Records from 1982 to 2025. Most recent: inspection, 3 December 2025.
Documentation record
Registered dimensions (L × B × D)71.6 ft × 24.1 ft × 7.2 ft
Registered tonnagegross 95 / net 65
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSTEINER SHIPYARD INC · BAYOU LA BATRE, AL, UNITED STATES · built 1981
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portHOMER, AK
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 22 May 2026 · expires 30 June 2027
Service, as the file records itIndustrial Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it95 - Regulatory (Subpart C or D), Gross Ton
65 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 20
3 December 2025
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8279402
30 August 2024
Type not recorded
No type recorded · Marine Safety Unit Kodiak · USCG Arctic District (CGD-A) · Activity 7998080
28 December 2023
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7850165
8 February 2022
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7392839
6 January 2012
Liferaft Servicing
Physical examination · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 4226919
4 September 2003
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 1910595
22 June 1998
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 35256
6 August 1997
Type not recorded
No type recorded · USCG Arctic District (dp) · USCG Arctic District (CGD-A) · Activity 722988
28 April 1992
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1267530
5 February 1992
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 668511
30 January 1992
Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 147008
1 April 1991
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1216676
9 April 1990
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 918588
3 April 1990
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 899575
8 February 1990
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1219674
8 November 1989
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1350770
24 March 1989
COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1197237
10 February 1989
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 890470
9 December 1986
Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1330899
5 February 1982
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 975508
Electrical
Issued 8 November 1989
Resolved
REPLACE THE RECENTLY INSTALLED (SWO-A) WIRING IN THE ENGINE ROOM WITH A PROPER WIRE. THESE SYSTEMS ARE TO BE DISCONNECTED AT THE SOURCE UNTIL REPLACED. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 8 November 1989
Resolved 8 November 1989
Construction/Loadline
Issued 8 November 1989
Resolved
AT NEXT VESSEL DRYDOCKING/REPAIR PERIOD OPEN AND GAS FREE BOTH FUEL OIL DAYTANKS TO FACILITATE INSPECTION OF FUEL LINE REMOTE CUT OFF VALVES.
Condition: Unknown
Due 10 August 1991
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 8 November 1989
Resolved
CONDUCT 1.25 HYDRO TEST OF AIR RECEIVERS. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 8 November 1989
Resolved 8 November 1989
Fire Fighting
Issued 8 November 1989
Resolved
PROVIDE A SECOND B-II FIRE EXTINGUISHER FOR THE ENGINE ROOM. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 8 November 1989
Resolved 8 November 1989
Documentation
Issued 8 November 1989
Resolved
PROVIDE NEW STABILITY DATA.
Condition: Unknown
Due 8 February 1990
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 8 November 1989
Resolved
PROVE THE RELIEF SETTING OF THE RELIEF VALVES ON THE AIR RECEIVERS, AND PROVIDE EVIDENCE THAT UNITS ARE ASME APPROVED. THIS ITEM IS TO BE COMP- LETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN NOTED DATE OF COMPLIANCE.
Condition: Unknown
Due 8 November 1989
Resolved 8 November 1989
Construction/Loadline
Issued 8 November 1989
Resolved
REPLACE FLAME SCREENS FOR THE VENTS ON THE FUEL OIL TANKS. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 8 November 1989
Resolved 8 November 1989
Fire Fighting
Issued 8 November 1989
Resolved
PROVIDE GAUGES ON THE DISCHARGE SIDE OF THE FIRE PUMPS. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 8 November 1989
Resolved 8 November 1989
Fire Fighting
Issued 8 November 1989
Resolved
PROVIDE HAND OPERATED PORTABLE FIRE/BILGE PUMP WITH SUCTION AND DISCHARGE HOSE, AND CAPABLE OF PUMPING 5 GPM. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN DATE OF COMPLIANCE.
Condition: Unknown
Due 8 November 1989
Resolved 8 November 1989
Documentation
Issued 8 November 1989
Resolved
PROVIDE AND POST CURRENT STABILITY LETTER THAT WAS ISSUED BY [name withheld], ALABAMA IN FEBRUARY 1982. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 8 November 1989
Resolved 8 November 1989
Fire Fighting
Issued 24 March 1989
Resolved
REPLACE THE 3 MON- COAST GUARD APPROVED FIVE HOSE NOZZLES OR ONES THAT HAVEA 1/2 INCH SOLID STREAM ORIFICE IN ACCORDANCE WITH 46CFR 181, 15-10(D)(2). THIS REQUIREMENT IS TO BE COMPLETED NOT LATER THAN 31MAR89.
Condition: Unknown
Due 24 March 1989
Resolved 24 March 1989