Records from 1984 to 1990. Most recent: inspection, 19 November 1990.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 18
19 November 1990
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1296093
19 October 1990
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 988645
27 August 1990
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1227279
18 January 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 919231
30 August 1989
Deficiency Check · Examination of Repairs
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1317062
12 July 1989
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1040398
1 July 1989
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1202762
4 April 1989
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1339932
25 February 1989
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1201942
4 November 1988
Drydock Extension
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 897757
7 June 1988
Deficiency Check · Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1210486
5 May 1988
Damage Survey · Drydock Extension · Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1198114
14 July 1987
COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1029886
8 May 1986
Credit Drydock
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1296065
15 January 1986
Credit Drydock · Examination of Repairs
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 993782
17 September 1985
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 986734
23 October 1984
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1287045
16 April 1984
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1281410
Engineering
Issued 1 July 1989
Resolved
PROVIDE FLAME SHIELDS FOR THE THREE (3) RACOR FUEL FILTERS ON GENERATORS 1 THROUGH 4.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Engineering
Issued 1 July 1989
Resolved
MAKE PERMANENT REPAIRS TO THE MISALIGNED COOLING WATER PIPING IN WAY OF THEEXPANSION JOINTS ON NO. 1 AND NO. 4 GENERATORS.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Lifesaving
Issued 1 July 1989
Resolved
REPLACE ALL WINDOW GLASS (3 EACH) OF PORT LIFEBOATS.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Lifesaving
Issued 1 July 1989
Resolved
PROVIDE A REMOTE RELEASE MECHANISM WHICH COMPLIES WITH 46 CFR 108.515(D)(2)WHICH CAN RELEASE THE 2-RING LIFE BUOYS WITH LIGHTS AND SMOKE SIGNALS FROM THE CONTROL ROOM.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Lifesaving
Issued 1 July 1989
Resolved
RESECURE THE REMOTE BRAKES RELEASE CABLE PULL TUBING AT BOTH LIFERAFT DAVIT STATIONS.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Electrical
Issued 1 July 1989
Resolved
REMOVE THE WELDING BOX OUTLET UNDER THE DRILL FLOOR WITHIN THE HAZARDOUS ZONE PRIOR TO COMMENCING ANY DRILLING OPERATIONS.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Electrical
Issued 1 July 1989
Resolved
COMPLETE ELECTRICAL INSTALLATION IN SHALE SHAKER AREA, ENSURING ALL TRANSITS ARE PROPERLY INSTALLED AND POWERED, PRIOR TO COMMENCING ANY DRILLING OPERATIONS.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Fire Fighting
Issued 1 July 1989
Resolved
OVERHAUL AND PROVE OPERATION OF THE SACK STORAGE AREA FIRE PUMP RELIEF.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Accommodation/Occupational Safety
Issued 1 July 1989
Resolved
PROVIDE HANDLE FOR FIRE DAMPER LOCATED MAIN DECK PASSAGEWAY OUTSIDE OF THE GALLEY AND MESS DECK.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Lifesaving
Issued 1 July 1989
Resolved
REPAIR AND PROVE OPERATION OF THE LIMIT SWITCH FOR THE NO. 1 LIFEBOAT. THEBOAT MUST BE HAND CRANKED THE LAST 2 FEET UNTIL THE SWITCHES ARE REPAIRED.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Electrical
Issued 1 July 1989
Resolved
REPLACE THE REMOTE SHUTDOWN BOXES AND THE GENERAL ALARM CONTACT MAKER ON THE DRILL FLOOR, AND INSTALL AN APPROVED TYPE DESIGNED FOR HAZARDOUS LOCATIONS.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Construction/Loadline
Issued 1 July 1989
Resolved
PRIOR TO DEPARTING THE PORT OF SINGAPORE, REINSTALL AND PROPERLY SECURE THE MANHOLE COVERS.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Engineering
Issued 1 July 1989
Resolved
REPAIR AND PROVE OPERATION OF THE REMOTE GENERATOR SHUTDOWN FOR THE DRILL FLOOR AND THE TOOL PUSHERS OFFICE.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Engineering
Issued 1 July 1989
Resolved
OVERHAUL AND PROVE OPERATION OF THE THREE (3) INLET AND THREE (3) DISCHARGEVALVES FOR THE STARTING AIR RECEIVERS.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Construction/Loadline
Issued 1 July 1989
Resolved
CROP AND RENEW HULL PLATING IN WAY OF TEMPORARY REPAIRS AT STORAGE BOX ON THE BOW, BOTTOM PLATING FORWARD OF THE LEG IN WAY OF THE FOUR (4) DOUBLERS AND THE 18" WELDED CRACK, AND THE BOTTOM PLATING IN WAY OF THE STBD LEG IN WAY OF THE THREE (3) DOUBLER PLATES.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Engineering
Issued 1 July 1989
Resolved
PROVIDE STAGING TO ALLOW INTERNAL INSPECTION OF THE RIG AIR RECEIVER UNDER DRILL FLOOR, OR HYDRO 1 1/4 TIMES THE MAWP.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Deck/Cargo
Issued 1 July 1989
Resolved
PRIOR TO INSTALLING THE HELICOPTER FUELING STATION, SUBMIT PLANS TO COAST GUARD MARINE SAFETY CENTER, WASHINGTON, DC, FOR REVIEW AND APPROVAL.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Engineering
Issued 1 July 1989
Resolved
MAKE PERMANENT REPAIRS AND PROVE OPERATION OF THE OVERSPEED TRIPS FOR THE NO. 1 AND NO. 3 GENERATORS WHICH WILL SHUT THE ENGINES DOWN, RATHER THAN TOA SLOW SPEED IDLE.
