HAITIEN PRIDE is a 1965 freight ship. The Coast Guard has recorded 36 inspections since 1981, most recently in February 2024, along with 133 deficiencies and 13 operational controls.
Records from 1981 to 2024. Most recent: inspection, 28 February 2024.
- Built
- 1965
- Last inspected
- 28 February 2024
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 133 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
298451
HO-4019
53237
Flag
PANAMA
—
Maury page id
psix-53237
Inspections, by type
…with no type recorded24
Years with a record
18 calendar years (1981–2024)
The 36 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it516 - Convention (Subpart B), Gross Ton
516 - Regulatory (Subpart C or D), Gross Ton
177 - Convention (Subpart B), Net Ton
177 - Regulatory (Subpart C or D), Net Ton
516 - Regulatory (Subpart C or D), Gross Ton
177 - Convention (Subpart B), Net Ton
177 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 36
28 February 2024
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7871732
22 October 2008
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 3349472
6 May 2006
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2642051
29 June 2004
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2114999
17 February 2004
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2007466
2 December 2003
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1957200
3 November 2003
Annual Inspection · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1940895
19 May 2003
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1796429
18 February 2003
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1746049
21 January 2003
Administrative Inspection
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1728386
27 December 2002
Administrative Inspection
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1723463
23 October 2002
Annual Inspection · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1694644
24 September 2002
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1679518
27 June 2002
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1638091
20 May 2002
Administrative Inspection · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1618586
1 March 2002
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1490473
29 January 2002
Administrative Inspection
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1482288
28 November 2001
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 433344
2 June 2000
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 732784
2 September 1999
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 432586
4 February 1998
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 412515
9 January 1998
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 411800
3 December 1997
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 410446
16 December 1995
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 386077
25 October 1994
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 691333
18 October 1994
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 866470
14 July 1994
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 368563
1 December 1993
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 362800
10 April 1993
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 357558
17 March 1993
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 357027
17 December 1992
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 356170
9 June 1987
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1012365
15 August 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1000689
22 July 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1273380
9 November 1981
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 964945
15 August 1981
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 968781
Deficiency record · 133
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 12 January 2006
Resolved
33U.S.C.1321(j)(G)-The vessel owner/operator has not provided certification that response resources are ensured under contract to respond to the maximum extent practicable, to a worst case discharge.
33U.S.C.1321(j)(D)(ii)-The NTVRP does not provide 24 hour contact information for the qualified individual, or discuss the qualified individuals responsibility to contact the NRC
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 12 January 2006
Resolved
33U.S.C.1321(j)(D)(i)-The NTVRP does not clearly identify the vessel's intended areas of operation/COTP zones. In addition, the NTVRP does not include the volume and type of oil that would be involved in a worst case discharge.
33U.S.C.1321(j)(D)(iv)-The NTVRP does not address training and all applicable drill/exercise frequencies.
Fire Fighting › Firemans Outfit
Issued 17 November 2003
Resolved
Provide proof of service to Oxygen Breathing Tanks for firefighting equipment. LEGACY COMPONENT DESC: Self-Contained Breathing Apparatus
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 3 November 2003
Resolved
Prove proper operation of OWS and that OWS has been approved by USCG.
Construction/Loadline › Hull
Issued 3 November 2003
Resolved
Flag address numerious doubler plates on Port side of ship. LEGACY COMPONENT DESC: Side Shell
Engineering › Sea-water System (primary cooling)
Issued 3 November 2003
Resolved
Wasted seawater intake piping servicing firefighting and ballest pumps, located Port side in engineroom. LEGACY COMPONENT DESC: Piping
Communications › Radio Communications
Issued 3 November 2003
Resolved
One GMDSS lifeboat radio inoperative discharged battery. LEGACY COMPONENT DESC: VHF Radiotelephone
Communications › Radio Communications
Issued 3 November 2003
Resolved
Program GMDSS System with proper MMSI number. Current number identifies prior name of vessel.
Personnel › Training
Issued 3 November 2003
Resolved
Conduct Fire and abandon ship drills.
