MAURY USCG vessel records Sign in
← All vessels

SPEEDY'S DELIGHT

SPEEDY'S DELIGHT is a 1981 passenger vessel (inspected). The Coast Guard has recorded 68 inspections since 1981, most recently in March 2016, along with 178 deficiencies — 8 with no resolution recorded —.

Records from 1981 to 2016. Most recent: inspection, 14 March 2016.

Built
1981
Last inspected
14 March 2016
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

ZJL3889
Flag
VIRGIN ISLANDS, BRITISH
—
Maury page id
psix-53474

Inspections, by type

…with no type recorded8
…past their stated due date8
Years with a record 29 calendar years (1981–2016)
The 68 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 10 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Tonnage as PSIX records it38 - Regulatory (Subpart C or D), Gross Ton
24 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 68

14 March 2016 Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5832683
27 February 2012 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4252063
11 August 2011 Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4112107
28 January 2011 ISPS II Exam · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3934163
14 September 2010 Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3849382
13 January 2009 COI Inspection · ISPS II Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3393129
21 May 2008 Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3212136
6 December 2007 Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3112543
14 November 2007 ISPS II Exam · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3098099
1 November 2007 Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3090926
31 May 2007 Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2989162
30 May 2007 Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2945931
30 October 2006 COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2810306
13 October 2006 COI Inspection · ISPS II Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2799707
3 October 2006 Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2792539
19 May 2006 Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2652773
6 October 2005 Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2509244
29 September 2005 MTSA/ISPS Verification · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2503603
17 May 2005 Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2359898
14 June 2004 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2098327
26 May 2004 ISPS II Exam · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2078575
13 May 2004 Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2065867
12 November 2002 Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1716045
22 July 2002 COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1650004
10 July 2001 COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1379607
4 June 2001 Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1389396
12 February 2000 MARPOL Annex V Examination · COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1372928
7 October 1999 Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1372783
10 August 1999 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 776221
14 April 1999 Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1441489
14 September 1998 Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1472811
13 July 1998 Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1128834
10 February 1998 Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1368590
22 August 1997 Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1368364
30 May 1997 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 774963
15 April 1997 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1097974
10 February 1997 COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1363957
30 October 1996 Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1355995
5 July 1996 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1088588
27 June 1996 Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 647031
27 April 1996 Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1080127
28 March 1996 Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1077677
3 January 1996 Deficiency Check · COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1407601
28 November 1995 Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1367565
4 January 1995 COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1455218
3 October 1994 Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1179226
13 September 1994 Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1409172
3 February 1994 Examination of Repairs
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1358292
12 November 1993 Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1422303
24 September 1993 Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 842557
24 September 1993 COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1447279
23 March 1993 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 837728
26 January 1993 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1134065
25 September 1992 COI Inspection · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 949491
17 September 1991 COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1248894
12 September 1991 Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 937359
22 August 1990 COI Inspection · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1225509
9 June 1989 Hull Examination · COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 893885
9 June 1989 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1201802
18 May 1989 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 894898
3 October 1988 Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1352731
20 July 1988 Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1338203
22 April 1988 COI Inspection · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 886793
11 March 1987 Hull Examination · COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1313866
14 February 1986 Credit Drydock · COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1293105
17 September 1985 Type not recorded
No type recorded · Commandant (CG-CVC) · Activity 1300678
18 January 1985 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 980819
9 November 1981 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 970113

Deficiency record · 178

Construction/Loadline › Hull › Weld
Issued 15 March 2016 No resolution recorded
Make permanent repairs to cracked weld on STBD strut inboard strut doubler.
Action required: 705 - Other - as specified
Due 15 April 2016 — due date passed with no resolution recorded
Engineering › Bilge Water Management System › Strainer
Issued 15 March 2016 No resolution recorded
Provide proper sized bilge strainers on all bilge piping.
Action required: 705 - Other - as specified
Due 15 April 2016 — due date passed with no resolution recorded
Engineering › Fuel Oil Service System › Piping
Issued 15 March 2016 No resolution recorded
Prove proper operation of emergency fuel shut-off valve.
Action required: 705 - Other - as specified
Due 15 April 2016 — due date passed with no resolution recorded
Engineering › Fuel Oil Service System › Vent Pipe
Issued 15 March 2016 No resolution recorded
Provide bonding wire for fuel vent piping.
Action required: 705 - Other - as specified
Due 15 April 2016 — due date passed with no resolution recorded
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 March 2016 No resolution recorded
Properly secure wire lumbe between wheel house and engine room.
Action required: 705 - Other - as specified
Due 15 April 2016 — due date passed with no resolution recorded
Electrical › Electric Supply System (service) › Battery Installation
Issued 15 March 2016 No resolution recorded
Remove extra battery from space below the wheel house.
Action required: 705 - Other - as specified
Due 15 April 2016 — due date passed with no resolution recorded
Electrical › Electric Supply System (service) › Battery Installation
Issued 15 March 2016 No resolution recorded
Properly secure whell house battery and provide cover.
Action required: 705 - Other - as specified
Due 15 April 2016 — due date passed with no resolution recorded
Engineering › Sea-water System (primary cooling) › Valve
Issued 15 March 2016 No resolution recorded
Prove proper operation of prt engine sea valve and fire pump sea valve.
Action required: 705 - Other - as specified
Due 15 April 2016 — due date passed with no resolution recorded
Electrical › Lighting (emergency) › Lighting Fixture
Issued 28 January 2011 Resolved
Prove proper operation of emergency light fixture in wheelhouse.
