MAURY USCG vessel records Sign in
← All vessels

RIG 83

RIG 83 is a 1978 mobile offshore drilling unit. The Coast Guard has recorded 42 inspections since 1984, most recently in August 1997, along with 77 deficiencies and 1 casualty investigation in 1996.

Records from 1984 to 1997. Most recent: inspection, 25 August 1997.

Built
1978
Last inspected
25 August 1997
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WYQ5601
Flag
UNITED STATES
367463000 (licence lapsed)
Maury page id
psix-53802

Inspections, by type

…with no type recorded3
Years with a record 14 calendar years (1984–1997)
The 42 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 29 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it3065 - Regulatory (Subpart C or D), Gross Ton
3065 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WCW5520MMSI 367463000 · expired · compulsorily equipped · granted 7 May 1996, cancelled 8 July 2006 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 42

25 August 1997 Administrative
Administrative · Activities Europe · Activity 1120027
11 June 1997 Administrative
Administrative · Activities Europe · Activity 775455
2 April 1997 Administrative
Administrative · Activities Europe · Activity 1102899
7 February 1997 Deficiency Check
Physical examination · Activities Europe · Activity 1104361
22 January 1997 Administrative
Administrative · Activities Europe · Activity 1104669
29 October 1996 Administrative
Administrative · Activities Europe · Activity 1164514
23 September 1996 Deficiency Check
Physical examination · Activities Europe · Activity 1142679
8 July 1996 Hull Examination · Damage Survey · COI Inspection
Physical examination · Activities Europe · Activity 1357639
6 May 1996 Type not recorded
No type recorded · Activities Europe · Activity 169437
2 May 1996 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1080195
21 November 1995 Administrative
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 1190131
14 October 1995 Administrative
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 1192480
5 August 1995 Re-Inspection · MARPOL Annex V Examination
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 1355386
1 July 1995 Administrative
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 1190487
8 June 1995 Administrative
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 879053
9 March 1995 Hull Examination
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 1151030
11 September 1994 COI Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1398125
30 September 1993 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1155464
10 September 1992 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1263678
8 February 1992 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 956273
2 October 1991 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 945605
12 August 1991 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1246552
5 August 1991 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 942536
16 April 1991 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 906911
28 December 1990 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1230963
11 October 1990 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 911323
13 September 1990 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 907655
19 March 1990 Deficiency Check · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 920266
17 January 1990 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1228831
30 September 1989 Re-Inspection · Drydock Extension
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 903784
4 April 1989 Drydock Extension
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1037986
27 September 1988 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1193879
30 December 1987 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1314779
25 December 1987 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1327251
19 November 1987 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1335020
4 April 1987 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1008101
24 March 1987 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1021364
7 October 1986 COI Inspection · Drydock Extension
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1325803
1 November 1985 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 993928
19 September 1985 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 984955
2 September 1985 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1298762
16 December 1984 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 980781

