Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Registered dimensions (L × B × D)26.8 ft × 10.8 ft × 5.1 ft
Registered tonnagegross 7 / net 6
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJARVIS NEWMAN INC · SOUTHWEST HARBOR, ME, UNITED STATES · built 1981
Hull materialFRP (Fiberglass)
PropulsionAuxiliary Sail
Hull shapeSail (Distinct Keel)
Hull configurationMonohull
Hailing portBURLINGTON, VT
Endorsements, as the file codes themcw_un
DocumentationValid · issued 26 May 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it7 - Simplified, Gross Ton 6 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 16 inspections, each with its date, unit and type; 10 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 16
17 July 2025Annual Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 8191270
24 July 2024Annual Inspection · DAPI Audit
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7965915
23 April 2024Drydock Exam · Hull Examination
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7900415
2 August 2023DAPI Audit · Annual Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7759756
12 August 2022DAPI Audit · COI Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7531659
11 August 2021Annual Inspection · DAPI Audit
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7283671
23 March 2021In-Service Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7161691
1 September 2020DAPI Audit · Annual Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7047729
8 May 2020In-Service Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 6950635
11 August 2019Type not recorded
No type recorded · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 6859487
7 August 2019Annual Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 6775686
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 17 July 2025Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. (Vessel did not have means of securing vents at time of inspection.)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 August 2025
Resolved 7 September 2025
Resolution: Means of closure provided.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 17 July 2025Resolved
A vessel not required to have a power driven fire pump by § 181.300 must have at least three 9.5 liter (2 1/2 gallon) buckets, with an attached lanyard satisfactory to the cognizant OCMI, placed so as to be easily available during an emergency. The words “FIRE BUCKET” must be stenciled in a contrasting color on each bucket.
(Vessel did not have three buckets at time of inspection).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 August 2025
Resolved 7 September 2025
Resolution: Two additional buckets provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 July 2025Resolved
Where flexible nonmetallic hose is permitted for use in piping systems by this section, it must meet SAE J-1942 (incorporated by reference; see 46 CFR 175.600) or be specifically approved by the Commandant. (Non-metallic fuel piping on main engine did not appear to meet J-1942 or equivalent).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 August 2025
Resolved 7 September 2025
Resolution: Evidence of compliance provided.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 17 July 2025Resolved
A vessel on a lakes, bays, and sounds, or rivers route must carry:(1) Three hand red flare distress signals approved in accordance with § 160.021 in subchapter Q of this chapter, or other standard specified by the Commandant; and(2) Three hand orange smoke distress signals approved in accordance with § 160.037 in subchapter Q of this chapter, or other standard specified by the Commandant. (Vessel only had three out of six approved pyro devices).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 August 2025
Resolved 7 September 2025
Resolution: New flares provided.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 17 July 2025Resolved
Fuel filter and strainer bowls must be highly resistant to shattering due to mechanical impact and resistant to failure due to thermal shock. Fuel filters fitted with bowls of other than steel construction must be approved by the Commandant and be protected from mechanical damage. Approval of bowls of other than steel construction will specify if a flame shield is required.
(Fuel filter with plastic bowl not fitting with flame shield).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 August 2025
Resolved 7 September 2025
Resolution: Flame bowl installed.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 17 July 2025Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date:(1) Charts of large enough scale to make safe navigation possible;(2) U.S. Coast Pilot or similar publication;(3) Coast Guard Light List.
(Vessel did not have current nav pubs at time of inspection).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 August 2025
Resolved 12 September 2025
Resolution: Updated publications provided.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 March 2021Resolved
Noted water seeping through screw holes were bilge pump is mounted. Grind out FRP to determine water migration and make repairs as needed.
Action required: 10 - Deficiency Rectified
Due 31 March 2021
Resolved 31 March 2021
Resolution: Area was ground out and no water migration was evident. Area was epoxied as before.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 2 August 2016Resolved
Prove proper operation of waterlight prior to operating dusk to dawn.
Condition: Invalid
Action required: 705 - Other - as specified
Due 12 August 2016
Resolved 13 August 2016
Engineering › Fuel Oil Service System › Valve
Issued 2 August 2016Resolved
Prove proper operation of remote fuel shut off.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 August 2016
Resolved 5 August 2016
Fire Fighting › Fixed CO2 Fire Extinguishing System › Remote Pulls
Issued 2 August 2016Resolved
Prove proper operation of engine interlock and install release mechanism.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 5 August 2016
Resolved 4 August 2016
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.