Records from 2000 to 2025. Most recent: inspection, 14 September 2025.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 37
14 September 2025
PSC A · COC-CVE Annual
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 8227177
19 September 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7794003
8 September 2023
PSC A · COC-CVE Annual
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7787630
14 September 2019
COC-CVE Annual · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6803774
27 September 2018
Type not recorded
No type recorded · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 6550081
23 September 2018
ISPS II Exam · Ballast Water Examination · COC-CVE Annual
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6546420
9 September 2017
ISPS II Exam · Ballast Water Examination · COC-CVE Quarterly
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6263033
22 March 2017
COC-CVE Annual · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6099992
31 January 2016
COC-CVE Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5805812
24 January 2016
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5842747
25 September 2015
COC-CVE Quarterly
Type not classified · Sector New York · USCG Northeast District (CGD-NE) · Activity 5728102
14 February 2012
Type not recorded
No type recorded · Marine Safety Detachment American Samoa · USCG Oceania District (CGD-O) · Activity 4244419
7 February 2012
Random ISPS/MTSA-No PSC
Physical examination · Marine Safety Detachment American Samoa · USCG Oceania District (CGD-O) · Activity 4240345
25 January 2012
ISPS III Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4231275
29 September 2011
Deficiency Check
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 4157695
29 September 2011
Type not recorded
No type recorded · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 4264175
25 September 2011
ISPS II Exam · COC-CVE Annual · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4153536
13 September 2010
Deficiency Check · COC-CVE Annual · Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3847039
19 March 2009
COC-CVE Quarterly · ISPS II Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3435668
8 September 2008
ISPS II Exam · MARPOL Annex I Examination · COC-CVE Annual · Ballast Water Examination · MARPOL Annex V Examination · PII Safety Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3320027
17 September 2007
Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3057553
17 September 2007
Ballast Water Examination · ILO-147 Exam · MARPOL Annex I Examination · ISPS III Exam · COC-CVE Quarterly
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3059759
27 March 2007
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2896096
21 March 2007
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 2892800
12 January 2007
Ballast Water Examination · ISPS II Exam · COC-CVE Annual
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2854810
25 September 2006
Type not recorded
No type recorded · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 2786356
22 September 2006
ISPS II Exam · Ballast Water Examination · MARPOL Annex V Examination · MARPOL Annex I Examination · COC-CVE Quarterly
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2784407
26 January 2006
Type not recorded
No type recorded · Maritime Safety & Security Team San Francisco (91105) · Activity 2573548
26 January 2006
COC-CVE Annual
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2574628
25 September 2004
COC-CVE Annual
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2204631
5 February 2004
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 2001366
4 February 2004
Ballast Water Examination · Certificate of Compliance
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2000704
24 September 2002
Security Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1679733
16 September 2002
Control Verification
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1654911
9 September 2001
Control Verification
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1417372
29 January 2001
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 287022
14 April 2000
Type not recorded
No type recorded · Activities Europe · Activity 1395415
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 14 September 2025
Resolved
The construction of all doors and door frames in ``A'' class
divisions, with the means of securing them when closed,
shall provide resistance to fire as well as to the passage of
smoke and flame, as far as practicable, equivalent to that of
the bulkheads in which the doors are situated. Such doors
and door frames shall be constructed of steel or other
equivalent material. PSCO observed FSD/10/VI/007,
FSD/10/VI/008, FSD/08/IV/015, FSD/06/VI/003, unable
to fully close.
74 SOLAS 97 II-2/30.2
16 abc
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2025
Resolved 22 September 2025
Resolution: Vessel has provided documentation and photos as evidence of the doors being able to close.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 14 September 2025
Resolved
In addition to complying with the specific provisions for fire integrity of bulkheads and decks mentioned elsewhere in
this part, the minimum fire integrity of all bulkheads and
decks shall be as prescribed in tables 26.1 to 26.4. Where,
due to any particular structural arrangements in the ship,
difficulty is experienced in determining from the tables the
minimum fire integrity value of any divisions, such values
shall be determined to the satisfaction of the Administration. PSCO observed 01 A-60 door in the computer room, and 04 B-15 doors were left open reducing the overall fire intergrity.