Deficiency record · 77

Documentation
Issued 8 July 1996 Resolved
SUBMIT TO CG FOR REVIEW AND APPROVAL A SHIPBOARD OIL POLLUTION EMERGENCY RESPONSE PLAN (SOPEP).
Condition: Unknown
Due 8 July 1996
Resolved 8 July 1996
Accommodation/Occupational Safety
Issued 8 July 1996 Resolved
OIM SHALL PROVIDE WRITTEN STATEMENT THAT ALL THE LIGHTS OVER THE ACCOMADATION BEDS HAVE BEEN REPLACED OR REPAIRED
Condition: Unknown
Due 15 September 1996
Resolved 15 August 1996
Construction/Loadline
Issued 8 July 1996 Resolved
PROVIDE COPY OF THE ABS ARROVED COLUMN REPAIR PROPOSAL TO USCG G-MSC-1 (POCLCDR CUSHING PH [phone withheld], FAX [phone withheld]). RIG 83 MAY BE TRANSPORTEDTO THE NEXT LOCATION BUT MAY NOT BE JACKED DOWN UNTIL USCG MSC HAS_x001C_ REVIEWED AND APPROVED THE REPAIR PROPOSAL. COMPLETE NLT 13SEP96.
Condition: Unknown
Due 13 September 1996
Resolved 15 August 1996
Documentation
Issued 8 July 1996 Resolved
SUBMIT TO CG FOR REVIEW AND APPROVAL UPDATED OPERATING MANUAL
Condition: Unknown
Due 31 July 1997
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Lifesaving
Issued 8 July 1996 Resolved
OIM SHALL HOLD A FIRE AND BOAT DRILL WHEN CREW REPORTS ABOARD AND FORWARD STATEMENT TO MIO EUROPE THAT A SATISFACTORY DRILL WAS HELD.
Condition: Unknown
Due 15 September 1996
Resolved 15 August 1996
Documentation
Issued 8 July 1996 Resolved
SUBMIT TO CG FOR REVIEW AN APPROVAL UPDATED CONSTRUCTION PORTFOLIO.
Condition: Unknown
Due 8 July 1996
Resolved 8 July 1996
Construction/Loadline
Issued 8 July 1996 Resolved
SUBMIT TO MARINE SAFETY CENTER SPECIFICATIONS FOR W360 G 650B STEEL USED INREPAIRS.
Condition: Unknown
Due 15 September 1996
Resolved 15 August 1996
Lifesaving
Issued 5 August 1995 Resolved
RENEW THE NO.1 & 2 LIFEBOAT DAVIT FALLS AND CONDUCT A LIFEBOAT WEIGHT TEST TO THE SATISFACTION OF A MARINE INSPECTOR.
Condition: Unknown
Due 5 August 1995
Resolved 5 August 1995
Construction/Loadline
Issued 9 March 1995 Resolved
Crop and replace approximately 45 ft of crack mat skirt plating in way of no. 3 permanent buoyant tank from aft mid-ship area extending to no. 4 inboard starboard tank.
Condition: Unknown
Due 9 March 1995
Resolved 9 March 1995
Documentation
Issued 9 March 1995 Resolved
Provide a video report of the entire underwater survey examination of the mat tanks including MPI test results of all three columns.
Condition: Unknown
Due 9 March 1995
Resolved 9 March 1995
Construction/Loadline
Issued 9 March 1995 Resolved
Crop and replace approximately 37 ft of crack mat skirt plating in way of no. 6 starboard aft permanent flooded tank.
Condition: Unknown
Due 9 March 1995
Resolved 9 March 1995
Construction/Loadline
Issued 9 March 1995 Resolved
Crop and replace approximately 40 ft of crack skirt plating in way of no. 6starboard inboard to no. 5 starboard tanks.
Condition: Unknown
Due 9 March 1995
Resolved 9 March 1995
Construction/Loadline
Issued 9 March 1995 Resolved
Install 40 ft of missing skirt plating in way of no. 6 port aft permanent flooded tank.
Condition: Unknown
Due 9 March 1995
Resolved 9 March 1995
Construction/Loadline
Issued 9 March 1995 Resolved
Remove one temporary doubler plating in way of no. 4 port of port aft column and make permanent insert with a 2 inch deck plating.
Condition: Unknown
Due 9 March 1995
Resolved 9 March 1995
Fire Fighting
Issued 11 September 1994 Resolved
