Inspection history · 23
30 March 2026
Inclining Experiment
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8334207
30 March 2026
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8339020
19 November 2025
Deficiency Check · Administrative Inspection · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 8270995
16 April 2025
Deficiency Check · COI Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 8095862
27 February 2025
Administrative Inspection
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 8085689
21 January 2025
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 8060060
10 April 2024
Deficiency Check · Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7893141
6 March 2024
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7867872
5 October 2023
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7804684
15 December 2022
COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7590881
15 December 2022
Plan Review "T" Boat
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7609881
17 February 2022
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7393492
7 October 2021
Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7326315
13 December 2020
Administrative Inspection
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7111061
18 November 2020
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7088972
5 July 2020
Deficiency Check · Damage Survey
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7001436
23 January 2020
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6890092
24 October 2019
Hull Examination · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6837348
17 January 2019
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6609270
14 December 2017
COI Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6314041
12 October 2017
Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6282299
11 January 2017
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6069593
12 February 2016
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 5807399
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 16 April 2025
Resolved
A hatch exposed to the weather must be watertight, except that the following hatches may be weathertight:(1) A hatch on a watertight trunk that extends at least 305 millimeters (12 inches) above the weather deck;(2) A hatch in a cabin top; and (3) A hatch on a vessel that operates only on protected waters. Engineroom and Lazzarette flush deck hatches did not function as designed and had wasted gasket material. Make hatches watertight and replace gaskets to the satisfaction of the attending inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2025
Resolution: Hatches tested SAT.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 16 April 2025
Resolved
An inflatable life raft or inflatable buoyant apparatus must be serviced at a facility specifically approved by the Commandant for the particular brand, and in accordance with servicing procedures meeting the requirements of part 160, subpart 160.151, of this chapter—(1) No later than the month and year on its servicing sticker affixed under 46 CFR 160.151-57(n). Life raft servicing was expired. Service life rafts at an approved facility and provide evidence to attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2025
Resolution: Valid life rafts provided.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 16 April 2025
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces:(1) A space with a through-hull fitting below the deepest load waterline, such as a lazarette;(2) A machinery space bilge, bilge well, shaft alley bilge, or other spaces subject to flooding from sea water piping within the space; Bilge alarms for the engine room could not be located and both visual and audible alarms at operating were not verified. Provide SAT bilge alarm test to the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2025
Resolution: Bilge alarm test sat.
05 - Radio Communications › N/A - No Subsystem › Operation/maintenance
Issued 16 April 2025
Resolved
A vessel must comply with the applicable requirements for any radio and Electronic Position Indicating Radiobeacon (EPIRB) installations, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission, as set forth in 47 CFR part 80. Vessel was missing valid Safety radiotelephony and Bridge to Bridge radio certificates. Get FCC licensed radio inspeciton for certificates and provide valid VHF-DCS MMSI and GPS capability to the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2025
Resolution: Radio certs sat.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 16 April 2025
Resolved
A vessel of 12 meters or more in length shall be provided with a whistle, a vessel of 20 meters or more in length shall be provided with a bell in addition to a whistle. Vessel's whistle did not work at the time of
inspection. Provide satisfactory whistle test to the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 May 2025
Resolution: Whistle test sat.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 16 April 2025
Resolved
A hinged watertight bulkhead door must be fitted with a
quick action closing devise operable from both sides of
the door and indicator lights at the operating station
showing whether the door is open or closed.
WTD indicator lights did not operate when tested at the
operator station to show door position changes. Provide
sat door indicator test to the attending inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 May 2025
Resolution: WTD indicator test at op station sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 April 2025
Resolved
An exposed hazard, such as gears or rotating machinery,
must be properly protected by a cover, guard, or rail.
Stbd machinery space hydraulic pump coupling was missing a protective device. Install protective device for the
hydraulic pumps exposed rotating parts.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 May 2025
Resolution: Protective device installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 April 2025
Resolved
A voltmeter and an ammeter, which can be used for measur
ing voltage and current of a generator that is in operation, must be provided for a generator rated at 50 volts
or more. #1 Generator voltmeter did not indicate rated voltage during test.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 May 2025
Resolution: Voltmeter test sat.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 21 January 2025
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces. Audible high level bilge alarm did not function at the operating station. 46 CFR 182.530
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 February 2025
Resolved 30 January 2025
Resolution: Vessel provided video evidence of function audible alarm.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 21 January 2025
Resolved
The EPIRB test required by paragraph (a) shall be logged or otherwise documented, as applicable. EPRIB monthly test log not available for inspection. Provide monthly EPRIB inspection log. 46 CFR 185.728(c)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 February 2025
Resolved 30 January 2025
Resolution: Vessel provided monthly log.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 21 January 2025
Resolved
Monthly inspections required by NFPA 10 may be conducted by the owner, operator, person-in-charge, or a designated member of the crew. Monthly crew portable fire extinguisher inspection log not available for inspection. Provide monthly fire extinguisher inspection log IAW NFPA 10. 46 CFR 186.710(b)(ii)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 February 2025
Resolved 30 January 2025
Resolution: Vessel provided monthly log.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 21 January 2025
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. Analgesic medication was expired. Replace analgesic medication. 46 CFR 184.710
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 February 2025
Resolved 30 January 2025
Resolution: Vessel provided analgesic medication.