Action required: 15 - Rectify deficiencies by next port
Due 28 January 2011
Resolved 28 January 2011
Navigation › Piloting/Steering › Steering Magnetic Compass
Issued 28 January 2011 Resolved
Prove proper operation of compass light.
Action required: 15 - Rectify deficiencies by next port
Due 28 January 2011
Resolved 28 January 2011
Electrical › Electric Supply System (service) › Battery Installation
Issued 28 January 2011 Resolved
Properly mount ship's generator starting battery in a tray lined with, or constructed of, a material that is resistant to damage by the electrolyte.
Action required: 15 - Rectify deficiencies by next port
Due 31 January 2011
Resolved 3 March 2012
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 28 January 2011 Resolved
Provide and install proper guard for ship's generator fan blades.
Action required: 15 - Rectify deficiencies by next port
Due 28 January 2011
Resolved 4 March 2012
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 28 January 2011 Resolved
Provide lights and shapes as per Navigation Rule # 27.
Action required: 705 - Other - as specified
Due 28 February 2011
Resolved 3 March 2012
Engineering › Sea-water System (primary cooling) › Piping
Issued 14 September 2010 Resolved
Prior to carrying passengers in U. S. waters, make permanent repairs to fractured exhaust pipe, stbd main propulsion engine.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 September 2010
Resolved 28 January 2011
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 14 September 2010 Resolved
Provide, install and prove proper operation of "Not Under Command" and Restricted in Their Ability to Maneuver navigation lights as per Rule 27(a) and Rule 27(b), respectively, and ANNEX 1 of Navigation Rules, International-Inland (72 COLREGS). Electrical installation shall meet 46 CFR Subchapter "J".
Action required: 705 - Other - as specified
Due 28 February 2011
Resolved 28 January 2011
Navigation › Collision/Grounding Avoidance › Day Shapes
Issued 14 September 2010 Resolved
Provide and place on board, all day shapes as required to meet Rule 27(a) and Rule 27(b) of Navigation Rules, International-Inland (72 COLREGS). Demonstrate means to properly display same.
Action required: 705 - Other - as specified
Due 31 October 2010
Resolved 28 February 2011
Communications › Radio Communications › EPIRB
Issued 14 November 2007 Resolved
PROVIDE VALID EPIRB REGISTRATION.
Action required: 705 - Other - as specified
Due 16 November 2007
Resolved 6 December 2007
Stability › Severe Wind/Roll › General
Issued 14 November 2007 Resolved
PROVIDE AND INSTALL LABEL/MARKING FOR A MAXIMUM OF SIXTEEN (16) PERSONS ALLOWED ON THE UPPER MAIN DECK.
Action required: 705 - Other - as specified
Due 16 November 2007
Resolved 6 December 2007
Engineering › Sea-water System (primary cooling) › Piping
Issued 30 May 2007 Resolved
PRIOR TO CARRYING MORE THAN SIX (6) PASSENGERS IN U.S. WATERS, RENEW STARBOARD MAIN ENGINE RAW WATER COOLING HOSE IN ITS ENTIRETY FROM SEA STRAINER TO ENGINE.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 May 2007
Resolved 31 May 2007
Construction/Loadline › Hull › Weld
Issued 30 May 2007 Resolved
PRIOR TO CARRYING MORE THAN SIX (6) PASSENGERS IN U.S. WATERS, MAKE PERMANENT REPAIRS TO HOLED DECK PLATE LOCATED AT AFT, STARBOARD CORNER OF MAIN DECK, AS SHOWN.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 May 2007
Resolved 31 May 2007
Engineering › Bilge Water Management System › Not Operational
Issued 30 May 2007 Resolved
PRIOR TO CARRYING MORE THAN SIX (6) PASSENGERS IN U.S. WATERS, PROVE PROPER OPERATION OF ENGINE ROOM HIGH BILGE WATER LEVEL ALARM.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 May 2007
Resolved 31 May 2007
Operations/Management › Vessel Safety Management › Company Verification/Review/Evaluation
Issued 13 October 2006 Resolved
PRIOR TO CARRYING PASSENGERS IN U.S. WATERS, PROVIDE PROOF THAT AN ANNUAL AUDIT OF THE SAFETY MANAGEMENT SYSTEM (SMS) HAS BEEN COMPLETED.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2006
Resolved 30 October 2006
Fire Fighting › Fire Pumps › Gland Sealing
Issued 13 October 2006 Resolved
PRIOR TO CARRYING PASSENGERS IN U.S. WATERS, MAKE PERMANENT REPAIRS TO ENGINE BELT-DRIVEN BILGE/FIRE PUMP.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2006
Resolved 30 October 2006
Stability › Unintentional Flooding › General
Issued 13 October 2006 Resolved
PRIOR TO CARRYING PASSENGERS IN U.S. WATERS, MAKE PERMANENT REPAIRS TO FOREPEAK FLUSH-DECK SCUTTLE COAMING FOUND CRACKED. IN ADDITION, MAKE PERMANENT REPAIRS TO FIXTURE TO ALLOW NORMAL OPENING AND CLOSING OF THE FIXTURE.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2006
Resolved 30 October 2006
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 13 October 2006 Resolved
PRIOR TO CARRYING PASSENGERS IN U.S. WATERS, MAKE PERMANENT REPAIRS TO PORT, AMIDSHIP HANDRAIL WELD FOUND FRACTURED AT MAIN DECK.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2006
Resolved 30 October 2006
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 13 October 2006 Resolved
PRIOR TO CARRYING PASSENGERS IN U.S. WATERS, INSTALL MARKINGS ON NEW VENTILATION CLOSURE DEVICE FOR UPPER PASSENGER DECK, STARBOARD, TO ALLOW PROPER INSTALLATION IN A TIMELY MANNER.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2006
Resolved 13 October 2006
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 13 October 2006 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2006
Resolved 30 October 2006
