
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1215626
7 November 1990
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1251203
19 July 1990
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 927750
4 May 1990
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 905653
4 May 1990
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1226020
10 April 1990
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1228891
1 May 1989
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1032441
29 July 1988
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1341969
14 April 1988
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1034098
18 June 1987
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1311577
27 April 1987
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1013839
15 July 1986
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1304850
24 April 1986
Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 985038
11 September 1985
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 990859
9 April 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1289878
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 7 July 2025
Resolved
"Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date." Vessel did not complete annual inspection within 3 months of anniversary date of AUG 30; last annual inspection was 01 AUG 23. Complete a US Coast Guard inspection prior to the carriage of passengers.
46 CFR 176.500(b)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 July 2025
Resolution: Cleared by COI activity.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 1 August 2023
Resolved
At each initial and subsequent inspection for certification, the owner or managing operator must be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment including the following...For fixed gas fire extinguishing systems, the inspections and tests required by Table 176.810(b), in addition to 46 CFR 147.60 and 147.65. At the time of inspection, vessel was unable to test pre engineered fixed fire suppression system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 August 2023
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 1 August 2023
Resolved
Chemical testing of personnel must be conducted as required by this subpart and in accordance with the procedures detailed in 49 CFR part 40. At the time of inspection, the vessel was not found in compliance with the above regulation.
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 August 2023
Resolved 7 August 2023
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 August 2023
Resolved
Except as otherwise provided in this section, all vessels shall carry pyrotechnic distress signals as follows: 6 red flare distress signals and 6 hand orange smoke distress signals or, 12 hand combination flare and smoke distress signals. Vessel does not have pyrotechnics on board.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 August 2023
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 1 August 2023
Resolved
Vessel's shall be equipped with a suitable number of portable battery lights. At the time of inspection, the vessel did not have working portable lights.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 August 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 1 August 2023
Resolved
Life preserves shall be distributed through the upper part of the vessel in protected places convenient to the persons on board. Vessel's life perseveres were not stored in an accessible location to passengers.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 August 2023
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 1 August 2023
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 August 2023
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 29 April 2020
Resolved
Vessel’s center longitudinal deck beam is rotten at the aft end IWO tiller access. A written repair proposal listing materials to be used and drawing of area must be submitted for approval prior to repairs being started.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 May 2020
Resolution: Repairs complete
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 29 April 2020
Resolved
Vessel’s transverse deck beam aft IWO tiller access has been cut and a 6-8’ piece removed to make room for the tiller which originally had brackets and a cross support brace. The bracket on the stbd side is missing, the support cross brace is wasted and not supporting the deck properly as designed. This area must be fixed to like new condition by submitting written repair proposal listing materials to be used and drawing of area must be submitted for approval prior to repairs being started.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 May 2020
Resolution: Repairs complete
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 31 July 2018
Resolved
The vessel may be inspected in accordance with standards
acceptable to the cognizant OCMI as good marine
practices. Covers must be obtained for the engine space ventilation. 46 CFR 176.800(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2018
Resolved 6 August 2018
Resolution: Ventilation covers obtained and demonstrated.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 31 July 2018
Resolved
The vessel may be inspected in accordance with standards
acceptable to the cognizant OCMI as good marine
practices. The gasket on the hatch for the engine space must be replaced.46 CFR 176.800(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2018
Resolved 6 August 2018
Resolution: Gasket replaced resulting in a good seal.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 31 July 2018
Resolved
Each connection to a conductor or terminal part of a conductor must be made inside an enclosure. The electrical connections in the engine space must be placed in a junction box. 46 CFR 183.340(g)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2018
Resolved 6 August 2018
Resolution: Wire connections placed inside junction box.
Construction/Loadline › Hull › Hull Plating
Issued 23 March 2016
Resolved
Provide repair propsal for damage to port bow and starboard beam fiberglass.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 May 2016
Resolved 24 June 2016
Resolution: Repairs made and approved.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 5 June 2012
Resolved
Make engine room bulkhead airtight by adding additional expansion foam in way of wire run.