Accommodation/Occupational Safety › Occupational Safety
Issued 3 November 2003
Resolved
Mount wheel guard on ballast pump. LEGACY COMPONENT DESC: Guards for Exposed Hazards
Navigation › Piloting/Steering
Issued 3 November 2003
Resolved
Update all charts to current editions and update IAW Notice to Mariners. LEGACY COMPONENT DESC: Marine Charts
Lifesaving › Inflatable Liferafts
Issued 3 November 2003
Resolved
Expired hydrostatic release on Port liferaft. LEGACY COMPONENT DESC: Hydrostatic Release Unit
Navigation › Piloting/Steering
Issued 3 November 2003
Resolved
Update deviation table dtd 05 Jan 2002. LEGACY COMPONENT DESC: Deviation Table/Graph
Fire Fighting › Fire Main
Issued 3 November 2003
Resolved
Prove proper operation of fire main. LEGACY COMPONENT DESC: Pressure
Operations/Management › Navigation Safety
Issued 3 November 2003
Resolved
NAVTEX in inoperable.
Personnel › Certificates/Documents/Licenses
Issued 3 November 2003
Resolved
Provide medical certificates for three crewman. LEGACY COMPONENT DESC: Medical Fitness Document
Documentation › Logs/Records › Logbook (official)
Issued 3 November 2003
Resolved
Have flage state address lack of GMDSS log book.
Operations/Management › Vessel Safety Management
Issued 3 November 2003
Resolved
Marine inspector doubts the valitity of vessels safety management system. Request ISM audit by third party prior to departure from port.
LEGACY COMPONENT DESC: Company Verification/Review/Evaluation
Fire Fighting › Self-contained Breathing Apparatus
Issued 3 November 2003
Resolved
Provide proof of service to oxygen breathing tanks for firefighting equipment. LEGACY COMPONENT DESC: Air Bottle
Documentation › Safety Management System
Issued 19 May 2003
Resolved
Due to the large number of deficiencies to basic safety requirements, a complete audit of the ISM system and documentation must be completed by the appropriate Recognized Organization (RO) in the presence of an attending USCG inspector, prior to loading any cargo or movement of the vessel.
Fire Fighting › Combustible Materials
Issued 19 May 2003
Resolved
Paint Locker filled with combustible material. Remove all combustible material and prove proper operation of the door to the satisfaction of the attending Class/Flag rep.
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 19 May 2003
Resolved
Properly mount CO2 bottle for Paint Locker. LEGACY COMPONENT DESC: Tanks
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 19 May 2003
Resolved
CO2 Control boxes wasted and hard to open. Clean, renew, boxes ensuring they are watertight. Repair/replace wiring to alarm, and post instruction outside the compartment for operation of the system. LEGACY COMPONENT DESC: Operating Controls
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 19 May 2003
Resolved
Fixed Fire Fighting system in disrepair. Have system serviced and provide this office with proof of servicing of the system including the status of hydro static testing of bottles. Report must be received from servicing company before a USCG Inspector will attend the vessel. LEGACY COMPONENT DESC: Tanks
Engineering › Diesel Engine (propulsion-direct drive)
Issued 19 May 2003
Resolved
Fuel Stop switch not water tight. Make proper repairs and prove proper operation of the same. LEGACY COMPONENT DESC: Fuel Stop Switch
Engineering › Freshwater System (air cooling)
Issued 19 May 2003
Resolved
Main Fuel tank access leaking. Make permanent and proper repairs to the satisfaction of the attending Class/Flag rep. prior to departing the Port of Miami. LEGACY COMPONENT DESC: MAIN FUEL TANK
Engineering › Diesel Engine (propulsion-direct drive)
Issued 19 May 2003
Resolved
Properly label fuel transfer shut off valve. LEGACY COMPONENT DESC: Fuel Transfer Shutoff Valve
Construction/Loadline › Penetrations
Issued 19 May 2003
Resolved