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 13 October 2006 Resolved
PRIOR TO CARRYING PASSENGERS IN U.S. WATERS, PROVIDE PROOF THAT ALL FLEXIBLE HOSES INSTALLED FOR DIESEL FUEL STORAGE TANK FILL PIPING ARE CLASSIFIED FOR "DIESEL FUEL SERVICE" AND EACH HOSE END IS DOUBLE STEEL CLAMPED.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2006
Resolved 30 October 2006
Electrical › Electric Generation Source (service) › Grounding Conductor
Issued 13 October 2006 Resolved
PRIOR TO CARRYING PASSENGERS IN U.S. WATERS, PROVIDE GROUNDING CONDUCTOR IN WAY OF ALL RUBBER FLEXIBLE HOSES USED IN FUEL OIL STORAGE TANK FILL PIPING.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2006
Resolved 30 October 2006
Documentation › Certificates/Documents › Document of Compliance (ISM)
Issued 13 October 2006 Resolved
PRIOR TO CARRYING PASSENGERS IN U.S. WATERS, PROVIDE VALID DOCUMENT OF COMPLIANCE (ISM) REFLECTING THE CORRECT VESSEL NAME AND VESSELS OFFICIAL NUMBER.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2006
Resolved 30 October 2006
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 13 October 2006 Resolved
PRIOR TO CARRYING PASSENGERS IN U.S. WATERS, PROVIDE SIX (6) ADDITIONAL ADULT CG APPROVED LIFEJACKETS WITH CG APPROVED LIGHTS, WHISTLE AND VESSELS NAME INSTALLED.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2006
Resolved 13 October 2006
Operations/Management › Drills/Instruction › Not Conducted
Issued 13 October 2006 Resolved
PRIOR TO CARRYING PASSENGERS IN U.S. WATERS, CONDUCT SATISFACTORY UNDERWAY MAN OVERBOARD, FIRE AND ABANDON SHIP DRILLS IN THE PRESENCE OF AN ATTENDING CG MARINE INSPECTOR.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2006
Resolved 30 October 2006
Documentation › Certificates/Documents › FCC SSL
Issued 19 May 2006 Resolved
PRIOR TO CARRYING PASSENGERS IN U. S. WATERS, PROVIDE A VALID SAFETY RADIOTELEPHONY CERTIFICATE WITH A RECORD OF EQUIPMENT FOR THE PASSENGER SAFETY CERTIFICATE (FORM P).
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 May 2006
Resolved 13 October 2006
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 29 September 2005 Resolved
Replace rotting lifeline around ring buoy.
Due 4 October 2005
Resolved 6 October 2005
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 29 September 2005 Resolved
Renew retro tape on one child lifejacket. Until item is cleared, vessel is restricted to carrying 60 total persons on board.
Due 4 October 2005
Resolved 6 October 2005
Documentation › Logs/Records › Logbook (official)
Issued 29 September 2005 Resolved
Log date for changing out batteries on waterlights for ring buoy and lifefloats.
Due 4 October 2005
Resolved 6 October 2005
Operations/Management › Passenger Operations › Safety Orientation
Issued 29 September 2005 Resolved
Make repairs to speaker for public address system in forward passenger cabin. Until repairs have been made, one crewmember is required to give safety orientation to passengers sitting in forward passenger cabin.
Due 4 October 2005
Resolved 6 October 2005
Communications › Radio Communications › EPIRB
Issued 29 September 2005 Resolved
Provide proof of EPIRB registration.
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 September 2005
Resolved 6 October 2005
Construction/Loadline › Hull › Bottom Plating
Issued 17 May 2005 Resolved
Crop and renew area of hull, port side, amidships. Insert will be minimum of 24'' transverse by 36'' longitudinal. (Corrosion due to possible electrolysis problem.)
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 May 2005
Resolved 24 May 2005
Documentation › Logs/Records › Logbook (official)
Issued 26 May 2004 Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, PROVIDE VESSEL OPERATIONS LOG
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2004
Resolved 14 July 2004
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 26 May 2004 Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, PROVIDE EVIDENCE THAT ALL BATTERIES HAVE BEEN RENEWED IN LIFEJACKET LIGHTS, LIFEFLOAT LIGHTS, AND RING BUOY LIGHT.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2004
Resolved 14 July 2004
Documentation › Safety Management System › Key Shipboard Operations Plans/Instructions
Issued 26 May 2004 Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, PROVIDE CORRECT PRE-UNDERWAY CHECKLIST IN SAFETY MANAGEMENT MANUAL.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2004
Resolved 14 July 2004
Documentation › Logs/Records › Logbook (official)
Issued 26 May 2004 Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, PROVIDE WRITTEN PROCEDURE FOR LEAVING PASSENGER COUNT ASHORE WITH ALL COMPANY MASTERS SIGNATURES ACKNOWLEDGING THE PROCEDURE.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2004
Resolved 14 July 2004
Documentation › Manifests/Lists › Emergency Checkoff List
Issued 26 May 2004 Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, PROVIDE EMERGENCY CHECK-OFF LIST POSTED IN THE VESSEL.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2004
Resolved 14 July 2004
Navigation › Collision/Grounding Avoidance › Danger Messages
Issued 26 May 2004 Resolved
PROVIDE VESSEL WITH BELL
Due 2 June 2004
Resolved 14 July 2004
Communications › Audible Communications › SPD (Other)
Issued 26 May 2004 Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, MAKE PUBLIC ADDRESS SYSTEM OPERABLE.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2004
Resolved 14 July 2004
Communications › Radio Communications › VHF Radiotelephone
Issued 26 May 2004 Resolved
PROVIDE NEW EMERGENCY BROADCAST PLACARD.
