Records from 1982 to 2006. Most recent: inspection, 5 October 2006.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 37
5 October 2006
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2794426
30 March 2005
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2319469
24 January 2005
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 2280278
7 August 2003
Administrative Inspection
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1869122
26 November 2002
COI Inspection · Simplified Stability Test
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1716173
24 October 2002
COI Inspection · Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1695277
4 October 2002
Hull Examination · Examination of Repairs
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1684286
23 October 2001
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1472076
3 October 2000
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1465593
27 October 1999
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1448033
24 September 1998
Re-Inspection · Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 799244
22 December 1997
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1116826
5 November 1997
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1117694
29 October 1996
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1164437
20 August 1996
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1084513
2 November 1995
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 882650
20 December 1994
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1157517
1 November 1994
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1174808
29 August 1994
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 860547
3 November 1993
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 828842
3 November 1993
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 848308
4 May 1993
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 826241
3 November 1992
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1262116
12 November 1991
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 940039
5 November 1991
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 936073
5 November 1990
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1243385
15 May 1990
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1240126
1 November 1989
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1006666
14 November 1988
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1202465
7 November 1988
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1203708
3 December 1987
Plan Review "T" Boat
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1337603
10 November 1987
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1022522
7 August 1987
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1029303
16 June 1987
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1328777
3 October 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 991384
10 May 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1281320
12 May 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1271632
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 5 October 2006
Resolved
Renew or replace both of the propellers.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: Both propellers were renewed.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 5 October 2006
Resolved
Replace the portside cutlass bearing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: portside cutlass bearing replaced in kind.
Engineering › Steering Gear System › Rudder Stock
Issued 5 October 2006
Resolved
Weld the crack in the port rudder post.
Condition: Unknown
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: rudder post renewed.
Construction/Loadline › Hull › Weld
Issued 5 October 2006
Resolved
Reweld the trim tab, top and bottom.
Condition: Unknown
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: trim tab realigned and rewelded.
Engineering › Steering Gear System › Rudder
Issued 5 October 2006
No resolution recorded
Staightened both rudders.
Condition: Unknown
Action required: 705 - Other - as specified
Due 26 October 2006 — due date passed with no resolution recorded
Construction/Loadline › Hull › Weld
Issued 5 October 2006
No resolution recorded
Reweld worn grooves in the stem.
Condition: Unknown
Action required: 705 - Other - as specified
Due 26 October 2006 — due date passed with no resolution recorded
Construction/Loadline › Hull › Side Shell
Issued 5 October 2006
Resolved
Crop and renew the dented area on the portside foward at the waterline.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: dent on portside renewed. Hose tested sat.
Construction/Loadline › Hull › Weld
Issued 5 October 2006
Resolved
Weld all cracks in the upper and lower rub rails and replace missing rub rail pieces.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: rub rails rewelded.
Construction/Loadline › Hull › Side Shell
Issued 5 October 2006
Resolved
Weld the small hole on the starboard side, amidships.
Condition: Unknown
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: small hole starboard side, amidships rewelded. hose tested sat.
Construction/Loadline › Penetrations › Weld
Issued 5 October 2006
Resolved
Crop and renew the overboard discharge spool piece on the starboard side, amidships.
Condition: Unknown
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: Spoll piece was replaced in kind.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 5 October 2006
Resolved
Repair all cracks in the stantions and hand rails around the entire vessel
Condition: Unknown
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: All cracks repaired.
Construction/Loadline › Hull › Hull Plating
Issued 5 October 2006
No resolution recorded
Clad weld washed out welds in the fore peak on the portside.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 26 October 2006 — due date passed with no resolution recorded
Construction/Loadline › Structures › Superstructure
Issued 5 October 2006
No resolution recorded
Repack stuffing tubes, foward of pilot house, and seal all un-used stuffing tubes thoughout the vessel.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2006 — due date passed with no resolution recorded
Construction/Loadline › Structures › Scuttle
Issued 5 October 2006
Resolved
Install retaining devices on all exterior scuttles.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: all exterior scuttle installed sat.
Engineering › Fuel Oil Service System › Tank
Issued 5 October 2006
Resolved
Replace grounding wire for the fuel tank.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: Grounding wire replaced in kind.
Engineering › Steering Gear System › Rudder Bearing
Issued 5 October 2006
Resolved
Repair the portside rudder post bearing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: Portside rudder post bearing replaced in kind.
Engineering › Sea-water System (primary cooling) › Piping
Issued 5 October 2006
Resolved
Replace the dry rotten overboard discharge hose for the generator.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: Discharge hose replaced in kind.
Engineering › Sea-water System (primary cooling) › Valve
Issued 5 October 2006
Resolved
Renew the portside though hull fitting for the MDE raw water cooling.
Condition: Unknown
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: through hull fitting replaced in kind.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 5 October 2006
Resolved
Replace in kind the exhaust pipe braket for the portside engine.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: pipe bracket on port engine replaced in kind.