Condition: Unknown
Due 1 July 1989
Resolved 1 July 1989
Construction/Loadline
Issued 4 April 1989
Resolved
REPAIR GOUGES AND PITTS IN HULL SKIN AS DESCRIBED IN ZAPATA OFF-SHORE CORRECTED DRYDOCK INSPECTION NDT REPORT. REPORT ON FILE AT PATMS.
Condition: Unknown
Due 4 April 1989
Resolved 4 April 1989
Fire Fighting
Issued 5 May 1988
Resolved
REPAIR GENERAL ALARM BELL IN THE SACK ROOM. (46 CFR 113.25)
Condition: Unknown
Due 5 May 1988
Resolved 5 May 1988
Accommodation/Occupational Safety
Issued 5 May 1988
Resolved
REPAIR PIPING TO THE FILTER TANK FOR THE KOOMEY SANITARY SYSTEM. (46 CFR 54)
Condition: Unknown
Due 5 May 1988
Resolved 5 May 1988
Documentation
Issued 5 May 1988
Resolved
PROVIDE ONBOARD AN APPROVED CONSTRUCTION PORTFOLIO PRIOR TO COMMENCING REPAIRS TO DAMAGE TO THE BOW SIDE SHELL. (46 CFR 107.305(H))
Condition: Unknown
Due 5 May 1988
Resolved 5 May 1988
Documentation
Issued 5 May 1988
Resolved
PROVIDE ONBOARD AN APPROVED HAZARDOUS LOCATION PLAN. (46 CFR 107.305(W))
Condition: Unknown
Due 5 May 1988
Resolved 5 May 1988
Documentation
Issued 5 May 1988
Resolved
PROVIDE ONBOARD AN APPROVED LIFESAVING AND FIREFIGHTING PLAN. (46 CFR 107.239)
Condition: Unknown
Due 5 May 1988
Resolved 5 May 1988
Lifesaving
Issued 5 May 1988
Resolved
PROVIDE EVIDENCE THAT THE HOOK FOR THE DAVIT LAUNCHED LIFERAFTS #2 AND #4 HAS BEEN WEIGHT TESTED (INSPECTION PLACARD IS MISSING).
Condition: Unknown
Due 5 May 1988
Resolved 5 May 1988
Deck/Cargo
Issued 5 May 1988
Resolved
PROVIDE EVIDENCE (I.E. DATAPLATE) THAT THE FORKLIFT IS VL/ OR FM APPROVED AND SUITABLE FOR THE SPACE INTENDED. (46 CFR 108.611)
Condition: Unknown
Due 5 May 1988
Resolved 5 May 1988
Electrical
Issued 14 July 1987
Resolved
PROVE PROPER OPERATION OF ALL THE VESSEL'S OBSTRUCTION LIGHTS.
Condition: Unknown
Due 14 July 1987
Resolved 14 July 1987
Electrical
Issued 14 July 1987
Resolved
PROVE PROPER OPERATION OF THE EMBARCATION LIGHT TO THE PORT LIFEBOAT.
Condition: Unknown
Due 14 July 1987
Resolved 14 July 1987
Construction/Loadline
Issued 15 January 1986
Resolved
COMPLETE UNDERWATER PORTION OF SPECIAL UNDERWATER SURVEY IN LIEU OF DRYDOCKING FOR CREDIT DURING THE NEXT RIG MOVE BUT NOT LATER THAN 01MAY86.
Condition: Unknown
Due 15 January 1986
Resolved 15 January 1986
Documentation
Issued 17 September 1985
Resolved
CONDUCT ANNUAL LOADLINE AND CRANE SURVEYS; AND CONDUCT QUADRENNIAL LOAD TESTS OF CRANES PRIOR TO 18NOV85.
Condition: Unknown
Due 17 September 1985
Resolved 17 September 1985
Lifesaving
Issued 17 September 1985
Resolved
CONDUCT WEIGHT TESTS OF THE STARBOARD DAVIT LAUNCHED LIFERAFT DAVIT IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR PRIOR TO 01FEB86. THE TOTAL PERSONS ALLOWED SHALL BE REDUCED TO 64 PENDING COMPLETION OF THIS REQUIRE- MENT.
Condition: Unknown
Due 17 September 1985
Resolved 17 September 1985
Electrical
Issued 17 September 1985
Resolved
CONDUCT TESTS OF GENERATOR OVERSPEED TRIPS AND ALARMS IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR DURING THE NEXT RIG MOVE BUT NOT LATER THAN 01FEB86.
Condition: Unknown
Due 17 September 1985
Resolved 17 September 1985