01 - Certificates & Documentation › 011 - Ships Certificates › Minimum Safe Manning Document
Issued 6 March 2024
Resolved
The owner or operator must conduct all tests as required by the OCMI, and make the vessel available for all specific inspections and drills required by subpart H of
this part. At each initial and subsequent inspection for certification, the marine inspector may require that an abandon ship or man overboard drill be held under simulated emergency conditions specified by the inspector. At each initial and subsequent inspection for certification, the marine inspector may require that a fire drill be held under simulated emergency conditions to be specified by the inspector. At time of inspection a crew was not provided. Prior to carrying passengers or cargo, provide properly licensed and trained crew who are enrolled in company's drug testing program, and complete fire, man overboard and abandon ship drills to the satisfaction of the attending USCG Marine Inspector.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 May 2025
Resolution: Drills completed with vessel crew.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 6 March 2024
Resolved
An inspection for renewal of a Certificate of Inspection is conducted to determine if the vessel is in satisfactory condition, fit for the service intended, and complies with all applicable regulations. It normally includes inspection and testing of the structure, machinery, equipment, and on a sailing vessel. Vessel reported that the stbd fuel tank had bad fuel and at the time of inspection and had the shutoff valve closed. F/O shutoff valves were not tested due to potential fuel contamination. Vessel will need to prove operational capability of valves before carriage of passengers or cargo.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 April 2024
Resolution: Fuel oil remote shutoff valves tested SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 6 March 2024
Resolved
All unfired pressure vessels must be installed to the satisfaction of the cognizant OCMI. The design, construction, and original testing of such unfired pressure vessels must meet the applicable requirements of subchapter F (Marine Engineering) of this chapter. PRVs did not relieve at designated pressure of 150 p.s.i. Replace PRVs and prove to marine inspector a satisfactory test.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 April 2024
Resolution: PRVs replaced and tested SAT.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 6 March 2024
Resolved
Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be energized from two sources of electricity. Stbd generator was out of service due to fuel pump repair. Repair generator and provide marine inspector with proof of satisfactory repair and service test.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2024
Resolved 10 April 2024
Resolution: Generator fuel pump replaced with SAT operational test.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 6 March 2024
Resolved
You are responsible for all actions of your officials, r
epresentatives, and agents in carrying out the requireme
nts of the DOT agency regulations. Vessel did not have enrollment with service agent for drug testing. Provide
proof of CY24 enrollment with consortium or valid testing program and enrollment.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2024
Resolved 16 April 2024
Resolution: Vessel provided valid enrollement with Pipeline Testing Consortium.
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 6 March 2024
Resolved
To qualify for a medical certificate, a mariner must provide evidence of meeting the medical and physical standards in this section on a CG–719–K or CG–719–K/E, as appropriate. Vessel master did not have medical certificate present at the time of inspection. Provide proof of valid medical certificate to marine inspector.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2024
Resolved 8 March 2024
Resolution: Vessel master provided valid medical certificate.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 6 March 2024
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. During inspection the following items were found requiring repair. Repairs must be made prior to credit for next scheduled dry docking.
(1) Stbd forward gangway entrance aft open portion has a 12-inch crack from the deck to the mid portion of the bulwark. Fully clean area to determine length and depth of weld crack. Provide marine inspector with repair proposal.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 6 April 2024
Resolved 7 May 2025
Resolution: Crack was drilled and welded. All sat.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 6 March 2024
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. During inspection the following items were found requiring repair. Repairs must be made prior to credit for next scheduled dry docking. Pilothouse deck had approximate 6-inch diameter area of exposed and pitted through deck plating. Provide marine inspector with repair proposal.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 April 2024
Resolved 21 January 2025
Resolution: Vessel repaired with patch using West Epoxy systems. Inspected patch at annual inspeciton and it appears to be structually sound.
