Inspection history · 45
15 April 2010
COI Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3696514
12 March 2010
Drydock Extension
Administrative · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3680452
30 April 2009
Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3467026
29 April 2009
Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3452475
17 April 2008
Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3180209
20 April 2007
Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2907289
28 April 2006
Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2639833
21 April 2006
Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2612010
13 June 2005
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2389212
31 May 2005
Deficiency Check · Examination of Repairs
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2385386
21 April 2005
Deficiency Check · COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2326921
3 March 2005
Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2284755
7 May 2004
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2061934
15 April 2004
Annual Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2034299
21 May 2003
Annual Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1789490
13 June 2002
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1631236
15 May 2002
Annual Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1614973
2 May 2001
Annual Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1063295
23 May 2000
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1052138
27 April 2000
COI Inspection · Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1423359
29 June 1999
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1079919
9 June 1999
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1397187
27 May 1998
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1381251
22 May 1997
COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 773390
11 April 1997
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1092302
23 September 1996
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1140392
5 June 1996
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1457353
15 June 1995
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 880323
7 June 1995
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1407490
26 April 1995
Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1355169
9 June 1994
COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1426924
17 June 1993
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1373876
24 June 1992
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1267438
12 August 1991
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 933894
21 June 1991
COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1227983
29 March 1991
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1230109
21 March 1991
Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1304928
25 July 1990
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1211066
26 June 1990
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1225845
13 June 1990
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1224980
22 June 1989
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 890938
22 June 1988
COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 897476
6 January 1988
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1317786
4 February 1986
Credit Drydock · Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1305449
6 February 1985
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1284070
Construction/Loadline › Hull › Longitudinal Frame
Issued 16 February 2010
Resolved
Repair cracked weld on #4 longitudinal, located in first bay (west of collission bulkhead) 46CFR176.802
Condition: Unknown
Due 16 March 2010
Resolved 12 March 2010
Construction/Loadline › Hull › Stiffener
Issued 16 February 2010
Resolved
Repair cracked weld on top of diaginal stanchion located in center void on fourth frame, below the pilot house. 46CCFR176.802
Condition: Unknown
Due 16 March 2010
Resolved 12 March 2010
Engineering › Diesel Engine (propulsion-electric) › Block
Issued 29 April 2009
Resolved
SM01 - Fix cooling water leak to oil cooler, clean coolant on deck around engine, 46 CFR 182.20-10.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 April 2009
Resolved 30 April 2009
Resolution: Installed new oil cooler and hoses and cleaned deck in engine room.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 29 April 2009
Resolved
SM02 - Replace line to ring lifebuoy, at least 60' in length, 46 CFR 180.30-10.
Due 29 May 2009
Resolved 30 April 2009
Resolution: Installed new line to ring life buoy per CFR''s.
Engineering › Pressure Vessel › Relief Valve
Issued 21 April 2006
Resolved
Prove proper operation of the pressure vessel relief valve. 46CFR54.15
Due 28 April 2006
Resolved 28 April 2006
Engineering › Diesel Engine (propulsion-electric) › Injector (fuel injection)
Issued 1 June 2005
Resolved
Prove proper operation of propulsion generator including the overspeed S/D, low LO S/D; volt, amp, hertz and rpm readings, high temp S/D, ensuring it is capable of operating at constant marine load and not exceeding the designed limitations. Provide tech report upon completion addressing all mentioned items. Report will included cause of failure and repairs made to correct it.
Action required: 705 - Other - as specified
Due 8 June 2005
Resolved 7 June 2005
Resolution: Proper operation of machinery proven. Tech reports from Farnham Electric Co. and [name withheld] provided
Engineering › Diesel Engine (propulsion-electric) › Governor
Issued 31 May 2005
Resolved
Prove proper operation of the vessel's diesel electric motors to the satisfaction of the cognizant marine inspector. Provide a copy of technician's report indicating cause of failure and repairs made to correct propulsion failure. Until this requirement is clear, the vessel may not get underway with passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 June 2005
Resolved 1 June 2005
Resolution: Safe operation of vessel was proven.