Action required: 705 - Other - as specified
Due 19 June 2012
Resolved 5 June 2012
Fire Fighting › Fixed Gas Fire Extinguishing System › Piping
Issued 5 June 2012
Resolved
Provide plugs for the engine room air intake plugs.
Action required: 705 - Other - as specified
Due 19 June 2012
Resolved 5 June 2012
Lifesaving › Lifebuoys › Serviceable
Issued 5 June 2012
Resolved
Replace life buoy.
Action required: 705 - Other - as specified
Due 19 June 2012
Resolved 26 June 2012
Fire Fighting › Portable CO2 Fire Extinguisher › Discharge Hose/Tube
Issued 4 October 2010
Resolved
Replace discharge hose on CO2 extinguisher located aft of engine room space.
Action required: 705 - Other - as specified
Due 6 October 2010
Resolved 6 October 2010
Resolution: Deficiency rectified to the satisfaction of attending marine inspector.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 4 October 2010
Resolved
attach a line for ring lifebuoy (60')
Action required: 705 - Other - as specified
Due 6 October 2010
Resolved 6 October 2010
Resolution: Deficiency rectified to the satisfaction of attending marine inspector.
Engineering › Bilge Water Management System › Pump
Issued 22 July 2008
Resolved
Properly mount bilge pump.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 August 2008
Resolved 7 August 2008
Resolution: Bilge pump was properly mount.
Engineering › Bilge Water Management System › Not Operational
Issued 22 July 2008
Resolved
Replace high level alarm for bilge.
Action required: 705 - Other - as specified
Due 7 August 2008
Resolved 7 August 2008
Resolution: High level alarm was found in good working order.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 22 July 2008
Resolved
Provide updated first aid kit.
Action required: 705 - Other - as specified
Due 7 August 2008
Resolved 7 August 2008
Resolution: First aid kit was updated.
Engineering › Fuel Oil Service System › Filter
Issued 20 September 2005
Resolved
Clean out fuel filter bowl.
Condition: Unknown
Due 21 October 2005
Resolved 31 October 2005
Resolution: Clear.
Fire Fighting › Fire Bucket › Availability
Issued 20 September 2005
Resolved
Provide 03 - 2.5 gallon buckets labeled "fire bucket".
Condition: Unknown
Due 21 October 2005
Resolved 31 October 2005
Resolution: Provided.
Accommodation/Occupational Safety › Ventilation › General
Issued 20 September 2005
Resolved
Replace rusted sections of ventilation piping in the forepeak.
Condition: Unknown
Due 21 October 2005
Resolved 31 October 2005
Resolution: Repaired.
Construction/Loadline › Hull › Bottom Plating
Issued 20 September 2005
Resolved
Patch hole in gel coat in bilge under engine P/S.
Condition: Unknown
Due 21 October 2005
Resolved 31 October 2005
Resolution: Patched.
Engineering › Bilge Water Management System
Issued 21 July 2003
Resolved
Prove proper operation of electrical automatic bilge pump. LEGACY COMPONENT DESC: Pump
Condition: Unknown
Due 31 July 2003
Resolved 27 July 2003
Lifesaving › Lifebuoys
Issued 21 July 2003
Resolved
Place 3' to 6' waterlight lanyard on lifebuoy. LEGACY COMPONENT DESC: Self-igniting Lights
Due 31 July 2003
Resolved 27 July 2003
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 2 July 2002
Resolved
Make E/R forward bulkhead penetrations vapor tight.
Due 23 July 2002
Resolved 30 September 2002
Resolution: Bulkhead penetrations were made vapor tight.
Fire Fighting › Ventilation Systems
Issued 2 July 2002
Resolved
Install vent closures to E/R vents. LEGACY COMPONENT DESC: Ducts
Due 23 July 2002
Resolved 30 September 2002
Resolution: Made vent closure devices for port and stbd E/R vents.
Engineering › Bilge Water Management System
Issued 2 July 2002
Resolved
Install positive stop closure valve to electrical submersible bilge pump discharge hose at sideshell penetration. LEGACY COMPONENT DESC: Valve
Due 23 July 2002
Resolved 30 September 2002
Resolution: Positive stop closure valve was installed.
