Records from 1981 to 2010. Most recent: inspection, 23 February 2010.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 54
23 February 2010
Drydock Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3683937
20 August 2008
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3304079
22 February 2008
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3151569
22 May 2007
COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2936963
8 March 2007
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2884119
4 March 2007
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2882098
21 August 2006
Deficiency Check · Re-Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2754655
15 February 2006
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2585482
29 August 2005
Re-Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2478240
25 July 2005
Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2448891
7 February 2005
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2287808
9 September 2004
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 2190990
5 April 2004
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 2037923
29 August 2003
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1911779
16 July 2002
Hull Examination · Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1651789
6 June 2002
Deficiency Check · COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1627060
11 June 2001
Re-Inspection · Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1423614
21 June 2000
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1389121
6 June 2000
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1373064
1 November 1999
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 731418
30 September 1999
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 74468
22 June 1999
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1191835
8 June 1999
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 806384
8 July 1998
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1128150
4 June 1998
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 791755
3 June 1997
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 779454
16 August 1996
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1084308
8 July 1996
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1087543
24 June 1996
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1087346
13 June 1996
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 879719
4 June 1996
COI Inspection · MARPOL Annex V Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1183234
13 June 1995
Re-Inspection · Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 881530
18 July 1994
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 869701
24 June 1994
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1025871
9 June 1994
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1019587
24 June 1993
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 844442
10 June 1993
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1145485
27 April 1993
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 835648
8 July 1992
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 947600
9 June 1992
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 955181
8 October 1991
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 934803
4 June 1991
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 918225
14 June 1990
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1241383
9 May 1990
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 919532
20 June 1989
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1352174
1 November 1988
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 890156
15 June 1988
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1201776
11 January 1988
Plan Review "T" Boat
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1337609
22 June 1987
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1314133
16 May 1987
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1314131
15 March 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 977949
19 June 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 974631
14 June 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 964082
18 December 1981
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 969413
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 21 August 2008
Resolved
Circuit breaker panel door missing and breakers not labeled.
Action required: 705 - Other - as specified
Due 21 September 2008
Resolved 18 September 2008
Resolution: owner replaced circuit panel door.
Engineering › Sea-water System (primary cooling) › Piping
Issued 14 August 2006
Resolved
Double hose clamp all hoses in line with through hull fittings as needed.
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 August 2006
Resolved 29 August 2006
Engineering › Sea-water System (primary cooling) › Piping
Issued 14 August 2006
Resolved
Replace dry rotten sea water cooling lines on the main engine.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 August 2006
Resolved 29 August 2006
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 14 August 2006
Resolved
Provide proper updated drug consortium enrollment.
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 August 2006
Resolved 29 August 2006
Navigation › Piloting/Steering › Magnetic Compass
Issued 14 August 2006
Resolved
Repair the compass light.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 August 2006
Resolved 29 August 2006
Fire Fighting › Fire Hoses › Condition
Issued 29 August 2005
Resolved
Replace garden type hose with new hose.
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 August 2005
Resolved 29 August 2005
Resolution: Hose replaced sat.
Engineering › Bilge Water Management System › Not Operational
Issued 9 September 2004
Resolved
Prove proper operation of fixed bilge system prior to carrying passengers onboard.
Action required: 705 - Other - as specified
Due 23 September 2004
Resolved 10 September 2004
Resolution: Bilge System repaired. Operational test sat.
Lifesaving › Lifefloat › Retroreflective Material
Issued 9 September 2004
Resolved
Properly place reflective tape on ring buoy
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 September 2004
Resolved 14 September 2004
Resolution: Reflective tape installed.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 9 September 2004
Resolved
Provide Emergency Broadcast Placard.
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 September 2004
Resolved 10 September 2004
Communications › Alarms/Indicators › Bilge Alarm
Issued 9 September 2004
Resolved
Prove proper operation of bilge high alarm.
Action required: 705 - Other - as specified
Due 23 September 2004
Resolved 21 September 2004
Resolution: Bilge Alarm operational test sat.