Hole wasted in side shell in way of (IWO) Port Side Ladder going to main engine room, bulk head appears thin and bowed with bowed frames. Have Class survey / gauge area and provide report to this office prior to scheduling a Coast Guard re-inspection. LEGACY COMPONENT DESC: Side Shell
Electrical › Electrical Distribution System (service)
Issued 19 May 2003
Resolved
Main electrical switchboard has holes and grab handle no longer non-conducting due to large amount of paint. Make permanent and proper repairs to satisfaction of attending Class / Flag Rep. LEGACY COMPONENT DESC: Switchboard
Electrical › Electrical Distribution System (service)
Issued 19 May 2003
Resolved
Dead end and improper wiring throughout engine room, make permanent and proper repairs to the satisfaction of the attending Class/Flag rep. prior to departing the Port of Miami. LEGACY COMPONENT DESC: Wiring
Engineering › Shafting/Propeller Arrangements
Issued 19 May 2003
Resolved
Vent on Shaft on shaft log bent, cracked and leaking. Submit repair proposal to this office on permanent repairs prior to conducting any repair in port. LEGACY COMPONENT DESC: Vent
Construction/Loadline › Hull
Issued 19 May 2003
Resolved
Hull plating in the area under and around port and starboard shafts wasted, and appears very thin. Have Class survey and gauge area and provide report to this office prior to scheduling a Coast Guard re-inspection. Have bilge area cleaned and deck plates removed for inspection. LEGACY COMPONENT DESC: Hull Plating
Construction/Loadline › Penetrations
Issued 19 May 2003
Resolved
Improper repair and hole wasted in starboard freshwater tank IWO air tank. Make permanent and proper repairs to satisfaction of attending Class/Flag rep. LEGACY COMPONENT DESC: Fresh Water Tank
Electrical › Electric Generation Source (service)
Issued 19 May 2003
Resolved
Generator not operational, Make permanent and proper repairs, mount batteries properly and prove proper operation to the satisfaction of the attending Class/Flag rep. prior to departing Port of Miami. LEGACY COMPONENT DESC: Generator
Construction/Loadline › Penetrations
Issued 19 May 2003
Resolved
Numerous holes wasted in port freshwater tank. Entire tank/bulkhead integrity in question, Have Class survey and gauge tank/bulkhead and provide report to this office. Tank must be open and gas free for attending USCG Marine Inspector at next CG Inspection. Have valid gas free inspection. LEGACY COMPONENT DESC: Fresh Water Tank
Construction/Loadline › Penetrations
Issued 19 May 2003
Resolved
Numerous holes wasted in starboard freshwater tank. Entire tank/bulkhead integrity in question, Have Class survey and gauge tank/bulkhead and provide report to this office. Tank must be open and gas free for attending CG Marine Inspector at next CG Inspection. Have valid gas free inspection cert LEGACY COMPONENT DESC: Fresh Water Tank
Construction/Loadline › Penetrations
Issued 19 May 2003
Resolved
Rudderpost and packing gear leaking profusely. Make permanent and proper repairs and survey of hull plating in area completed to satisfaction of Class/Flag rep. Provide gauging report to the office and have rudderpost de-scaled and cleaned up for inspection prior to a CG Marine Inspector attending LEGACY COMPONENT DESC: Rudder Posts
Engineering › Bilge Water Management System
Issued 19 May 2003
Resolved
Bilge filled with oil. Properly remove and dispose of oil and provide receipts to this office with proper Oil Record Book entries at next US Coast Guard inspection. LEGACY COMPONENT DESC: Bilge
Engineering › Bilge Water Management System
Issued 19 May 2003
Resolved
Ensure all sea chest, sea valves and associated piping is clean and visible for inspection at next US Coast Guard inspection. LEGACY COMPONENT DESC: Bilge
Documentation › Certificates/Documents
Issued 19 May 2003
Resolved
Prior to scheduling a Coast Guard Inspector, provide this office with all applicable, up to date documents, required by international treaty, laws and regulation, to include crew licenses and International Safety Documents
