M/V SEACHASER

M/V SEACHASER is a 1981 passenger vessel (inspected). The Coast Guard has recorded 54 inspections since 1981, most recently in December 2011, along with 183 deficiencies and 1 operational control.

Records from 1981 to 2011. Most recent: inspection, 16 December 2011.

Built
1981
Last inspected
16 December 2011
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDE6416
Flag
UNITED STATES
366837160, 367380030 (licence lapsed)
Maury page id
psix-53338

Inspections, by type

…with no type recorded15
Years with a record 27 calendar years (1981–2011)
The 54 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 15 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Tonnage as PSIX records it66 - Regulatory (Subpart C or D), Net Ton
97 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WDE6416MMSI 367380030 · expired · compulsorily equipped · granted 9 October 2008, cancelled 15 December 2018 · licensed under a name not among this hull’s recorded names (not shown)
WDA6884MMSI 366837160 · expired · compulsorily equipped · granted 31 January 2002, cancelled 7 April 2012 · licensed under a name not among this hull’s recorded names (not shown)
WYR9473MMSI not assigned · expired · compulsorily equipped · granted 26 June 1998, cancelled 13 December 2008 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 54

16 December 2011 Administrative Inspection
Administrative · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 4209545
8 February 2011 Annual Inspection
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 3956934
19 February 2010 Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3680914
17 February 2010 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3681412
28 August 2008 Hull Examination · Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 3352248
25 April 2007 Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2914079
12 January 2006 Hull Examination · Internal Structural Exam · COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2568906
9 May 2005 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2352781
7 April 2005 Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2328246
21 June 2004 Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2107192
9 February 2004 Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2003646
13 January 2004 Hull Examination · Internal Structural Exam
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1983327
25 April 2003 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1780316
3 April 2003 Deficiency Check
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1767693
1 April 2003 Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1766257
14 May 2002 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1616515
25 April 2002 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1615528
3 January 2002 Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1475359
14 October 1999 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 787217
29 October 1998 Hull Examination · Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1421571
30 October 1997 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1364438
18 August 1997 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 505803
19 March 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1104053
31 October 1996 Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1414705
18 August 1996 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 531531
6 December 1995 Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1188976
5 December 1995 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 35918
29 November 1995 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 484745
2 November 1995 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1422596
19 April 1995 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 441415
17 April 1995 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 533454
14 April 1995 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 440440
2 November 1994 Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1405616
25 August 1994 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 866557
28 July 1994 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1180762
15 November 1993 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1139587
19 August 1993 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 829780
18 August 1992 Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1473296
6 August 1992 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1259202
24 July 1992 Drydock Extension
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1260176
7 October 1991 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 941205
30 September 1991 COI Inspection · Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 937213
15 November 1990 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 930334
12 October 1990 COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 911186
10 April 1990 Drydock Extension
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 929797
11 October 1989 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1039968
14 October 1988 Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1197978
4 August 1987 Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1033338
7 October 1986 COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1014123
10 October 1985 COI Inspection · Credit Drydock
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1294748
10 October 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 977008
4 September 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 975405
26 August 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1275312
24 August 1981 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1272758

Deficiency record · 183

Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 19 February 2010 Resolved
Install light in port side crew berthing.
Action required: 705 - Other - as specified
Due 26 February 2010
Resolved 8 February 2011
Resolution: Verified completed during annual insepction
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 19 February 2010 Resolved
Secure blackwater discharge valve.
Action required: 705 - Other - as specified
Due 26 February 2010
Resolved 8 March 2011
Resolution: Verified during annual inspection
Engineering › Bilge Water Management System › Valve
Issued 19 February 2010 Resolved
Unseize valve in forepeak.
Action required: 705 - Other - as specified
Due 26 February 2010
Resolved 16 December 2011
Resolution: Vessel surrendered COI. If vessel enters service it must complete DDE, COI, ISE.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 17 February 2010 Resolved
VSL overdue Annual exam as of 12 FEB 2010
Action required: 705 - Other - as specified
Due 19 February 2010
Resolved 19 February 2010
Resolution: Vessel past annual exam.