CROP AND PARTIALLY RENEW THE EIGHT (8) INCH SEAWATER LINE TO THE FOAM PUMP IN WAY OF TEMPORARY REPAIR. TO BE COMPLETED TO THE SATIFACTION OF THE COGNIZANT [name withheld] DRY DOCKING.
Condition: Unknown
Due 11 September 1994
Resolved 11 September 1994
Fire Fighting
Issued 11 September 1994 Resolved
CROP AND PARTIALLY RENEW THE SIX (6) INCH SALT WATER LINE FROM THE ENGINE ROOM TO THE FIRE PUMP IN WAY OF TEMPORARY REPAIR. TO BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT [name withheld] DRY DOCKING.
Condition: Unknown
Due 11 September 1994
Resolved 11 September 1994
Fire Fighting
Issued 11 September 1994 Resolved
CROP AND PARTIALLY RENEW THE FOUR (4) INCH FIRELINE DISCHARGE ABOVE THE MANIFOLD IN WAY OF TEMPORARY REPAIR. TO BE COMPLETED TO THE SATISFACTION OFTHE COGNIZANT [name withheld] DRY DOCKING.
Condition: Unknown
Due 11 September 1994
Resolved 11 September 1994
Fire Fighting
Issued 11 September 1994 Resolved
CROP AND PARTIALLY RENEW THE FOUR (4) INCH LINE TO HOSE STATION #5 IN WAY OF TEMPORARY REPAIR. TO BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT_x001C_OCMI PRIOR TO NEXT DRY DOCKING.
Condition: Unknown
Due 11 September 1994
Resolved 11 September 1994
Engineering
Issued 11 September 1994 Resolved
CROP AND PARTIALLY RENEW THE EIGHT (8) INCH ENGINE SALT WATER COOLING LINE FROM THE DEEPWELL TO THE MECHANICS WORKSHOP IN WAY OF TEMPORARY REPAIRS. TO BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT [name withheld] DRYDOCKING.
Condition: Unknown
Due 11 September 1994
Resolved 11 September 1994
Unknown
Issued 11 September 1994 Resolved
CROP AND PARTIALLY RENEW THE FIVE (5) INCH JETTING LINE FROM THE MAIN DECK TO THE PORT PODHOUSE. TO BE COMPLETED TO THE SATISFACTION OF THE COGNIZANTOCMI PRIOR TO NEXT DRY DOCKING.
Condition: Unknown
Due 11 September 1994
Resolved 11 September 1994
Unknown
Issued 11 September 1994 Resolved
CROP AND PARTIALLY RENEW THE FIVE (5) INCH SUPPLY AND THREE (3) INCH DISCHARGE, SALT WATER COOLING LINES IN WAY OF TEMPORARY REPAIRS. TO BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT [name withheld] DRY DOCKING.
Condition: Unknown
Due 11 September 1994
Resolved 11 September 1994
Unknown
Issued 11 September 1994 Resolved
CROP AND PARTIALLY RENEW THE MUD RETURN LINE IN THE COMPRESSOR ROOM IN WAY OF TEMPORARY REPAIR. TO BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT_x001C_OCMI PRIOR TO NEXT DRY DOCKING.
Condition: Unknown
Due 11 September 1994
Resolved 11 September 1994
Engineering
Issued 11 September 1994 Resolved
CROP AND PARTIALLY RENEW THE SIX (6) INCH DISCHARGE LINE FROM THE ENGINE COOLING SYSTEM, FROM ABOVE DIESEL CIRCULATING PUMP TO THE OVERBOARD DISCHARGE LINE. TO BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT [name withheld] DRY DOCKING.
Condition: Unknown
Due 11 September 1994
Resolved 11 September 1994
Construction/Loadline
Issued 8 February 1992 Resolved
EFFECT PERMANENT REPAIRS TO TWO 3" PUNCTURES ON TOP OF MAT IN WAY OF #1 S_x001C_ FLOODED TANK AND #2 P FLOODED TANK. REPAIRS ARE TO BE NDT'ED AND RESULTS FORWARDED TO [name withheld]._x001C_ _x001C_
Condition: Unknown
Due 8 February 1992
Resolved 8 February 1992
Construction/Loadline
Issued 8 February 1992 Resolved
SUBMIT GAUGING REPORT AND MPI REPORT OF LEG TO MAT CONNECTIONS TO [name withheld]._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 February 1992
Resolved 8 February 1992
Construction/Loadline
Issued 8 February 1992 Resolved