Construction/Loadline › Hull › Longitudinal Frame
Issued 3 March 2005
Resolved
Center Void - scarf and reweld all cracked welds (3rd deck long from stbd sideshell). Drill stop and weld where crack propagates into frame.
Due 3 April 2005
Resolved 21 April 2005
Construction/Loadline › Hull › Longitudinal Frame
Issued 3 March 2005
Resolved
Bow Rake (west) - scarf and reweld all cracked welds along deck longs on stbd half of rake.
Due 3 April 2005
Resolved 21 April 2005
Construction/Loadline › Hull › Longitudinal Frame
Issued 3 March 2005
Resolved
Stern rake (east) - scarf and reweld one cracked weld at deck long.
Due 3 April 2005
Resolved 21 April 2005
Engineering › Fuel Oil Storage/Transfer System
Issued 15 April 2004
Resolved
Renew flame screen at fuel tank vent with 30x30 flame screen. 46CFR182.450(e) LEGACY COMPONENT DESC: Vent Pipe
Due 15 May 2004
Resolved 7 May 2004
Resolution: Received fax of letter signed by Master stating that the flames screens at both fuel tanks have been replaced with stainless steel 30x30 flame screen.
Navigation › Collision/Grounding Avoidance
Issued 15 April 2004
Resolved
Prove proper operation of the port navigation light (east side). 46CFR183.420 LEGACY COMPONENT DESC: Navigation Lights
Due 15 May 2004
Resolved 7 May 2004
Resolution: Received fax of letter signed by Master stating that the navigation light was installed and is operating correctly.
Engineering › Fuel Oil Service System
Issued 15 May 2002
Resolved
Replace/renew fuel return line and cooling system hose on main diesel generator. Both hoses show signs of deterioration and cracking. LEGACY COMPONENT DESC: Hose
Condition: Improper/Lack of Maintenance
Due 15 June 2002
Resolved 13 June 2002
Lifesaving › Lifebuoys
Issued 15 May 2002
Resolved
Renew/replace lanyard to floating water-light where deteriorated by UV. LEGACY COMPONENT DESC: Self-igniting Lights
Condition: Improper/Lack of Maintenance
Due 15 June 2002
Resolved 13 June 2002
Engineering › Lubricating Oil Service System
Issued 15 May 2002
Resolved
Renew chaffed and cracked hydraulic hoses on the ferry door hydraulic ram and eliminate the chaffing problem with the equipment guard and hose. LEGACY COMPONENT DESC: Hose
Condition: Damaged By Earlier Event
Due 15 June 2002
Resolved 13 June 2002
Lifesaving › Lifejacket/PFD (Type I)
Issued 15 May 2002
Resolved
Vessel is missing two adult lifejackets. Provide two adult lifejackets. Vessel is limited to 27 passengers until the lifejackets are aboard the vessel. LEGACY COMPONENT DESC: Quantity
Condition: Unknown
Due 15 June 2002
Resolved 16 May 2002
Resolution: Received faxed confirmation of completion of the requirement.
Fire Fighting › Fire Hoses
Issued 15 May 2002
Resolved
Renew worn nozzle for fire hose. Currently, the installed nozzle's threads are worn and the nozzle will not stay on the hose when in operation. LEGACY COMPONENT DESC: Connections
Condition: Improper/Lack of Maintenance
Due 16 May 2002
Resolved 16 May 2002
Resolution: Received faxed confirmation of completion of the requirement.
Electrical › Electrical Distribution System (service)
Issued 15 May 2002
Resolved
Renew/replace wiring for the ferry door limit switches, where cracked and deteriorated. LEGACY COMPONENT DESC: Wiring
Condition: Improper/Lack of Maintenance
Due 15 June 2002
Resolved 13 June 2002
Engineering › Bilge Water Management System
Issued 15 May 2002
Resolved
The Master is to conduct an operational test of the vessel's installed bilge system. The Master is to send a signed statement to MSO Portland stating that the test has been completed.
