Records from 2002 to 2017. Most recent: inspection, 6 October 2017.
Documentation record
Registered dimensions (L × B × D)98.9 ft × 22.1 ft × 7.4 ft
Registered tonnagegross 93 / net 63
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderNEUVILLE · LOREAUVILLE, LA, UNITED STATES · built 1981
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portCRUZ BAY, ST. JOHN, VI
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationCase Pending · issued 16 May 2025 · expires 30 June 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it93 - Regulatory (Subpart C or D), Gross Ton
63 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Construction/Loadline › Hull › Side Shell
Issued 6 October 2017
Resolved
Repair emergency exit, PA system, broken cleats and stbd stanchions.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 October 2017
Resolved 1 January 2020
Resolution: Vessel not longer in service.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 10 May 2017
Resolved
Provide directory for all electrical panelboards.
Action required: 705 - Other - as specified
Due 10 June 2017
Resolved 10 July 2017
Resolution: Vessel labeled panels.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 10 May 2017
Resolved
Provide exhaust lagging to cooling water input on all exhausts.
Action required: 705 - Other - as specified
Due 24 May 2017
Resolved 15 May 2017
Resolution: Vessel installed lagging.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 10 May 2017
Resolved
Identify and label circuit breakers on port side of engine room.
Action required: 705 - Other - as specified
Due 10 June 2017
Resolved 10 July 2017
Resolution: Circuit breakers not in use and removed.
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 10 May 2017
Resolved
Replace hand rail leading to engine room.
Action required: 705 - Other - as specified
Due 17 May 2017
Resolved 15 May 2017
Resolution: Vessel reinstalled hand rail.
Electrical › Electrical Distribution System (service) › Shore Connection Box
Issued 10 May 2017
Resolved
Secure shore power connection.
Action required: 705 - Other - as specified
Due 17 May 2017
Resolved 15 May 2017
Resolution: Vessel secured shore connection box.
Communications › Radio Communications › VHF Radiotelephone
Issued 10 May 2017
Resolved
Provide DSC radio with GPS input and correct MMSI identification.
Action required: 705 - Other - as specified
Due 24 May 2017
Resolved 10 July 2017
Resolution: Vessel showed proper operation and installation.
Construction/Loadline › Hull › Side Shell
Issued 20 March 2017
Resolved
Inset on port side, side shell plating just forward of fuel tank. NDT ordered to ensure there is no cracking in area of damage.
Action required: 705 - Other - as specified
Resolved 10 April 2017
Resolution: Cracks found, area to be crop and renewed.
Construction/Loadline › Hull › Side Shell
Issued 20 March 2017
Resolved
Crop and renew inset, port side iwo frame 8.
Action required: 705 - Other - as specified
Resolved 10 April 2017
Resolution: Area crop and renewed, see narative for details.
Construction/Loadline › Structures › Deck Plating
Issued 20 March 2017
Resolved
Replace forepeak deck hatch.
Action required: 705 - Other - as specified
Resolved 10 April 2017
Resolution: Deck hatch replaced.
Construction/Loadline › Structures › Deck Plating
Issued 20 March 2017
Resolved
Ensure watertighness of all deck hatches.
Action required: 705 - Other - as specified
Resolved 10 May 2017
Resolution: Ensured watertightness. Chalk-tested water tight door.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 20 March 2017
Resolved
Provide flame screens for fuel vent pipes.
Action required: 705 - Other - as specified
Resolved 10 May 2017
Resolution: Flame screens provided.
Construction/Loadline › Hull › Side Shell
Issued 20 March 2017
Resolved
Crop & renew port side side shell plating in way of side shell/deck plating just forward of transom at rub rail.
Action required: 705 - Other - as specified
Resolved 10 April 2017
Resolution: Area crop and renewed.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 20 March 2017
Resolved
Crop and renew wasted exhaust piping on center MDE.
Action required: 705 - Other - as specified
Resolved 10 April 2017
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 20 March 2017
Resolved
Repair all cracked deck railings.
Action required: 705 - Other - as specified
Resolved 15 May 2017
Resolution: Cracked railings properly repaired.
Engineering › Shafting/Propeller Arrangements › Stern Tube
Issued 20 March 2017
Resolved
Crop center MDE shaftlog and install new shaft seal.
Action required: 705 - Other - as specified
Resolved 10 May 2017
Resolution: New shaft log installed.