Documentation › Manuals/Policy Documentation
Issued 10 January 2003
Resolved
Stability Book, Cargo Securing Manual, Garbage Management Plan, and SOPEP do not have the approval of the Flag State. Have Flag State Rep. attest to the approval of the aforementioned manuals and provide a report to MSO Miami via fax. LEGACY COMPONENT DESC: Stability Instructions
Personnel › Certificates/Documents/Licenses
Issued 23 October 2002
Resolved
Provide an original Belize STCW 95 endorsement for the Master's GMDSS operator license. LEGACY COMPONENT DESC: STCW Endorsement
Personnel › Certificates/Documents/Licenses
Issued 23 October 2002
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Personnel › Manning/Qualifications
Issued 23 October 2002
Resolved
Provide 1 additional AB as required by the vessel's safe manning certificate. AB shall have appropriate original STCW 95 documents. LEGACY COMPONENT DESC: Minimum Safe Manning
Engineering › Fuel Oil Storage/Transfer System
Issued 23 October 2002
Resolved
Make proper permanent repairs to the leaking fuel piping on the discharge side of the fuel transfer pump. LEGACY COMPONENT DESC: Piping
Stability › Watertight Integrity
Issued 23 October 2002
Resolved
Adjust the watertight door leading from the engine room to the steering flats to ensure that it is watertight.
Deck/Cargo › Ballast
Issued 23 October 2002
Resolved
Make proper permanent repairs in way of the soft patch on the ballast piping on the discharge side of the ballast pump. LEGACY COMPONENT DESC: Piping
Deck/Cargo › Ballast
Issued 23 October 2002
Resolved
Replace the shaft packing for the ballast pump. LEGACY COMPONENT DESC: Pumps
Fire Fighting › Fire Pumps
Issued 23 October 2002
Resolved
Repack the fire pump suction valve just forward of the port main engine. LEGACY COMPONENT DESC: Suction Valve
Engineering › Fuel Oil Storage/Transfer System
Issued 23 October 2002
Resolved
Replace the rubber hose sight glasses on both diesel tanks, the lube oil tank, and the dirty oil tank with proper sight glasses and securing devices. LEGACY COMPONENT DESC: Tank
Engineering › Generator (propulsion-electric)
Issued 23 October 2002
Resolved
Replace the battery box cover for the starting battery on the port generator. LEGACY COMPONENT DESC: Battery
Electrical › Electrical Distribution System (service)
Issued 23 October 2002
Resolved
Eliminate access in the circuit breaker panels on the main switchboard and the panel in the passageway aft of the sewage tank. Panels must have either additional circuit breakers or blanks installed. LEGACY COMPONENT DESC: Circuit Breaker
Fire Fighting › Fire Main
Issued 23 October 2002
Resolved
Make proper permanent repairs to the tee fitting in the fire main located in the engine room overhead just forward of the port main engine LEGACY COMPONENT DESC: Material
Pollution Prevention/Response › Prevention Equipment
Issued 23 October 2002
Resolved
Demonstrate proper operation of the OWS. LEGACY COMPONENT DESC: Oily Water Separator (15 ppm)
Operations/Management › Pollution
Issued 23 October 2002
Resolved
Provide copy of the receipts for discharging waste oil and bilge slops ashore. Make proper entries in the vessel's oil record book LEGACY COMPONENT DESC: Control of Discharge of Oil
Construction/Loadline › Markings
Issued 23 October 2002
Resolved
Provide permanent draft marks fwd and aft. LEGACY COMPONENT DESC: Draft Marks/Indicating System
Construction/Loadline › Markings
Issued 23 October 2002
Resolved
Provide permanent/correct loadline issuing authority mark on hull. LEGACY COMPONENT DESC: Load Line Assigning Authority Mark
Stability › Watertight Integrity
Issued 23 October 2002
Resolved
Have Flag State address hole and wastage on port fwd bow
Stability › Watertight Integrity
Issued 23 October 2002
Resolved