EFFECT PERMANENT REPAIRS TO 30" DIAMETER HOLE ON MAT BOTTOM AND SKIRT DAMAGE IN WAY OF #3 C BUOYANT TANK. INSERT IS REQUIRED TO BE NDT'ED. RESULTS OF NDT TO BE FORWARDED TO [name withheld]._x001C_ _x001C_
Condition: Unknown
Due 8 February 1992
Resolved 8 February 1992
Unknown
Issued 13 September 1990 Resolved
UPON REINSTALLATION OF #1 GENERATOR, CONDUCT TEST OF OVERSPEED TRIP, REVERSE POWER RELAY, AND LOW LUBE OIL PRESSURE SHUT DOWN.
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Unknown
Issued 13 September 1990 Resolved
SUBMIT COPY OF FIRE FIGHTING FOAM ANALYSIS REPEAT TO [name withheld].
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Unknown
Issued 13 September 1990 Resolved
REPLACE, RETEST AND MAKE READY FOR OPERATION THE FIXED HALON SYSTEMS FOR THE SCR ROOM AND SWITCHBOARD ROOM, WHICH WERE INADVERTENTLY DISCHARGED DURING ANNUAL SERVICING.
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Unknown
Issued 13 September 1990 Resolved
PROVIDE ON BOARD ADEQUATE MEANS TO ACCURATELY CALIBRATE THE PORTABLE EXPLOSIMETERS.
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Unknown
Issued 13 September 1990 Resolved
RENEW PATCHED SECTION OF DEEP WELL SYSTEM MANIFORD PIPING ELBOW JOINT.
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Fire Fighting
Issued 13 September 1990 Resolved
CONDUCT HYDRO TEST ON BOTH B-V SEMI-PORTABLE FIRE EXTINGUISHER'S N2 CYL'S. UPON COMPLETION OF TEST SUBMIT SERVICING REPORT TO THE [name withheld], HI. WHILE THE EXISTING SEMI-PORTABLE FIRE EXTINGUISHERS ARE OUT OF SERVICE REPLACEMENT UNITS SHALL BE PROVIDED OR USE OF THE HELO DECK IS PROHIBITED.
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Unknown
Issued 13 September 1990 Resolved
PROVIDE ON BOARD ALCOHOL BREATH TEST KIT REQUIRED BY 46 CFR 4.06-20(A).
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Unknown
Issued 19 March 1990 Resolved
PROVIDE A COPY OF THE USCG APPROVED OPERATING MANUAL PER 46 CFR 109.121(C).
Condition: Unknown
Due 19 March 1990
Resolved 19 March 1990
Electrical
Issued 30 September 1989 Resolved
CHANGE OUT 3 ELECTRICAL SWITCHES ON SHALE SHAKER FLAT WITH SWITCHES SUITABLE FOR HAZARDOUS LOCATIONS.
Condition: Unknown
Due 30 September 1989
Resolved 30 September 1989
Lifesaving
Issued 30 September 1989 Resolved
PROVIDE 24 14 OUNCE CANS OF CONDENSED MILK FOR THE STARBOARD LIFEBOAT.
Condition: Unknown
Due 30 September 1989
Resolved 30 September 1989
Lifesaving
Issued 30 September 1989 Resolved
REPLACE BROKEN STEERING CABLE IN STARBOARD LIFEBOAT.
Condition: Unknown
Due 30 September 1989
Resolved 30 September 1989
Lifesaving
Issued 30 September 1989 Resolved
REPLACE RUSTED LANTERN IN STARBOARD LIFEBOAT.
Condition: Unknown
Due 30 September 1989
Resolved 30 September 1989
Electrical
Issued 30 September 1989 Resolved
REPLACE LOUD HAILER ON RIG FLOOR WITH ONE SUITABLE FOR HAZARDOUS LOCATIONS.
Condition: Unknown
Due 30 September 1989
Resolved 30 September 1989
Electrical
Issued 30 September 1989 Resolved
REPLACE BATTERY OBSTRUCTION LIGHT SYSTEM.
Condition: Unknown
Due 30 September 1989
Resolved 30 September 1989
Fire Fighting
Issued 30 September 1989 Resolved
PROVIDE CURRENT FOAM ANALYSIS REPORT OR RENEW FOAM IN HELO DECK FOAM SYSTEM
Condition: Unknown
Due 30 September 1989
Resolved 30 September 1989
Fire Fighting
Issued 30 September 1989 Resolved
PROVIDE AND REINSTALL FIRE PUMP RELIEF VALVE NOW PLUGGED OFF.