Accommodation/Occupational Safety › Medical/First Aid
Issued 2 July 2002
Resolved
Provide first aid kit with contents listed at 46CFR160.041. LEGACY COMPONENT DESC: Medicine Chest
Due 23 July 2002
Resolved 30 September 2002
Resolution: Purchased new first aid kits IAW 160.041.
Operations/Management › Drug and Alcohol Testing
Issued 2 July 2002
Resolved
Provide proof of 60 minute supervisory training in regard to Employee Assistance Program. LEGACY COMPONENT DESC: EAP Training Requirements
Due 23 July 2002
Resolved 30 September 2002
Resolution: Review logs that training had been conducted and interviewed individuals involved.
Operations/Management › Drug and Alcohol Testing
Issued 2 July 2002
Resolved
Provide proof of employer policy in regard to Employee Assistance Program. LEGACY COMPONENT DESC: EAP Training Requirements
Due 23 July 2002
Resolved 30 September 2002
Resolution: Proof of employer policy reviewed.
Fire Fighting
Issued 23 April 1999
Resolved
Install a Fixed Fire Fighting System in machinery spaces in accordance withU.S. Coast Guard approved plans.
Condition: Unknown
Due 27 April 1999
Resolved 27 April 1999
Fire Fighting
Issued 23 April 1999
Resolved
Vessel is not to be operated with passengers for hire after March 11, 1999,until the above requirements have been cleared to the satisfaction of an attending U.S. Coast Guard Marine Inspector.
Condition: Unknown
Due 27 April 1999
Resolved 27 April 1999
Fire Fighting
Issued 23 April 1999
Resolved
Submit plans for review and approval for the installation of a Fixed Fire Fighting System in the machinery spaces in accordance with 46 CFR 181.115(b) and 46 CFR 181.400
Condition: Unknown
Due 27 April 1999
Resolved 27 April 1999
Lifesaving
Issued 23 July 1998
Resolved
Provide markings to distinguish between adult and child life jackets.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Documentation
Issued 23 July 1998
Resolved
Vessel is restricted from operation unless an individual with the appropriate license is in control of vsl.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Engineering
Issued 23 July 1998
Resolved
Renew worn hose clamps for shaft stuffing box.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Engineering
Issued 23 July 1998
Resolved
Tighten engine bed bolts as needed.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Electrical
Issued 23 July 1998
Resolved
Remove dead ended wires in console.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Electrical
Issued 23 July 1998
Resolved
Test bond wire for continuity on rudder stock and repair as needed.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Engineering
Issued 23 July 1998
Resolved
Renew propulsion shaft cutlass bearing at normal winter haulout.
Condition: Unknown
Due 23 July 1998
Resolved 23 July 1998
Fire Fighting
Issued 23 July 1998
Resolved
Provide specifications for installation of a fixed fire extinguishing system in the engine space. OCMI plan approval required prior to installation.
Condition: Unknown
Due 23 July 1998
Resolved 23 July 1998
Construction/Loadline
Issued 23 July 1998
Resolved
Renew sea valve operating handle.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Engineering
Issued 23 July 1998
Resolved
Renew raw water intake hose.
Condition: Unknown
Due 23 July 1998
Resolved 2 August 1998
Engineering
Issued 23 July 1998
Resolved
Renew fuel fill hose and properly ground fill pipe.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Engineering
Issued 23 July 1998
Resolved
Renew water cooled exhaust hose.
Condition: Unknown
Due 23 July 1998
Resolved 2 August 1998
Engineering
Issued 23 July 1998
Resolved
Renew cut hose on transsmission cooler.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Construction/Loadline
Issued 23 July 1998
Resolved
Install seal on engine compartment hatch.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Engineering
Issued 7 July 1997
Resolved
PROPERLY STENCIL FUEL SHUT-OFF VALVE.
Condition: Unknown
Due 21 July 1997
Resolved 23 July 1997
Lifesaving
Issued 7 July 1997
Resolved
REPAIR TACHOMETER ON CONSOLE.
Condition: Unknown
Due 21 July 1997
Resolved 23 July 1997
Electrical
Issued 7 July 1997
Resolved
CONNECT BATTERY CONNECTIONS SECURELY
Condition: Unknown
Due 21 July 1997
Resolved 23 July 1997
Engineering
Issued 7 July 1997
Resolved
PROPERLY SECURE THE RED GEAR LINKAGE TO THE TRANSMISSION.