Engineering › Bilge Water Management System › Hose
Issued 5 October 2006
Resolved
Double hose clamp bilge discharge, starboard side in the engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2006
Resolved 14 November 2006
Resolution: Hose clamp is barbed fitted. Double not required.
Accommodation/Occupational Safety › Heating › Piping
Issued 5 October 2006
No resolution recorded
Replace the heating hose to the pilot hose from the engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2006 — due date passed with no resolution recorded
Construction/Loadline › Structures › Machinery Space Opening
Issued 5 October 2006
No resolution recorded
Renew hatch cover gaskets around both engine room deck hatches.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2006 — due date passed with no resolution recorded
Construction/Loadline › Structures › Transverse Bulkhead
Issued 5 October 2006
No resolution recorded
Make all penetrations through all watertight bulkheads watertight.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2006 — due date passed with no resolution recorded
Construction/Loadline › Structures › Superstructure
Issued 5 October 2006
No resolution recorded
Renew the gasket to the aft weather tight door on the superstucture.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2006 — due date passed with no resolution recorded
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 31 January 2005
Resolved
REPLACE 3 WORN TYPE I PFDs.
Condition: Unknown
Due 7 February 2005
Resolved 4 February 2005
Lifesaving › Lifebuoys › Serviceable
Issued 31 January 2005
Resolved
REPLACE WORN RING LIFE BUOY.
Condition: Unknown
Due 7 February 2005
Resolved 4 February 2005
Lifesaving › Lifefloat › Paddle
Issued 31 January 2005
Resolved
PROVIDE 2 PADDLES FOR LIFE FLOAT.
Condition: Unknown
Due 7 February 2005
Resolved 4 February 2005
Lifesaving › Lifefloat › Float-free Link
Issued 31 January 2005
Resolved
RIG LIFE FLOAT WITH FLOAT-FREE LINK.
Condition: Unknown
Due 7 February 2005
Resolved 4 February 2005
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 31 January 2005
Resolved
PROVIDE PROOF OF DRUG AND ALCOHOL PROGRAM ENROLLMENT.
Condition: Unknown
Due 7 February 2005
Resolved 7 February 2005
Stability › Incline Test › General
Issued 31 January 2005
Resolved
PROVIDE COPY OF STABILITY LETTER.
Condition: Unknown
Due 7 February 2005
Resolved 2 February 2005
Engineering › Diesel Engine (propulsion-reduction gear) › Crankshaft
Issued 31 January 2005
Resolved
REPAIR PORT MDE CRANKSHAFT.
Condition: Unknown
Due 7 February 2005
Resolved 1 February 2005
Engineering › Fuel Oil Service System
Issued 24 October 2002
Resolved
Prior to carrying passengers inspect and replace main engine fuel lines as needed and install brackets and chafing on same. LEGACY COMPONENT DESC: Piping
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 November 2002
Resolved 6 November 2002
Resolution: Fuel lines replaced with blue flex hose. Installation included chafing gear and rubberized clamps.
Accommodation/Occupational Safety › Medical/First Aid
Issued 24 October 2002
Resolved
Provide appropriate first aid kit. LEGACY COMPONENT DESC: Medicine Chest
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 November 2002
Resolved 6 November 2002
Electrical › Electrical Distribution System (service)
Issued 24 October 2002
Resolved
Remount wires and junction box for engine block heaters. LEGACY COMPONENT DESC: Junction Box
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 November 2002
Resolved 6 November 2002
Engineering › Shafting/Propeller Arrangements
Issued 24 October 2002
Resolved
Install double clamps on stuffing box hoses. LEGACY COMPONENT DESC: Stern Tube Lubrication/Sealing
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 November 2002
Resolved 6 November 2002
Electrical › Electric Supply System (service)
Issued 24 October 2002
Resolved
Mount Generator battery. LEGACY COMPONENT DESC: Battery Installation
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 November 2002
Resolved 6 November 2002
Resolution: Battery encased in approved container.
Documentation › Certificates/Documents
Issued 24 October 2002
Resolved
Provide FCC station license with correct call sign. LEGACY COMPONENT DESC: FCC SSL
Action required: 705 - Other - as specified
Due 7 November 2002
Resolved 6 November 2002
Engineering › Diesel Engine (propulsion-direct drive)
Issued 24 October 2002
Resolved
Double clamp stbd exhaust muffler at transom. LEGACY COMPONENT DESC: Silencer (exhaust)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 November 2002
Resolved 6 November 2002
Lifesaving
Issued 24 September 1998
Resolved
REPAIR/REPLACE LIFEFLOAT.
Condition: Unknown
Due 10 December 1998
Resolved 8 December 1998
Documentation
Issued 5 November 1997
Resolved
PROVIDE PROOF OF CURRENT RADIO STATION LICENSE AND RADIOTELEPHONY CERTIFICATE.