74 SOLAS 97 II-2/26.1
16 abc
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2025
Resolved 22 September 2025
Resolution: Vessel has provided documentation and photos as evidence of the doors being able to close.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 14 September 2025
Resolved
Where the contents and use of a space are such that there is a doubt as to its classification for the purpose of this regulation, it shall be treated as a space within the relevant category having the most stringent boundary requirements. Spaces are classified according to their fire risk as shown in categories (1) to (14). A/C machinery space on port side deck 8, MVZ 3 is a category (10) space where storage of combustibles is prohibited. PSCO observed storage of cardboard boxes and other combustible materials in A/C
space deck 5 Port side as well as deck 7 STBD atrium.
74 SOLAS 97 II-2/26.2.2
16 abc
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2025
Resolved 22 September 2025
Resolution: Vessel has provided documentation and photos as evidence of the space being cleared of all combustible materials.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 14 September 2025
Resolved
Stairway enclosures in accommodation and service
spaces shall have direct access from the corridors and be of
a sufficient area to prevent congestion, having in view the
number of persons likely to use them in an emergency.
Within the perimeter of such stairway enclosures, only
public toilets, lockers of non-combustible material
providing storage for non-hazardous safety equipment and open information counters are permitted. Only public
spaces, corridors, public toilets, special category spaces,
other escape stairways required by regulation 28.1.5 and
external area are permitted to have direct access to these
stairway enclosures. PSCO observed multiple chairs,
wheelchairs and waste receptacles located in category 2
spaces.
74 SOLAS 97 II-2/29.2
16 abc
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2025
Resolved 22 September 2025
Resolution: Vessel has provided documentation and photos as evidence of the space being cleared of wheelchairs and waste receptacles.
14 - Pollution Prevention › 141 - MARPOL Annex I › 15 PPM Alarm arrangements
Issued 15 September 2023
Resolved
Oil filtering equipment shall be provided with alarm arrangements to indiciate when this level cannot be maintained. PSC Team was unable to verify operation of oil filtering equipment and alarm due to detected high levels of H2S in the space.
MARPOL Annex I/14.7
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 20 September 2023
Resolution: Received LR Class report attesting to the proper operation of the oily water separator and normal atmospheric conditions in the OWS space.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 15 September 2023
Resolved
All life-saving appliances and arrangements shall comply with the applicable requirements of the Code. The propeller shafting shall be so arranged that the propeller can be disengaged from the engine. Provision shall be made for ahead and astern propulsion of the lifeboat. Port side tender #8 experienced a grounding incident which bent the rudder and required temporary repairs to the hull by the crew. Flag issued a dispensation assigned the tender as a lifeboat, however, class has not confirmed repairs or attested that the manueverability and integrity of the lifeboat are adequate.
74 SOLAS 20 III/34
LSA Code 4.4.6.5
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2023
Resolved 18 September 2023
Resolution: No.8 tender boat now lowered into the water and maneuvered under supervision of the surveyor with satisfactory results. The cracks iwo of the Stbd shaft bracket found not penetrating and repaired with proper epoxy by crew.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 15 September 2023
Resolved
General arrangement plans shall be permanently exhibited for the guidance of the ship's officers, showing clearly for each deck the control stations, the various fire sections enclosed by "A" class divisions, the sections enclosed by "B" class divisions together with particulars of the fire detection and fire alarm systems, the sprinkler installations, the fire-extinguishing appliances, means of access to different compartments, decks, etc. and the ventilating system, including particulars of the fan control positions, the position of dampers and identification numbers of the ventilating fans serving each section.
Two fire-doors on deck 04 were found intentionally removed - the fire control plan has not been updated to reflect this change.
74 SOLAS 20 II-2/15.2.4.1
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 September 2023
Resolution: Received LR Class report stating the identifed doors are not fire doors and the fire control plan has been updated to reflect the changes.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 14 September 2019
Resolved
Fire extinguishing appliances shall be kept in good order and be available for immediate use at all times. The hoisting chain for the horizon grill fire shutter was off its track, rendering the fire shutter inoperable.
74 SOLAS (97) II-2/21
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 16 September 2019
Resolved 16 September 2019
Resolution: 10c - deficiency rectified.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 14 September 2019
Resolved
Each MBR of the crew shall be given INST which shall include OPS and use of fire-extinguishing appliances. Cook was unfamiliar w/how to operate fire shutter at his normal cooking station.
