MAURY USCG vessel records Sign in
← All vessels

RIG P-53

RIG P-53 is a 1982 mobile offshore drilling unit. The Coast Guard has recorded 102 inspections since 1982, most recently in July 2006, along with 188 deficiencies.

Records from 1982 to 2006. Most recent: inspection, 20 July 2006.

Built
1982
Last inspected
20 July 2006
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8754231 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WRB2799
Flag
UNITED STATES
—
Maury page id
psix-53485

Inspections, by type

…with no type recorded31
Years with a record 25 calendar years (1982–2006)
The 102 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 20 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it2259 - Regulatory (Subpart C or D), Gross Ton
2259 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WRB2799MMSI not assigned · cancelled · voluntarily equipped · granted 12 March 1999, cancelled 14 June 2002 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 102

20 July 2006 Re-Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2718964
30 September 2005 Re-Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2504569
21 March 2005 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2315825
9 November 2004 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2236835
2 August 2004 Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2133302
16 December 2003 Administrative Inspection
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1965151
17 July 2003 Administrative Inspection
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1849046
9 July 2003 Annual Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1923346
7 February 2002 Hull Examination · Deficiency Check · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1484748
28 January 2002 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1481989
16 January 2002 Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1479339
20 November 2001 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1077330
14 April 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1061603
3 April 2001 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1458862
19 August 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1053181
21 June 2000 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1050920
30 March 2000 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 816428
8 March 2000 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1046114
8 February 2000 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1469944
18 November 1999 Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1404868
26 October 1999 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1131496
14 June 1999 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 807431
2 April 1999 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1388775
12 February 1999 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1128315
21 August 1998 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 802444
7 July 1998 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1128589
22 June 1998 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1126499
30 March 1998 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 787005
20 March 1998 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1449018
13 March 1998 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 787612
12 February 1998 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1408049
13 January 1998 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 768647
25 December 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 197021
18 April 1997 Re-Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1368103
26 July 1996 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1090089
25 March 1996 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1078941
23 February 1996 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1465237
16 February 1996 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1383147
9 January 1996 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1190586
7 January 1996 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 879916
8 December 1995 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1187962
21 July 1995 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 880514
19 June 1995 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1188207
15 June 1995 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1190098
8 June 1995 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1188934
31 May 1995 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1422521
9 March 1995 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 860728
2 November 1994 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1450919
14 February 1994 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1464505
5 April 1993 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 653470
28 March 1993 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 16202
8 March 1993 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 97251
16 February 1993 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1433988
14 October 1992 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 952562
8 September 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1259889
7 September 1992 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 119986
13 August 1992 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 179320
27 July 1992 Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1451812
14 May 1992 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1238470
18 March 1992 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 71155
5 March 1992 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1317959
13 January 1992 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 944601
7 May 1991 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1228396
8 April 1991 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 919095
26 March 1991 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1210929
25 February 1991 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1238853
7 November 1990 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1242268
21 March 1990 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1228861
14 February 1990 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 921733
30 December 1989 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 918567
2 November 1989 Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1235765
23 August 1989 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 895768
20 March 1989 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1208937
17 February 1989 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1262303
10 February 1989 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1349335
15 November 1988 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1043553
7 October 1988 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 888797
23 June 1988 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1209850
20 June 1988 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1039075
29 February 1988 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 993048
17 February 1988 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1328310
22 January 1988 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1202844
1 October 1987 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1013200
2 September 1987 Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1011907
21 August 1987 Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1338482
29 May 1987 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1027469
20 April 1987 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1024965
10 April 1987 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1002566
24 June 1986 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1303517
6 June 1986 Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 988565
6 January 1986 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1294285
27 August 1985 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 989462
31 May 1985 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 980893
26 March 1985 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 979156
23 May 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1282847
11 April 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1280510
20 July 1983 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1272161
9 March 1983 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 966140
9 July 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1277660
1 April 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 965190
29 March 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1273663
24 March 1982 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 963904

Deficiency record · 188

Construction/Loadline › Hull › Hull Plating
Issued 9 November 2004 Resolved
Issued CG-835 to complete underwater portion of SEILOD (dry-dock) exam during next rig move.
Action required: 705 - Other - as specified
Resolved 21 March 2005
Resolution: Received and reviewed ABS, diving and video reports for PHASE II of SEILOD (underwater examination). No discrepencies.
Electrical › Electric Generation Source (emergency)
Issued 9 July 2003 Resolved
Insure the Emergency generator is operational and tested. LEGACY COMPONENT DESC: Generator
Action required: 705 - Other - as specified
Resolved 18 September 2003
Resolution: Cleared Items 1 and 2 via email from [name withheld].
Communications › Alarms/Indicators
Issued 9 July 2003 Resolved
Insure all general alarms and lights are operating properly. LEGACY COMPONENT DESC: General Alarm
Action required: 705 - Other - as specified
Resolved 18 September 2003
Resolution: Cleared items 1 and 2 via fax from [name withheld].
Electrical › Electric Generation Source (emergency)
Issued 7 May 2002 Resolved
PROVE PROPER OPERATION OF THE EMERGENCY GENERATOR UNDER LOAD. LEGACY COMPONENT DESC: Generator
Condition: Unknown
Due 7 June 2002
Resolved 25 June 2002
Lifesaving › Lifeboat
Issued 7 May 2002 Resolved
MAKE APPROVED REPAIRS TO THE FRACTURED FRP ON THE PORT LIFEBOAT. LEGACY COMPONENT DESC: Rigid Cover
Condition: Damaged By Earlier Event
Due 7 June 2002
Resolved 25 June 2002
Operations/Management › Drills/Instruction
Issued 7 May 2002 Resolved
ONCE PROPERLY MANNED CONDUCT A FIRE AND BOAT DRILL LEGACY COMPONENT DESC: Fire
Condition: Unknown
Action required: 705 - Other - as specified
Due 7 June 2002
Resolved 11 July 2002
Construction/Loadline › Hull
Issued 7 May 2002 Resolved
CROP & RENEW TO GOOD STEEL HOLED SECTION OF THE SIDE SHELL IN PRELOAD TANK #17. LEGACY COMPONENT DESC: Side Shell
Condition: Improper/Lack of Maintenance
Due 7 June 2002
Resolved 25 June 2002
Construction/Loadline › Hull
Issued 7 February 2002 Resolved
CROP & RENEW TO GOOD STEEL (4) WASTED DECK LONGS IN PRELOAD TANK #3, INCLUDING REPAIRS TO THE ACCESS LADDER. LEGACY COMPONENT DESC: Stiffener
Condition: Improper/Lack of Maintenance
Due 7 June 2002
Resolved 25 June 2002
Lifesaving
Issued 20 November 2001 Resolved
CROP AND RENEW DAVIT BRACE WHERE HOLED AND WASTED AT #1 LIFEBOAT STATION. WEIGHT TEST DAVIT WHEN REPAIRS COMPLETE.