Due 2 June 2004
Resolved 14 July 2004
Communications › Radio Communications › EPIRB
Issued 26 May 2004 Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, PROVIDE EVIDENCE THAT EPIRB IS CURRENTLY REGISTERED.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2004
Resolved 14 July 2004
Stability › Intact Righting Energy › General
Issued 26 May 2004 Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, LABEL UPPER DECK WITH MAXIMUM PASSENGER CAPACITY.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2004
Resolved 14 July 2004
Lifesaving › Buoyant Apparatus › Serviceable
Issued 26 May 2004 Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, RENEW LIFEFLOATS
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2004
Resolved 14 July 2004
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 26 May 2004 Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, LABEL MAIN CABIN LIFEJACKET STORAGE TO REFLECT ACTUAL STOWAGE PLAN.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2004
Resolved 14 July 2004
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 26 May 2004 Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, PROVIDE 15 ADDITIONAL ADULT TYPE I PFD'S
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2004
Resolved 14 July 2004
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 26 May 2004 Resolved
PROVIDE 1 ADDITIONAL HAND HELD FLASHLIGHT
Due 2 June 2004
Resolved 14 July 2004
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 26 May 2004 Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, RENEW 1 B-II FIRE EXTINGUISHER AS DESIGNATED BY THE ATTENDING MARINE INSPECTOR.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2004
Resolved 14 July 2004
Electrical › Electric Generation Source (service) › Generator
Issued 12 November 2002 Resolved
Prior to placing the generator back in service, demonstrate proper operation and installation to the satisfaction of the attending Coast Guard Inspector.
Action required: 705 - Other - as specified
Resolved 29 July 2004
Resolution: Converted to a note. Generator not required by Regulations.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 22 July 2002 Resolved
Replace the B-1 fire extinguisher in the pilot house prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 July 2002
Navigation › Collision/Grounding Avoidance › Navigation Bridge Visibility
Issued 22 July 2002 Resolved
Replace the port and center pilot house windows.
Due 22 August 2002
Resolved 26 July 2002
Construction/Loadline
Issued 10 July 2001 Resolved
MAKE BILGE PUMP OPERABLE.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Lifesaving
Issued 10 July 2001 Resolved
MARK FORWARD LIFEJACKET STORAGE CONTAINER WITH NUMBER OF LIFEJACKETS, SIZE AND QUANTITY.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Construction/Loadline
Issued 10 July 2001 Resolved
MAKE AFT COMPARTMENT BILGE ALARM OPERABLE.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Documentation
Issued 10 July 2001 Resolved
PROVIDE EVIDENCE THAT ALL CREW ARE ENROLLED IN A RANDOM DRUG TESTING CONSORTIUM.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Documentation
Issued 10 July 2001 Resolved
PROVIDE TRAINING LOG BOOK
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Documentation
Issued 10 July 2001 Resolved
PROVIDE A LOG BOOK TO RECORD MAINTENANCE OF LIFESAVING AND FIREFIGHTING GEAR IN ACCORDANCE WITH YOUR SAFETY MANAGEMENT SYSTEM.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Lifesaving
Issued 10 July 2001 Resolved
PROVIDE BRIGHT COLORED WATERPROOF CONTAINER FOR VISUAL DISTRESS SIGNALS ANDMARK BOX WITH APPROPRIATE LABELING.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Lifesaving
Issued 10 July 2001 Resolved
RENEW HYDROSTATIC RELEASE MECHANISM FOR EPIRB.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Lifesaving
Issued 10 July 2001 Resolved
PROVIDE 3-6FT LANYARD WITH CORROSION RESISTANT CLIP FOR LIFERING WATERLIGHT.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Electrical
Issued 10 July 2001 Resolved
PROVIDE COVERS FOR ALL EXPOSED LIGHT BULBS IN CABIN AREA AND THROUGHOUT VESSEL.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Accommodation/Occupational Safety
Issued 10 July 2001 Resolved
RENEW ALL BROKEN PILOTHOUSE WINDOWS.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Documentation
Issued 10 July 2001 Resolved
PROVIDE VALID RADIO CERTIFICATE.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Lifesaving
Issued 10 July 2001 Resolved
PROVIDE PROOF OF EPIRB REGISTRATION.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Documentation
Issued 10 July 2001 Resolved
PROVIDE CPR CERTIFICATION FOR AT LEAST 50% OF THE CREW NO LATER THAN 03AUG01.
Condition: Unknown
Due 3 August 2001
Resolved 22 July 2002
Documentation
Issued 10 July 2001 Resolved
PROVIDE AND IMPLIMENT A PRE-UNDERWAY CHECK LIST IN ACCORDANCE WITH YOUR SAFETY MANAGEMENT SYSTEM.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Navigation
Issued 10 July 2001 Resolved
PROVIDE REQUIRED NAVIGATION PUBLICATIONS IN ACCORDANCE WITH 46 CFR 184.420.
Condition: Unknown
Due 22 July 2002
Resolved 22 July 2002
Lifesaving
Issued 14 April 1999 Resolved
Properly install 406 MHz EPIRB to allow float free deployment.
Condition: Unknown
Due 14 April 1999
Resolved 14 April 1999
Engineering
Issued 14 April 1999 Resolved
Install heat shields on Raycor fuel separators.
Condition: Unknown
Due 14 April 1999
Resolved 14 April 1999
Construction/Loadline
Issued 14 April 1999 Resolved
Complete installation of bilge high level alarms.