Condition: Unknown
Due 30 September 1989
Resolved 30 September 1989
Documentation
Issued 30 September 1989 Resolved
PROVIDE DOCUMENTATION THAT 4 CERTIFICATED LIFEBOATMEN WERE ON BOARD RIG DURING MIDPERIOD REINSPECTION.
Condition: Unknown
Due 30 September 1989
Resolved 30 September 1989
Lifesaving
Issued 30 September 1989 Resolved
RENEW 15 LIFE JACKET LIGHTS WHICH ARE EXPIRED/UNSERVICEABLE.
Condition: Unknown
Due 30 September 1989
Resolved 30 September 1989
Lifesaving
Issued 30 September 1989 Resolved
RENEW PORT RING BUOY SMOKE SIGNAL.
Condition: Unknown
Due 30 September 1989
Resolved 30 September 1989
Lifesaving
Issued 30 September 1989 Resolved
PROVIDE TWO WATERTIGHT CONTAINERS FOR ALL FLARES IN THE STARBOARD LIFEBOAT AND ONE WATERTIGHT CONTAINER FOR PARACHUTE FLARES IN THE PORT LIFEBOAT.
Condition: Unknown
Due 30 September 1989
Resolved 30 September 1989
Lifesaving
Issued 30 September 1989 Resolved
RENEW PROVISIONS FOR 58 PERSONS IN THE STARBOARD LIFEBOAT AND PROVISIONS FOR 20 PERSONS IN THE PORT LIFEBOAT, WHICH ARE EXPIRED.
Condition: Unknown
Due 30 September 1989
Resolved 30 September 1989
Lifesaving
Issued 30 September 1989 Resolved
RENEW 108 QUARTS OF DRINKING WATER IN THE STARBOARD LIFEBOAT AND 132 QUARTSOF DRINKING WATER IN THE PORT LIFEBOAT, WHICH ARE EXPIRED.
Condition: Unknown
Due 30 September 1989
Resolved 30 September 1989
Documentation
Issued 27 September 1988 Resolved
PROVIDE EVIDENCE OF CURRENT, FULL TERM LOADLINE CERTIFICATE.
Condition: Unknown
Due 27 September 1988
Resolved 27 September 1988
Fire Fighting
Issued 27 September 1988 Resolved
CONDUCT ANNUAL SERVICING OF FIXED AND SEMI-PORTABLE FIRE FIGHTING SYSTEMS.
Condition: Unknown
Due 27 September 1988
Resolved 27 September 1988
Deck/Cargo
Issued 27 September 1988 Resolved
PROVIDE EVIDENCE OF CURRENT QUADRENNIAL PROOF LOAD TESTING AND EXAMINATION OF CRANES.
Condition: Unknown
Due 27 September 1988
Resolved 27 September 1988
Lifesaving
Issued 27 September 1988 Resolved
PROVIDE EIGHT 30" COAST GUARD APPROVED RING BUOYS ONBOARD.
Condition: Unknown
Due 27 September 1988
Resolved 27 September 1988
Construction/Loadline
Issued 27 September 1988 Resolved
MAKE OPERABLE THE AFT BILGE PUMP LOCATED IN THE GENERATOR ROOM.
Condition: Unknown
Due 27 September 1988
Resolved 27 September 1988
Fire Fighting
Issued 27 September 1988 Resolved
PROVIDE ONBOARD, ONE ADDITIONAL B-V, SEMI-PORTABLE FIRE EXTINGUISHER FOR THE HELICOPTER DECK.
Condition: Unknown
Due 27 September 1988
Resolved 27 September 1988
Lifesaving
Issued 19 November 1987 Resolved
REPLACE THE FIVE LIFE RINGS THAT ARE DETERIORATED FROM EXPOSURE TO THE ELEMENTS.
Condition: Unknown
Due 19 November 1987
Resolved 19 November 1987
Deck/Cargo
Issued 19 November 1987 Resolved
THE HYDRAULIC UNITS ON BOTH CRANES HAVE FAILED. INSTALL NEW HYDRAULIC PUMPS PRIOR TO USE OF EITHER CRANE.
Condition: Unknown
Due 19 November 1987
Resolved 19 November 1987
Unknown
Issued 7 October 1986 Resolved
DEMONSTRATE ALL (FIVE EACH) SHIP SERVICE GENERATORS AND THEIR RELATED SAFETY DEVICES.
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 7 October 1986 Resolved
DEMONSTRATE THE EMERGENCY GENERATOR AND THE EMERGENCY LIGHTING SYSTEM.
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 7 October 1986 Resolved
DEMONSTRATE THE GENERAL ALARM SYSTEM.
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 7 October 1986 Resolved