Condition: Unknown
Due 20 December 2001
Resolved 28 January 2002
Lifesaving
Issued 3 April 2001 Resolved
Locate source of, and repair oil at exhaust #2 lifeboat.
Condition: Unknown
Due 8 May 2001
Resolved 8 May 2001
Documentation
Issued 3 April 2001 Resolved
Provide copy of endorsed ABS load line to [name withheld].
Condition: Unknown
Due 3 April 2001
Resolved 3 April 2001
Fire Fighting
Issued 3 April 2001 Resolved
Make all interior fire doors self closing and latching with no hold back devices. (Reference posted Fire Control & Safety Plan)
Condition: Unknown
Due 3 May 2001
Resolved 8 May 2001
Lifesaving
Issued 3 April 2001 Resolved
Repair rubrail #1 lifeboat, forward starboard side. Repair any fiberglass damage.
Condition: Unknown
Due 3 April 2001
Resolved 3 April 2001
Accommodation/Occupational Safety
Issued 3 April 2001 Resolved
Crop and renew wasted and holed handrails. (Aft of rig floor, at port escape ladder)
Condition: Unknown
Due 3 May 2001
Resolved 8 May 2001
Lifesaving
Issued 3 April 2001 Resolved
Provide 6 additional parachute flares for the rig.
Condition: Unknown
Due 3 May 2001
Resolved 8 May 2001
Electrical
Issued 3 April 2001 Resolved
Provide inner panel that surrounds circuit breaker on main panel,_x001C_ swithboard room.
Condition: Unknown
Due 3 April 2001
Resolved 3 April 2001
Documentation
Issued 8 February 2000 Resolved
Amend outdated Fire Control/Lifesaving Plan and submit to [name withheld] for review/approval.
Condition: Unknown
Due 8 February 2000
Resolved 8 February 2000
Fire Fighting
Issued 8 February 2000 Resolved
Prove proper operation of both fire pumps' relief valves at designated set pressure.
Condition: Unknown
Due 8 February 2000
Resolved 8 February 2000
Lifesaving
Issued 8 February 2000 Resolved
Perform 100 percent full load weight test on both lifeboats and their respective davits and falls.
Condition: Unknown
Due 8 February 2000
Resolved 8 February 2000
Fire Fighting
Issued 8 February 2000 Resolved
Complete audible survey of all general alarm bells and repair or replace asnecessary.
Condition: Unknown
Due 8 February 2000
Resolved 8 February 2000
Construction/Loadline
Issued 18 November 1999 Resolved
ADDRESS PORT SIDE LEG WELL CORROSION, REPLACE ALL 4 LEGWELL ACCESS LADDERS AS NECESSARY.
Condition: Unknown
Due 3 January 2000
Resolved 3 January 2000
Fire Fighting
Issued 18 November 1999 Resolved
CROP AND RENEW OR ARREST CORROSION/PITTING ON FIRE MAIN THROUGHOUT RIG AS NECESSARY.
Condition: Unknown
Due 3 January 2000
Resolved 3 January 2000
Construction/Loadline
Issued 18 November 1999 Resolved
CROP AND RENEW AREA AROUND HOLE IN TANK #30, SUBMIT REPAIR PROPOSAL, AND WELDER QUALS, PROCEDURES TO [name withheld].
Condition: Unknown
Due 18 January 2000
Resolved 3 January 2000
Construction/Loadline
Issued 18 November 1999 Resolved
CROP AND RENEW HAND RAILS ON TOP STBD AFT LEG, CROP AND RENEW WALK WAY SUPPORT ON 0-3 LEVEL WALK WAY, C/R HATCH COMBING ON CHANGE ROOM WTD.
Condition: Unknown
Due 3 January 2000
Resolved 3 January 2000
Construction/Loadline
Issued 18 November 1999 Resolved
SUBMIT PHASE II UNDERWATER PORTION OF HULL EXAM TO [name withheld], INCLUDING MAT EXAM AND CRITICAL CONNECTIONS FOR LEG TO MAT.
Condition: Unknown
Due 18 November 1999
Resolved 18 November 1999
Construction/Loadline
Issued 18 November 1999 Resolved
CROP AND RENEW MUD CLEANER DECK, AND C/R LADDER TO ACCESS THAT DECK.
Condition: Unknown
Due 18 January 2000
Resolved 3 January 2000
Lifesaving
Issued 2 April 1999 Resolved
OPERATIONALLY TEST RELEASE GEAR TO 1.1 TIMES THE MAX LOAD OF THE BOAT OR CONDUCT AN ALTERNATE TEST TO [name withheld].
Condition: Unknown
Due 2 April 1999
Resolved 2 April 1999
Lifesaving
Issued 20 March 1998 Resolved
Remove no-longer-used/wired in shutdown in SCR room behind locker, by door going into generator room.
Condition: Unknown
Due 20 March 1998
Resolved 20 March 1998
Lifesaving
Issued 20 March 1998 Resolved
Find data plate for air receiver in air compressor room or provide manufacturer's certification.
Condition: Unknown
Due 20 March 1998
Resolved 20 March 1998
Lifesaving
Issued 20 March 1998 Resolved
Perform test of air relief valve for air receiver in air compressor room.
Condition: Unknown
Due 20 March 1998
Resolved 20 March 1998
Electrical
Issued 20 March 1998 Resolved
Replace 3M splice under drill floor with explosion proof type.
Condition: Unknown
Due 20 March 1998
Resolved 20 March 1998
Fire Fighting
Issued 12 February 1998 Resolved
REPLACE GENERAL ALARM WARNING SIGN NEAR FIRE STATION NO4.
Condition: Unknown
Due 13 February 1998
Resolved 18 February 1998
Lifesaving
Issued 12 February 1998 Resolved
PROVE OPERATION OF PRESSURE RELIEF VALVES ON AIR RECEIVERS.
Condition: Unknown
Due 12 February 1998
Resolved 12 February 1998
Unknown
Issued 12 February 1998 Resolved
FIX THE FOLLOWING ITEMS: (1)Adjust generator rm WT door, (2) Replace wasted lower edge of port SCR rm WT door, (3) Adjust change rm hatch, (4) Adjust port crane house door, (5) Adjust large port storeroom hatch.
Condition: Unknown
Due 12 February 1998
Resolved 12 February 1998
Lifesaving
Issued 12 February 1998 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 13 February 1998
Resolved 18 February 1998
Lifesaving
Issued 12 February 1998 Resolved
PUT RETRO TAPE ON RINGBUOY ON PORT SIDE.