Have Flag State address starboard fed through hull fitting that is cracked
Accommodation/Occupational Safety › Occupational Safety
Issued 23 October 2002
Resolved
Stow oxygen and acetylene cylinders proper on the main deck starboard under ladder LEGACY COMPONENT DESC: Welding/Hot Work
Lifesaving › Lifebuoys
Issued 23 October 2002
Resolved
Remove light from lifebuoys with line and remove line from lifebuoys with light LEGACY COMPONENT DESC: Buoyant Lifeline
Lifesaving › Lifebuoys
Issued 23 October 2002
Resolved
Provide addition lifebuoy for a total of eight IAW Form B of the Safety Equipment Certificate LEGACY COMPONENT DESC: Quantity
Stability › Weathertight Integrity
Issued 23 October 2002
Resolved
Crop and renew deck IWO starboard stack. Several wasted spots were identified
Engineering › Fuel Oil Storage/Transfer System
Issued 23 October 2002
Resolved
Repair starboard F/O tank access cover and weld on fwd bulkhead just outside engine room. Oil is leaking through gasket, bolts and welds. LEGACY COMPONENT DESC: Tank
Construction/Loadline › Penetrations
Issued 23 October 2002
Resolved
Provide gasket material on all access covers on main deck and mooring deck. LEGACY COMPONENT DESC: Gasket
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 23 October 2002
Resolved
Service fire extinguisher IWO sewage holding tank. Extinguisher is currently expended. LEGACY COMPONENT DESC: Service
Stability › Weathertight Integrity
Issued 23 October 2002
Resolved
Repair/replace crack portlight starboard aft pilothouse
Electrical › Lighting (service)
Issued 23 October 2002
Resolved
Permanently hard wire all deck lights. Deck lights are currently plugged in using extension cords. LEGACY COMPONENT DESC: Lighting Feeder
Engineering › Fuel Oil Service System
Issued 23 October 2002
Resolved
Provide metallic flame shields for Racor filters LEGACY COMPONENT DESC: Filter
Accommodation/Occupational Safety › Occupational Safety
Issued 23 October 2002
Resolved
Provide guards for both generators' flywheels LEGACY COMPONENT DESC: Guards for Exposed Hazards
Navigation › Piloting/Steering
Issued 23 October 2002
Resolved
Make repairs to and prove proper operation of rudder angle indicator on bridge.
Navigation › Collision/Grounding Avoidance
Issued 23 October 2002
Resolved
Install echo depth sounder. LEGACY COMPONENT DESC: Echo-sounding Device
Communications › Radio Communications
Issued 23 October 2002
Resolved
Provide three spare batteries for GMDSS hand held radios
Fire Fighting › Self-contained Breathing Apparatus
Issued 23 October 2002
Resolved
Provide charged SCBA bottles to the satisfaction of the Administration. LEGACY COMPONENT DESC: Air Bottle
Documentation › Certificates/Documents
Issued 23 October 2002
Resolved
Complete the following items from the operator's self generated worklist:Items # 1,2,3,4,5,6,7,9,11,12,13,14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 31, 34, 35, 38, 39
Construction/Loadline › Markings
Issued 23 October 2002
Resolved
Properly stencil the vessel's flag on the stern. LEGACY COMPONENT DESC: Vessel Name/Home Port
Operations/Management › Drills/Instruction
Issued 23 October 2002
Resolved
Conduct satisfactory fire and abandon ship drills in the presence of a USCG inspector.
Personnel › Manning/Qualifications
Issued 29 January 2002
Resolved
Man the vesel IAW STCW 95. The current 2nd Engineer's license was found to be invalid in that it was fraudulant.
Documentation
Issued 28 November 2001
Resolved
Provide Original Safe Manning Document on board.
Documentation
Issued 28 November 2001
Resolved
Update the muster list to be ship specific.
Unknown
Issued 28 November 2001
Resolved
Vessel failed to depart from the Miami River as orderd by COTP Miami Order number 2000-156.
Accommodation/Occupational Safety
Issued 28 November 2001
Resolved
Secure Marine Sanitation Device(MSD) tank and provide placard, manual and Chemicals, prior to loading and departure.