CONDUCT EMERGENCY DRILLS (FIRE AND BOAT) UNDER COAST GUARD OBSERVATION.
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 7 October 1986 Resolved
PROVIDE A CURRENT FOAM SAMPLE ANALYSIS AND DEMONSTRATE THE FOAM MONITORS.
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 7 October 1986 Resolved
DEMONSTRATE THE BILGE PUMPING SYSTEM.
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 7 October 1986 Resolved
DEMONSTRATE BY TEST, ALL RELIEF VALVES FOR PRESSURE VESSELS LISTED ON THE CERTIFICATE OF INSPECTION.
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 7 October 1986 Resolved
PROVIDE A CURRENT ABS CARGO GEAR CERTIFICATE OR EVIDENCE OF CRANE TESTING (I.E. ABS STATEMENT OF FACT) IN ACCORDANCE WITH 46 CFR 107.258.
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 7 October 1986 Resolved
DEMONSTRATE ALL EMERGENCY (REMOTE) SHUT DOWNS FOR GENERATORS, VENTILATION, AND FUEL SYSTEMS.
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 7 October 1986 Resolved
INSURE THE FIXED CO2 SYSTEM FOR THE PAINT LOCKER IS IN PROPER OPERATING CONDITION. PROVIDE PROOF OF SERVICING TO MARINE SAFETY OFFICE HONOLULU, HAWAII.
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 7 October 1986 Resolved
PROVIDE CURRENT ROCKETS FOR THE LINE THROWING APPLIANCE IN ACCORDANCE WITH 46 CFR 94.45.
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 7 October 1986 Resolved
PROVIDE 12 HAND HELD, ROCKET, PARACHUTE, RED FLARE DISTRESS SIGNALS IN ACCORDANCE WITH 46 CFR 108.521.
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 7 October 1986 Resolved
INSTALL AN EXPLOSION PROOF JUNCTION BOX IN THE SHALE SHAKER AREA (LOCATED ON THE OVERHEAD).
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 7 October 1986 Resolved
SERVICE ALL (FOUR EACH) DAVIT LAUNCHED LIFERAFTS.
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 7 October 1986 Resolved
WEIGHT TEST LIFEBOAT AND LIFERAFT DAVITS IN ACCORDANCE WITH 46 CFR 107.239.
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 7 October 1986 Resolved
MAKE BOTH LIFEBOATS, LIFEBOAT EQUIPMENT, AND LIFEBOAT SUPPLIES AVAILABLE FOR INSPECTION.
Condition: Unknown
Due 7 October 1986
Resolved 7 October 1986
Unknown
Issued 2 September 1985 Resolved
INSTALL NEW PORT LIFEBOAT AND CONDUCT OPERATIONAL TEST AND WEIGHT TEST TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 2 September 1985
Resolved 2 September 1985
Unknown
Issued 2 September 1985 Resolved
REPLACE WIRE TRAYS IN MUD PIT ROOM WITH APPROVED TYPE.
Condition: Unknown
Due 2 September 1985
Resolved 2 September 1985
Unknown
Issued 2 September 1985 Resolved
INSTALL NEW JUNCTION BOX AND REINSTALL OVERHEAD WIRING WITH APPROVED WIRE HANGERS IN SHALE SHAKER ROOM.
Condition: Unknown
Due 2 September 1985
Resolved 2 September 1985
Fire Fighting
Issued 16 December 1984 Resolved
PROVIDE A CLASS DOORS AND ENCLOSURES AT ONE LEVEL FOR ALL INTERIOR STAIRWAYS WHICH ARE OPEN AT EACH END.
Condition: Unknown
Due 16 December 1984
Resolved 16 December 1984
Construction/Loadline
Issued 16 December 1984 Resolved
PROVIDE SELF CLOSING DEVICES (WHERE MISSING) FOR THE INSTALLED DOORS LEADING TO THE MUD PIT ROOM IN ORDER TO MAINTAIN EXEMPTION UNDER 46 CFR 108.175(C).
Condition: Unknown
Due 16 December 1984
Resolved 16 December 1984

Casualty record · 1

6 May 1996Major Marine Casualty · role: Involved in a Marine Casualty · activity 169437
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.