Condition: Unknown
Due 9 July 1997
Resolved 7 July 1997
Lifesaving
Issued 7 July 1997
Resolved
PROPERLY SECURE CONSOLE TO THE STAND.
Condition: Unknown
Due 21 July 1997
Resolved 23 July 1997
Lifesaving
Issued 7 July 1997
Resolved
REPAIR TEMP GAUGE ON CONSOLE.
Condition: Unknown
Due 21 July 1997
Resolved 7 July 1997
Navigation
Issued 7 July 1997
Resolved
PROPERLY INSTALL BOLTS ON THE RUDDER BRACKETS
Condition: Unknown
Due 9 July 1997
Resolved 7 July 1997
Lifesaving
Issued 7 July 1997
Resolved
PROPERLY INSTALL RETRO ON THE LIFE RING.
Condition: Unknown
Due 21 July 1997
Resolved 23 July 1997
Unknown
Issued 7 July 1997
Resolved
PROPERLY DISPLAY EAP POLICY & HOTLINE #.
Condition: Unknown
Due 21 July 1997
Resolved 23 July 1997
Electrical
Issued 7 July 1997
Resolved
REMOVE DEAD WIRES FROM UNDER CONSOLE.
Condition: Unknown
Due 21 July 1997
Resolved 23 July 1997
Lifesaving
Issued 7 July 1997
Resolved
DISPLAY LIFE JACKET DONNING PROCEDURES.
Condition: Unknown
Due 21 July 1997
Resolved 23 July 1997
Lifesaving
Issued 7 July 1997
Resolved
DISPLAY EMERGENCY BROADCAST PLACARD.
Condition: Unknown
Due 21 July 1997
Resolved 23 July 1997
Unknown
Issued 7 July 1997
Resolved
PROPERLY LABEL THE CIRCUIT BOARD PANEL FOR THE HORN.
Condition: Unknown
Due 21 July 1997
Resolved 23 July 1997
Lifesaving
Issued 22 July 1996
Resolved
REPLACE LIFE RINGS AND AND INSTALL RETRO-REFLECTIVE TAPE.
Condition: Unknown
Due 22 July 1996
Resolved 22 July 1996
Lifesaving
Issued 22 July 1996
Resolved
PURCHASE FLARES AND INSTALL IN A BRIGHTLY COLORED WATERTIGHT CONTAINER.
Condition: Unknown
Due 22 July 1996
Resolved 22 July 1996
Lifesaving
Issued 11 July 1995
Resolved
PROPERLY MARK PFD STORAGE AREAS WITH NUMBER AND TYPE PFD'S.
Condition: Unknown
Due 11 July 1995
Resolved 11 July 1995
Engineering
Issued 30 March 1994
Resolved
PROVIDE FLAME PAN FOR RACOR FUEL FILTER.
Condition: Unknown
Due 30 March 1994
Resolved 30 March 1994
Engineering
Issued 30 March 1994
Resolved
PROVIDE 30 X 30 MESH FLAME SCREEN FOR FUEL TANK VENT.
Condition: Unknown
Due 30 March 1994
Resolved 30 March 1994
Documentation
Issued 30 March 1994
Resolved
PROVIDE DOCUMENTATION FOR CHEMICAL TESTING PROGRAM.
Condition: Unknown
Due 30 March 1994
Resolved 30 March 1994
Engineering
Issued 19 July 1990
Resolved
PROVE PROPER OPERATION OF MAIN DIESEL ENGINE.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Electrical
Issued 19 July 1990
Resolved
PROVE PROPER OPERATION OF GAUGE PANEL FOR MAIN ENGINE, INSTALL WIRING TO GAUGE PANEL AND SWITCHBOARD.
Condition: Unknown
Due 19 July 1990
Resolved 19 July 1990
Electrical
Issued 10 April 1990
Resolved
PROVIDE LEAD LINED OR FIBERGLASS LINED BATTERY BOX FOR ENGINE STARTING BATTERY.
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990