Engineering
Issued 28 November 2001
Resolved
Secure Portside day tank, locate and secure/repair leak, prior to loading and departure.
Documentation
Issued 28 November 2001
Resolved
Vessel must undergo an Initial SOLAS exam prior to loading and departure.
Documentation
Issued 28 November 2001
Resolved
Provide all new certificates prior to loading and departure.
Construction/Loadline
Issued 28 November 2001
Resolved
Vessel was ordered to stop all operations and remove all excess oily water and diesel from bilges prior to conducting any operations.
Documentation
Issued 28 November 2001
Resolved
Begin proper logging of oil record book.
Navigation
Issued 28 November 2001
Resolved
Provide current Deviation Table.
Lifesaving
Issued 28 November 2001
Resolved
Replace hydrostatic release on portside liferaft.
Documentation
Issued 28 November 2001
Resolved
Provide medical certificate for AB (Merino).
Accommodation/Occupational Safety
Issued 28 November 2001
Resolved
Remove bunks from engineering spaces prior to loading and departure.
Electrical
Issued 28 November 2001
Resolved
Remove excess loose wiring located on left side of phone booth in engine room.
Engineering
Issued 28 November 2001
Resolved
Install coupling guard on fuel oil transfer pump.
Electrical
Issued 28 November 2001
Resolved
Replace light cover on alarm light in engine room.
Navigation
Issued 28 November 2001
Resolved
Provide surveyor's report addressing excessive wastage in aft steering (rudder posts, gussets, structural members.)
Navigation
Issued 28 November 2001
Resolved
Repair leak to portside hydraulic steering ram.
Documentation
Issued 28 November 2001
Resolved
Have flag approval for SOPEP.
Construction/Loadline
Issued 28 November 2001
Resolved
Repair holes in bulkhead of #1 cargo hold. Provide class surveyor's reportaddressing repairs.
Construction/Loadline
Issued 28 November 2001
Resolved
Soap test weld in #2 portside cargo hold in presence of surveyor. JWD # 2 fuel wing tank.
Engineering
Issued 28 November 2001
Resolved
Have surveyor address fuel oil leaking into #3 cargo hold from engine room_x001C_bilge.
Construction/Loadline
Issued 28 November 2001
Resolved
Vessel to have the interior of the #3 port aft ballast tank/water tank inspected by a Class/Flag Surveyor, and to have the report faxed to the US Coast Guard prior to the vessel next US entry.
Construction/Loadline
Issued 28 November 2001
Resolved
Provide report of internal structure exam (noted wastage on Fore Peak Tank/Chain locker, Main Engine Room/Stack Casing, doublers on Deck), prior to loading and departure.
Documentation
Issued 2 September 1999
Resolved
PRIOR TO DEPARTURE FROM MIAMI CORRECT ALL DEFICIENCIES NOTED ON CLASS REPORT DATED 23AUG99.
Unknown
Issued 2 September 1999
Resolved
PRIOR TO 15SEP99 PROVIDE SATISFACTORY COMMUNICATION SYSTEM BETWEEN BRIDGE AND ENGINE ROOM.
Documentation
Issued 2 September 1999
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Electrical
Issued 2 September 1999
Resolved
PRIOR TO DEPARTURE PROVE PROPER OPERATION OF SHIP'S RADIO. PROVIDE CLASS REPORT TO MSO TAMPA.
Documentation
Issued 2 September 1999
Resolved
PRIOR TO DEPARTURE PROVIDE VALID LICENSE FOR CHIEF ENGINEER.
Fire Fighting
Issued 2 September 1999
Resolved
PRIOR TO DEPARTURE DEMONSTRATE A SATISFACTORY FIRE DRILL TO COAST GUARD BOARDING OFFICER.
Documentation
Issued 2 September 1999
Resolved
PRIOR TO DEPARTURE PRESENT TO THE CAPTAIN OF THE PORT A PROPOSAL FOR THE VESSEL TO SAFELY TRANSIT THE WATERS OF TAMPA BAY WITHOUT EMERGENCY STEERING.