Condition: Unknown
Due 5 November 1997
Resolved 5 November 1997
Construction/Loadline
Issued 20 August 1996
Resolved
GRIND OUT AND REWELD THE FRACTURED WELD IN THE LAZARETTE, CENTERLINE AFT BULKHEAD STIFFENER WHERE IT MEETS THE MAIN DECK AS DISCUSSED AND MARKED.
Condition: Unknown
Due 30 August 1996
Resolved 30 August 1996
Construction/Loadline
Issued 20 August 1996
Resolved
CROP AND INSERT TO A MINIMUM OF 18" X 18" SIDE SHELL PLATE WHERE THE SIDE SHELL WAS TORN AND CLAD WELDED, STARBOARD SIDE FORWARD, AS DISCUSSED AND MARKED.
Condition: Unknown
Due 30 August 1996
Resolved 30 August 1996
Engineering
Issued 20 August 1996
Resolved
REPLACE BOTH PORT AND STARBOARD EXHAUST COOLING LINE VALVES.
Condition: Unknown
Due 30 August 1996
Resolved 30 August 1996
Construction/Loadline
Issued 20 August 1996
Resolved
GRIND OUT AND REWELD THE THREE (03) FRACTURED WELDS IN THE FOREPEAK AS DISCUSSED AND MARKED.
Condition: Unknown
Due 30 August 1996
Resolved 30 August 1996
Construction/Loadline
Issued 2 November 1995
Resolved
PROVE PROPER OPERATION OF BILGE SYSTEM BY FLOODING SPACES AND TAKING SUCTION AND PUMPING SPACE DOWN.
Condition: Unknown
Due 15 November 1995
Resolved 15 November 1995
Engineering
Issued 2 November 1995
Resolved
FUEL TANK VENT PIPE CONNECTION HOSE DETERIORATED. RENEW WITH HOSE APPROVEDFOR INTENDED SERVICE._x001C_
Condition: Unknown
Due 15 November 1995
Resolved 15 November 1995
Fire Fighting
Issued 2 November 1995
Resolved
END OF CARRYING HANDLE FOR ENGINE ROOM BII CO2 PORTABLE FIRE EXTINGUISHER BROKEN. RENEW OR REPAIR ENGINE ROOM BII EXTINGUISHER AS REQUIRED.
Condition: Unknown
Due 15 November 1995
Resolved 15 November 1995
Fire Fighting
Issued 2 November 1995
Resolved
PORTABLE FIRE HALON 1211 EXTINGUISHER LOCATED IN PILOT HOUSE NOT A UL APPROVED MARINE TYPE. PROVIDE USCG APPROVED AND OR UL APPROVED FOR MARINE FIRE EXTINGUISHER.
Condition: Unknown
Due 15 November 1995
Resolved 15 November 1995
Accommodation/Occupational Safety
Issued 2 November 1995
Resolved
PLASTIC AIR DUCT INUSE FOR CONSOLE HEATING SYSTEM. PROVIDE RIGID DUCT PIPING FOR WHEEL HOUSE HEATING SYSTEM.
Condition: Unknown
Due 15 November 1995
Resolved 15 November 1995
Unknown
Issued 1 November 1994
Resolved
REMOVE FUEL OIL FROM BILGE IN STEERING COMPARTMENT.
Condition: Unknown
Due 8 November 1994
Resolved 9 November 1994
Electrical
Issued 1 November 1994
Resolved
PROVE PROPER OPERATION OF VESSEL'S SERVICE GENERATOR.
Condition: Unknown
Due 1 November 1994
Resolved 1 November 1994
Engineering
Issued 1 November 1994
Resolved
PROVE PROPER OPERATION OF EXHAUST COOLING FAILURE INDICATORS ON PORT AND STARBOARD MAIN ENGINE EXHAUST COOLING SYSTEM. _x001C_
Condition: Unknown
Due 8 November 1994
Resolved 9 November 1994
Construction/Loadline
Issued 29 August 1994
Resolved
GRIND, VEE-OUT, AND REWELD 3 FRACTURES NOTED IN LAZARETTE.
Condition: Unknown
Due 1 September 1994
Resolved 1 September 1994
Electrical
Issued 29 August 1994
Resolved
INSTALL SAFETY GUARDS FOR OPEN KNIFE SWITCHES TO BATTERIES.
Condition: Unknown
Due 1 September 1994
Resolved 1 September 1994
Electrical
Issued 29 August 1994
Resolved
PROPERLY SECURE VESSEL'S GENERATOR.
Condition: Unknown
Due 1 September 1994
Resolved 1 September 1994
Electrical
Issued 29 August 1994
Resolved
PROPERLY SECURE VESSEL'S GENERATOR.
Condition: Unknown
Due 1 September 1994
Resolved 1 September 1994
Construction/Loadline
Issued 16 June 1987
Resolved
PORTSIDE; FOWARD INSERT; LAY ON AN ADDITIONAL PASS ON OUTSIDE AND SPOT WELDINSIDE AS INDICATED BY MARINE INSPECTOR.
Condition: Unknown
Due 16 June 1987
Resolved 16 June 1987