Accommodation/Occupational Safety › Other Accommodation Spaces › Recreation Space
Issued 25 April 2007 Resolved
Remove from the vessel all paint cans from under the seats in the crew accomadation space.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Personnel › Training › Fire Fighting Basic
Issued 25 April 2007 Resolved
Provide a training logbook and conduct man overboard ,fire and and abandon ship drills at least once every three months.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Communications › Radio Communications › EPIRB
Issued 25 April 2007 Resolved
Test EPRIB monthy and log in vessels logbook.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Navigation › Piloting/Steering › Coast Guard Light List
Issued 25 April 2007 Resolved
Provide current copy of the light list.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 27 October 2008
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 25 April 2007 Resolved
Demonstrate proper operation of all main engine stops from the pilot house.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 4 June 2007
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 25 April 2007 Resolved
Demonstrate proper operation of all main engine guages at the pilot house.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 27 October 2008
Electrical › Electric Supply System (service) › Cable
Issued 25 April 2007 Resolved
Remove extention cord wirng all rudder angle indicators and install approved marine cable and demonstrate proper operation of all rudder indicators.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 25 May 2007
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 25 April 2007 Resolved
Demonstrate proper operation of the anchor light.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Lifesaving › Launching Appliances › Lines
Issued 25 April 2007 Resolved
Repair rescue platform and demonstrate proper operation.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Electrical › Lighting (service) › Lighting Fixture
Issued 25 April 2007 Resolved
Repair 01 deck port side deck light wiring.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 25 May 2007
Electrical › Electrical Distribution System (service) › Cable
Issued 25 April 2007 Resolved
Properly support wiring fo 01 deck radio antenna.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 25 May 2007
Electrical › Electric Supply System (service) › Battery Installation
Issued 25 April 2007 Resolved
Remove battery and charger powering the anchor light and properly wire the light from a generator source of power.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Electrical › Electrical Distribution System (service) › Cable
Issued 25 April 2007 Resolved
Properly repair wire for the public address system speaker 01 deck.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 25 April 2007 Resolved
Install a protective cover over the light bulb above the stove.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 25 April 2007 Resolved
Install protective guards over all bunk light fixtures.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Fire Fighting › Fire Main › Pressure
Issued 25 April 2007 Resolved
Renew fire pump guage and demonstrate proper operation.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Electrical › Electrical Distribution System (emergency) › Cable
Issued 25 April 2007 Resolved
Properly support wiring to all main engine pressure switches and secure brackets for all pressure switches.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 25 April 2007 Resolved
Install protective lagging on the port main engine exhaust piping.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 25 April 2007 Resolved
Remove oil soaked exhaust lagging from the port generator piping and renew.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 25 April 2007 Resolved
Renew fire extinguisher bracket engine room aft bulkhead.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Engineering › Freshwater Generation System › Piping
Issued 25 April 2007 Resolved
Properly support potable water fill pipe port side engine room at the potable water tank.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Electrical › Electric Supply System (service) › Cable
Issued 25 April 2007 Resolved
Properly support all wiring currently lay in the engine room bilges. Support them as high from the bilge as possible.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Electrical › Electric Supply System (service) › Cable
Issued 25 April 2007 Resolved
Remove all dead end wiring in the engine room.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Engineering › Sea-water System (primary cooling) › Piping
Issued 25 April 2007 Resolved
Repair salt water cooling pipe to the starboard main engine due to cracking.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Electrical › Electric Supply System (service) › Cable
Issued 25 April 2007 Resolved
Properly repair wiring to the steering compartment high bilge switch.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 25 April 2007 Resolved
Provide and install an approved marine grade distribution panel in the steering compartment.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 25 May 2007
Electrical › Electric Supply System (service) › Cable
Issued 25 April 2007 Resolved
Properly support wiring to # 1 and # 2 steering motors.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Electrical › Electric Supply System (service) › Cable
Issued 25 April 2007 Resolved
Properly wire the # 1 steering motor.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 25 April 2007 Resolved
Make available both air receivers for an internal inspection.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 25 May 2007
Engineering › Compressed Air System (start air) › Bursting Disc
Issued 25 April 2007 Resolved
Renew both pressure releif valves for both air receivers.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Engineering › Compressed Air System (start air) › Valve
Issued 25 April 2007 Resolved
Renew the pressure guage on the port air receiver.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Electrical › Electric Generation Source (service) › Switch
Issued 25 April 2007 Resolved
Demonstrate proper operation of the lube oil pressure guage on the port generator.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Electrical › Electric Supply System (service) › Battery Charger
Issued 25 April 2007 Resolved
Demonstrate proper operation of the constant voltage battery and charger arrangement in the steering compartment.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 25 May 2007
Electrical › Electric Generation Source (service) › Generator
Issued 25 April 2007 Resolved
Demonstrate proper operation of the starboard generator.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Engineering › Steering Gear System › Linkage
Issued 25 April 2007 Resolved
Repair the starboard steering gear ram coupling and demonstrate proper operation.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Accommodation/Occupational Safety › Other Accommodation Spaces › Recreation Space
Issued 25 April 2007 Resolved
Repair and demonstrate proper operation of the starboard main deck escape hatch.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 25 May 2007
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 25 April 2007 Resolved
Provide portable electrical equipment at the pilot house and entrance to the engine room.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 25 April 2007 Resolved
Repair/replace rudder angle indicator switch on the steering gear system.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 25 May 2007
Engineering › Steering Gear System › Hydraulic Hose
Issued 25 April 2007 Resolved
Install chaffing gear on all steering gear hydralic hoses.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Construction/Loadline › Hull › Transverse Frame
Issued 25 April 2007 Resolved
Repair all tripped brackets on the aft steering gear bulkhead as marked.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 25 May 2007
Engineering › Lubricating Oil Service System › Piping
Issued 25 April 2007 Resolved
Properly support lube oil piping to the port generator.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Engineering › Freshwater System (cylinder head cooling) › Accumulator
Issued 25 April 2007 Resolved
Repair a leak on the starboard generator head tank.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Electrical › Lighting (emergency) › Lighting Fixture
Issued 25 April 2007 Resolved
Demonstrate proper operation of the vessels emergency lighting.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 25 April 2007 Resolved
Repair starboard top side of escape ladder in the generator space.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 25 May 2007
Engineering › Steering Gear System › Pin
Issued 25 April 2007 Resolved
Provide proper size retaining pin on aft starboard steering ram.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Construction/Loadline › Structures › Machinery Space Opening
Issued 25 April 2007 Resolved
Demonstrate proper operation of the engine room escape scuttle.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 25 May 2007
Construction/Loadline › Hull › Bracket
Issued 25 April 2007 Resolved
Repair cracked welds on both inboard corners of port forward engine room vent louvers on main deck.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Accommodation/Occupational Safety › Other Accommodation Spaces › Insect Screen
Issued 25 April 2007 Resolved
Install insect screens on all accomodation vents.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Accommodation/Occupational Safety › Other Accommodation Spaces › Insect Screen
Issued 25 April 2007 Resolved
Install a flame screen on the sewage vent.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 25 May 2007
Accommodation/Occupational Safety › Occupational Safety › Storm Rail
Issued 25 April 2007 Resolved
Insatll additional rail courses on the bow storm rails.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Electrical › Electrical Distribution System (service) › Switch
Issued 25 April 2007 Resolved
Stencil fuel oil pump motor controller with its intended use.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 25 May 2007
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 25 April 2007 Resolved
Properly support the fuel oil pipe from the fuel tank to the fuel pump.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 25 May 2007
Engineering › Fuel Oil Service System › Piping
Issued 25 April 2007 Resolved
Repair fuel oil leak on starboard generator return line.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 25 April 2007 Resolved
Permanently affix draft marks on hull and paint in a contrasting color to the hull.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 8 May 2007
Personnel › Training › Fire Fighting Basic
Issued 25 April 2007 Resolved
Demonstrate crew drills for fire fighting, man overboard and abandon ship drills while vessel is underway.