Navigation
Issued 2 September 1999
Resolved
PRIOR TO DEPARTURE PROVIDE CHART 11417.
Lifesaving
Issued 2 September 1999
Resolved
PRIOR TO DEPARTURE DEMONSTRATE VESSEL IS MANNED IN ACCORDANCE WITH ITS SAFEMANNING CERTIFICATE.
Documentation
Issued 2 September 1999
Resolved
PRIOR TO 09SEP99 PROVIDE VERIFICATION FROM FLAG OF THE ACCEPTANCE OF THE CREW LICENSES.
Navigation
Issued 2 September 1999
Resolved
PRIOR TO DEPARTURE PROVE PROPER OPERATION OF STEERING SYSTEM. PROVIDE CLASSREPORT TO MSO TAMPA.
Lifesaving
Issued 16 December 1995
Resolved
Self activating smoke for bridge wing buoys not attached. attached prior to next international voyage.
Navigation
Issued 16 December 1995
Resolved
No compass deviation Table or equivalent. Prior to next U.S voyage.
Navigation
Issued 14 July 1994
Resolved
The "Pig Iron" failed to have a current copy of Inlad Navigation Rules onboard, as required by 33 CFR 88.05.
Lifesaving
Issued 14 July 1994
Resolved
Any vessel 150 Gross tons and over is required to have onboard 12 hand rocket propelled parachute red flares as per 46 CFR 94.90, the "Pig Iron" only had 10 onboard.
Fire Fighting
Issued 14 July 1994
Resolved
"Pig Iron" failed to provide properly equipted fire stations as per 46 CFR95.10, fire stations were missing fire hose nozzels.
Navigation
Issued 14 July 1994
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Navigation
Issued 14 July 1994
Resolved
Vessel failed to provide up to date charts for the local area, as required by 46 CFR 97.05-5(a).
Documentation
Issued 14 July 1994
Resolved
The deckmark marking was not permanently marked on the port/starboard sideof vessel as required by 46 CFR 42.07-5(a).
Documentation
Issued 14 July 1994
Resolved
"Pig Iron" failed to provide Oil Transfer Procedures, as required by 33 CFR 155.720.
Construction/Loadline
Issued 14 July 1994
Resolved
Vessel failed to provide watertight intergrity for forward doors, worn _x001C_ gasteskets and some dogs were frozen, as required by 46 CFR 42.15.
Electrical
Issued 14 July 1994
Resolved
The batteries in engine room did not have covers, 46 CFR 90.25.
Documentation
Issued 17 March 1993
Resolved
The acting chief engineer of the Pig Iron, a vessel of greater than 250 barrel fuel oil capacity, conducted a transfer of diesel on March 16, 1993 without oil transfer procedures.
Documentation
Issued 17 March 1993
Resolved
The Pig Iron, a vessel of greater than 250 barrel fuel capacity, failed to provide Oil Transfer Procedures.
Accommodation/Occupational Safety
Issued 17 March 1993
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Documentation
Issued 17 March 1993
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Accommodation/Occupational Safety
Issued 17 December 1992
Resolved
The Pig Iron, a vessel with two installed toilets, failed to have an operable marine sanitaion device onboard.
Construction/Loadline
Issued 17 December 1992
Resolved
The Pig Iron, an oceangoing ship of 177 gross tons, failed to have a standard discharge connection as described in 33 CFR 155.430.
Documentation
Issued 17 December 1992
Resolved
The Pig Iron, a vessel with a fuel capacity of greater than 10,500 gallons,failed to provide Oil Transfer Procedures for inspection by boarding officers, or as reference by crew.
Documentation
Issued 17 December 1992
Resolved
The operator of the Pig Iron, a vessel with a fuel capacity of greater than10,500 gallons, failed to maintain as a record, and make available for inspection, the Declaration Of Inspection for a transfer that took place on/or about November 29, 1992.
Navigation
Issued 9 November 1981
Resolved
REPAIR RUDDER ANGLE INDICATOR WITHIN 30 DAYS.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National