74 SOLAS (97) III/18.4.2.4
Action required: 17 - Rectify deficiencies prior to departure
Due 16 September 2019
Resolved 16 September 2019
Resolution: 10c - deficiency rectified.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 September 2019
Resolved
All life-saving appliances prescribed in this part shall be fitted w/retro-reflective material where it will assist in detection and IAW the recommendations of the organization. 03 lifebuoys found w/worn and unserviceable retro tape.
Action required: 17 - Rectify deficiencies prior to departure
Due 16 September 2019
Resolved 16 September 2019
Resolution: 10c - deficiency rectified.
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 25 September 2015
Resolved
Fire control plans required by SOLAS 2014 II-2 Reg 15.2.4.1 shall provide information regarding fire protection based on the guidelines developed by the organization. Identify space categorization on the Fire Control Plan (FCP) for the Pennant Bar Deck 12 Aft, and identify fire suppression requirements as per FCP for the space addressed above.
Action required: 705 - Other - as specified
Due 25 October 2015
Resolved 31 January 2016
Resolution: Verified space categorization identification on the FCP for Pennant Bar Deck 12 Aft and that fire suppression requirements were identified as per FCP for Pennant Bar Deck 12 Aft.
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 25 September 2015
Resolved
Construction of doors and door frame in "A" Class divisions as per SOLAS 2014 II-2 Reg 9.4.1.1.2, shall provide resistance to fire as well as to the passage of smoke and flame equivalent to that of the bulkhead in which the doors are situated. FSD 07-V-003 appears to be weathered and warped due to environmental exposure. Ensure overall integrity of door meets "A" class boundary requirements.
Action required: 705 - Other - as specified
Due 25 October 2015
Resolved 31 January 2016
Resolution: Verified integrity of FSD-07-V-003 was no longer worn/weathered and otherwise met "A" class boundary requirements.
Operations/Management › Port and Waterways Safety › Notice of Arrival, General
Issued 7 February 2012
Resolved
Visited ASG port facility to conduct MTSA / ISPS spot-check on board the PV COSTA DELIZIOSA IMO# 9398937. Inspectors observed PV at terminal was the PV AURORA IMO#9169524 . Vessel AURORA failed to provide an advanced Notice of Arrival
Action required: 705 - Other - as specified
Resolved 7 February 2012
Resolution: When boarded by USCG Inspectors to investigate failure to provide ANOA, Master immediately submitted NOA to SANS.
Electrical › Electric Generation Source (service) › Circuit Breaker
Issued 29 September 2011
Resolved
Main service of electrical power is necessary for propulsion and steering of the ship. Two electrical breakers are currently inoperable resulting in reduction of electrical supply to ships systems.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 October 2011
Resolution: One electrical breaker fixed. Received condition of class allowing vessel to depart port. See activity # 4159598 for description.
Lifesaving › Rescue Boat › Propulsion Engine
Issued 13 September 2010
Resolved
During USCG PSC/CVE exam, it was noted that port side rescue boat engine does not start. Vessels is to use tender#8 as designated temporary rescue boat until primary port side rescue is repaired/operating.
Action required: 705 - Other - as specified
Due 20 September 2010
Resolved 14 September 2010
Resolution: Received faxed picture (boat in water and operating) and statement from Master/CE that starter unit was replaced with spare.
Engineering › Steam Boiler (auxiliary/waste heat) › Piping
Issued 8 September 2008
Resolved
Condensate return piping to the hot well located top level port side of engine room was observed wasted and leaking excessively on associated electrical wires and lighting fixtures. This makes for an unsafe condition.
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 September 2008
Resolved 19 March 2009
Resolution: Corrected and verified by class surveryor.
System not recorded
Issued 14 April 2000
Resolved
Complete ICVE worklist items 1, 3, 11, 16, 25, 38, 39, 40, 41, 42, 43, 44, 46, 48, 51, 60, 61, 63, 64, 67, 73, 76, 77, 78, 79, 80, 83, 85, 89, 90, 91,94, 95, 96, 97, 98, 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 114, 115, 116, 117, 118, & 119 prior to U.S. waters.
Condition: Unknown
Due 25 February 2001
Resolved 28 January 2001
Resolution: [name withheld] (MSO San Fran) performed CVE and no descrepancies found