Condition: Unknown
Due 13 February 1998
Resolved 18 February 1998
Fire Fighting
Issued 12 February 1998 Resolved
REPLACE MISSING BATTERY IN SMOKE DETECTOR IN ROOM 100.
Condition: Unknown
Due 13 February 1998
Resolved 18 February 1998
Lifesaving
Issued 12 February 1998 Resolved
REPAIR LIMIT SWITCH ON NO 2 LIFEBOAT.
Condition: Unknown
Due 12 February 1998
Resolved 12 February 1998
Electrical
Issued 12 February 1998 Resolved
FIND OUT FUNCTION OF UNLABELED SWITCH ON (1) DRILL FLOOR CONSOLE AND (2) SHUTDOWN SWITCH IN SCR ROOM BY DOOR BEHIND LOCKER, AND LABEL BOTH APPROPRIATELY.
Condition: Unknown
Due 12 February 1998
Resolved 12 February 1998
Electrical
Issued 12 February 1998 Resolved
TEST EMERGENCY GENERATOR LOW L/O SHUTDOWN, AND REMOTE SHUTDOWNS FROM ALL STATIONS. (TOOLPUSHER'S OFFICE AND DRILL FLOOR).
Condition: Unknown
Due 12 February 1998
Resolved 12 February 1998
Electrical
Issued 12 February 1998 Resolved
PROVE OPERATION OF EMERGENCY GENERATOR BATTERIES. (3 CONSECUTIVE STARTS).
Condition: Unknown
Due 12 February 1998
Resolved 12 February 1998
Fire Fighting
Issued 12 February 1998 Resolved
REPAIR WATER LEAK ON VALVE STEM FOR FIRE STATION #5.
Condition: Unknown
Due 12 February 1998
Resolved 18 February 1998
Lifesaving
Issued 12 February 1998 Resolved
COMPLETE IMPLEMENTING 46CFR108,109 REQUIREMENTS.
Condition: Unknown
Due 12 February 1998
Resolved 12 February 1998
Lifesaving
Issued 12 February 1998 Resolved
REMOVE PAINT FROM STBD STORE ROOM AND PUT IN PAINT LOCKER.
Condition: Unknown
Due 13 February 1998
Resolved 18 February 1998
Electrical
Issued 12 February 1998 Resolved
TEST GENERATOR LOW L/O SHUTDOWN.
Condition: Unknown
Due 12 February 1998
Resolved 12 February 1998
Electrical
Issued 12 February 1998 Resolved
REPLACE/REMOVE SECTIONS OF DAMAGED CABLE GOING INTO EXPLOSION PROOF BOX UNDER DRILL FLOOR AND SECTION OF DAMAGED CABLE THAT IS TAPED OVER WITH ELECTRICAL TAPE.
Condition: Unknown
Due 12 February 1998
Resolved 12 February 1998
Electrical
Issued 12 February 1998 Resolved
REPLACE JUNCTION BOX WITH BROKEN CONNECTION, UNDER COOMY UNIT.
Condition: Unknown
Due 12 February 1998
Resolved 12 February 1998
Electrical
Issued 18 April 1997 Resolved
PROPERLY SECURE WIRE RUNS ON DRILL FLOOR WITH METAL BANDING.
Condition: Unknown
Due 7 May 1997
Resolved 7 May 1997
Electrical
Issued 18 April 1997 Resolved
LABEL EMERGENCY LIGHTING THROUGHOUT RIG AS NECESSARY.
Condition: Unknown
Due 7 May 1997
Resolved 7 May 1997
Engineering
Issued 18 April 1997 Resolved
INSTALL NONMETALLIC FUEL LINES ON BOTH DRILL FLOOR POWER UNITS SO THAT LINES ARE <30 IN LONG, WITH FACTORY ASSEMBLED END FITTINGS.
Condition: Unknown
Due 18 April 1997
Resolved 18 April 1997
Lifesaving
Issued 18 April 1997 Resolved
LOWER ESCAPE LADDERS TO SAFE DISTANCE FROM WATER'S SURFACE.
Condition: Unknown
Due 7 May 1997
Resolved 7 May 1997
Lifesaving
Issued 18 April 1997 Resolved
MAKE LIFERING ARRANGEMENT IAW APPROVED FIRE AND SAFETY PLAN; SPECIFICALLY, AT LEAST ONE LIFERING ON EA SIDE MUST PROVIDE A BOUYANT LINE
Condition: Unknown
Due 7 May 1997
Resolved 7 May 1997
Electrical
Issued 18 April 1997 Resolved
INSTALL COVER ON ELECTRICAL OUTLET NEXT TO FIRE STA #2.
Condition: Unknown
Due 7 May 1997
Resolved 7 May 1997
Electrical
Issued 18 April 1997 Resolved
INSTALL EMERGENCY LIGHTING AT LIFEBOAT EMBARKATION STATIONS SO THAT STATIONS ARE ILLUMINATED FROM LAUNCHING AREA TO THE WATER.
Condition: Unknown
Due 18 April 1997
Resolved 18 April 1997
Accommodation/Occupational Safety
Issued 18 April 1997 Resolved
REPLACE RAILS AND GRATINGS ON AFT LANDING.
Condition: Unknown
Due 18 April 1997
Resolved 18 April 1997
Engineering
Issued 18 April 1997 Resolved
REPLACE BOTH FUEL LINES ON FWD THRUSTER PRIME MOVER AND SUPPLY FUEL LINE ONCAT WITH APPROVED TYPE.
Condition: Unknown
Due 18 April 1997
Resolved 18 April 1997
Documentation
Issued 18 April 1997 Resolved
PROVIDE APPROVED EMERGENCY EVACUATION PLAN ON BOARD RIG.
Condition: Unknown
Due 18 April 1997
Resolved 18 April 1997
Accommodation/Occupational Safety
Issued 18 April 1997 Resolved
GALLEY: REPAIR RANGE HOOD GREASE SCREEN, INSTALL COVER OVER ELECTRICAL BOX,AND LABEL ON/OFF SWITCHES FOR RANGE/DEEP FAT FRYER/WATER HEATERS.
Condition: Unknown
Due 7 May 1997
Resolved 7 May 1997
Accommodation/Occupational Safety
Issued 18 April 1997 Resolved
REPAIR LAVATORY WATER SUPPLY AND TOILET PROBLEMS, UPPER LEVEL RESTROOM; TIGHTEN LOCKSETS TO ALL ROOMS AS NECESSARY; ADJUST DOORS AT UPPER AND LOWERLEVELS OF STAIRCASE FOR PROPER SELF-CLOSING; REPAIR ADJUSTABLE VENT LOUVERSIN ALL ROOMS; VACUUM DUST OUT OF ACCESSIBLE AREAS OF VENT DUCTING.