Action required: 705 - Other - as specified
Due 9 May 2007
Resolved 4 June 2007
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 25 April 2007 Resolved
Repair excessive leakage from the center shaft packing in engine room.
Action required: 705 - Other - as specified
Due 22 May 2007
Resolved 25 May 2007
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 25 April 2007 Resolved
Repair exhaust lagging for the center main engine.
Action required: 705 - Other - as specified
Due 22 May 2007
Resolved 25 May 2007
Fire Fighting › Fire Main › Pressure
Issued 25 April 2007 Resolved
Demonstrate proper operation of the main fire pump at 60 psi.
Action required: 705 - Other - as specified
Due 22 May 2007
Resolved 25 May 2007
Engineering › Bilge Water Management System › Piping
Issued 25 April 2007 Resolved
Remove excessive oilf from all bilges.
Action required: 705 - Other - as specified
Due 22 May 2007
Resolved 25 May 2007
Documentation › Certificates/Documents › FCC SSL
Issued 1 March 2006 Resolved
Provide a Radio Telephony Certificate in accordance with 46 CFR 176.402.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: provided Radio Telephony Certificate as required.
Personnel › Training › First Aid/CPR
Issued 1 March 2006 Resolved
Provide CPR and First Aid cards in accordance with NVIC 1-91.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: CPR and First Aid cards were provided to the satisfaction of the attending marine inspector.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 1 March 2006 Resolved
Provide current copy of Light list and Coast Pilot in accordance with 46 CFR 184.420.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 27 October 2008
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 1 March 2006 Resolved
Service fire extinguisher in main deck cabin in accordance with 46 CFR 172.810 (b)(2).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Provided serviced fire extinguisher to main deck cabin to the satisfaction of the attending marine inspector.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 1 March 2006 Resolved
Provide proof of enrollment in a drug consortium in accordance with 46 CFR part 16.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Chemical testing report and proof of enrollment was supplied to the satisfaction of the attending marine inspector.
Operations/Management › Vessel Traffic Service › Sailing Plan
Issued 1 March 2006 Resolved
Provide voyage plan in accordance with 46 CFR 185.503
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Provided voyage plan to the satisfaction of the attending marine inspector
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 March 2006 Resolved
Install proper splice on electrical wiring under bridge console in accordance with 46 CFR 183.340
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Provided proper slices using proper wire nuts to the satisfaction of the attending marine inspector.
Electrical › Lighting (service) › Lighting Fixture
Issued 1 March 2006 Resolved
Install protective covers for light fixtures on bridge and accommodations in accordance with 46 CFR 183.200 (b)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Protective covers were installed to the satisfaction of the attending marine inspector.
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 1 March 2006 Resolved
Demonstrate proper operation of the smoke detectors as per 46 CFR 181.480.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: vessel demonstrated proper operation of the smoke detectors to the satisfaction of the attending marine inspector.
Electrical › Electrical Distribution System (service) › Cable
Issued 1 March 2006 Resolved
Demonstrate proper operation of the main engine oil pressure and water temperature guages at the pilot house in accordance with 46 CFR 182.20-5(b) to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 27 October 2008
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 1 March 2006 Resolved
Demonstrate proper operation of the waterlights located on starboard bridge wing and center lifefloat in accordance with 46 CFR 180.70(d)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: demonstrated proper operation to the satisfaction of the attending marine inspector
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 March 2006 Resolved
Provide proper wiring supports for deck lighting and engine room in accordance with 46 CFR 183.340.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Vessel provided proper supports for wiring to the satisfaction of the attending marine inspector.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 1 March 2006 Resolved
Provide proper markings to ring buoy with vessel name in accordance with 46 CFR 185.604(3)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Vessel marked ring buoy appropriately to the satisfaction of the attending marine inspector.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 1 March 2006 Resolved
Provide stenciled stowage locations of life jackets on main deck in accordance with 46 CFR 180.78 (a)(5)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: vessel stenciled life jacket location properly to the satisfaction of the attending marine inspector.
Engineering › Fuel Oil Service System › Filter
Issued 1 March 2006 Resolved
Provide plugs for raycor filters on fuel oil drains in accordance with 46 CFR 182.455 (b)(9).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Plugs were installed to the filters to the satisfaction of the attending marine inspector.