Due 15 June 2002
Resolved 13 June 2002
Fire Fighting
Issued 27 April 2000
Resolved
Install proper bracket for house fire extinguisher.
Condition: Unknown
Due 27 April 2000
Resolved 27 April 2000
Navigation
Issued 27 April 2000
Resolved
Repair west side green running light.
Condition: Unknown
Due 27 April 2000
Resolved 27 April 2000
Navigation
Issued 27 April 2000
Resolved
Submit boiler plate data (mfg serial no., MAWP, ASME certification) for newpressure vessel (air recvr) for approval.
Condition: Unknown
Due 27 April 2000
Resolved 27 April 2000
Construction/Loadline
Issued 27 April 2000
Resolved
Install new gaskets on all deck hatches.
Condition: Unknown
Due 27 April 2000
Resolved 27 April 2000
Accommodation/Occupational Safety
Issued 9 June 1999
Resolved
Repair up-river deck railing as necessary.
Condition: Unknown
Due 9 June 1999
Resolved 9 June 1999
Fire Fighting
Issued 9 June 1999
Resolved
Provide one B-II fire extinguisher for the vehicle deck, as required by 46 CFR 181.500.
Condition: Unknown
Due 9 June 1999
Resolved 9 June 1999
Construction/Loadline
Issued 22 May 1997
Resolved
INSTALL OIL POLLUTION PLACARD AT BILGE PUMP.
Condition: Unknown
Due 22 May 1997
Resolved 22 May 1997
Documentation
Issued 22 May 1997
Resolved
PROVIDE AND MAINTAIN SHIP'S LOG AND START LOGGING REQUIRED DRILLS.
Condition: Unknown
Due 22 May 1997
Resolved 22 May 1997
Fire Fighting
Issued 22 May 1997
Resolved
INSTALL ADEQUATE FIREHOSE IN ACCORDANCE WITH 46 CFR 181.15-10.
Condition: Unknown
Due 22 May 1997
Resolved 22 May 1997
Lifesaving
Issued 22 May 1997
Resolved
PROPERLY SEPARATE CHILDREN'S PERSONAL FLOTATION DEVICES AND MARK CONTAINER ACCORDINGLY.
Condition: Unknown
Due 22 May 1997
Resolved 22 May 1997
Electrical
Issued 22 May 1997
Resolved
INSTALL ADEQUATE BATTENS IN BATTERY BOX TO PREVENT MOVEMENT.
Condition: Unknown
Due 22 May 1997
Resolved 22 May 1997
Lifesaving
Issued 22 May 1997
Resolved
PROVIDE FIRST AID KIT WHICH MEETS 46 CFR 160.041 OR EQUIVALENT.
Condition: Unknown
Due 22 May 1997
Resolved 22 May 1997
Lifesaving
Issued 22 May 1997
Resolved
UPDATE EMERGENCY PLANS/CHECKLIST TO INDICATE PROPER RESCUE PROCEDURES.
Condition: Unknown
Due 22 May 1997
Resolved 22 May 1997
Lifesaving
Issued 22 May 1997
Resolved
INSTALL RETROREFLECTIVE TAPE ON RING BUOY.
Condition: Unknown
Due 22 May 1997
Resolved 22 May 1997
Construction/Loadline
Issued 22 May 1997
Resolved
PROPERLY LABEL BILGE MANIFOLD VALVES.
Condition: Unknown
Due 22 May 1997
Resolved 22 May 1997
Electrical
Issued 22 May 1997
Resolved
PROVIDE/INSTALL FLASHLIGHTS AT CONTROL STATION AND MACHINERY SPACE.
Condition: Unknown
Due 22 May 1997
Resolved 22 May 1997
Lifesaving
Issued 22 May 1997
Resolved
PROVIDE SAFETY ORIENTATION CARDS OR CONDUCT ANNOUNCEMENT PRIOR TO EACH VOYAGE IN ACCORDANCE WITH 46 CFR 185.506.