Condition: Unknown
Due 7 May 1997
Resolved 7 May 1997
Construction/Loadline
Issued 18 April 1997 Resolved
MAKE REPAIRS TO MAT TO LEG CONNECTIONS IAW ABS APPROVED REPAIR PROCEDURE AND APPROVED CONSTRUCTION PORTFOLIO. PROVIDE APPROVED REPAIR PROCEDURE PRIOR TO COMMENCING REPAIRS.
Condition: Unknown
Due 22 April 1997
Resolved 22 April 1997
Lifesaving
Issued 18 April 1997 Resolved
MAKE REVISIONS TO POLICY TO COMPLY WITH REVISIONS TO 46 CFR 107-109; FEDERAL REGISTER VOL. 61, NO. 98, DATED 20MAY96.
Condition: Unknown
Due 18 April 1997
Resolved 18 April 1997
Construction/Loadline
Issued 18 April 1997 Resolved
COMPLETE PHASE I OF SEILOD. INCLUDE INSPECTION OF ALL DUMP VALVES, SEA CHEST VALVES AND THROUGH-HULL FITTINGS. COMPLETE IAW USCG APPROVED SEILOD PROPOSAL.
Condition: Unknown
Due 22 April 1997
Resolved 22 April 1997
Construction/Loadline
Issued 18 April 1997 Resolved
PRELOAD TANKS 1, 3, 17, 26 AND 27: CROP AND RENEW ALL DECK FRAMING WHERE WASTAGE EXCEEDS 15 PERCENT.
Condition: Unknown
Due 22 April 1997
Resolved 22 April 1997
Fire Fighting
Issued 18 April 1997 Resolved
PLACE TWO PROPERLY FILLED AND HYDROSTATICALLY TESTED SCBA BOTTLES AT EACH FIREMAN'S OUTFIT STATION.
Condition: Unknown
Due 18 April 1997
Resolved 18 April 1997
Fire Fighting
Issued 18 April 1997 Resolved
TRAIN ALL FIRE RESPONSE TEAM MEMBERS ON BASIC FIREFIGHTING TECHNIQUES AND PROPER USE / LIMITATIONS OF SCBA'S. TRAIN ON ABANDONMENT DRILL; ENSURE MUSTER TAKEN / ACCOUNTABILITY OF ALL PERSONNEL.
Condition: Unknown
Due 7 May 1997
Resolved 7 May 1997
Lifesaving
Issued 18 April 1997 Resolved
REPAIR GENERAL ALARMS THROUGHOUT. IN INTERIM, OIM SHALL ASSIGN CREWMAN TO NOTIFY PERSONNEL OF GEN ALARM IN THOSE AREAS WHERE GENERAL ALARMS ARE NOT AUDIBLE ON A 24 HR PER DAY BASIS.
Condition: Unknown
Due 7 May 1997
Resolved 7 May 1997
Construction/Loadline
Issued 18 April 1997 Resolved
PROVIDE DIVERS REPORT OF U/W NDT, INSPECTION AND GAUGINGS. PROVIDE COPY OF ABS REPORT FOR ALL PHASES OF HULL INSPECTION (SPECIAL SURVEY NO. 3).
Condition: Unknown
Due 22 April 1997
Resolved 22 April 1997
Construction/Loadline
Issued 18 April 1997 Resolved
PROVIDE WELDER QUALIFICATIONS PRIOR TO COMMENCING REPAIRS TO MAT/LEG CONNECTIONS.
Condition: Unknown
Due 22 April 1997
Resolved 22 April 1997
Construction/Loadline
Issued 26 July 1996 Resolved
CONDUCT PERMANENT REPAIRS IN WAY OF THE MAT AT THE PORT FORWARD LEG AND TO BE COMPLETED NLT 30APRIL97 IN THE PRESENCE OF A COGNIZANT OCMI MARINE INSPECTOR. REFER TO CASE MI94044759. NO FURTHER EXTENSIONS WILL BE GRANTED.
Condition: Unknown
Due 26 July 1996
Resolved 26 July 1996
Construction/Loadline
Issued 16 February 1996 Resolved
Crop and renew lower knife edge (coaming) on MCC compartment watertight door where wasted away.
Condition: Unknown
Due 16 March 1996
Resolved 25 March 1996
Lifesaving
Issued 16 February 1996 Resolved
Renew badly crimped breathing air cylinder supply hose on bottom cylinder port lifeboat.
Condition: Unknown
Due 25 March 1996
Resolved 25 March 1996
Engineering
Issued 16 February 1996 Resolved
Replace with approved safety relief valves the valves on the drill floor and the two on port side deck outside generator room. Replacement valves must be ASME code (stamped "UV").
Condition: Unknown
Due 16 April 1996
Resolved 25 March 1996
Construction/Loadline
Issued 16 February 1996 Resolved
Straighten or replace all bent or wasted reach rods for pre-load tanks and renew packing on all valves where needed.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Electrical
Issued 16 February 1996 Resolved
Clean up electrical wiring in generator room: replace start/stop controller boxes that are currently held together with wire straps, secure loose cables in accordance with IEEE 45 section 18. (broken conduit, loose cable glands, etc.)
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Electrical
Issued 16 February 1996 Resolved
Properly mount all explosion proof junction boxes in hazardous areas and marine weatherproof junction boxes elsewhere where they are not bolted (secured) to structure or where suspended by cable itself.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Lifesaving
Issued 16 February 1996 Resolved
Repair excessive leakage (oil) on air compressors and hydraulic jacking pumps. Clean up decks, bulkheads, and electrical connections in same areas.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Engineering
Issued 16 February 1996 Resolved
Renew broken sightglass on diesel day tank on port side engine in shaker/mud pit area; renew flamescreens where needed or seal gaps in fuel oil tank vents in same area.
Condition: Unknown
Due 16 March 1996
Resolved 25 March 1996
Construction/Loadline
Issued 16 February 1996 Resolved
Free-up all dogs on watertight doors to engine room, tool room, change room, and accesses to below-deck compartments.
Condition: Unknown
Due 16 March 1996
Resolved 25 March 1996
Electrical
Issued 16 February 1996 Resolved
Proved proper operation of both ship's service generators including: parallel operation, overspeed and low lube oil pressure shutdowns, reverse power relays. Also test remote shutdowns for engines and machinery space ventilation.
Condition: Unknown
Due 16 February 1996
Resolved 16 February 1996
Electrical
Issued 16 February 1996 Resolved
Replace wasted electrical cable trays and/or supports on main deck cableways in front of house and at various locations in pit/shaker area andcantilever area.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Engineering
Issued 16 February 1996 Resolved
Renew deteriorated and/or chaffed diesel fuel oil hoses from day tank piping to Racor filters and from Racor filters to engine. Secure (with pipe brackets) hard piping from day tank.
