This record may be incomplete: the most recent inspection recorded for this vessel was 37 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
1942 - Regulatory (Subpart C or D), Gross Ton
1942 - Regulatory (Subpart C or D), Net Ton
Maury page id
psix-53717
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 10
29 September 1989Administrative
Administrative · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1005262
15 March 1988Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1338410
INSTALL PERMANENT INSERTS IN NON-APPROVED CUTOUTS IN #3 STARBOARD TANK'S INBOARD BULKHEAD.
Condition: Unknown
Due 21 October 1986
Resolved 21 October 1986
Construction/Loadline
Issued 21 October 1986Resolved
REPAIR BROKEN WELDS ALONG OVERHEAD BRACKET IN #5 CENTER TANK.
Condition: Unknown
Due 21 October 1986
Resolved 21 October 1986
Deck/Cargo
Issued 21 October 1986Resolved
INSTALL PERMANENT MANHOLE COVER IN WAY OF MANHOLE IN FORWARD BULKHEAD OF #5 CENTER TANK.
Condition: Unknown
Due 21 October 1986
Resolved 21 October 1986
Engineering
Issued 21 October 1986Resolved
INSTALL A 30 X 30 MESH FLAME SCREEN ON FUEL TANK VENT.
Condition: Unknown
Due 21 October 1986
Resolved 21 October 1986
Navigation
Issued 21 October 1986Resolved
PERMANENTLY MOUNT STERN LIGHT IN ITS SCREEN.
Condition: Unknown
Due 21 October 1986
Resolved 21 October 1986
Unknown
Issued 21 October 1986Resolved
PAINT DRAFT MARKS, LOAD LINE MARKS, HOME PORT, & VESSEL NAME ON HULL.
Condition: Unknown
Due 21 October 1986
Resolved 21 October 1986
Deck/Cargo
Issued 21 October 1986Resolved
PROVE THE OPERATION OF DIESEL OVERSPEED TRIP.
Condition: Unknown
Due 21 October 1986
Resolved 21 October 1986
Fire Fighting
Issued 21 October 1986Resolved
HAVE ENGINEROOM FIRE EXTINGUISHER SERVICED AND PROVIDE A PERMANENT MOUNTING BRACKET FOR SAME.
Condition: Unknown
Due 21 October 1986
Resolved 21 October 1986
Deck/Cargo
Issued 21 October 1986Resolved
CROP BACK TO GOOD METAL AND PROVIDE INSERT AT HOLE IN INBOARD BULKHEAD OF #3 PORT TANK.
Condition: Unknown
Due 21 October 1986
Resolved 21 October 1986
Documentation
Issued 21 October 1986Resolved
OBTAIN AMENDED ABS LOADLINE CERTIFICATE, REFLECTING CARRIAGE OF LIQUID CARGO BELOW THE MAIN DECK.
Condition: Unknown
Due 21 October 1986
Resolved 21 October 1986
Unknown
Issued 21 October 1986Resolved
SUBMIT PLANS REFLECTING ALL ALTERATIONS TO THE VESSEL INVOLVING THE CARRIAGE OF LIQUID CARGO, THE INSTALLATION OF MACHINERY, AND THE INSTALLA- TION OF A STERN RAMP, INCLUDING FUEL AND HYDRAULIC SYSTEMS. ALSO, SUBMIT REVISED STABILITY CALCULATIONS.
Condition: Unknown
Due 21 October 1986
Resolved 21 October 1986
Documentation
Issued 21 October 1986Resolved
RENEW CERTIFICATE OF DOCUMENTATION AND HAVE AMENDED TO REFLECT OWNER'S CURRENT ADDRESS.
Condition: Unknown
Due 21 October 1986
Resolved 21 October 1986
Electrical
Issued 21 October 1986Resolved
PROVIDE FIBERGLASS OR LEAD-LINED BOX FOR MACHINERY ROOM BATTERIES.
Condition: Unknown
Due 21 October 1986
Resolved 21 October 1986