09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 August 2019
Resolved
Battery connections shall be with permanent type connectors. Connections to terminals are with wing nuts. Make connections permanent by using items such as locking nuts.
46 CFR 183.05-20(c)
Action required: 10 - Deficiency Rectified
Resolved 14 August 2019
Resolution: Wing nuts were replaced with locking nuts and verified by the attending Coast Guard Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 14 August 2019
Resolved
Diesel fuel supply piping shut off valves shall close against the flow of fuel. The port fuel fill line valve located in the engine room has a slight leak when in the open position. Repair or replace valve.
46 CFR 182.20-40(b)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 August 2019
Resolved 19 August 2019
Resolution: Valves were repaired and leak stopped.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 14 August 2019
Resolved
At each inspection the marine inspector shall require that all observed hazardous situations be corrected. The sea chest in the engine room has additional piping that is open to the engine room providing a potential flooding situation. Removed unused piping and cap the remaining section above the existing screw down valve.
46 CFR 176.25-50(a)
Action required: 10 - Deficiency Rectified
Resolved 14 August 2019
Resolution: Crew cut the pipe above the screw down valve and put a permanent cap on it.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 14 August 2019
Resolved
An exposed hazard such as gears or rotating machinery must be properly protected by a cover, guard or rail. The port ship service generator shaft is not properly guarded on the sides. Provide appropriate guards around the rotating shaft.
46 CFR 177.960
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 August 2019
Resolved 15 August 2019
Resolution: An appropriate guard was made and put in place.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 14 August 2019
Resolved
Each generator shall be protected with an overcurrent device set at a value not exceeding 15% above the full-load rating. Testing of over speed trips for both ship service generators failed. Provide proper operation of the SSG's over speed trips.
46 CFR 183.10-35
Action required: 10 - Deficiency Rectified
Resolved 14 August 2019
Resolution: Crew was able to prove proper operations of the over speed trip device to the attending Coast Guard Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 August 2019
Resolved
Each line of a bilge system shall be provided with a stop valve at the control point or manifold. The stop valve located at the mid point of the engine room that controls the forward manifold is missing a handle. Provide new handle or replace valve.
46 CFR 182.25-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 August 2019
Resolved 29 August 2019
Resolution: Handle was replaced.
Personnel › Certificates/Documents/Licenses › License, Radio Officer
Issued 15 June 2018
Resolved
Provide proof of masters Marine Radio Operator Permit
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 June 2018
Resolution: Master and Mate provided proof of attending certified course.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 15 June 2018
Resolved
Provide batteries for 02 lifefloat lights and 01 lifebuoy lights.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 June 2018
Resolution: Vessel provided non-expired batteries and ensured lights were operational.
Engineering › Steering Gear System › Hydraulic Hose
Issued 15 June 2018
Resolved
Replace hydraulic lines on both hydraulic pumps.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 June 2018
Resolved 18 June 2018
Resolution: Vessel provided new hydraulic lines on both hydraulic pumps for the steering gear
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 15 June 2018
Resolved
Provide ground tackle to safely anchor the vessel.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 15 June 2018
Resolution: Vessel provided anchor and line.
Stability › Watertight Integrity › General
Issued 15 June 2018
Resolved
Provide watertight engine room escape hatch.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 June 2018
Resolution: Vessel provided watertight hatch, hose tested, sat.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 15 June 2018
Resolved
Provide operational STBD running light.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 15 June 2018
Resolution: Vessel provided operational STBD running light.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 12 September 2016
Resolved
Prove operation of emergency lighting to satisfaction of attending marine inspector IAW 46CFR184.30-5 Prior to sail.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 November 2016
Resolution: Witnessed proper operation; all sat.
Stability › Watertight Integrity › General
Issued 12 September 2016
Resolved
Provide serviceable watertight door from passenger lounge to galley IAW 46CFR171.124 Prior to Sail
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 November 2016
Resolution: Witnessed proper operation, all sat.
Communications › Radio Communications › Emergency Source of Power
Issued 12 September 2016
Resolved
Prove operation of backup radio power supply IAW 47CFR80.905 Prior to sail.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 November 2016
Resolution: Witnessed proper operation, all sat.
Personnel › Training › Visual Communications
Issued 12 September 2016
Resolved
Provide proof of master FCC licensing marine radio permit IAW 47CFR80.159 by 2 weeks.
Due 15 November 2016
Resolved 1 November 2016
Resolution: Vessel master provided proof of documentation.
Documentation › Safety/Response Plans/Programs › Waste Management Plan
Issued 12 September 2016
Resolved
Update waste management plan to reflect current MARPOL regulations IAW 33CFR151.57 by 1 week.
Due 8 November 2016
Resolved 4 November 2016
Resolution: Witnessed proper operation, all sat.
Electrical › Electrical Distribution System (service) › Wiring
Issued 12 September 2016
Resolved
. Remove unsafe wiring in captain's cabin IAW 46CFR183.310 by 1 week
Due 8 November 2016
Resolved 4 November 2016
Resolution: Witnessed proper operation, all sat.
Unknown
Issued 12 September 2016
Resolved
Remove fire hazard of excess oil under hydraulic tank IAW 46CFR177.405 by 3 days.
Due 4 November 2016
Resolved 4 November 2016
Resolution: Witnessed area was cleaned, all sat.