Condition: Unknown
Due 16 March 1996
Resolved 25 March 1996
Electrical
Issued 16 February 1996 Resolved
Remove dead-end electrical cable or properly terminate in junction box the cable on port side of cantilever under mud trough.
Condition: Unknown
Due 16 March 1996
Resolved 25 March 1996
Engineering
Issued 16 February 1996 Resolved
Replace port crane diesel refueling hose (deteriorated) with hose approved for petroleum service.
Condition: Unknown
Due 25 March 1996
Resolved 25 March 1996
Accommodation/Occupational Safety
Issued 16 February 1996 Resolved
Replace missing door handles on all quarters' exit doors.
Condition: Unknown
Due 25 March 1996
Resolved 25 March 1996
Lifesaving
Issued 16 February 1996 Resolved
Send in all three breathing air cylinders for overdue hydrostatic testing/recharging (stbd lifeboat).
Condition: Unknown
Due 25 March 1996
Resolved 25 March 1996
Documentation
Issued 16 February 1996 Resolved
Update Operating Manual: current revision (rev 5) does not include all pages from previous revisions (rev 4,3). Also remove and discard all previous stability letters that were superceded by latest (and current) letter dtd 14MAY92.
Condition: Unknown
Due 25 March 1996
Resolved 25 March 1996
Documentation
Issued 16 February 1996 Resolved
Submit copy of current applicable Emergency Escape Plan (EEP) to [name withheld] for CG approval.
Condition: Unknown
Due 26 March 1996
Resolved 26 March 1996
Electrical
Issued 16 February 1996 Resolved
Renew frayed wiring (or strip back to good wiring) and properly secure withcable glands on fwd end of stbd fwd bow thruster.
Condition: Unknown
Due 26 March 1996
Resolved 26 March 1996
Construction/Loadline
Issued 19 June 1995 Resolved
Provide a copy of the ABS UWILD report of 31 May 1995 and an engineering analysis by a qualified naval architect of the impact of the damage to the structural integrity of the mat in way of the deck adjacent to port forwardleg.
Condition: Unknown
Due 19 June 1995
Resolved 19 June 1995
Construction/Loadline
Issued 19 June 1995 Resolved
Per Marine Inspection case MI94044759 of 02NOV94: Make permanent repairs topuncture hole in flooded tank adjacent to port forward leg. Puncture hole is presently covered with removable lid.
Condition: Unknown
Due 19 June 1995
Resolved 19 June 1995
Construction/Loadline
Issued 31 May 1995 Resolved
PROVIDE REPAIR PROPOSAL FOR PERMANENT REPAIRS TO BALLAST TANK #5 TO [name withheld].
Condition: Unknown
Due 31 May 1995
Resolved 31 May 1995
Construction/Loadline
Issued 31 May 1995 Resolved
SUBMIT COPY OF FINAL NDT REPORT AND VIDEO TO [name withheld].
Condition: Unknown
Due 31 May 1995
Resolved 31 May 1995
Construction/Loadline
Issued 2 November 1994 Resolved
CROP AND RENEW W/MINIMUM 18" X 18" INSERT W/RADIUS CORNERS WASTED SIDE SHELL OF PRELOAD TANK #17 BY WAY OF THIRD TRANSVERSE FRAME AND BOTTOM SIDE STIFFENER AND SIXTH TRANSVERSE FRAME AND BOTTOM TWO SIDE STIFFENERS.
Condition: Unknown
Due 2 November 1994
Resolved 2 November 1994
Construction/Loadline
Issued 2 November 1994 Resolved
MAKE PERMANENT REPAIRS TO PUNCTURE HOLE IN FLOODED TANK ADJACENT TO PORT FORWARD LEG. PUNCTURE HOLE IS PRESENTLY COVERED WITH REMOVABLE LID.
Condition: Unknown
Due 2 November 1994
Resolved 2 November 1994
Construction/Loadline
Issued 2 November 1994 Resolved
COMPLETE LOWER HULL PORTION OF SEILOD PRIOR TO NEXT RIG MOVE, NLT 23 MAY95.
Condition: Unknown
Due 2 November 1994
Resolved 2 November 1994
Engineering
Issued 14 February 1994 Resolved
REPAIR AND PROVE PROPER OPERATION OF FUEL TRANSFER SYSTEM REMOTE SHUTDOWN.
Condition: Unknown
Due 2 March 1994
Resolved 2 March 1994
Lifesaving
Issued 14 February 1994 Resolved
PROVIDE THE FOLLOWING FOR LIFEBOAT NO. 1: 1ST AID KIT, COMPASS, REPAIR BILGE PUMP AND SUCTION HOSE, INVENTORY WATER, REPLACE BOW WINDOW, STRIP ANDCLEAN BOAT, REPLACE PLEXIGLASS WINDOWS (WITH LEXAN), CONDUCT OPERATIONAL TEST IN WATER.
Condition: Unknown
Due 2 March 1994
Resolved 2 March 1994
Lifesaving
Issued 14 February 1994 Resolved
PROVIDE THE FOLLOWING FOR LIFEBOAT NO. 2: 1ST AID KIT, BREATHING AIR GAGE, STRIP AND CLEAN BOAT, INVENTORY WATER, REPLACE PLEXIGLASS WINDOWS, CONDUCT OPERATIONAL TEST IN WATER.
Condition: Unknown
Due 2 March 1994
Resolved 2 March 1994
Lifesaving
Issued 14 February 1994 Resolved
REPAIR AND PROVE PROPER OPERATION OF RIG SHUTDOWN FROM BOTH LOCATIONS.
Condition: Unknown
Due 2 March 1994
Resolved 2 March 1994
Lifesaving
Issued 14 February 1994 Resolved
PROVIDE LIGHTING FOR LIFEBOAT EMBARKATION AREAS ON EMERGENCY CIRCUIT.
Condition: Unknown
Due 2 March 1994
Resolved 2 March 1994
Electrical
Issued 14 February 1994 Resolved
INSTALL BATTERY E-LIGHT OVER EXIT FROM T.V. ROOM.
Condition: Unknown
Due 2 March 1994
Resolved 2 March 1994
Construction/Loadline
Issued 27 July 1992 Resolved
PROVE PROPER OPERATION OF ALL PRELOAD DUMP VALVES AND FLAPPER GATES TO DUMPVALVES._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 October 1992
Resolved 14 October 1992
Electrical
Issued 25 February 1991 Resolved
REPAIR AND MAKE READY FOR TESTING OF PURGE AIR ALARM FOR DRILLERS CONSOLE ON DRILL FLOOR
Condition: Unknown
Due 25 February 1991
Resolved 25 February 1991
Unknown
Issued 25 February 1991 Resolved
INSTALL SCHRAEDER VALVES FOR AIR LINE GOING TO POTABLE WATER SURGE TANK.
