Records from 2016 to 2018. Most recent: inspection, 11 October 2018.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 9 August 2018
Resolved
Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date. Vessel's anniversary date on the COI is 23 Apr, making an annual inspection required by 23 Jul. Vessel has not yet completed an annual inspection in 2018 and is restricted from carrying passengers until an annual inspection is scheduled and completed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2018
Resolved 11 October 2018
Resolution: Received official letter from vessel owner requesting to surrender COI. Vessel no longer operating and is laid up.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 27 October 2017
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of the hull structure and its appurtenances. Various handrails on upper deck of the vessel are highly corroded and need to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 November 2017
Resolved 12 January 2018
Resolution: All Repairs are complete. Repairs were all tested and passed inspection. Vessel is fit for its service.
Engineering › Bilge Water Management System › Valve
Issued 27 October 2017
Resolved
During the examination all accessible parts of the vessel's underwater body and all through hull fittings, including the hull plating and planking, appendages, propellers, shafts, bearings, rudders, sea chests, sea valves, and sea strainers must be opened for examination. FWD PEAK Bilge suction valve found to be highly wasted. Repair / replace valve.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 November 2017
Resolved 12 January 2018
Resolution: All Repairs are complete. Repairs were all tested and passed inspection. Vessel is fit for its service.
Engineering › Bilge Water Management System › Valve
Issued 27 October 2017
Resolved
During the examination all accessible parts of the vessel's underwater body and all through hull fittings, including the hull plating and planking, appendages, propellers, shafts, bearings, rudders, sea chests, sea valves, and sea strainers must be opened for examination. Reach rod for FWD Peak Bilge suction is broken. Repair replace reach rod.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 November 2017
Resolved 12 January 2018
Resolution: All Repairs are complete. Repairs were all tested and passed inspection. Vessel is fit for its service.
Construction/Loadline › Hull › Transverse Frame
Issued 27 October 2017
Resolved
During the examination all accessible parts of the vessel's underwater body and all through hull fittings, including the hull plating and planking, appendages, propellers, shafts, bearings, rudders, sea chests, sea valves, and sea strainers must be opened for examination. FWD Peak Port lower void 2nd frame in, frame has a weld broken. Repair weld.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 November 2017
Resolved 12 January 2018
Resolution: All Repairs are complete. Repairs were all tested and passed inspection. Vessel is fit for its service.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 5 September 2017
Resolved
You reported your vessel sustained damage due to Hurricane Havery. All repairs or alterations to the hull, machinery or equipment that effects the safety of the vessel must not be made without approval of the cognizant OCMI. Prior to any repairs, you are directed to schedule a damage inspection and an assessment of all repair plans for approval to the satisfaction of the attending CG Marine Inspector within 7 days.
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 September 2017
Resolved 27 October 2017
Resolution: Vessel was able to drydock and schedule inspection. Conducted inspection and issued new 835 under activity #6259882. Cleared 835 and working under drydock activity.
Engineering › Fuel Oil Service System › Piping
Issued 19 July 2017
Resolved
Found 2 hoses for fuel on both port and stbd MDEs chaffed through and leaking. Flexible hose shall be fabricated of inner tube and outer cover. 46 CFR 182.20-40(a)(2)(ii)
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 July 2017
Resolution: Chaffed fuel hoses replaced and properly supported, All connections tightened on both MDE's.
Communications › Radio Communications › EPIRB
Issued 19 July 2017
Resolved
EPIRB HRU expired. Vessels operating beyond 3nm must have an EPIRB equipped to automatically float free. Vessel route is restricted to less than 3nm from the coastline. Properly install new hydrostatic release to satisfaction of attending CG marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 29 July 2017
Resolution: EPIRB hydrostatic release replaced with new. Op Control restricting vessel to less than 3nm offshore removed.
Lifesaving › Lifefloat › Serviceable
Issued 19 July 2017
Resolved
One of the vessels life floats has deteriorated and is no longer in serviceable condition. Life floats must be maintained in good and serviceable condition. Vessels passenger count has been reduced to 24 total persons on board. Replace or repair to manufacturers specs.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 July 2017
Resolution: Unserviceable Life Float replaced with new and properly installed.
Fire Fighting › Means of Escape › Doorways
Issued 19 July 2017
Resolved
Identified broken dog on emergency escape hatch from engine room. A hatch cover must have securing devices. Replace or repair to satisfaction of attending marine inspector.
Action required: 705 - Other - as specified
Due 26 July 2017
Resolved 26 July 2017
Resolution: Emergency escape hatch replaced with new.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 19 July 2017
Resolved
Emergency escape from E/R was not properly labeled. Emergency escapes must be marked on each side in 1" lettering "Emergency Exit, Keep Clear". Properly label emergency escapes.
Action required: 705 - Other - as specified
Due 26 July 2017
Resolved 26 July 2017
Resolution: Emergency escape route/hatch in E/R properly marked.
Navigation › Piloting/Steering › Marine Charts
Issued 19 July 2017
Resolved
Vessel charts and light list were not up to date. Vessels must carry adequate and up to date charts and publications. Supply update charts and publications.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 July 2017
Resolved 26 July 2017
Resolution: Current marine charts on board.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 19 July 2017
Resolved
Alcohol test strips on board were expired. Alcohol test strips must be provided for each crew member if operating more than 2 hours from a testing facility. Vessel route restricted to less than 2 hours from the dock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 July 2017
Resolved 26 July 2017
Resolution: Valid alcohol testing strips on board.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 19 July 2017
Resolved
Guards on stbd generator and starboard MDE were falling off. Suitable covers shall be installed in way of exposed hazards. Properly secure guards.rotating machinery not secured properly.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 July 2017
Resolved 26 July 2017
Resolution: Protective guards on MDE's and generators properly installed.
Engineering › Freshwater System (jacketwater cooling) › Hose
Issued 19 July 2017
Resolved
Suitable connections must be provided on flexible hoses. Replace missing hose clamps
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 July 2017
Resolved 26 July 2017
Resolution: Double hose clamps installed where appropriate.
Navigation › Piloting/Steering › Marine Charts
Issued 16 May 2016
Resolved
Marine charts outdated and uncorrected. All pubs are outdated.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 May 2016
Resolved 18 May 2016
Resolution: Purchased current pubs and new chart on board.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 16 May 2016
Resolved
Alcohol test strips on board are expired.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 May 2016
Resolved 18 May 2016
Resolution: Replaced alcohol test strips with proper expiration date.
Lifesaving › Hand Flares › Storage
Issued 16 May 2016
Resolved
Distress signal container not watertight or brightly colored.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 23 May 2016
Resolved 18 May 2016
Resolution: Replaced with proper distress signal container.
Engineering › Bilge Water Management System › Piping
Issued 16 May 2016
Resolved
#2 Bilge pick up would not provide suction.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 May 2016
Resolution: Proved proper operation of bilge system.