Condition: Unknown
Due 14 April 1999
Resolved 14 April 1999
Navigation
Issued 10 February 1998 Resolved
PROVIDE AN ANCHOR LIGHT I.A.W. COLREGS.
Condition: Unknown
Due 10 February 1998
Resolved 10 February 1998
Lifesaving
Issued 10 February 1998 Resolved
RENEW ALL LIFEFLOAT HAND AND PAINTER LINES WITH UV RESISTENT DARK COLOR FLOATING LINE (POLYPROPLENE).
Condition: Unknown
Due 10 February 1998
Resolved 10 February 1998
Engineering
Issued 10 February 1998 Resolved
REPAIR STBD ENGINE RPM GAUGE.
Condition: Unknown
Due 10 February 1998
Resolved 10 February 1998
Documentation
Issued 15 April 1997 Resolved
LOG CREW MONTHLY TRAINING.
Condition: Unknown
Due 15 April 1997
Resolved 15 April 1997
Navigation
Issued 15 April 1997 Resolved
INSTALL A SHIPS BELL BY THE PILOT HOUSE.
Condition: Unknown
Due 15 April 1997
Resolved 15 April 1997
Lifesaving
Issued 15 April 1997 Resolved
PLACE 1/2 INCH SPACERS BETWEEN LIFEFLOATS.
Condition: Unknown
Due 15 April 1997
Resolved 15 April 1997
Unknown
Issued 10 February 1997 Resolved
COMPLETE INTERIM FINAL RULES
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Electrical
Issued 10 February 1997 Resolved
LABLE ALL ELECTRICAL BREAKERS WITH THE SYSTEM THEY OPERATE.
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Construction/Loadline
Issued 10 February 1997 Resolved
REPAIR THE FOUR 1/4 INCH HOLES IN THE VESSEL'S TRANSOM.
Condition: Unknown
Due 12 February 1997
Resolved 12 February 1997
Lifesaving
Issued 10 February 1997 Resolved
ATTACH PADDLES TO LIFEFLOATS.
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Unknown
Issued 10 February 1997 Resolved
PROVIDE/POST SAFE RADIO CERTIFICATE
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Lifesaving
Issued 10 February 1997 Resolved
PLACE 1/2 INCH SPACERS IN BETWEEN LIFEFLOATS.
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Unknown
Issued 10 February 1997 Resolved
DOUBLE CLAMP RUBBER JOINTS ON EXHAUST PIPES.
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Electrical
Issued 10 February 1997 Resolved
INSTALL A COVER INSIDE THE BREAKER BOX IN ENGINE ROOM SO A PERSONS HAND CANNOT MAKE CONTACT WITH THE WIRES.
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Lifesaving
Issued 10 February 1997 Resolved
STENCIL LIFEJACKET CONTAINERS WITH THE NUMBER AND TYPE OF LIFEJACKET STOWEDIN THEM.
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Unknown
Issued 10 February 1997 Resolved
POST THE VESSEL'S STABILITY LETTER IN THE PILOT HOUSE.
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Unknown
Issued 10 February 1997 Resolved
INSTALL A BELL BY THE PILOT HOUSE
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Unknown
Issued 10 February 1997 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Unknown
Issued 10 February 1997 Resolved
PROVIDE COPY OF DRUG TESTING PROGRAM TO MSD ST. THOMAS FOR REVIEW.
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Lifesaving
Issued 10 February 1997 Resolved
REMOVE OR REPAIR EXTRA 5 PERSON LIFEFLOAT
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Lifesaving
Issued 10 February 1997 Resolved
PROVIDE 4 ADDITIONAL ADULT LIFEJACKETS. VESSEL CAN ONLY CARRY 62 PERSONS ONBOARD WHILE OPERATING IN U.S. WATERS UNTIL THIS REQUIREMENT IS CLEARED BYAN ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 10 February 1997
Resolved 10 February 1997
Engineering
Issued 10 February 1997 Resolved
REPAIR/REPLACE EMERGENCY FUEL OIL SHUTOFF VALVE
Condition: Unknown
Due 12 February 1997
Resolved 12 February 1997
Documentation
Issued 3 January 1996 Resolved
PROVIDE A U.S. COAST GUARD ISSUED STABILITY LETTER IN ACCORDANCE WITH_x001C_ 46 CFR 170.120 , NO LATER THAN 30 APRIL 1996.
Condition: Unknown
Due 3 January 1996
Resolved 3 January 1996
Documentation
Issued 3 January 1996 Resolved
Provide a copy of the vessel's British Virgin Island (BVI)radio certificate.
Condition: Unknown
Due 31 January 1996
Resolved 2 February 1996
Documentation
Issued 3 January 1996 Resolved
Provide a copy of the masters British Virgin Island (BVI) radio operators certificate.
Condition: Unknown
Due 31 January 1996
Resolved 2 February 1996
Engineering
Issued 3 January 1996 Resolved
Replace broken shaft coupling on the port main diesel engine.
Condition: Unknown
Due 31 January 1996
Resolved 2 February 1996
Electrical
Issued 3 January 1996 Resolved
Remove dead end wires and improper connections from wiring in the engine room and wheelhouse. (old generator wires, starboard MDE, rule pump, instrumentation)
Condition: Unknown
Due 31 January 1996
Resolved 2 February 1996
Lifesaving
Issued 3 January 1996 Resolved
Provide 6 Coast Guard approved orange smoke visual distress signals.
Condition: Unknown
Due 31 January 1996
Resolved 2 February 1996
Accommodation/Occupational Safety
Issued 3 January 1996 Resolved
Prove proper operation of vessel's Marine Sanitation Device.