Condition: Unknown
Due 25 February 1991
Resolved 25 February 1991
Construction/Loadline
Issued 25 February 1991 Resolved
RENEW VALVE HANDLE TO SEACHEST SUCTION FROM DEEPWELL DISCHARGE AND HANDLES TO VALVES IN AIR SYSTEM FOR PRESSURE VESSELS
Condition: Unknown
Due 25 February 1991
Resolved 25 February 1991
Electrical
Issued 25 February 1991 Resolved
REPAIR GENL ALARM BELL ON DRILL FLOOR
Condition: Unknown
Due 25 February 1991
Resolved 25 February 1991
Electrical
Issued 25 February 1991 Resolved
REPAIR GOVERNOR CONTROL ON PORT DIESEL GENERATOR AND MAKE READY FOR TESTS OF REVERSE POWER RELAYS AND LOW OIL PRESSURE ALARM
Condition: Unknown
Due 25 February 1991
Resolved 25 February 1991
Lifesaving
Issued 25 February 1991 Resolved
REPLACE OUTDATED EPIRB BATT WITH A CURRENT UNIT
Condition: Unknown
Due 25 February 1991
Resolved 25 February 1991
Lifesaving
Issued 25 February 1991 Resolved
REPAIR AND PROVE PROPER OPERATION OF THE WATER SPRAY SYSTEM IN #1 LIFE CAPSULE
Condition: Unknown
Due 25 February 1991
Resolved 25 February 1991
Unknown
Issued 7 November 1990 Resolved
SUBMIT REVISION TO OPERATING MANUAL PER MSO PORT ARTHUR LETTER OF 7JAN91
Condition: Unknown
Due 7 November 1990
Resolved 7 November 1990
Unknown
Issued 14 February 1990 Resolved
PLACE FLAME REFLECTORS ON ALL FUEL STRAINERS AND REMOVE ALL BRASS PETCOCKS.
Condition: Unknown
Due 14 February 1990
Resolved 14 February 1990
Unknown
Issued 14 February 1990 Resolved
MAKE PERMANENT REPAIRS TO OVERBOARD DISCHARGE PIPING FROM THE GRAYWATER _x001C_ TANK WHERE HOLED AND PATCHED.
Condition: Unknown
Due 14 February 1990
Resolved 14 February 1990
Unknown
Issued 14 February 1990 Resolved
PROVIDE REPORT OF ANNUAL SERVICEING OF PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 14 February 1990
Resolved 14 February 1990
Unknown
Issued 14 February 1990 Resolved
INSTALL A REMOTE FUEL SHUTOFF VALVE FOR THE EMERGENCY DIESEL GENERATOR.
Condition: Unknown
Due 14 February 1990
Resolved 14 February 1990
Unknown
Issued 14 February 1990 Resolved
REPAIR #1 GENERATOR HIGH WATER TEMPERATURE ALARM.
Condition: Unknown
Due 14 February 1990
Resolved 14 February 1990
Unknown
Issued 14 February 1990 Resolved
REPAIR #2 GENERATOR REVERSE POWER TRIP.
Condition: Unknown
Due 14 February 1990
Resolved 14 February 1990
Unknown
Issued 14 February 1990 Resolved
REPAIR REMOTE SHUTDOWN FOR DIESEL ENGINES FROM DRILLERS CONSOLE.
Condition: Unknown
Due 14 February 1990
Resolved 14 February 1990
Unknown
Issued 14 February 1990 Resolved
REMOVE ALL LOOSE GEAR FROM MAIN DISTRIBUTION PANEL AND REPLACE BROKEN _x001C_ BREAKER SWITCH.
Condition: Unknown
Due 14 February 1990
Resolved 14 February 1990
Unknown
Issued 14 February 1990 Resolved
REPLACE BROKEN NUTS AND BOLTS TO VOID AND TANK COVERS.
Condition: Unknown
Due 14 February 1990
Resolved 14 February 1990
Unknown
Issued 14 February 1990 Resolved
REMOVE PAINT STOWAGE FROM STORE ROOM 14.
Condition: Unknown
Due 14 February 1990
Resolved 14 February 1990
Unknown
Issued 14 February 1990 Resolved
REPAIR E-LIGHT AT EXIT FROM GENERATOR ROOM.
Condition: Unknown
Due 14 February 1990
Resolved 14 February 1990
Construction/Loadline
Issued 2 November 1989 Resolved
CONDUCT VIDEO SWIMBY OF MAT SKIRT AT THE NEXT RIG MOVE IN THE PRESENCE OF AN CG MARINE INSPECTOR.
Condition: Unknown
Due 2 November 1989
Resolved 2 November 1989
Electrical
Issued 17 February 1989 Resolved
REMOUNT JUNCTION BOX AND REMOVE DEAD END WIRING LOCATED STBD. AFT. JACKING HOUSE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Accommodation/Occupational Safety
Issued 17 February 1989 Resolved
MAKE DOORS IN STAIR TOWER SELF-CLOSING._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Deck/Cargo
Issued 17 February 1989 Resolved
PERFORM ANNUAL INSPECTION OF CRANES BY CERIFYING AGENCY (ABS)._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Engineering
Issued 17 February 1989 Resolved
REPAIR LOW LUBE OIL PRESSURE LIGHT TO #2 MAIN GENERATOR._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Accommodation/Occupational Safety
Issued 17 February 1989 Resolved
MAKE REPAIRS/ADJUST THE GENERAL ALARMS AS INDICATED IN THE FOLLOWING LOCATIONS: 1.RIG FLOOR(PLACE LIGHT IN READILY SEEN LOCATION FROM WORK STA.)2.PUMP ROOM (ADJUST)3.PORT JACK HOUSE(CLEAN LABEL)4.OUTSIDE COMPRESSORROOM (LABEL)5.STATERM 105(ADJUST)6.STBD AFT JACKING HOUSE(MOVE SIGN)._x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
REMOVE DEAD END WIRES OR ISOLATE AND TAG THE FOLLOWING LOCATIONS: 1.ON AFT INBOARD SIDE OF PORT CANTILEVER BEAM. 2.IN WIRE TRAY ABOVE FWD ENTRANCE TO PUMP ROOM AREA.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
PROVIDE APPROVED FACE PLATE FOR JUNCTION BOX IN OVERHEAD WIRE TRAY LOCATED ION FORWARD STBD. CORNER OF PUMP ROOM AREA.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
REMOVE DEAD END WIRE AND TERMINATE AT JUNCTION BOX ABOVE 32 DRAWWORKS ENGINE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Deck/Cargo
Issued 17 February 1989 Resolved
REPAIR VENT CLOSURE TO TOOL ROOM FOR PROPER SEAL LOCATED BOW PASSAGE WAY ONMAIN DECK.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
REPLACE NON-APPROVED 3M SCOTCH CAST POURED SPLICES WITH APPROVED JUNCTION BOXES IN THE FOLLOWING LOCATIONS: 1.WIRE FOR STBD. OVERHEAD LIGHT ABOVE #2 DRAWWORKS ENGINE. 2.WURE FOR SWITCHBOX OF #1 FWD SHAKER. 3.TWO WIRES ALONG PORT SIDE OF FWD SIDE-TO-SIDE SKID OF DRILL RIG. 4.WIRE TO OVERHEAD LIGHT _x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