Electrical › Electric Supply System (service) › Cable
Issued 1 March 2006 Resolved
Provide proper support for wiring in engine room bilge in accordance with 46 CFR 183.40(4).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Vessel crew supported engine room bilge wiring to the satisfaction of the attending marine inspector.
Engineering › Generator (propulsion/auxiliary-electric) › Circuit Breaker (overload/over current protection)
Issued 1 March 2006 Resolved
Demonstrate proper operation of port generator in accordance with 46 CFR 183.322
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Vessel engineer demonstrated port generator to the satisfaction of the attending marine inspector.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 1 March 2006 Resolved
Demonstrate proper operation of the vessel emergency lighting in accordance with 46 CFR 183.432
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Proper operation of the vessel''''s emergency lighting was demonstrated to the satisfaction of the attending marine inspector.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 1 March 2006 Resolved
Provide covers for main distribution panel in accordance with 46 CFR 183.200.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Vessel provided covers for open voids in main distribution panel as required to the satisfaction of the attending marine inspector.
Engineering › Compressed Air System (start air) › Valve
Issued 1 March 2006 Resolved
Demonstrate proper operation of all start air receivers relief valves in accordance with 46 CFR 61.10.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Vessel crew demonstrated relief valve operations to the satisfaction of the attending marine inspector.
Engineering › Steering Gear System › Pin
Issued 1 March 2006 Resolved
Install locking devices on all pins in steering system in accordance with 46 CFR 182.610.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Vessel crew installed locking retainers on pins in steering system to the satisfaction of the attending marine inspector
Electrical › Electric Generation Source (service) › Power Requirement
Issued 1 March 2006 Resolved
Renew wiring at generator light in accordance with 46 CFR 183.200(b).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Wiring at generator light was renewed by vessel crew to the satisfaction of the attending marine inspector.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 1 March 2006 Resolved
Demonstrate proper operation of vessel's steering system in accordance with 46 CFR 176.814.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Vessel''''s steering system was demonstrated to the satisfaction of the attending marine inspector.
Electrical › Electric Generation Source (service) › Switch
Issued 1 March 2006 Resolved
Provide covers for murphy level switches in emergency generator space port and starboard side in accordance with 46 CFR 183.200.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Vessel crew provide appropriate covers for switches to the satisfaction of the attending marine inspector.
Electrical › Electric Generation Source (emergency) › Switch
Issued 1 March 2006 Resolved
Provide covers for starboard generator pressure switches in accordance with 46 CFR 183.200
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Vessel''''s crew provide adequate covers for pressure switches on starboard generator to the satisfaction of the attending marine inspector.
Engineering › Reduction Gearing/Clutches › Gear
Issued 1 March 2006 Resolved
Install chafing gear on all main engine clutch hoses.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Vessel''s crew provided adequate chafing gear to the satisfaction of the attending marine inspector.
Electrical › Electrical Distribution System (service) › Busway
Issued 1 March 2006 Resolved
Properly seal up wire penetrations from engine room and generator room bulkhead as per 46 CFR part 183.200
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Wiring penetrations from engine and genertor room were sealed to the satisfaction of the attending marine inspector.
Construction/Loadline › Structures › Door
Issued 1 March 2006 Resolved
Stencil watertight doors to engine room in accordance with 46 CFR 185.610
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Crew stenciled all watertight doors satisfactory to the attending marine inspector.
Construction/Loadline › Structures › Door
Issued 1 March 2006 Resolved
Repair watertight door dogging closure devices in accordance with 46 CFR 179.330.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 27 October 2008
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 1 March 2006 Resolved
Provide a Coast Guard approved first aid kit that meets the standard of 46 CFR 184.710
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Vessel obtained USCG approved first aid kit to meet requirement and to the satisfaction of the attending marine inspector.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 1 March 2006 Resolved
Install deck rails at bow and stern of vessel as per 46 CFR 177.900
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 27 October 2008
Deck/Cargo › Mooring/Anchoring › Anchor Rope
Issued 1 March 2006 Resolved
Provide a proper wrench for forepeak access cover to anchor line in accordance with 46 CFR 184.300.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Vessel crew provided suitable wrench for access cover for forepeak to the satisfaction of the attending marine inspector.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 1 March 2006 Resolved
Demonstrate proper operation of the bilge system in accordance with 46 CFR 182.510.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 6 March 2006
Resolution: Crew demonstrated properly working bilge system to the satisfaction of the attending marine inspector.
Engineering › Diesel Engine (propulsion-reduction gear) › Valve
Issued 1 March 2006 Resolved
Demonstrate proper operations of the main engine stops at the pilot house in accordance with 46 CFR 184.620 (2) (b)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 1 March 2006
Construction/Loadline › Hull › Side Shell
Issued 18 January 2006 Resolved
Crop and renew nose cone where 2 cracks were found in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 18 February 2006
Resolved 7 February 2006
Resolution: It was determined that drill stopping, "v" out the cracks and welding them would be a satisfactory repair. This was done satisfactorily.
Construction/Loadline › Hull › Side Shell
Issued 18 January 2006 Resolved
Repair crack just forward of the second tire hanger from the bow in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 18 February 2006
Resolved 7 February 2006
Resolution: Crack repaired satisfactorily.
Engineering › Steering Gear System › Rudder Bearing
Issued 18 January 2006 Resolved
Port and starboard rudder bearings are excessively worn renew in accordance with 46 CFR 182.610.