Condition: Unknown
Due 31 January 1996
Resolved 2 February 1996
Documentation
Issued 3 January 1996 Resolved
Prove proper crew drug testing has been performed in way of records maintained by the company.
Condition: Unknown
Due 31 January 1996
Resolved 2 February 1996
Documentation
Issued 3 January 1996 Resolved
Provide a copy of the vessel's stability letter and post it aboard the vessel.
Condition: Unknown
Due 31 January 1996
Resolved 2 February 1996
Lifesaving
Issued 3 January 1996 Resolved
Repair properly or replace all life floats on vessel.
Condition: Unknown
Due 31 January 1996
Resolved 2 February 1996
Lifesaving
Issued 3 January 1996 Resolved
Replace weak link to life float arrangement. Current weak link is unservicable.
Condition: Unknown
Due 31 January 1996
Resolved 2 February 1996
Lifesaving
Issued 3 January 1996 Resolved
Provide 10 additional SOLAS approved lights for 10 Adult PFD's. Until corrected maximum number of passengers in U.S. waters is reduced to 40.
Condition: Unknown
Due 31 January 1996
Resolved 2 February 1996
Engineering
Issued 3 January 1996 Resolved
Properly repair various and numerous oil leaks to both Main diesel engines from ruptured gaskets.
Condition: Unknown
Due 31 January 1996
Resolved 2 February 1996
Engineering
Issued 3 January 1996 Resolved
Properly repair fuel oil leak on fuel piping in lazarette. Properly removeall diesel fuel from the lazarette.
Condition: Unknown
Due 31 January 1996
Resolved 2 February 1996
Construction/Loadline
Issued 3 January 1996 Resolved
Remove "bondo" repair to port Main diesel engine water intake line at the spool peice and repair properly to the satisfaction of the attending marineinspector.
Condition: Unknown
Due 31 January 1996
Resolved 2 February 1996
Construction/Loadline
Issued 28 November 1995 Resolved
CROP AND RENEW HULL PLATING, MINIMUM 18X18 WITH ROUNDED CORNERS, AFT OF PORT SHAFT. TEMP REPAIRS SATISFACTORY UNTIL NEXT COI INSPECTION.
Condition: Unknown
Due 28 November 1995
Resolved 28 November 1995
Engineering
Issued 28 November 1995 Resolved
PROPERLY REPLACE STARBOARD PROPELLER.
Condition: Unknown
Due 7 December 1995
Resolved 7 December 1995
Lifesaving
Issued 28 November 1995 Resolved
PROPERLY CAP TWO (2) THROUGH HULL VALVES ON STARBOARD SIDE E/R.
Condition: Unknown
Due 28 November 1995
Resolved 28 November 1995
Engineering
Issued 28 November 1995 Resolved
PROPERLY RELPACE STARBOARD CUTLASS BEARING.
Condition: Unknown
Due 2 December 1995
Resolved 2 December 1995
Lifesaving
Issued 28 November 1995 Resolved
PROPERLY REMOVE OIL FROM BILGE IN ENGINE ROOM.
Condition: Unknown
Due 29 November 1995
Resolved 2 December 1995
Construction/Loadline
Issued 4 January 1995 Resolved
FREE UP ENGINE ROOM VENT CLOSURES AND ATTACH MEANS OF SECURING CLOSURE IN THE CLOSED POSITION._x001C_
Condition: Unknown
Due 5 January 1995
Resolved 5 January 1995
Engineering
Issued 4 January 1995 Resolved
PROVIDE GROUNDING STRAPS FOR FUEL TANK FILL PIPES._x001C_
Condition: Unknown
Due 4 January 1995
Resolved 4 January 1995
Fire Fighting
Issued 4 January 1995 Resolved
STENCIL FUEL SHUTOFF LOCATION._x001C_
Condition: Unknown
Due 5 January 1995
Resolved 5 January 1995
Engineering
Issued 4 January 1995 Resolved
INSTALL FLAME SCREEN IN EACH FUEL VENT. SCREEN MATERIAL MUST BE 30 X 30 MESH, CORROSION RESISTANT MATALLIC MATERIAL._x001C_
Condition: Unknown
Due 4 January 1995
Resolved 4 January 1995
Electrical
Issued 4 January 1995 Resolved
REPLACE OR REPAIR BROKEN LIGHT FIXTURE IN WHEELHOUSE._x001C_
Condition: Unknown
Due 4 January 1995
Resolved 4 January 1995
Engineering
Issued 4 January 1995 Resolved
REPAIR LOOSE AND MISSING LAGGING (INSULATION) FOR MAIN DIESEL ENGINES AND GENERATOR EXHAUST SYSTEMS._x001C_
Condition: Unknown
Due 5 January 1995
Resolved 5 January 1995
Unknown
Issued 4 January 1995 Resolved
ARRANGE TO CONDUCT SIMPLIFIED STABILITY TEST IN PRESENCE OF MARINE INSPECTORS._x001C_
Condition: Unknown
Due 16 February 1995
Resolved 16 February 1995
Lifesaving
Issued 4 January 1995 Resolved
REPLACE BATTERIES IN LIFE PRESERVER LIGHTS WHERE NECESSARY._x001C_
Condition: Unknown
Due 4 January 1995
Resolved 4 January 1995
Navigation
Issued 4 January 1995 Resolved
PROVIDE COPIES OF NAVIGATION CHARTS FOR ALL AREAS OF OPERATION._x001C_
Condition: Unknown
Due 5 January 1995