REPLACE SHRINK WRAPPED SPLICES WITH APPROVED JUNCTION BOX FOR GENERAL ALARMBELL WIRE AT DRILLER'S CONSULE.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
BENEATH PORT SIDE OF RIG FLOOR. 5.WIRE ON AFT INBOARD SIDE OF PORT CANTILEVER BEAM. 6.WIRE ON AFT INBOARD SIDE OF STBD CANTILEVER BEAM. 7.WIREIN TRAY ABOVE BACK-UP AIR COMPRESSOR IN PUMP ROOM AREA. 8. WIRE FOR OUTBOARD LIGHT OF SHAKER FLAT._x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Lifesaving
Issued 17 February 1989 Resolved
PROVIDE A LIFESAVING SIGNAL TABLE FOR EACH LIFEBOAT.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
VERIFY THAT THE OBSTRUCTION LIGHTS ARE VISIBLE FOR 360 DEGREES AROUND THE RIG.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Lifesaving
Issued 17 February 1989 Resolved
PROVIDE A 3 INCH CIRCUM. 500FT. MANILA ROPE FOR LINE THROWING GUN._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
PROPERLY SUPPORT WIRING TO PUMP ROOM GENERAL ALARM LIGHT USING BANDING IAW IEEE-45.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Engineering
Issued 17 February 1989 Resolved
EXTEND CONTAINMENT FOR L/O TANK TO BENEATH DISCHARGE VALVES ON PORT SIDE OFPUMP ROOM AREA.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Accommodation/Occupational Safety
Issued 17 February 1989 Resolved
GUAGE PITTING IN AIR RECEIVERS HOU 78-00335 AND 78-00739 AND SUBMIT ENGINEERING DOCUMENTATION THAT CORROSION DOES NOT EXCEED LIMITS. ELSE REPLACE WITH AIR RECEIVER OF APPROVED TYPE._x001C_ _x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Deck/Cargo
Issued 17 February 1989 Resolved
LABEL ALL VALVES THROUGHOUT RIG AND/OR CLEAN EXISTING LABELS.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Deck/Cargo
Issued 17 February 1989 Resolved
CLEAN CORRODED MATERIAL OUT OF DECK VENTS AND LABEL ALL DECK VENTS THROUGHOUT RIG._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Fire Fighting
Issued 17 February 1989 Resolved
HYDROSTATICALLY TEST TWO(2) OF THREE(3) CO2 BOTTLES AND HOSE ASSEMBLIES FORTHE MAIN GENERATOR FIXED FIRE FIGHTING EQUIPMENT._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
ADJUST LIGHT BULB TO STARBOARD AFT OBSTRUCTION LIGHT._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
PROVIDE LEASH FOR THE CLAMP-MOUNTED EXPLOSION PROOF LIGHT FOR THE CENTER LIGHT ABOVE THE MUD PIT._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Deck/Cargo
Issued 17 February 1989 Resolved
REPAIR FORWARD AIR COMPRESSOR ROOM VENT CLOSURE FOR PROPER SEAL.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Deck/Cargo
Issued 17 February 1989 Resolved
REPAIR AFT AIR COMPRESSOR ROOM VENT CLOSURE FOR PROPER SEAL._x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Deck/Cargo
Issued 17 February 1989 Resolved
REPAIR FORWARD MOTOR ROOM VENT CLOSURE FOR PROPER SEAL.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
RE-HANG WIRING RUNNING TO ELECTRICAL PLUG. BOX LOCATED PORT FORWARD BY #2 FIRE STATION.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
RENEW CORRODED WIRE BANDING LOCATED PORT FORWARD JUST AFT OF WALKWAY BEHIND#1 FIRE PUMP.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
RENEW CORRODED WIRE BANDING ON OVERHEAD CABLE TRAY RUNNING ALONG PORT FORWARD SIDE AND AFT OF HOUSE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
RE-HANG ALL WIRING IN AREA OF FWD. STBD. JACKING HOUSE.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
REPAIR TACH ON EMERGENCY GENERATOR.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
RENEW CORRODED WIRE BANDINGS RUNNING ALONG PORT AFT JACKING HOUSE IN CABLE TRAY RUNNING BACK TO REMOTE PILOT HOUSE.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Fire Fighting
Issued 17 February 1989 Resolved
REALIGN TANK #15 AFT VENT CLOSURE FOR PROPER SEAL AND CHECK FWD VENT CLOSURE.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Fire Fighting
Issued 17 February 1989 Resolved
REPAIR TANK #14 FORWARD AND AFT VENT CLOSURE FOR PROPER SEAL.
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
RENEW CORRODED WIRE BANDINGS AROUND STBD AFT JACKING HOUSE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Electrical
Issued 17 February 1989 Resolved
RENEW CORRODED WIRE BANDING AND PROPERLY HANG WIRING AROUND PORT FORWARD JACKING HOUSE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 2 March 1992
Resolved 6 March 1992
Deck/Cargo
Issued 10 February 1989 Resolved
PROVIDE DOCUMENTATION THAT ANNUAL CRANE SURVEY HAS BEEN COMPLETED.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Electrical
Issued 10 February 1989 Resolved
CONDUCT TEST OF EMERGENCY GENERATOR OVERSPEED TRIP.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Accommodation/Occupational Safety
Issued 10 February 1989 Resolved
PROVIDE DOCUMENTATION THAT MARINE SANITATION DEVICE IS COAST GUARD ACCEPTED.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Engineering
Issued 10 February 1989 Resolved
PROVIDE FLAME SCREENS AND ACCEPTABLE PLUGS FOR #1 AND #2 EMERGENCY GENERATOR FUEL OIL STRAINERS.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Unknown
Issued 17 February 1988 Resolved
MAKE AVAILABLE FOR UNDERWATER EXAMINATION & NDT, THE CRACK IN THE MAT TO LEG CONNECTION.
Condition: Unknown
Due 17 February 1988
Resolved 17 February 1988
Construction/Loadline
Issued 2 September 1987 Resolved
PROVIDE FOR VIDEO SURVEY OF MUD SKIRT AND UNDERSIDE OF MUD MAT TO COMPLETE SPECIAL EXAM IN LIEU OF DRYDOCK THIS SURVEY TO BE COMPLETED IN THE PRESENCEOF CG INSPECTOR AND UNER THE SAME PARAMETERS AS YOUR ORIGINAL APPROVE PROPOSAL.