Action required: 705 - Other - as specified
Due 18 February 2006
Resolved 7 February 2006
Resolution: Port and starboard rudder bearing were replaced.
Engineering › Steering Gear System › Rudder
Issued 18 January 2006 Resolved
Rudder post housing excessively corroded, crop and renew housing for rudder post in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 18 February 2006
Resolved 1 March 2006
Resolution: Rudder post housing was replaced and tested underway.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 18 January 2006 Resolved
Renew port cutlass bearing as per 46 CFR 182.200.
Action required: 705 - Other - as specified
Due 18 February 2006
Resolved 1 March 2006
Resolution: Port cutlass bearing was renewed and tested underway.
Construction/Loadline › Hull › Side Shell
Issued 12 January 2006 Resolved
Repair numerous cracks in rub rail in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 12 February 2006
Resolved 7 February 2006
Resolution: All cracks were gound out and rewelded.
Construction/Loadline › Structures › Deck Plating
Issued 12 January 2006 Resolved
Insert deck and straighten or insert side shell at port engine room vent in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 12 February 2006
Resolved 2 February 2006
Resolution: Deck was inserted and the side shell was straightened.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 12 January 2006 Resolved
Remove oil from all bilges exposing structural members for inspection as per 46 CFR 176.610.
Action required: 705 - Other - as specified
Due 12 February 2006
Resolved 27 January 2006
Resolution: All oil removed from bilges.
Construction/Loadline › Hull › Transverse Frame
Issued 12 January 2006 Resolved
Crop and renew bent vertical sections of frames in lazarette in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 12 February 2006
Resolved 7 February 2006
Resolution: All bent sections were cropped and renewed.
Construction/Loadline › Hull › Transverse Frame
Issued 12 January 2006 Resolved
Crop and renew cracked inboard starboard frame and grind and weld associated cracked welds in lazarette in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 12 February 2006
Resolved 7 February 2006
Resolution: Inboard frame was cropped and renewed and all cracks were repaired.
Engineering › Reduction Gearing/Clutches › Shaft
Issued 12 January 2006 Resolved
Pull all three shafts and inspect for condition and straightness as per 46 CFR 176.670.
Action required: 705 - Other - as specified
Due 12 February 2006
Resolved 1 March 2006
Resolution: All three shafts were pulled and found to be in satisfactory. They were reinstalled and tested underway.
Construction/Loadline › Hull › Side Shell
Issued 12 January 2006 Resolved
Prepare a repair proposal for aft port corner due to excessive insets in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 12 February 2006
Resolved 7 February 2006
Resolution: Proposal was written and area was repaired satisfactorily.
Engineering › Bilge Water Management System › Valve
Issued 12 January 2006 Resolved
Pull all valves on fire main, AC drain, sewage overflow, sink overboard, and raw water suction for inspection as per 46 CFR 176.610.
Action required: 705 - Other - as specified
Due 12 February 2006
Resolved 27 January 2006
Resolution: All valves were pulled and inspected.
Construction/Loadline › Structures › Door
Issued 12 January 2006 Resolved
Prove operation of all dead light covers in accordance with 46 CFR 171.117.
Action required: 705 - Other - as specified
Due 12 February 2006
Resolved 27 January 2006
Resolution: Operation was poven.
Construction/Loadline › Hull › Side Shell
Issued 12 January 2006 Resolved
Renew or repair hole in port side shell in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 12 February 2006
Resolved 1 February 2006
Resolution: Hole in port side shell repaired satisfactorily.
Construction/Loadline › Hull › Hull Plating
Issued 12 January 2006 Resolved
Renew or repair cracks in insert at port engine exhaust in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 12 February 2006
Resolved 7 February 2006
Resolution: Crack repaired satisfactorily.
Construction/Loadline › Hull › Side Shell
Issued 12 January 2006 Resolved
Weld interior side of insert at port engine exhaust in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 12 February 2006
Resolved 7 February 2006
Resolution: Interior side of insert welded.
Lifesaving › Lifebuoys › Stowage
Issued 7 April 2005 Resolved
properly stow life rings and replace reflective tape.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Satisfactory inspected the stowage and new reflective tape for the life rings.
Lifesaving › Lifefloat › Paddle
Issued 7 April 2005 Resolved
properly attach paddles to life floats.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 8 April 2005
Resolution: properly attached paddles to life floats
Engineering › Bilge Water Management System › Valve
Issued 7 April 2005 Resolved
prove proper operation of bilge suction valve in forward peak tank.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Witnessed satisfactory operation of the forward peak bilge suction valve.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 7 April 2005 Resolved
properly repair circuit pannel below wheel house.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Panel was properly secured to the bulkhead.
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 7 April 2005 Resolved
provide valve handle for sewage tank line.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Crew installed new handle on sewage tank valve.
Construction/Loadline › Penetrations › Bottom Plug
Issued 7 April 2005 Resolved
properly plug penetration in watertight bulkhead from lower lounge to galley.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Verified all penetrations in watertight were properly plugged.
Construction/Loadline › Penetrations › Bottom Plug
Issued 7 April 2005 Resolved
make repairs to penetrations for bilge alarm cables through watertight bulkheads, and make watertight.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: All bilge alarm cable penetration were properly repaired using compression type connectors.