Resolved 5 January 1995
Electrical
Issued 4 January 1995 Resolved
REMOVE OR PROPERLY TERMINATE UNUSED/DEAD-ENDED CABLES AS NECESSARY._x001C_
Condition: Unknown
Due 5 January 1995
Resolved 5 January 1995
Lifesaving
Issued 4 January 1995 Resolved
PROVIDE 100 FOOT PAINTERS FOR LIFEFLOATS._x001C_
Condition: Unknown
Due 4 January 1995
Resolved 4 January 1995
Lifesaving
Issued 4 January 1995 Resolved
REPLACE ROTTING NETTING ON AFT PORT 22 PERSON LIFE FLOAT._x001C_
Condition: Unknown
Due 4 January 1995
Resolved 4 January 1995
Lifesaving
Issued 4 January 1995 Resolved
PROVIDE WATERLIGHTS AND REPAIR EXISTING FORWARD STARBOARD WATERLIGHT ON LIFE FLOATS._x001C_
Condition: Unknown
Due 4 January 1995
Resolved 4 January 1995
Lifesaving
Issued 4 January 1995 Resolved
PROVIDE TWO PADDLES FOR EACH LIFE FLOAT AND STENCIL EACH WITH VESSEL NAME._x001C_
Condition: Unknown
Due 4 January 1995
Resolved 4 January 1995
Lifesaving
Issued 4 January 1995 Resolved
PROVIDE RETROREFLECTIVE TAPE FOR RINGBUOYS AND STENCIL VESSL NAME ON EACH._x001C_
Condition: Unknown
Due 4 January 1995
Resolved 4 January 1995
Construction/Loadline
Issued 3 February 1994 Resolved
INSPECT REPAIRS TO FRAMES, STRINGERS AND ASSOCIATED FITTINGS ON A WEEKLY BASIS FOR A PERIOD OF SIX MONTHS. IF ANY FRACTURES OR FAILURES OCCUR, NOTIFY U.S. COAST GUARD MSD ST. THOMAS IMMEDIATELY._x001C_
Condition: Unknown
Due 3 February 1994
Resolved 3 February 1994
Electrical
Issued 24 September 1993 Resolved
PROVIDE ADEQUATE CHAFING GEAR FOR WIRING THROUGH NON-WATERTIGHT PLYWOOD BULKHEAD IN SPACE BELOW WHEELHOUSE._x001C_
Condition: Unknown
Due 24 September 1993
Resolved 24 September 1993
Construction/Loadline
Issued 24 September 1993 Resolved
REPAIR CRACKED WELDS IN HANDRAIL STANCHIONS AT DECK._x001C_
Condition: Unknown
Due 24 September 1993
Resolved 24 September 1993
Lifesaving
Issued 24 September 1993 Resolved
STENCIL VESSEL NAME ON ALL LIFEFLOAT PADDLES._x001C_
Condition: Unknown
Due 24 September 1993
Resolved 24 September 1993
Navigation
Issued 24 September 1993 Resolved
PROVE SATISFACTORY OPERATION OF SHIP'S HORN._x001C_
Condition: Unknown
Due 24 September 1993
Resolved 24 September 1993
Engineering
Issued 24 September 1993 Resolved
REPLACE MISSING HANDLE TO PORT MDS COOLING SUCTION VALVE._x001C_ _x001C_
Condition: Unknown
Due 24 September 1993
Resolved 24 September 1993
Electrical
Issued 24 September 1993 Resolved
PROVIDE JUNCTION BOX FOR OR PROPERLY SPLICE CONNECTION ABOVE FRESH WATER TANK._x001C_
Condition: Unknown
Due 24 September 1993
Resolved 24 September 1993
Documentation
Issued 23 March 1993 Resolved
COORDINATE SIMPLIFIED STABILITY TEST W/MSD ST. THOMAS INSPECTORS.
Condition: Unknown
Due 23 March 1993
Resolved 23 March 1993
Construction/Loadline
Issued 26 January 1993 Resolved
MISSING DOG TO WATERTIGHT DOOR LEADING TO PASSENGER AREA. REPLACE AND SCHEDULE FOLLOWUP INSPECTION.
Condition: Unknown
Due 26 January 1993
Resolved 26 January 1993
Lifesaving
Issued 26 January 1993 Resolved
THREE (3) WATERLIGHTS FOR BOUYANT APPARATUSES ARE INOPERATIVE. REPAIR AND_x001C_SCHEDULE FOLLOWUP INSPECTION.
Condition: Unknown
Due 26 January 1993
Resolved 26 January 1993
Lifesaving
Issued 25 September 1992 Resolved
Conduct an underway test of vessel in the presence of a Coast Guard inspector. Conduct a man overboard and fire drill during the underway test.
Condition: Unknown
Due 25 September 1992
Resolved 25 September 1992
Construction/Loadline
Issued 25 September 1992 Resolved
Grind out salt blisters underneath boot stripe paint in way of waterline.
Condition: Unknown
Due 18 June 1993
Resolved 18 June 1993
Construction/Loadline
Issued 25 September 1992 Resolved
Re-weld cracked port stern tube in way of hull penetration and strut.
Condition: Unknown
Due 18 June 1993
Resolved 18 June 1993
Lifesaving
Issued 25 September 1992 Resolved
Repair covering for life float where deteriorated.
Condition: Unknown
Due 18 June 1993
Resolved 18 June 1993
Electrical
Issued 25 September 1992 Resolved
Provide covers for all light fixtures throughout the vessel where missing.
Condition: Unknown
Due 25 September 1992
Resolved 25 September 1992
Fire Fighting
Issued 25 September 1992 Resolved
Service all portable fire extinguishers. Requirement must be completed prior to carriage of passengers.
