MAURY USCG vessel records Sign in
← All vessels

VIRGEN DEL CARMEN III

VIRGEN DEL CARMEN III is a 1982 tank ship. The Coast Guard has recorded 20 inspections since 1987, most recently in September 2023, along with 18 deficiencies and 3 operational controls.

Records from 1987 to 2023. Most recent: inspection, 13 September 2023.

Built
1982
Last inspected
13 September 2023
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8027690 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
PANAMA
—
Maury page id
psix-53776

Inspections, by type

…with no type recorded8
Years with a record 8 calendar years (1987–2023)
The 20 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 3 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it4999 - Convention (Subpart B), Gross Ton
9478 - Displacement, Ton
5990 - Dead Weight, Ton
1499 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 20

13 September 2023 Deficiency Check
Physical examination · Liquefied Gas Carrier National Center of Expertise · Activity 7790906
16 February 2011 In-Service Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3947071
11 February 2011 COC-GAS Renew · Ballast Water Examination · ISPS II Exam · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3940675
10 February 2011 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3944916
13 December 2007 ISPS II Exam · Ballast Water Examination · MARPOL Annex I Examination · COC-GAS Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3114847
12 July 2007 PII Safety Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2992298
25 April 2007 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2915380
5 January 2007 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2850907
3 January 2007 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2849649
1 December 2005 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2544254
22 June 2005 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2399128
24 February 2005 ISPS II Exam · COC-GAS Renew
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2300517
21 February 2005 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2298727
18 August 1992 Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1251402
27 April 1992 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 350341
25 November 1989 Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1216680
26 September 1988 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 479846
20 May 1988 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 323432
6 May 1987 Certificate of Compliance
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1020905
1 May 1987 Type not recorded
No type recorded · THE UNKNOWN UNIT · Activity 1322024