Construction/Loadline › Structures › Cofferdam
Issued 7 April 2005 Resolved
replace plastic plugs in cofferdam forward of engine room with approved plugs, and also throughout vessel.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Plastic plugs were replaced with metallic plugs.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 7 April 2005 Resolved
properly insulate exhaust manifold piping.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Installed new exhaust lagging.
Engineering › Diesel Engine (propulsion-reduction gear) › Valve
Issued 7 April 2005 Resolved
provide handle for fuel shut-off to port main engine.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Installed new valve handle on fuel shut-off valve.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 7 April 2005 Resolved
double clamp all hoses on port side exhaust overboard
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Provided double hose clamps for all exhaust cooling hoses.
Electrical › Lighting (service) › Lighting Fixture
Issued 7 April 2005 Resolved
properly install overhead light in engine room
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Fixture was properly secured.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 7 April 2005 Resolved
make proper repairs to stop leak on outboard exhaust for starboard engine.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Leak was properly repaired.
Engineering › Reduction Gearing/Clutches › Casing
Issued 7 April 2005 Resolved
properly secure the clutch/reduction gear on port main deisel engine.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Reduction was properly secured.
Engineering › Diesel Engine (propulsion-reduction gear) › Gear, Timing
Issued 7 April 2005 Resolved
prove proper operation of tachometer, water temperature gage, and oil pressure gage.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Witnessed satisfactory operation of all gauges.
Engineering › Diesel Engine (propulsion-reduction gear) › Valve
Issued 7 April 2005 Resolved
provide and install valve handles throughout vessel (this includes deficiency 4 and 8).
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Witnessed the installation of several new valve handles throughout vessel.
Engineering › Reduction Gearing/Clutches › Shaft
Issued 7 April 2005 Resolved
prove proper operation of starboard clutch.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Witnessed satisfactory operation of the starboard clutch.
Engineering › Steering Gear System › Motor
Issued 7 April 2005 Resolved
make repairs to No.2 hydraulic steering pump motor.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Leak was repaired satisfactory.
Construction/Loadline › Structures › Manhole
Issued 7 April 2005 Resolved
make repairs to all broken welds in the transom
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Inspected satisfactory repairs to all cracks on transom.
Engineering › Fuel Oil Service System › Tank
Issued 7 April 2005 Resolved
plug both port and starboard fuel tank drain lines
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Both drain lines were properly plug with metallic plugs.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 7 April 2005 Resolved
remove all oil from all bilges prior to sailing
Action required: 17 - Rectify deficiencies prior to departure
Due 7 May 2005
Resolved 8 April 2005
Resolution: removed oil from bilges and cleaned bilges
Lifesaving › Lifefloat › Float Free
Issued 7 April 2005 Resolved
properly stow six-man life float
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Six man float was properly secured.
Engineering › Diesel Engine (propulsion-reduction gear) › Crankcase
Issued 7 April 2005 Resolved
prove proper operation of center main deisel engine
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Witnessed satisfactory operation of center main diesel engine.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 7 April 2005 Resolved
make repairs to main diesel engines and service generators to stop excessive leaks.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Did not observe any excessive leaks.
Operations/Management › Drills/Instruction › Not Conducted
Issued 7 April 2005 Resolved
Conduct fire drill and abandon ship drill at the time a marine inspector is called out to clear all other deficiencies.
Action required: 705 - Other - as specified
Due 7 May 2005
Resolved 9 May 2005
Resolution: Witnessed satisfactory fire and abandon ship drills.
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 June 2004 Resolved
Properly secure generator room port battery bank cables as required by 46 CFR 183.340(b)(4).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 June 2004
Resolved 21 June 2004
Resolution: Inspected the proper securing of the generator room port battery bank cables.
Engineering › Bilge Water Management System › Not Operational
Issued 21 June 2004 Resolved
Prove proper operation of the bilge alarm system as required by 46 CFR 182.530.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 21 June 2004
Resolved 21 June 2004
Resolution: Witnessed the proper operation of the bilge system.
Pollution Prevention/Response › Prevention Equipment › Portable Containment
Issued 21 June 2004 Resolved
Remove all diesel fuel from engine room bilge as required by 46 CFR 176.830(b).
Action required: 705 - Other - as specified
Due 21 June 2004
Resolved 21 June 2004
Resolution: Inspected the removal of all diesel fuel from the engine room bilge.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 21 June 2004 Resolved
Provide exhaust lagging for the port and starboard generator exhaust piping as required by 46 CFR 182.430(g)(1).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 21 June 2004
Resolved 21 June 2004
Resolution: Inspected the installation of exhaust lagging for port and starboard generator.
Construction/Loadline › Hull
Issued 13 January 2004 Resolved
Crop and install 18" X 18" insert at the side shell penetration in way of the starboard generator engine exhaust due to cracking. LEGACY COMPONENT DESC: Side Shell
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the proper installation of the 18" X 18" insert at the side shell penetration in way of the starboard generator engine exhaust.
Construction/Loadline › Hull
Issued 13 January 2004 Resolved
Gouge and weld port and starboard keel coolers forward ends as marked. LEGACY COMPONENT DESC: Keel Coolers
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the proper repairs of the port and starboard keel coolers forward ends.
Engineering › Shafting/Propeller Arrangements
Issued 13 January 2004 Resolved
Crop and renew starboard strut due to cracking of previously repaired cracks. LEGACY COMPONENT DESC: Strut
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the proper installation of the new starboard strut.