Condition: Unknown
Due 18 June 1993
Resolved 18 June 1993
Accommodation/Occupational Safety
Issued 22 August 1990 Resolved
PROVIDE METALLIC EXHAUST TRUNK WHICH EXTENDS TO BASE OF E/R BILGE AREA.
Condition: Unknown
Due 22 August 1990
Resolved 22 August 1990
Electrical
Issued 22 August 1990 Resolved
REPAIR AC GENERATOR.
Condition: Unknown
Due 22 August 1990
Resolved 22 August 1990
Construction/Loadline
Issued 22 August 1990 Resolved
PLUG WELD HOLES BETWEEN FUEL SPACE AND ENGINE ROOM.
Condition: Unknown
Due 22 August 1990
Resolved 22 August 1990
Accommodation/Occupational Safety
Issued 22 August 1990 Resolved
REPLACE ALL BROKEN WINDOWS.
Condition: Unknown
Due 22 August 1990
Resolved 22 August 1990
Accommodation/Occupational Safety
Issued 22 August 1990 Resolved
PROVIDE MSD HOLDING TANK.
Condition: Unknown
Due 22 August 1990
Resolved 22 August 1990
Lifesaving
Issued 22 August 1990 Resolved
PROVIDE PROPER WEAK LINK FOR LIFE FLOATS.
Condition: Unknown
Due 22 August 1990
Resolved 22 August 1990
Documentation
Issued 22 August 1990 Resolved
PROVIDE AND POST THE VESSEL'S STABILITY LETTER.
Condition: Unknown
Due 22 August 1990
Resolved 22 August 1990
Engineering
Issued 9 June 1989 Resolved
BOTH PORT AND STARBOARD MAIN ENGINES REQUIRE 100 PERCENT EXHAUST INSULATIONBETWEEN AND ENCLUDING MAIN ENGINE TURBOS TO A POSITION WHERE SALT WATER EXHAUST STACK COOLING TAKES PLACE ON EACH EXHAUST PIPE.
Condition: Unknown
Due 9 June 1989
Resolved 9 June 1989
Electrical
Issued 22 April 1988 Resolved
BATTERY BOXES NOT PROPERLY LINED WITH FRP.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Engineering
Issued 22 April 1988 Resolved
REPLACE OLD WORN MAIN ENGINE FUEL RETURN HOSES.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Engineering
Issued 22 April 1988 Resolved
PORT PROPELLER NEEDS REPLACEMENT OR REPAIR.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Engineering
Issued 22 April 1988 Resolved
INCREASE SUPPORT ON SALT WATER DISHCHARGE PIPING FROM MAIN ENGINE HEAT EXCHANGERS.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Engineering
Issued 22 April 1988 Resolved
INSTALL FUEL TANK VENT SCREENS AS REQUIRED.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Engineering
Issued 22 April 1988 Resolved
INSTALL RADIATOR CAPS ON MAIN ENGINE FRESH WATER EXPANSION TANKS.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Lifesaving
Issued 22 April 1988 Resolved
PLACE WHISTLES ON ALL LIFE JACKETS AS REQUIRED.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Engineering
Issued 22 April 1988 Resolved
REMOVE OIL FROM STEERING COMPARTMENT BILGES.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Engineering
Issued 22 April 1988 Resolved
STARBOARD MARINE GEAR SELECTOR CABLE IS BENT REPAIR OR REPLACE.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Engineering
Issued 22 April 1988 Resolved
HAVE PINS MADE FOR ENGINEROOM VENT CLOSURES AS REQUIRED.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Engineering
Issued 22 April 1988 Resolved
FREE UP BILGE MANIFOLD VALVES AND INSURE THEIR PROPER OPERATION.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Fire Fighting
Issued 22 April 1988 Resolved
REPLACE THE ONE B-I FIRE EXTINGUISHER WHICH WAS DISCHARGED LOCATED ON THE BRIDGE.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Fire Fighting
Issued 11 March 1987 Resolved
SERVICE ALL PORTABLE FIREEXTINGUISHERS
Condition: Unknown
Due 11 March 1987
Resolved 11 March 1987
Navigation
Issued 11 March 1987 Resolved
REPLACE PORT AND STERN RUNNING LIGHTS.
Condition: Unknown
Due 11 March 1987
Resolved 11 March 1987
Engineering
Issued 11 March 1987 Resolved
REPLACE WORN FUELTANK VENT SCREENS.
Condition: Unknown
Due 11 March 1987
Resolved 11 March 1987
Electrical
Issued 11 March 1987 Resolved
MAKE OPERATIONAL AUXILIARY GENERATOR
Condition: Unknown
Due 11 March 1987
Resolved 11 March 1987
Electrical
Issued 11 March 1987 Resolved
BATTERY BOX NOT PROPERLY LINED.
Condition: Unknown
Due 11 March 1987
Resolved 11 March 1987
Engineering
Issued 11 March 1987 Resolved
REPLACE MISSING LABELS ON BILGE MAINFOLD.
Condition: Unknown
Due 11 March 1987
Resolved 11 March 1987
Electrical
Issued 11 March 1987 Resolved
REPLACE MISSING CIRCUIT BREAKER LABELS.
Condition: Unknown
Due 11 March 1987
Resolved 11 March 1987
Engineering
Issued 11 March 1987 Resolved
REPLACE WORN FLEXIBLE FUEL SERVICE HOSES.
Condition: Unknown
Due 11 March 1987
Resolved 11 March 1987
Lifesaving
Issued 14 February 1986 Resolved
INSTALL WEAK LINKS ON INFLATABLE LIFERAFTS.
Condition: Unknown
Due 14 February 1986
Resolved 14 February 1986

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.