Condition: Unknown
Due 2 September 1987
Resolved 2 September 1987
Construction/Loadline
Issued 2 September 1987 Resolved
AFFECT REPAIRS TO CRACK IN STARBOARD FORWARD LEG TO THE SATISFACTION OF COGNIZANT [name withheld].
Condition: Unknown
Due 2 September 1987
Resolved 2 September 1987
Engineering
Issued 20 April 1987 Resolved
REPAIR DAMAGED BOW THRUSTER, THRUSTER BOX FRAME STRUCTURE, AND DIESL POWER SOURCE.
Condition: Unknown
Due 20 April 1987
Resolved 20 April 1987
Lifesaving
Issued 20 April 1987 Resolved
REPAIR HELO DECK PERIMETER SAFETY NETTING.
Condition: Unknown
Due 20 April 1987
Resolved 20 April 1987
Unknown
Issued 10 April 1987 Resolved
REPAIR OR REPLACE THE BROKEN DOGS ON THE WATERTIGHT CLOSURES ADJACENT TO THE ELECTRO-MOTOR DIVISION DIESEL'S.
Condition: Unknown
Due 10 April 1987
Resolved 10 April 1987
Unknown
Issued 10 April 1987 Resolved
PROVIDE LABELS FOR THE TWO FIRE PUMP CONTROLLERS.
Condition: Unknown
Due 10 April 1987
Resolved 10 April 1987
Unknown
Issued 10 April 1987 Resolved
PROVIDE A PROPER BOTTOM AND TERMINAL COVERS FOR THE BATTERY TRAY IN THE EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 10 April 1987
Resolved 10 April 1987
Unknown
Issued 10 April 1987 Resolved
PROVIDE DOCUMENTATION OF A RECENT CRANE INSPECTION.
Condition: Unknown
Due 10 April 1987
Resolved 10 April 1987
Unknown
Issued 10 April 1987 Resolved
REPAIR THE EMERGENCY LIGHTS IN THE HOSPITAL AND ON THE 3RD DECK OF THE LIVING QUARTERS.
Condition: Unknown
Due 10 April 1987
Resolved 10 April 1987
Unknown
Issued 10 April 1987 Resolved
REPLACE THE BURNED OUT LIGHTS THROUGHOUT THE RIG.
Condition: Unknown
Due 10 April 1987
Resolved 10 April 1987
Fire Fighting
Issued 6 January 1986 Resolved
SUBMIT FIRE AND SAFETY PLAN TO [name withheld] FOR APPROVAL.
Condition: Unknown
Due 6 January 1986
Resolved 6 January 1986
Construction/Loadline
Issued 26 March 1985 Resolved
OVERHAUL AND RENEW SEA VALVE AT SEA CHEST IN TANK #3.
Condition: Unknown
Due 26 March 1985
Resolved 26 March 1985
Construction/Loadline
Issued 26 March 1985 Resolved
REINSPECT AND MAKE REPAIRS AS NECESSARY TO FORWARD SCOUR SKIRT IN WAY OF INDENTATION LOCATED 25 FEET FROM STARBOARD SIDE.
Condition: Unknown
Due 26 March 1985
Resolved 26 March 1985
Construction/Loadline
Issued 26 March 1985 Resolved
MAKE PERMANENT REPAIRS TO PORTSIDE SCOUR SKIRT VERTICLE BUTT FLANGE PLATE.
Condition: Unknown
Due 26 March 1985
Resolved 26 March 1985
Construction/Loadline
Issued 26 March 1985 Resolved
MAKE PERMANENT REPAIRS TO MAT TO LEG AREA FRACTURES AT BOTTOM MATS CLOSURE PLATE WELDAMENT CONNECTION TO COLUMNS GEAR BLANK RACK AS NEEDED.
Condition: Unknown
Due 26 March 1985
Resolved 26 March 1985
Construction/Loadline
Issued 26 March 1985 Resolved
DESCALE, CLEAN, REINSPECT, AND GAUGE AS FOUND NECESSARY TO DETERMINE EXTENTOF WASTAGE IN THE FOLLOWING TANKS: 1,2,3,7 AND ANY OTHERS THAT THE ATTENDING INSPECTOR MAY DETERMINE.
Condition: Unknown
Due 26 March 1985
Resolved 26 March 1985
Construction/Loadline
Issued 26 March 1985 Resolved
OVERHAUL OR RENEW AS NEEDED ALL PRELOAD DUMP VALVES.
Condition: Unknown
Due 26 March 1985
Resolved 26 March 1985
Electrical
Issued 11 April 1984 Resolved
DEMONSTRATE OPERATION OF THE OVERSPEED TRIP MECHANISM ON GENERATOR NUMBER TWO. 46 CFR 111.10.
Condition: Unknown
Due 11 April 1984
Resolved 11 April 1984
Electrical
Issued 11 April 1984 Resolved
PROVIDE APPROVED COPY OF HAZARDOUS LOCATION PLAN ON BOARD THE RIG. 46 CFR 107.305.
Condition: Unknown
Due 11 April 1984
Resolved 11 April 1984
Documentation
Issued 11 April 1984 Resolved
PROVIDE THE CERTIFICATE OF DOCUMENTATION ON BOARD THE RIG.
Condition: Unknown
Due 11 April 1984
Resolved 11 April 1984
Unknown
Issued 11 April 1984 Resolved
THE FOLLOWING DEFICIENCIES PERTAIN TO THE VESSEL POOL RIG 53, DN645917.
Condition: Unknown
Due 11 April 1984
Resolved 11 April 1984
Deck/Cargo
Issued 11 April 1984 Resolved
PROVIDE A CRANE RECORD BOOK FOR BOTH CRANES INSTALLED ON THE RIG. 46 CFR 107.258.
Condition: Unknown
Due 11 April 1984
Resolved 11 April 1984
Deck/Cargo
Issued 11 April 1984 Resolved
ROUTE THE AIR INTAKE FOR THE LOWER DRAWWORKS DIESEL ENGINE OUTSIDE THE CLASSIFIED AREA. 46 CFR 58.10-10.
Condition: Unknown
Due 11 April 1984
Resolved 11 April 1984
Deck/Cargo
Issued 11 April 1984 Resolved
CONDUCT ANNUAL INSPECTION OF THE CRANES AS REQUIRED BY REGULATION. 46 CFR 107.259.
Condition: Unknown
Due 11 April 1984
Resolved 11 April 1984
Documentation
Issued 1 April 1982 Resolved
PROVIDE ON BOARD THE UNIT AN APPROVED CONSTRUCTION PORTFOLIO.
Condition: Unknown
Due 1 April 1982
Resolved 1 April 1982

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.