Construction/Loadline › Hull
Issued 13 January 2004 Resolved
Crop and install insert in way of doubler located on the middle stern bottom shell. LEGACY COMPONENT DESC: Bottom Plating
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the removal of the doubler and proper installation of the insert on the middle stern bottom shell.
Construction/Loadline › Hull
Issued 13 January 2004 Resolved
Remove doubler and install an 18" X 18" insert located on the upper port bow. LEGACY COMPONENT DESC: Hull Plating
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the removal of the doubler and proper installation of the 18" X 18" INSERT LOCATED ON THE UPPER PORT BOW.
Construction/Loadline › Hull
Issued 13 January 2004 Resolved
Gouge and weld cracks on the port and starboard stern corners. LEGACY COMPONENT DESC: Side Shell
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the proper repairs of the cracks on the port and starboard stern corners.
Engineering › Shafting/Propeller Arrangements
Issued 13 January 2004 Resolved
Install new propellers for the middle and starboard shafts due to missing blades. LEGACY COMPONENT DESC: Propeller (fixed pitch)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the installation of new propellers for the middle and starboard shafts.
Engineering › Shafting/Propeller Arrangements
Issued 13 January 2004 Resolved
Install new cutlass bearings for all three stern tubes. LEGACY COMPONENT DESC: Stern Tube Bearing
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the installation of new cutlass bearings for all three stern tubes.
Construction/Loadline › Hull
Issued 13 January 2004 Resolved
Gouge and reweld cracks around vents on the port and starboard side main deck. LEGACY COMPONENT DESC: Main Deck
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the proper repairs of the cracks around the vents on the port and starboard side main deck.
Construction/Loadline › Hull
Issued 13 January 2004 Resolved
Insert main deck starboard stern approximately 18" X 30" in way of hole. LEGACY COMPONENT DESC: Main Deck
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 March 2004
Resolved 12 February 2004
Resolution: Inspected the proper installation of the insert on the main deck starboard stern.
Engineering › Freshwater Generation System
Issued 13 January 2004 Resolved
Crop and renew fresh water piping on the port side main deck. LEGACY COMPONENT DESC: Piping
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the installation of the new fresh water piping on the port side main deck.
Construction/Loadline › Hull
Issued 13 January 2004 Resolved
Crop and renew inboard and outboard main girders approximately three foot located in the generator space. Both main girders were cracked in way of previously repaired cracks. LEGACY COMPONENT DESC: Longitudinal Frame
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the proper installation of the new inboard and outboard main girders.
Construction/Loadline › Hull
Issued 13 January 2004 Resolved
Grind and reweld brackets on starboard stern corner located in generator space. LEGACY COMPONENT DESC: Bracket
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the proper repairs of the brackets on the starboard stern corner located in the generator space.
Engineering › Diesel Engine (auxiliary)
Issued 13 January 2004 Resolved
Repair exhaust leaks on the #1 and #2 ship service generator's. LEGACY COMPONENT DESC: Piping (exhaust)
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the repairs the the #1 and #2 ship service generators exhaust leaks.
Construction/Loadline › Hull
Issued 13 January 2004 Resolved
Gouge and reweld insert on starboard side under blower located in generator space. LEGACY COMPONENT DESC: Side Shell
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the proper repairs to the insert on the starboard side under blower located in generator space.
Construction/Loadline › Structures
Issued 13 January 2004 Resolved
Remove doublers and epoxy compound and properly repair starboard potable water tank. LEGACY COMPONENT DESC: Potable Water Tank
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the repairs to the starboard potable water tank.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 13 January 2004 Resolved
Crop and renew pipe hangers for both main diesel engine exhaust and piping located forward of both main diesel engines. LEGACY COMPONENT DESC: Piping (exhaust)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the installation of new pipe hangers on the main diesel engine exhaust and piping located forward of both main diesel engines.
Construction/Loadline › Structures
Issued 13 January 2004 Resolved
Gouge and weld flooring supports behind port and starboard main diesel engines. LEGACY COMPONENT DESC: Deck Plating
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the proper repairs to the flooring supports behind the port and starboard main diesel engines.
Construction/Loadline › Hull
Issued 13 January 2004 Resolved
Gouge and weld existing insert starboard side hull located in the engine room. LEGACY COMPONENT DESC: Side Shell
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the proper repairs to the existing insert located on the starboard hull in the engine room.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 13 January 2004 Resolved
Repair fuel leak on the starboard engine. LEGACY COMPONENT DESC: Distributor (fuel injection)
Action required: 17 - Rectify deficiencies prior to departure
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the repairs to the fuel leak on the starboard engine.
Construction/Loadline › Structures
Issued 13 January 2004 Resolved
Crop and install insert in way of doubler located on the inboard bulkhead of the starboard day tank. LEGACY COMPONENT DESC: Fuel Tank
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the removal of the doubler and proper installation of insert on the inboard bulkhead of the starboard day tank.
Construction/Loadline › Hull
Issued 13 January 2004 Resolved
Install 18" X 18" insert where existing hydraulic lines are penetrating collision bulkhead. LEGACY COMPONENT DESC: Collision Bulkhead
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the proper installation of the 18" X 18" insert located on the collision bulkhead.
Engineering › Bilge Water Management System
Issued 13 January 2004 Resolved
Prove proper operation of the fore peak bilge suction valve reach rod. LEGACY COMPONENT DESC: Reach Rod
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Witnessed the proper operation of the fore peak reach rod.
Fire Fighting › Fire Pumps
Issued 13 January 2004 Resolved
Install new fire pump strainer due to wastage. LEGACY COMPONENT DESC: Strainer
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the installation of the new strainer for the fire pump.