Deficiency record · 18

Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 16 February 2011 Resolved
During cargo operations at PPG Facility the vessel detected cargo vapor leaks at the starboard manifold, starboard #1 tank dome, starboard #2 tank dome, and port #3 tank dome. Prior to loading or discharging cargo in the U.S. the vessel must submit documentation from the certificate issuing authority attesting to the proper operation of the entire cargo containment system. SOLAS 2009 Ch. 1 Reg. 11
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 17 February 2011
Resolved 7 May 2011
Resolution: Open deficiencies on this decommissioned and scrapped vessel were administratively closed based on the objective evidence provided in Bureau Veritas’ email dated August 16, 2023. The email has been uploaded into the vessel’s documents.
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 11 February 2011 Resolved
1835: #2P maximum allowable relief valve seal is broken. Pressure relief valves shall be set and sealed by a competent authority acceptable to the Administration. Set and seal prior to cargo operations. IGC Code VIII 8.2.6 To the satisfaction of the Coast Guard.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 February 2011
Resolved 13 February 2011
Resolution: Safety relief valve was set and sealed in the presence of BV class surveyor.
Fire Fighting › Fire Main › Condition
Issued 11 February 2011 Resolved
0730: Starboard side forward of compressor room fire main at bend has several pinhole leaks. Vessel must have ready availability of fire extinguishing appliances. SOLAS 74 Ch II-2 Reg 3(a) To the satisfaction of the Coast Guard.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 February 2011
Resolved 14 February 2011
Resolution: CG Inspectors boarded vessel and confirmed good pressure from hoses w/ no leaks from fire main.
Fire Fighting › Automatic Sprinkler System › Piping
Issued 11 February 2011 Resolved
0730: Port side forward of compressor room near cargo pump 2P has a dime size leak in fixed deck spray water system. Vessel must have ready availability of fire extinguishing appliances. SOLAS 74 Ch II-2 Reg 2(a) To the satisfaction of the Coast Guard.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 February 2011
Resolved 13 February 2011
Resolution: Fire line was cropped and renewed. System tested satisfactorily in the presence of attending CG inspector.
Navigation › Voyage Data Recorder › Simplified Voyage Data Recorder (SVDR)
Issued 11 February 2011 Resolved
1510: Voyage data recorder is showing an incorrect IMO number, not meeting the requirements of IMO resolution A.861(20). SOLAS 2004 Ch V Reg 20. To the satisfaction of the Coast Guard.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 February 2011
Resolved 13 February 2011
Resolution: IMO number in VDR has been corrected.
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 11 February 2011 Resolved
Water closet accommodation shall be provided for the exclusive use of occupants of the hospital accommodation. Water closet is inoperable. ILO 147 To the satisfaction of the Coast Guard.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 May 2011
Resolution: Open deficiencies on this decommissioned and scrapped vessel were administratively closed based on the objective evidence provided in Bureau Veritas’ email dated August 16, 2023. The email has been uploaded into the vessel’s documents.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Piping (exhaust)
Issued 13 December 2007 Resolved
The vessel's #1 ship service generator has an exhaust leak located on the # 3 cylinder. Repair to the satisfaction of the certificate issuing authority.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 December 2007
Resolution: GASKETS RENEWED AND LAGGING REPLACED TO THE SATISFACTION OF CLASS
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Piping (exhaust)
Issued 13 December 2007 Resolved
The vessl's #3 ship service generator has oil saturated lagging located in between the #3 and #4 cylinders. Repair leaks and replace lagging to the satisfaction of the certificate issuing authority.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 December 2007
Resolution: GASKETS HAVE BEEN RENEWED LAGGING REPLACED TO SATISFACTION OF CLASS
Navigation › Piloting/Steering › Gyro Compass
Issued 25 April 2007 Resolved
Vessel's Gyro Compass is "hunting" and is not operating properly. Vessel is required to provide a technician's report attesting to the proper repair and operation of the vessel's Gyro Compass prior to departure from port.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 April 2007
Resolution: Received Radio Holland Tech Report attesting to the repair and proper operation of the Vessels Gyro Compass.
Deck/Cargo › Towing › Chocks
Issued 5 January 2007 Resolved
Starboard Chock forward of amidships was torn from the deck by a tug boat during mooring evolution. Damage did not cause penetration of the skin of the ship, but did cause damage to 1 lower section of life line. Vessel issued 1 deficency for damaged life lines.
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 5 January 2007
Resolution: 05 Jan 2007 Recieved Class Report From BV having sighted the damage and issued a Condition of Class untill 22 Jan 2007
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 24 February 2005 Resolved
Quick-closing valves serving blue Vapor Balancing Lines closed too quickly (10 seconds). Prior to using pipelines/connections in U.S. waters, closing of valves must be demonstrated to close within 20-30 seconds. To be completed to the satisfaction of class.
Action required: 705 - Other - as specified
Due 24 March 2005
Resolved 16 June 2005
Resolution: Received fax from Class attesting to to ssaticfactory performance of the quicl closing valves.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 24 February 2005 Resolved
Class to attest to the satisfactory condition of the expansion joint serving #1 starboard deepwell cargo pump (rubber has cracks). To be completed to the satisfaction of class.
Action required: 705 - Other - as specified
Due 10 March 2005
Resolved 25 February 2005
Resolution: Class inspected expansion joint and said they found NO cracks (this inspector disagrees). According to class sealant IWO joint was starting to breakdown with vessel to reseal the joint IAW manufacture''s procedures.
Fire Fighting › Automatic Sprinkler System › Sprinklers
Issued 24 February 2005 Resolved
Provide proper demonstration of deck spray in way of port side bridge on forward side of wheelhouse. To be completed to the satisfaction of class.
Action required: 705 - Other - as specified
Due 10 March 2005
Resolved 25 February 2005
Resolution: Class reported that inoperative sprinkler heads were reported removed and cleared of debris. Confirmed operation of all sprinkler heads on forward end of main deck house from bridge to main deck.
Fire Fighting › Automatic Sprinkler System › Piping
Issued 24 February 2005 Resolved
Remove paint from fusible links in way of cargo tank domes, as necessary. To be completed to the satisfaction of class.
Action required: 705 - Other - as specified
Due 10 March 2005
Resolved 25 February 2005
Resolution: Class reported that the fusible links were examined and found free of paint.
Navigation
Issued 18 August 1992 Resolved
Place a copy of the Navigation Rules on board the vessel prior to next U.S.port.
Condition: Unknown
Due 18 August 1993
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Navigation
Issued 18 August 1992 Resolved
Place copy of 1992 Tidal Current Tables on board the vessel prior to next U.S. port.
Condition: Unknown
Due 18 August 1993
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Deck/Cargo
Issued 18 August 1992 Resolved
Demonstrate proper operation of the indicator device for the "Top Spray" quick closing valve on the No. 1 Port cargo tank at the next U.S. port.
Condition: Unknown
Due 18 August 1993
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 25 November 1989 Resolved
PROVE OPERATION OF INERT GAS GENERATOR PRIOR TO LOADING CARGO REQUIRING INERT GAS.
Condition: Unknown
Due 25 November 1989
Resolved 25 November 1989

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.