Construction/Loadline › Penetrations
Issued 16 July 2002
Resolved
Prove watertight integrity of forepeak hatch cover gasket. LEGACY COMPONENT DESC: Gasket
Action required: 705 - Other - as specified
Due 16 August 2002
Resolved 30 August 2002
Resolution: Witnessed satisfactory hose test of forepeak hatch cover.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 6 June 2002
Resolved
Properly apply retro reflective tape to all childrens lifejackets
Condition: Improper/Lack of Maintenance
Due 10 June 2002
Resolved 10 June 2002
Resolution: Applied retro reflective tape to all childrens lifejackets
Engineering › Bilge Water Management System
Issued 6 June 2002
Resolved
Prove proper operation of bilge system.
Due 10 June 2002
Resolved 10 June 2002
Resolution: properly operated bilge system
Electrical
Issued 6 June 2002
Resolved
Properly mount generator battery switch.
Due 10 June 2002
Resolved 10 June 2002
Resolution: Mounted battery switch.
Pollution Prevention/Response
Issued 6 June 2002
Resolved
Remove excess oil from bilge.
Due 10 June 2002
Resolved 10 June 2002
Resolution: excess oil is removed from bilge.
Construction/Loadline
Issued 11 June 2001
Resolved
Renew gasket on forepeak hatch and prove watertight integrity of the hatch.
Condition: Unknown
Due 18 June 2001
Resolved 30 July 2001
Construction/Loadline
Issued 11 June 2001
Resolved
Prove proper operation of engine room and lazarette bilge high water alarms. Until completed, provide surviellance of both compartments at least every thirty (30) minutes while passengers are on board.
Condition: Unknown
Due 18 June 2001
Resolved 30 July 2001
Electrical
Issued 21 June 2000
Resolved
properly blank off opening in circuit breaker panel.
Condition: Unknown
Due 21 June 2000
Resolved 21 June 2000
Electrical
Issued 21 June 2000
Resolved
properly install oil pump circuit breaker.
Condition: Unknown
Due 21 June 2000
Resolved 21 June 2000
Engineering
Issued 8 June 1999
Resolved
MAKE PERMANENT REPAIR TO THE LEAKING PORT MAIN ENGINE EXHAUST.
Condition: Unknown
Due 24 June 1999
Resolved 24 June 1999
Lifesaving
Issued 8 June 1999
Resolved
RESTORE LIFE FLOAT TO ORIGINAL COLOR AND RENEW DETERIORATED _x001C_ RETRO-REFLECTIVE TAPE ON THE LIFE FLOAT
Condition: Unknown
Due 15 June 1999
Resolved 24 June 1999
Engineering
Issued 8 June 1999
Resolved
IDENTIFY SOURCE OF THE FUEL LEAK IN THE LAZARETTE, REPAIR, AND PROVE SYSTEMLEAK FREE.
Condition: Unknown
Due 24 June 1999
Resolved 24 June 1999
Construction/Loadline
Issued 8 July 1998
Resolved
MAKE PROPER REPAIRS TO FOUR FRACTURED WELDS IN LAZARETTE, PORT-SIDE TOP LONGITUDINAL.
Condition: Unknown
Due 10 August 1998
Resolved 10 August 1998
Lifesaving
Issued 3 June 1997
Resolved
REPAIR MINOR SURFACE CRACKS IN LIFE FLOAT WHERE INDICATED._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 June 1997
Resolved 8 July 1997
Engineering
Issued 3 June 1997
Resolved
REPAIR AND PROVE PROPER OPERATION OF EMERGENCY FUEL SHUT-OFF VALVE.
Condition: Unknown
Due 8 June 1997
Resolved 8 July 1997
Accommodation/Occupational Safety
Issued 24 June 1996
Resolved
REHANG THE LOADING DOORS WITH APPROPRIATE SIZE PINS AND RETAINERS.
Condition: Unknown
Due 24 June 1996
Resolved 24 June 1996
Electrical
Issued 24 June 1996
Resolved
RENEW OR REMOVE THE WASTED BREAKER BOX SERVICING THE MSD IN THE VOID SPACE.
Condition: Unknown
Due 24 June 1996
Resolved 24 June 1996
Accommodation/Occupational Safety
Issued 24 June 1996
Resolved
REPLACE THE STARBOARD FORWARD WINDOW IN THE PILOT HOUSE.
Condition: Unknown
Due 24 June 1996
Resolved 24 June 1996
Engineering
Issued 24 June 1996
Resolved
REPLACE/RENEW THE EXHAUST LAGGING ON BOTH MDE EXHAUST RUNS WHERE WORN/MISSING.