Construction/Loadline › Hull
Issued 13 January 2004 Resolved
Crop and renew both longitudinal and transverse internal frames located in generator space in way of starboard strut due to cracking of previously repaired cracks. LEGACY COMPONENT DESC: Transverse/Longitudinal Frames
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 12 February 2004
Resolution: Inspected the installation of both longitudinal and transverse internal frames located in the generator space in way of starboard strut.
Engineering › Shafting/Propeller Arrangements
Issued 13 January 2004 Resolved
Crop and renew starboard shaft log due to wastage. LEGACY COMPONENT DESC: Shaft Log
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 February 2004
Resolved 6 February 2004
Resolution: Inspected the installation of the new starboard shaft log.
Engineering › Diesel Engine (propulsion-reduction gear) › Valve
Issued 1 April 2003 Resolved
Reduction gear selector valve was leaking.
Condition: Improper/Lack of Maintenance
Due 30 April 2003
Resolved 2 April 2003
Resolution: Vessel''s crew tightened valve to stop leak.
Engineering › Steering Gear System
Issued 1 April 2003 Resolved
Repair rudder stop so that jockey bar does not make contact
Due 30 April 2003
Resolved 3 April 2003
Resolution: Rudder stop was adjusted so that jockey bar did not make contact.
Stability › Watertight Integrity
Issued 1 April 2003 Resolved
Puncture located between #2 and #3 longitudinals on the starboard side. LEGACY COMPONENT DESC: Crack in Forepeak
Condition: Damaged By Earlier Event
Due 2 April 2003
Resolved 2 April 2003
Resolution: Quality Welding and Fabrication of Cameron, LA. inserted an 1/4 X 18 X 18 on the starboard bow. Invoice # 11164
Deck/Cargo › Mooring/Anchoring
Issued 1 April 2003 Resolved
Vessel removed its hydrolic winch system and replace it with an electrical one. However hydrolic lines were left intact below the deck and were leaking hydrolic oil into the forepeak. Crew directed to cap or remove lines from forepeak. LEGACY COMPONENT DESC: Remove leaking hydrolic lines from forepeak
Condition: Improper Installation
Due 30 April 2003
Resolved 3 April 2003
Resolution: Lines were properly plugged and hydrolic oil was removed from forepeak.
Stability › Watertight Integrity
Issued 1 April 2003 Resolved
Cables that were pentrating a watertight bulkhead were not properly packed, thus eleminating the watertight integrity of bulkhead. LEGACY COMPONENT DESC: Bulkhead penetration properly sealed
Condition: Improper Installation
Due 30 April 2003
Resolved 3 April 2003
Resolution: Bulkhead penetration was properly sealed to provide watertight integrity.
Navigation
Issued 3 January 2002 Resolved
Light screens not painted mat black. LEGACY COMPONENT DESC: Running light screens
Due 11 January 2002
Resolved 11 January 2002
Resolution: Painted light screens mat black.
Engineering › Pressure Vessel
Issued 3 January 2002 Resolved
As per 46 CFR 54.01-5 (e) please provide to the satisfaction of an attending marine inspector the requried plans for the port pressure vessel located in the generator room.
Condition: Unknown
Due 14 February 2002
Resolved 25 April 2003
Resolution: Recvd required documentation via fax dated 22APR03.
Construction/Loadline
Issued 19 March 1997 Resolved
PRIOR TO LEAVING PORT, REPAIR AND PROVE OPERATION OF BILGE PUMP WHICH IS DRIVEN BY THE STARBOARD PROPULSION ENGINE.
Condition: Unknown
Due 19 April 1997
Resolved 29 April 1997
Construction/Loadline
Issued 19 March 1997 Resolved
PRIOR TO LEAVING PORT, PROPERLY REMOVE EXCESSIVE OIL AND WATER FROM THE BILGES.
Condition: Unknown
Due 19 April 1997
Resolved 29 April 1997
Navigation
Issued 19 March 1997 Resolved
REPLACE ALL NAVIGATION LIGHTING FIXTURES WITH U.S. COAST GUARD APPROVED FIXTURES.
Condition: Unknown
Due 19 April 1997
Resolved 29 April 1997
Documentation
Issued 19 March 1997 Resolved
OBTAIN ALL REQUIRED PUBLICATIONS. ENSURE THAT ALL PUBLICATIONS ARE CURRENT.
Condition: Unknown
Due 19 April 1997
Resolved 29 April 1997
Navigation
Issued 19 March 1997 Resolved
PRIOR TO LEAVING PORT, REPAIR THE RUDDER ANGLE INDICATORS AT BOTH THE FORWARD AND AFT STEERING STATIONS.
Condition: Unknown
Due 19 April 1997
Resolved 29 April 1997
Lifesaving
Issued 19 August 1993 Resolved
PROVIDE TWO 25 MAN LIFERAFTS SERVICED AND APPROVED BY U.S. COAST GUARD TO SATISFACTION OF ATTENDING MARINE INSPECTOR NO LATER THAN 19OCT93.
Condition: Unknown
Due 16 November 1993
Resolved 16 November 1993
Construction/Loadline
Issued 15 November 1990 Resolved
PAINT NAME AND HAILING PORT ON STERN OF VESSEL AS PER CFR SUB T.
Condition: Unknown
Due 15 November 1990
Resolved 15 November 1990

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.