Documentation record
Registered dimensions (L × B × D)40.1 ft × 12.0 ft × 4.9 ft
Registered tonnagegross 17 / net 11
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderLAFCO, INC. · LAFAYETTE, LA, UNITED STATES · built 1981
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW CASTLE, DE
Endorsements, as the file codes themcw_un
DocumentationValid · issued 24 June 2026 · expires 31 July 2027
Service, as the file records itPassenger (Uninspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it17 - Regulatory (Subpart C or D), Gross Ton
11 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 15
10 November 2025
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8269703
27 November 2024
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8039611
13 December 2023
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7838718
15 November 2023
Drydock Exam · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7824461
29 November 2022
Internal Structural Exam · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7601353
27 October 2021
Deficiency Check · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7336396
29 September 2021
Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7321518
12 November 2020
Annual Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7093373
13 November 2019
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6854216
20 October 2019
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6838512
19 October 2019
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6838519
31 October 2018
Annual Inspection · Administrative Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6568948
9 November 2017
Annual Inspection · Administrative Inspection · DAPI Audit · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6301525
26 October 2016
Administrative Inspection · DAPI Audit · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6030277
14 September 2016
Administrative Inspection · Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6000898
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 27 November 2024
Resolved
The construction and arrangement of the vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. Both aft aluminum inboard engine bed structural braces for the port and starboard main engines were cracked. Repair or replace the damaged engine beds in accordance with an approved repair proposal submitted to the cognizant OCMI.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 December 2024
Resolved 17 December 2024
Resolution: MI's attended the vessel and observed welds on both engine beds repaired.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 27 November 2024
Resolved
The construction and arrangement of the vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. Both port and starboard main engine exhaust pipes are leaking at their through-hull fittings at the transom. Repair or replace the exhaust terminus fittings in accordance with an approved repair proposal submitted to the cognizant OCMI.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 December 2024
Resolved 2 February 2025
Resolution: A repair proposal was submitted and approved by the OCMI. The OCMI has agreed to allow the vessel to operate as is until or before next dry docking period where repairs can be safely carried out.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 November 2024
Resolved
Where flexible nonmetallic hose is permitted for use in piping systems by this section, it must meet SAE J-1942 (incorporated by reference; see 46 CFR 175.600) or be specifically approved by the Commandant. Those fuel hose connecting the secondary fuel filter to the port main engine was not bearing markings of approval. Provide proof of the hoses approval for suitability.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 December 2024
Resolved 3 December 2024
Resolution: Fuel hose replaced with approved fire-rated hose.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 27 November 2024
Resolved
A vessel must be provided with bilge pumps. The bilge pump did not operate upon activation as installed. Repair bilge pump to operate as installed.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 November 2024
Resolution: Operator replaced pump breaker, and the attending MI witnessed satisfactory operation of the bilge pump. 01 Deficiency removed.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 27 November 2024
No resolution recorded
The construction and arrangement of the vessel musty allow the safe operation in accordance with the terms of it's Certificate of Inspection giving consideration to provisions for a seaworthy hull. The horizontal dry exhaust system has been not been deemed water tight due to the free floating stainless exhaust pipes exiting the aluminum hull and caulked with non-permanent sealant. Prior to next credit dry dock, repair the exhaust system in accordance with the repair proposal submitted to and approved by the Sector Delaware bay OCMI.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 November 2028
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 29 November 2022
Resolved
At each initial and and subsequent inspection for certification, the marine inspector shall examine and test the following items to determine that they are in proper operating condition and fit for the service for which they are intended. Cotter pin on locking nut was broken on port side rudder post and bolt on tiller arm was loose. Replace cotter pin and tighten bolt on tiller arm. 46 CFR 176.25-10(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 December 2022
Resolved 2 December 2022
Resolution: Vessel owner sent in picture of repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 27 October 2021
Resolved
Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds (150 degrees F) must be suitably insulated where necessary to prevent injuries. Lagging on the STBD engine turbo exhaust had excessive soot build up and the Port engine turbo exhaust was not properly secured. Remove Port turbo lagging to ensure no exhaust leak is present, properly secured Port engine turbo lagging. 46 CFR 177.970
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 5 November 2021
Resolution: O/O provided picture evidence correcting lagging and ensuring no exhaust leak, sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 27 October 2021
Resolved
All vessels shall be provided with bilge pumps in accordance with table 182.25-10-10a. Installed bilge pump was rated for 8 GPM. Replace the bilge pump with a 10 GPM rating. 46 CFR 182.25-10(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 5 November 2021
Resolution: O/O provided picture evidence of correctly rated bilge pump, sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 27 October 2021
Resolved
Rails or equivalent protection shall be installed near the periphery of all weather decks accessible to passengers and crews. Noticed crack in welds of the base mounting bracket of both Port and STBD deck rails. Make affect repairs to both deck rails. 46 CFR 177.35-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 5 November 2021
Resolution: O/O provided picture evidence of handrail base repair, sat.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 27 October 2021
Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed and hazardous places such as gears, machinery, etc. Port and STBD engines flywheel were missing covers. Provide adequate protection cover over flywheel. 46 CFR 177.35-15
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 November 2021
Resolved 5 November 2021
Resolution: O/O provided picture evidence of guard rails on both port and STBD engines, sat.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 29 September 2021
Resolved
Wastage found on port and starboard propeller shaft struts. Submit repair plan. To be fixed prior to receiving credit drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 September 2021
Resolved 18 October 2021
Resolution: Gauging and repairs done to affected areas. 2 year credit dry dock issued.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 September 2021
Resolved
Fuel vent line leaking on port side exhaust.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 October 2021
Resolved 18 October 2021
Resolution: Re threaded and sealed fuel line with no visible leaks.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 12 November 2020
Resolved
A vessel of at least 7.9 meters (26ft) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in normally unmanned spaces. The bilge high level alarm for the machinery space did not produce an audible alarm when tested.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 November 2020
Resolved 19 November 2020
Resolution: [name withheld] attesting to the operation of the visual and audible bilge alarm at the operating station
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 November 2020
Resolved
Piping, including valves, pipe fittings and flanges conveying vapor, gas, or liquid, the temperature of which exceeds 150 degrees F, must be suitably insulated where necessary to prevent injuries. Port exhaust lagging was not properly secured.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 November 2020
Resolved 19 November 2020
Resolution: Recieved photographic evidence attesting to the repaired exhaust lagging.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 October 2019
Resolved
Vessel reported a loss of propulsion. Diagnose and repair main propulsion engines to the satisfaction of the attending marine inspector prior to the movement of the vessel.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 November 2019
Resolution: [name withheld] went onboard and verified that both M/E function properly. //[name withheld]
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 9 November 2017
Resolved
MAB02: Provide MIS report to CG marine inspector.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 23 November 2017
Resolved 14 November 2017
Resolution: Received MIS report in email.
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 November 2017
Resolved
MAB01: Connections for pilot house window heater damaged due to apparent overload: identify source and repair. Window heater to be secured until deficiency cleared. Remove dead end wiring.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 23 November 2017
Resolved 9 November 2017
Resolution: Both wire nuts have been replaced w/ two crimp on connecters. We have also replaced the heater control switch w/ a different type/kind, we think the switch was bad and this is what caused the short. We trimmed the orange wire back and added a new connectr