Condition: Unknown
Due 24 June 1996
Resolved 24 June 1996
Engineering
Issued 24 June 1996
Resolved
RENEW BOTH MDE COOLING WATER VENT HOSES LEADING TO THE EXPANSION TANK.
Condition: Unknown
Due 24 June 1996
Resolved 24 June 1996
Construction/Loadline
Issued 24 June 1996
Resolved
PROPERLY INSTALL THE BILGE OVERBOARD THRU HULL FITTING.
Condition: Unknown
Due 24 June 1996
Resolved 24 June 1996
Fire Fighting
Issued 4 June 1996
Resolved
PROFESSIONALLY SERVICE ALL HAND PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
PROPERLY SEAL BULKHEAD PENETRATIONS IN FORWARD ENGINE ROOM BULKHEAD.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Fire Fighting
Issued 4 June 1996
Resolved
PROVIDE AN ADDITIONAL BII FIRE EXTINGUISHER IN ENGINE SPACE.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Lifesaving
Issued 4 June 1996
Resolved
PROVIDE 4, 2" WIDE STRIPS OF RETROREFLECTIVE TAPE ON BOTH SIDES OF RING BUOY.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Electrical
Issued 4 June 1996
Resolved
PROVIDE AN ADDITIONAL EMERGENCY FLASHLIGHT FOR ENGINE SPACE.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
PROPERLY LABEL BILGE PIPING SYSTEM IN ENGINE SPACE.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Electrical
Issued 13 June 1995
Resolved
PROPERLY SPLICE AND CONNECT WIRING TO STARBOARD BATTERIES NO LATER THAN 27 JUNE 1995.
Condition: Unknown
Due 27 June 1995
Resolved 28 June 1995
Engineering
Issued 13 June 1995
Resolved
PROPERLY LABEL FUEL OIL SHUT OFF VALVE REMOTE PULL, NO LATER THAN 27 JUNE 1995.
Condition: Unknown
Due 27 June 1995
Resolved 28 June 1995
Electrical
Issued 9 June 1994
Resolved
PROVE PROPER OPERATION OF GENERATOR IN ENGINE ROOM.
Condition: Unknown
Due 9 July 1994
Resolved 19 July 1994
Engineering
Issued 10 June 1993
Resolved
PROVIDE EXHAUST LAGGING ON BOTH PORT AND STARBOARD EXHAUST RUNS WHERE BARE METAL IS EXPOSED.
Condition: Unknown
Due 10 June 1993
Resolved 10 June 1993
Engineering
Issued 10 June 1993
Resolved
PROVIDE VENTILATION TO THE FUEL TANK/STEERING GEAR SPACE AS REQUIRED BY _x001C_ 46 CFR 182.20-50.
Condition: Unknown
Due 31 July 1993
Resolved 15 June 1993
Accommodation/Occupational Safety
Issued 10 June 1993
Resolved
ON OR BEFORE NEXT DRYDOCK BUT NO LATER THAN 31 OCTOBER 1994, REPAIR, REPLACE OR DISABLE THE MSD SYSTEM INCLUDING CAPPING THE INTAKE AND DISCHARGE LINES AND REMOVING THE FUSE BOX.
Condition: Unknown
Due 10 June 1993
Resolved 10 June 1993
Accommodation/Occupational Safety
Issued 9 June 1992
Resolved
REMOVE OR PROVE PROPER OPERATION OF MARINE SANITATION DEVICE (MSD).
Condition: Unknown
Due 9 June 1992
Resolved 9 June 1992
Lifesaving
Issued 9 June 1992
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 9 June 1992
Resolved 9 June 1992
Lifesaving
Issued 22 June 1987
Resolved
PROVIDE CG APPROVED BOUYANT APPARATUS.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Engineering
Issued 22 June 1987
Resolved
REPAIR/REPLACE EMERGENCY FUEL SHUT OFF MECHANISM
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Engineering
Issued 22 June 1987
Resolved
REPLACE FUEL TANK VENT SCREEN.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Engineering
Issued 22 June 1987
Resolved
PROVE PILOT HOUSE CONTROL OF BOTH MAIN ENGINES.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Engineering
Issued 22 June 1987
Resolved
STENCIL LOCATION OF FUEL SHUT OFF VALVE.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987