08 - Alarms › N/A - No Subsystem › Closing water-tight doors alarm
Issued 17 February 2022
Resolved
A hinged watertight bulkhead door must be fitted with a quick action closing devise operable from both sides of the door and indicator lights at the operating station showing whether the door is open or closed. The indicator for the doors located at frames 18 and 20 was inoperable. Repair and demonstrate proper operation.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2022
Resolved 23 February 2022
Resolution: Vessel found that the breaker for the door alarm had been secured during maintenance. Vessel reenergized breaker and demonstrated operation.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 17 February 2022
Resolved
The emergency lighting required by paragraph (a) of this section must automatically actuate upon failure of the main lighting system. If a vessel is not equipped with a single source of power for emergency lighting, it must have individual battery powered lights that: (1) Are automatically actuated upon loss of normal power; (2) Are not readily portable; (3) Are connected to an automatic battery charger; and (4) Have sufficient capacity for a minimum of 2 hours of continuous operation. Battle lantern type emergency light located on the forwad engine room bulkhead was inoperable. Demonstrate proper operation of emergency lighting.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2022
Resolved 23 February 2022
Resolution: Vessel replaced light and demonstrated operation.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 17 February 2022
Resolved
Each pressure type wire connector and lug must meet UL 486A (incorporated by reference; see 46 CFR 175.600) or other standard specified by the Commandant. The use of twist-on type wire nuts is permitted under the following conditions:
(1) The connections must be made within an enclosure and the insulated cap of the connector must be secured to prevent loosening due to vibration; and
(2) Twist-on type connectors may not be used for making joints in cables, facilitating a conductor splice, or extending the length of a circuit. An improper wire nut splice was found in way of the potable water pump in the fore belly. Provide proper splice.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2022
Resolved 23 February 2022
Resolution: Vessel made a proper splice using butt connected shrink fittings.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 5 July 2020
Resolved
Vessel punctured/cracked their port side fuel oil tank.
O/O to Provide a repair proposal and make permanent repairs to the fuel oil tank to the satisfaction of the attending MI.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 July 2020
Resolution: Repairs were made to the satisfaction of the attending MI.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 23 January 2020
Resolved
Provide complete and current first aid kit.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2020
Resolved 7 February 2020
Resolution: Vessel provided complete first aid kit.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 23 January 2020
Resolved
Properly mark water tight door at frame 18.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2020
Resolved 7 February 2020
Resolution: Vessel marked doors and provided pictures.
08 - Alarms › N/A - No Subsystem › Closing water-tight doors alarm
Issued 23 January 2020
Resolved
Provide water tight door alarm for water tight door at frame 20.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2020
Resolved 7 February 2020
Resolution: Vessel provided evidence of functioning alarm.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 23 January 2020
Resolved
Provide non-return ball for forward starboard vent on main deck.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2020
Resolved 7 February 2020
Resolution: Vessel provided devices.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 23 January 2020
Resolved
Provide screen for potable water tank vent.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2020
Resolved 7 February 2020
Resolution: Vessel provided screen.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 14 December 2017
Resolved
Provide 04 alcohol swabs.
Condition: Invalid
Action required: 705 - Other - as specified
Due 31 December 2017
Resolved 14 December 2017
Resolution: Swabs were provided.
Lifesaving › Inflatable Liferafts › Weak Link
Issued 14 December 2017
Resolved
Properly install weak link and hydrostatic release on liferafts.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 December 2017
Resolved 14 December 2017
Resolution: Weak links and Hammar hydrostatic releases were installed correctly.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 12 October 2017
Resolved
Replace junction box in port aft laz.
Action required: 705 - Other - as specified
Due 12 November 2017
Resolved 25 October 2017
Resolution: Junction box replaced.
Electrical › Electrical Distribution System (service) › Wiring
Issued 12 October 2017
Resolved
Remove dead end wire in laz.
Action required: 705 - Other - as specified
Due 12 November 2017
Resolved 25 October 2017
Resolution: Dead end wires were removed.
Construction/Loadline › Penetrations › Valve Flange
Issued 12 October 2017
Resolved
Cap unused through hull valve stbd side E/R.
Action required: 705 - Other - as specified
Due 12 November 2017
Resolved 25 October 2017
Resolution: Unused through hull valve was capped.
Stability › Watertight Integrity › General
Issued 12 October 2017
Resolved
Open up for further inspection discussed deck leak into portside E/R IWO deck chain locker.
Action required: 705 - Other - as specified
Due 12 November 2017
Resolved 25 October 2017
Resolution: Space opened and checked.
Construction/Loadline › Hull › Hull Plating
Issued 12 October 2017
Resolved
Clad weld isolated pits as marked in forward salon void portside hull plating.
Action required: 705 - Other - as specified
Due 12 November 2017
Resolved 25 October 2017
Resolution: Hull was clad welded as indicated.
Electrical › Electrical Distribution System (service) › Wiring
Issued 12 October 2017
Resolved
Remove extension cord in stateroom and install an additional outlet.
Action required: 705 - Other - as specified
Due 12 November 2017
Resolved 25 October 2017
Resolution: Extention cord removed and outlet installed.
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 12 October 2017
Resolved
Properly secure refrigerator in the galley.
Action required: 705 - Other - as specified
Due 12 November 2017
Resolved 25 October 2017
Resolution: Refrigerator was properly secured.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 12 February 2016
Resolved
Hydro 04 CO2 extinguishers or replace with servicable B-IIs.
Action required: 705 - Other - as specified
Due 19 February 2016
Resolved 16 February 2016
Resolution: 04 new B-II Dry Chem extinguishers installed.