Condition: Unknown
Due 22 May 1997
Resolved 22 May 1997
Documentation
Issued 5 June 1996
Resolved
PROVIDE DOCUMENTARY EVIDENCE OF A VALID CERTIFICATE OF DOCUMENTATION.
Condition: Unknown
Due 12 June 1996
Resolved 12 June 1996
Fire Fighting
Issued 5 June 1996
Resolved
PROVIDE DOCUMENTARY EVIDENCE OF PROPER 6 YEAR SERVICING OF ONE BII PORTABLEFIRE EXTINGUISHER LOCATED IN THE ENGINE ROOM.
Condition: Unknown
Due 12 June 1996
Resolved 12 June 1996
Lifesaving
Issued 5 June 1996
Resolved
PROVIDE DOCUMENTARY EVIDENCE OF REPLACEMENT OF THREE ORANGE SMOKE AND THREERED FLARE DISTRESS SIGNALS.
Condition: Unknown
Due 12 June 1996
Resolved 12 June 1996
Documentation
Issued 5 June 1996
Resolved
PROVIDE DOCUMENTARY EVIDENCE OF MEMBERSHIP IN AN APPROVED DRUG TESTING PROGRAM.
Condition: Unknown
Due 12 June 1996
Resolved 12 June 1996
Construction/Loadline
Issued 7 June 1995
Resolved
PROVE PROPER OPERATION OF BILGE PUMP.
Condition: Unknown
Due 7 June 1995
Resolved 7 June 1995
Fire Fighting
Issued 7 June 1995
Resolved
PROVE PROPER OPERATION OF FIRE PUMP.
Condition: Unknown
Due 7 June 1995
Resolved 7 June 1995
Construction/Loadline
Issued 21 June 1991
Resolved
REMOVE CONDENSATION FROM EAST COMPARTMENT BILGE.
Condition: Unknown
Due 21 June 1991
Resolved 21 June 1991
Engineering
Issued 21 June 1991
Resolved
TEST OPERATE OUTBOARD ENGINE.
Condition: Unknown
Due 21 June 1991
Resolved 21 June 1991
Navigation
Issued 21 June 1991
Resolved
REPLACE OR REPAIR RUNNING LIGHT ON WEST END OF VESSEL.
Condition: Unknown
Due 21 June 1991
Resolved 21 June 1991
Construction/Loadline
Issued 21 March 1991
Resolved
RENEW ALL HATCH GASKETS.
Condition: Unknown
Due 21 March 1991
Resolved 21 March 1991
Construction/Loadline
Issued 21 March 1991
Resolved
REMOVE AND REPLACE ALL AREAS OF ROTTED WOOD ON UPSTREAM SIDE OF CABIN_x001C_ DECK.
Condition: Unknown
Due 21 March 1991
Resolved 21 March 1991
Engineering
Issued 21 March 1991
Resolved
PROPERLY STENCIL ALL FUEL TANKS.
Condition: Unknown
Due 21 March 1991
Resolved 21 March 1991
Engineering
Issued 21 March 1991
Resolved
PROVIDE RETAINING PIN ON DOWNSTREAM SHAFT.
Condition: Unknown
Due 21 March 1991
Resolved 21 March 1991
Fire Fighting
Issued 13 June 1990
Resolved
PROVIDE PROOF OF HYDROSTATIC TESTING OF 1 B-II EXTINGUISHER.
Condition: Unknown
Due 13 June 1990
Resolved 13 June 1990
Lifesaving
Issued 13 June 1990
Resolved
PROVIDE SEPARATE STOWAGE FOR CHILDRENS PFD'S.
Condition: Unknown
Due 13 June 1990
Resolved 13 June 1990
Engineering
Issued 13 June 1990
Resolved
MAKE REMOTE FUEL CUT-OFF VALVES REACH RODS PERMANENTLY ATTACHED TO VALVES.
Condition: Unknown
Due 13 June 1990
Resolved 13 June 1990